HomeMy WebLinkAbout13020148.4NEW FIXTURES TO EXIST. WASTE
MATCH EXISTING R.R. I VERIFY LOCATION
- -- - -
�fi 1 r
YE'
! 3 �2'11W EX TING PLUMBING _
FIXT�JRES TO REMAIN/ i li
TIIE INTO 60STING
LAVATORY WASTE "a `_J
!a
'I
I.
�I
PLUMBING PLAN
SCALE - 1/4 11 1'
p I IMRTNIF, III -ITFC
PR ❑VIDE HW AND CW TO ALL LAVATORIES AND SINKS
VERIFY DIRECTI ❑N OF FLOW OF WASTE LINE IN FIELD
VERIFY LOCATI ❑N OF EXISTING WATER METER AND CONNECT SERVICES ACCORDINGLY
3" VENT
THRU ROOF
i
i
i
i
i
i
NASTE RISER DIA
NOT TO SCALE
- EXISTING
CONNECT TO INCOMING WASTE -
VERIFY, LOCATION, SIZE, & FLOW DIRECTION
Ir _ - -
K
EXISTING BACKFLOW
i LOCATION
NCO
NEW EXHAUST FAN f
80 CFM DUCTED /t
DIRECTLY OUTSIDE
EXPOSED STRUCTURE
EXISTING LIGHTING &
HVAC TO REMAIN
HVAC PLAN
SCALE - 1/4••
MECHANICAL GENERAL NOTES
1. AIR HANDLERS MUST HAVE CONDENSATE DRAINS. VERIFY W/ PLUMBING CONTRACTORS
2. A/H TO HAVE EMERGENCY OVERFLOW PANS W/ FLOAT SWITCHES
3. METAL DUCT, INSULATED EXTERNALLY, INSULATED FLEX PIPE FOR RUNS TO DIFFUSERS
4. ALL HVAC EQUIPMENTS 208 /230 3 PHASE
5. ALL ROOF PENETRATIONS SHALL BE BY LANDLORD'S ROLIFING CONTRACTOR & UNIT:;
SHALL BE SET ON TREATED 2X4'S. VERIFY WITH ROOFING CONTRACTOR
6. LOCATE COND. UNIT AS REQUIRED TO MISS EXISTING ROOF EQUIPMENT - VERIFY IN FIELD
7. ROOFING CONTRACTOR SHALL REPAIR ROOFING & FLASH ALL EQIiIPMENT AT TENANT'S
GENERAL CONTRACTOR'S EXPENSE
EXPOSED STRUCTURE
EXISTING LIGHTING &
HVAC TO REMAIN \ /
-i . ICE -
MECHANICAL NOTES
1. ALL DUCTWORK REQUIRED FOR HVAC SYSTEM SHALL BE PER SHEET METAL CONTRACTOR'S NATIONAL ASSOCIATION
(SMACNA) LATEST EDITION HANDS ❑ ❑K - LOW VELOCITY DUCT C❑NSTRUCTI ❑N STANDARDS
2. TRANSFORMER TYPE THERMOSTAT W /BATTERY BACKUP AN DAY /NIGHT SETBACK 0DAY PROGRAMMABLE PREFERRED),
TEMPERATURE RANGE OF 55F TO 75F DEGREES HEATING AND 75F TO 85F DEGREES C❑ ❑LING
3. DIFFUSERS TO BE 24'X24' UNLESS NOTED OTHERWISE
4. RETURN AIR GRILLS TO BE EGGCRATE TYPE ONE SQUARE FOOT FREEAIR 500 CFM
5. CONNECT DIFFUSER TO SHEET METAL DUCT W /ROUND FLEXIBLE DUCT
6. PR ❑VIDE ECONOMIZER IS UNIT CAPACITY IS 5000 CFM ❑R MORE
7. PR ❑VIDE DAMPER AT EACH FLEXIBLE DUCT BRANCH
8. GAS PIPING MUST WITHSTAND 100 P.S,I. TEST FOR 4 HOURS
9. ROOF TOP UNITS (R,T.U,) MUST HAVE PREFABRICATED CURB LEVEL (WHERE APPLICABLE)
10. ROOF TOP UNITS (R,T,U,) MUST WIRE FROM INSIDE, NO PITCH POCKETS, (WHERE APPLICABLE)
ii. FIT ROOF TOP UNITS W /MANUAL OUTSIDE AIR DAMPER (WHERE APPLICABLE)
12. PROVIDE DISCONNECT SWITCHES AT FURNACE AND COMPRESSOR.
Legend
Junction boxes coordinate with tenant on wiring
requirements
® Building standard 2x4 fluorescent light fixture existing to
remain
® 2x4 fluorescent light fixture with acrylic lens. (2) 32WT8
lamps 73 Watts total
Denotes light fixture wired to 24 hour circuit ( "night light")
o- Pendant hung light fixture to be selected
18W fluorescent can light with white trim ring 23 watts
total
OThermostat
Wall mounted light or other switch
3 = 3 way switch
4 = 4 way switch
D = electronic dimmer
Wall mounted emergency light w/ 90 min. backup. Equal
to navilite N1WH with (2) 5.4 watt lamps, 11 watts total
EXIT Wall mounted exit light w/ 90 min. backup equal to navilite
NXP3GWH. 2.7 watt total LED lamps
EXIT
14 t7 Wall Mounted combo emergency light and exit light w/ 90
min. backup. Equal to navilite NXPC3GWH. 4.2 watts total
standby
Existing ceiling grid
®Gypsum board bulkhead
aDiffuser - Supply
�Ytm Diffuser - Return
1001EB
® Combination fluorescent light /fan ducted to exterior.
Equal to Boran QTXE- 150FLT with (2) 18 watt lamps, 48
watts total
Note: Supply and Return locations shown on plans for reference
only. Contractor is to provide new layout under design - build
contract
Mechianical contractor is to locate all roof mounted equipment
for structural stability and to provide any required bracing and
support needed for any roof top equipment.
Provide deduct alternate to re -lamp existing 2x4 fixtures and
re- install in rooms: Utility, Dry Storage, Kitchen, Prep and serving
areas
Final location and selection of all fixtures to be coordinated with
tenant and architect
m
W
ac
W
II
PROJECT NUMBER 2013.02
DATE: February 4th 2013
DRAWING NUMBER
MEP -1
OF DRAWINGS
N
N
W
Z
Q
Z
Q
�■■�
LV
J
Ll
U
a
Cie
V
0
Q
J
Q
2:
a
LU
N
U
Z
a
LU
LL
W
N
r
Cf1
N
r
X
�
o
LU
In
Z co
o
J
tA
,
Zm
Q
W
Y i
00
Z N
N
LL
F-
U
LLJ
I
�U
LL
Q
N
H
u
W
H
ME
L-)
Cr
Q
PROJECT NUMBER 2013.02
DATE: February 4th 2013
DRAWING NUMBER
MEP -1
OF DRAWINGS
N
Q
�■■�
LV
N
cn
a
Cie
V
0
Q
J
Q
2:
a
N
a
PROJECT NUMBER 2013.02
DATE: February 4th 2013
DRAWING NUMBER
MEP -1