DEMO FLOOR PLAN
SCALE: 1 /8" = V -0"
DEMO CEILING PLAN
SCALE: 1/8" = V -0"
SPECIFIC DEMOLITION NOTES
!
i
i
OREMOVE EXISTING DOOR, FRAME, AND RELATED ITEMS.
SALVAGE FOR RELOCATION
OREMOVE EXISTING DUPLEX RECEPTACLE
BACK TO SOURCE
O3 REMOVE AND RELOCATE EXISTING THERMOSTAT AS REQUIRED, TYP.
REMOVE COUNTER TOP AND BACKSPLASH
I �
-- - 5 REMOVE EXISTING WALL CONSTRUCTION AS INDICATED BY DASHED LINES
12 I I REPAIR REMAINING WALLS TYP.
I 6 REWORK EXISTING SUSPENDED CEILING GRID AS REQUIRED FOR NEW
O
2'X 4' LAY -IN TILES. SHOWN AS DASHED LINES
REMOVE AND RELOCATE EXISTING LIGHT FIXTURE AS REQUIRED.
/ 13 �O 9 SHOWN AS DASHED LINES. SALVAGE FOR RELOCATION
DEMO AND PREP FOR NEW WINDOW
g0 PATCH REPAIR AND SALVAGE EXISTING CEILING GRID
FIXTURES, DIFFUSERS AND RETURNS AS NEEDED.
NOT USED
I�
!
8 REMOVE AND RELOCATE EXISTING SHOWER
\ \ I 1 t 2 12
12 DEMO AND PREP FOR NEW DOOR
�, o
EXISTING THERMOSTAT TO REMAIN
II 5 - - - --
z
II
q
I�!I' 1 5
LL
9 \
- '' - - -- 9
5
0 2 II 5
II I
II 8
! !
LL
2
1
II 5
�f II u
II !�
T "f —I — t- -t Lzo
f -1
-r
I I I I I I I All I I I I IF- - - - - -_
L 1 I I _ill -I a- a j.- III -F I
LJ_ -i J_L1J
u i I I I j',I I I I I rn
'I I I I I I III I I I I I I Ir
I - r�rT_T�I I I 1 —
1 _1_ L 1 I I —1 I I I I I �I— I I —I— I I -1-F 1 —I— —_
_= 7 I��T -1—r I t- -t I t--1 =CIS_
� I ���I I I I I I I! 1 1 1 1 1 1 1
—I— I I- - 1 L 1 J— L J�'
1 III I
h1 1 1 1 1 1 1I I I I I I IIJi I I I I!
1= 1- LZy— F - +� —F-
7 —T7 I I I I I I I =CIS_
1 I IL1J_L
_T- 1y�- rt —I —r� I— t'rt- 1— t-4 —I- 1 1 1 1 1
n 1 I I I I I I I I I I I
I I I I II I� 1 1 1 I I I I I I 1 I n
I -,'� -- —
1 1 I I I I I I— T -T —1-1 Fi— +- i
I I I I III I �� I I I �I I I I I I In1 I I I I
J -! -! - J4- r+``T�� -� 1- J- -4 - 1- �1- 1�`l -FT-1
�1� '�
I- I-r -I- fi rt -1�'
Iu
I— ( I I I I I I I -.1-4 I -
1I T 1 -1— r I —I—
�1— L1 -1 —II I_4
GENERAL DEMOLITION NOTES
1. PRIOR TO STARTING DEMOLITION, DUST CONTROL BARRIERS SHALL BE
CONSTRUCTED TO PREVENT SPREAD OF DUST INTO SURROUNDING AREAS.
2. EXITING FROM STRUCTURE, IF REQUIRED TO PASS THROUGH DEMOLITION
AREA, SHALL HAVE APPROVED BARRIERS, ETC. TO ENSURE SAFETY OF
PUBLIC AND OFFICE EMPLOYEES.
3. SAVE ALL REMOVED LIGHTING FIXTURES, CEILING TILE & SUSPENSION
SYSTEM FOR REUSE IN NEW OFFICE AREA. CONTRACTOR TO REUSE
LIGHTING FIXTURES, CEILING TILE & SUSPENSION SYSTEM AS MUCH
AS POSSIBLE. VERIFY ANY ITEMS WHICH ARE QUESTIONABLE WITH
ARCHITECT. SEE MECHANICAL & ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
4. RELOCATED ITEMS SHALL CLEANED AND PLACED IN STORAGE UNTIL
ITEMS ARE READY TO BE REINSTALLED. IF ITEM IS DAMAGED, IT SHALL
BE REPAIRED OR REPLACE WITH NEW ITEM AS APPROVED.
