HomeMy WebLinkAbout06120009.111. PREPARE SOIL BEFORE INSTALLING BLANKETS,
4. THE EDGES OF PARALLEL BLANKETS MUST BE
INCLUDING APPLICATION OF LIME, FERTILIZER, AND
STAPLED WITH APPROXIMATELY 2" OVERLAP.
SEED. NOTE: WHEN USING CELL —O —SEED, DO
5. WHEN BLANKETS MUST BE SPUCED DOWN THE
NOT SEED PREPARED AREA. CELL —O —SEED MUST
SLOPE, PLACE BLANKETS END OVER END
BE INSTALLED WITH PAPER SIDE DOWN.
(SHINGLE STYLE) WITH APPROXIMATELY 6"
2. BEGIN AT THE TOP OF THE SLOPE BY
OVERLAP. STAPLE THROUGH OVERLAPPED AREA,
ANCHORING THE BLANKET IN A 6" DEEP X 6"
APPROXIMATELY 12" APART.
WIDE TRENCH. BACKFILL AND COMPACT THE
TRENCH AFTER STAPLING.
REFER TO GENERAL STAPLE PATTERN
3. ROLL THE BLANKETS DOWN THE SLOPE IN THE
GUIDE EC -14 FOR CORRECT STAPLE
DIRECTION of THE WATER FLOW.
PATTERN RECOMMENDATIONS.
SLOPEIN� LL ATION GUIDE
EC -15 NO SCALE
3
6 X� 6'
3'
A
X
1 STAPLES PER SQ. YD.
�mY
3'
1 —�1.5'
— 3'
�1
X 4' X
LK
3' --•I
X X
C
X
X X
1.5 STAPLES PER SQ. YD. 2 STAPLES PER SQ. YD.
300
275
250
225
0 200
175
150
125
100
75
50
25
ft
XI -20-- X
X X X
X X X
D
X X X
3.5 STAPLES PER SQ. YD.
4:1 3:1 2:1
SLOPE GRADIENT
STAPLE PATTERN GUIDE
EC-14 NO SCALE
DRIPLINE
— DRIPLINE
1:1 LOW MED /HIGH
FLOW FLOW
CHANNEL CHANNEL
AND
SHOREUNE
ORANGE PLASTIC FENCING
INSTALLED AT THE DRIPUNE
TREE AND SHRUB PRESERVATION
WITH TEMPORARY FENCING
LS-15 NO SCALE
ORANGE PLASTIC FENCE SHALL
COMPLETELY SUROUND THE DRIPLINE
OF THE VEGETATION.
THE DRIPLINE IS THE FURTHEST
OUTREACHING OF THE BRANCHES.
II
l
Y
T t_ -- _ � T
_=
TREE AND SHRUB PRESERVATION
WITH TEMPORAY FENCING
LS -15A NO SCALE
STEP 1:
EXCAVATE A 6' X 4' DEEP
TRENCH —
'`•,rte - �'
6'
STEP 3:
4'
STEP 2:
L'T FABRIC TO STAKES AND BURY 2' X 2'
' INTO THE TRENCH � STAKES
I, -I��/ NON -WOVEN HEAVY
DULY FABRIC
'
DRIVE STAKES IN TRENCH '' NON -WOVEN HEAVY
Dt1TY FABRIC
TO ATTATCH SILT FENCE
STEP 4:
r-
SILT FENCE
SOIL ..+
FLOW - ri
PLAN
a ,f
SECTION -'
2" x 2" STAKE
2.5'
MAINTENANCE
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED
PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS
CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING
THE DISTURBED AREA TO GRADE, AND STABIUZE.
