Loading...
HomeMy WebLinkAbout13020148.1PROJECT NUMBER 2013.02 DATE: February 4th 2013 DRAWING NUMBER G -1 OF DRAWINGS Q P N M L K J H G F E D C B A InI- J Cd 2: Z SCOPE NOTES Q Q W UJ In the event of questions regarding the contract documents, a U N specifications, existing conditions or design intent, the contractor U Z shall be responsible for obtaining clarification from the architect L.IIJ a prior to bid submittal and proceeding with any work in question w These contract documents are intended to describe only the Ln N scope and appearance of the real property improvements, X Ix 't o including the performance and level of quality expected of its L U to ? o cl components. It is the contractor's responsibility to insure that all I— N Q I ?m Q W work completed and materials installed are in full compliance at a W r Q n minimum, with all applicable codes, regulations, and ordinances fn N ILL having jurisdiction over the project. U These contract documents do not attempt to instruct the N N LtJ contractor in the details of his trade. They are performance specifications in that they do require that all manufactures items, I materials and equipment be installed in the strict conformance to the manufacture's recommended specifications, except in the Q case where the documents are more stringent. Any mist. items N H or materials not specifically notes, but required for proper H installation shall be furnished and installed by the contractor. u All work shall be warranted satisfactory, in materials and CC Q Ir workmanship for a period of one (1) year, or period of warranty customary, or stipulated for the trade, craft or product whichever is longer. Only competent mechanics capable of producing good r� workmanship customary to the trade should be used. Commencing work by a contractor or subcontractor constitutes acceptance of the conditions and surfaces concerned. If any such conditions are unacceptable, the general contractor shall be notified immediately, and no work shall be performed until the conditions are made acceptable. The contractor shall be responsible for familiarizing himself with the project scope of work, building standards, schedule and deadlines. The contractor shall further be responsible for advising the owner of all long lead items affecting the project schedule and shall, upon request form the owner, submit order confirmations � �* and delivery dates for such long lead time items. All contractor or supplier requests for substitutions of specified items shall be submitted in writing accompanied by the alternative product information. General contractor shall provide a through construction cleaning at project close out, prior to punch list walk through. The contractor shall submit shop drawings of all fabricated items, and physical samples of all finish materials specified to the architect for review. Reviewed shop drawings and submittals by LO LO others will not be considered as part of the contract documents. The architect assumes not responsibility for drawings, schedules, and /or specifications for work on the project prepared by others. The architect will review all shop drawings, submittals and samples for conformity with the contract documents and return 742 ADAMS STREET them to the contractor within seven (7) working days. Any submittal required to be reviewed more than the initial review and one (1) additional review, will be considered to be in excess of the scope of the project. The time required for third and subsequent reviews of a submittal will be paid for by the CO contractor to the architect at the architect's standard billing rates, plus reimbursable expenses. CARMEL IN 46032� The contractor shall be responsible for verification of any existing conditions and all critical dimensions associated with the proposed work. The contractor shall confirm that all work outlined within the contract documents can be accomplished as shown, prior to bid opening. The contractor shall notify the architect of any conditions encountered which may affect building code compliance, life safety, issuance of CofO, or completion of the project as directed in the contract documents. r, No additional funds will be approved for work omitted form the contractor's bid due to lack of verification by the contractor, except as otherwise approved by the owner for work associated with hidden conditions which are not accessible [prior