5. DEMOLITION SHALL BE PERFORMED WITHOUT DAMAGE TO ADJACENT
RETAINED WORK. WHERE SUCH DAMAGE OCCURS, PATCH, REPAIR OR
OTHERWISE RESTORE TO ITS ORIGINAL CONDITION.
6. WHERE DEMOLITION WORK LEAVES HOLES AND DAMAGED SURFACES
THAT WILL BE EXPOSED IN FINISHED WORK, THESE HOLES AND
DAMAGED SURFACES SHALL BE PATCHED AND REPAIRED TO MATCH
ADJACENT FINISH SURFACE.
7. PATCH AND /OR REPAIR CEILING GRID SYSTEM WHERE
WALLS OR PARTITIONS HAVE BEEN REMOVED.
8, PATCH AND /OR REPAIR FLOOR IN PREPARATION FOR NEW
FLOORING WHERE PARTITIONS HAVE BEEN REMOVED
9, REMOVE ELECTRICAL WIRING IN WALLS THAT ARE
TO BE REMOVED. SEE ELECTRICAL PLAN FOR ADDITIONAL
INFORMATION.
10. SOLID LINES INDICATE STRUCTURE AND /OR EQUIPMENT TO REMAIN.
11. DASHED LINES INDICATE STRUCTURE AND /OR EQUIPMENT TO BE REMOVED.
12. THE PREFIX "E" ON ROOM NUMBERS INDICATES EXISTING ROOM.
13. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION MATERIALS.
14. THE MECHANICAL AND ELECTRICAL CONTRACTORS ARE TO FIELD VERIFY
ALL EXISTING CONDITIONS TO COORDINATE POINTS OF TERMINATION,
ANY RELOCATION OF EXISTING EQUIPMENT, RECONNECTION AND /OR
REPLACEMENT OF COMPONENTS NEEDED TO MAINTAIN EXISTING AREAS
NOT INCLUDED IN THE DEMOLITION SCOPE OF THE WORK. ALL
ELECTRICAL DEMOLITION IS TO BE COMPLETED BACK TO MAIN SOURCE.
15. THE MECHANICAL AND ELECTRICAL CONTRACTORS ARE TO COORDINATE
THE CUTTING AND CAPPING OF ALL EXISTING UTILITY SERVICE LINES.
HOWEVER THE GENERAL DEMOLITION CONTRACTOR WILL BE RESPONSIBLE
FOR THE REMOVAL OF ALL MECHANICAL AND ELECTRICAL EQUIPMENT
THAT WILL NOT BE REQUIRED ONCE THE UTILITY SERVICES HAVE BEEN
CUT AND CAPPED.
16. THE DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE TO
COORDINATE THE CUTTING AND CAPPING OF ALL EXISTING UTILITY
SERVICE LINES WITH THE MECHANICAL AND ELECTRICAL CONTRACTORS IN
UNISON WITH THE GENERAL DEMOLITION WORK.
17. CONTRACTOR TO REPORT ANY DISCREPANCIES WITH EXISTING
CONDITIONS TO ARCHITECT FOR ADDITIONAL INFORMATION.
DEMO PLAN LEGEND
SYMBOL DESCRIPTION
2' -0" X 4' -0" SUSPENDED
CEILING GRID & LAY -IN TROFFER
CEILING GRID /LIGHT FIXTURE TO BE DEMOLISHED
EXISTING WALL CONSTRUCTION TO BE REMOVED.
EXISTING WALL CONSTRUCTION TO REMAIN
DESIGNATES SPECIFIC ITEM TO BE REMOVED
EXISTING DOOR TO REMAIN
I10\
go , EXISTING DOOR TO REMOVED
J
DRWG START DATE:
04/08/08
W
BW
SHEET:
D101
O
x
W
�o
�kD
WLU�
z
wg
x
z
�~
w O
�WW
X
w�
No
0
LLJ
0�
J
�U
U
W
m
a
U
W�
aQ
3�
.W
Q
J
DRWG START DATE:
04/08/08
W
BW
SHEET:
D101
O
W
�o
�kD
WLU�
z
wg
z
�~
w O
�WW
X
w�
No
0
LLJ
0�
J
�U
W
m
a
DRWG FILE NAME: DEMO PLAN
DRWG START DATE:
04/08/08
DRAWN BY:
BW
SHEET:
D101
FBi PROJECT #: ASPEN INDY