to construction. All interior finishes shall comply with chapter eight (8) of the 2006 interrational building code with Indiana amendments. Light gauge metal studs, studs, their components and their connections shall be engineered by a professional engineer CC co licensed in the state of Indiana. The engineer shall affix their seal and signature to shop drawings and calculations submitted for review. Steel required to transmit gravity and /or lateral loads to the structure not detailed on the structural drawings is the responsibility of the metal stud supplier to design, detail, provide and install. Metal studs shall be designed to support the loads shown in the design data in addition to the weight of the materials attached to the metal studs. Metal studs shall be designed using the load rn �i combinations in section 1605.3.1 of the IBC 2006 edition.. No °°- increase in allowable stress Is allowed. Deflection due to lateral �+ load shall be limited to 1/360 of the stud span. Metal stud t ; manufactures shall determine final layout and gauge of studs to meet the architectural and structural requirements. VICINITY MAP: APPLICABLE CODES: PROJECT INFORMATION: Where rough carpentry is in contact with the ground, expose g pry ,(I N��aN� weather or in areas of high relative humidity provide fastene A� :e) r - and anchorages with a hot dip zinc coating of G90 complying itsih _ ` BUILDING CODE FIRE CODE OCCUPANCY: ASTM A153 or provide fasteners and anchorages of type 204 v � 2008 INDIANA BUILDING CODE (IBC) 2008 INCIANAFIRE CODE - CLASSIFICATION(S): ARCHITECTURAL DRAWINGS: stainless steel. o T PROJECT - 675 IAc 13-2.5 R INTERNATIONAL BUILDING CODE - 2006 INTERNATIONAL FIRE CODE PROPOSED PER SECTION 0030JECT: A2 - OCCUPANCY G1.0 COVER SHEET Where treated lumber (rough carpentry) is in contact with other - oaf G f LOCATION - INDIANA AMENDMENTS MECHANICf,L CODE materials it must be separated from these materials by a product ` 2008 INDIANA MECHANICAL CODE (IMO) CONSTRUCTION: Al ARCHITECTURAL PLANS that will not allow ant reaction between the perspective and HANDICAP ACCESSIBILITY CODE - 2006 INTERNATIONAL MECHANICAL CODE - CLASSIFICATION(S): 11 -B A2 FIXTURE SCHEDUA /SECTIONS L S adjacent material. Coordinate with lumber manual. 2008 INDIANA BUILDING CODE CHAPTER 11 - 675 LAC 18 -1.5 - 675IAC 13- 2.5 -12 CHAPTER 11 INDIANA AMENDMENTS SQUARE FOOTAGE: MEP1 MECHANICAL AND PLUMBING - INDIANA AMENDMENTS - 1,719 S.F. — TOTALAREA INTERIOR PLANS ENERGYC)DE REMODEL 3' ELECTRICAL CODE 2010 INDIANA ENEP,GY CONSERVATION CODE (IECC)� MEP1.1 PLUMBING SCHEDUAL 2009 INDIANA ELECTRICAL CODE IEC - ASHRAE 90.1, 2(07 EDITION ( ) SPRINKLER: NATIONAL ELECTRIC CODE, 2008 EDITION - 675 LAC ARTICLEI9 -NONE MEP2 ELECTRICAL PLANS T T -• - 675 LAC 17 -1.8 - INDIANAAMENDIYENTS _F ' - INDIANA AMENDMENTS HOOD AND ANSUL� -YES TO BE SUBMITTED BY OTHERS MEP3 HOOD DETAILS AND PLANS _ - .1 rr PLUMBING CODE . but 1999 INDIANA PLUMBING CODE (IPC) 111b1 - 1997 UNIFORM PLUMBING CODE PROJECT NOTES: 4T - 675 LAC 16 -1.3 01. EXISTING "STRIP C_-NTER" SHELL BUILDING TO REMAIN AS IS WITH NO EXTERIOR WORK - INDIANA AMENDMENTS BEING PERFORMED AS PART OF THIS PROJECT. REMODELED AREA OCCUPANCY TYPE IS ALLOWABLE PEP ORIGINAL BUILDING OCCUPANCY TYPE y _ f s: FUEL GAS CODE 02. NEW TENANT TO BE CONFIGURED AS SHOWN. NO CHANGES TO EXISTING DEMISING WALLS _ s INDIANA FUEL GAS CODE, 2008 EDITION IN THIS PROJECT. NO CHANGES TO OTHER EXISTING TENANTS TO REMAIN AS IS. OWN* - INTERNATIONAL FUEL GAS CODE, 2006 03. NEW TENANT IS UTILIZING EXISTING HVAC, PLUMBING, POWER AND LIGHTING SYSTEMS, ICr�s+laad r EDITION LAYOUTS, SIZES, EQUIPMENT, ETC. AS IS U.N.O. IN THESE DRAWINGS. 675 LAC 25 -2 -1 04. NO COMCHECK REPORT REQUIRED FOR ARCHITECTURAL WORK PER SECTION 12 OF GENERAL ADMINISTRATIVE RULES (675 LAC 12 -4 -12 EXISTING BUILDINGS, ADDITIONS & ,�� ALTERATIONS. 05. THIS LOCATION WILL BE A RESTAURANT Q P N M L K J H G F E D C B A PROJECT NUMBER 2013.02 DATE: February 4th 2013 DRAWING NUMBER G -1 OF DRAWINGS N Ix W Z Q Z a X N .J IY J d �n a a InI- J Cd 2: Z J Q Q W UJ N a U N U Z L.IIJ a l...1. w N Ln N in ' X Ix 't o L U to ? o cl J I— N Q I ?m Q W J r Y i W r Q n fn N ILL U LtJ I L J Q N H u W H u CC Q PROJECT NUMBER 2013.02 DATE: February 4th 2013 DRAWING NUMBER G -1 OF DRAWINGS Q X N .J IY N 0 �n a a InI- >M Cd 2: Z Q Q W N a n N U a PROJECT NUMBER 2013.02 DATE: February 4th 2013 DRAWING NUMBER G -1 OF DRAWINGS