SILT FENCE BARRIER INSTALLATICIN
EC-2 NO SCALE
PRE FABRICATED BAG
NON WOVEN FILTER FABRIC
PAVEMENT INLET
PRE FABRICATED BAG
NON WOVEN FILTER FABRIC
CHAIRBACK CURB INLET
PRE FABRICATED BAG
NON WOVEN FILTER FABRIC
ROLL CURB INLET
MAINTENANCE NOTES
1. BAGS SHALL BE INSPECTED AFTER EVERY STORM EVENT AND WEEKLY
TO MAKE SURE THEY ARE IN PROPER WORKING CONDITION.
2. SEDIMENT SHOULD BE REMOVED AND RETURNED TO PLACE OF ORIGIN
AFTER EVERY STORM EVENT.
3. USE CARE WHEN REMOVING SEDIMENT FILLED BAGS TO PREVENT
DROPPING INTO STORM STRUCTURE. DO NOT DUMP SEDIMENT INTO
STORM STRUCTURE.
EC -24 NO SCALE
INLET SILT BARRIER
3' DIAMETER 6 °x6" 10 10 GAUGE WIRE
3' HIGH ANCHOR TO GRATE
NON WOVEN
FILTER FABRIC
YARD CASTING
#4 GAGE WIRE GRASS
SILT PROTECTION FOR DITCH GRATE
(NEENAH R- 4:542) CASTINGS. TUCK FILTER FABRIC
'JR EQUIVALENT UNDER CASTING
MAINTENANCE
1. INSPECT THE STRUCTURE AFTER EACH STORM EVENT.
2. REMOVE ACCUMULATED SEDIMENT AND MAKE NEEDED REPAIRS IMMEDIATELY.
3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABIUZED, REMOVE
AND PROPERLY DISPOSE OF ALL CONSTRUC11ON MATERIAL AND SEDIMENT
AND STABILIZE.
YARD GRATE SILT BARRIER
EC -8A NO SCALE
oa °a #2 STONE
R
;c
J
GEOTE)MLE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT 6° �IIN.�Q
WHERE WETNESS IS ANTICIPATED)
TEMPORARY CONSTRUCTION
ENTRANCE
EC-30 NO SCALE
SEASONAL SOIL PROTECTION CHART
Stabilization— -- - -- -- - -- -- - -- -- -- - -- -- - -- --
Practice: JAN. FEB. MAR APR MAY JUN JUL. AUG SEP OCT. NOV DEC
Permanent
Seeding
Dormant. g
Seeding
------ -• - - -- -- - -- -- - -- -- - -- - - - - -- - -- -- - -- --
Temporary E // /1/ /
Seeding
Sodding
Mulching
A = KENTUCKY BLUEGRASS 40 Ibs /acre: CREEPING RED FESCUE
40 Ibs /acre; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL
RYE GRASS 20 Ibs /acre.
B = KENTUCKY BLUEGRASS 60 Ibs /acre; CREEPING RED FESCUE
60 Ibs /acre; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL
RYE GRASS 30 Ibs /acre.
C = SPRING OATS 3 BUSHEL /ACRE.
D = WHEAT OR RYE 2 BUSHEL /ACRE
E = ANNUAL RYE GRASS 40 Ibs /acre. (1 lb/1000 sq. ft.)
F = SOD
G = STRAW MULCH 2 TONS /ACRE
* /I /* = IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER.
** = IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD.
C
B
C
C
B
C
D
A
0
a_
A
B
B
4:1 3:1 2:1
SLOPE GRADIENT
STAPLE PATTERN GUIDE
EC-14 NO SCALE
DRIPLINE
— DRIPLINE
1:1 LOW MED /HIGH
FLOW FLOW
CHANNEL CHANNEL
AND
SHOREUNE
ORANGE PLASTIC FENCING
INSTALLED AT THE DRIPUNE
TREE AND SHRUB PRESERVATION
WITH TEMPORARY FENCING
LS-15 NO SCALE
ORANGE PLASTIC FENCE SHALL
COMPLETELY SUROUND THE DRIPLINE
OF THE VEGETATION.
THE DRIPLINE IS THE FURTHEST
OUTREACHING OF THE BRANCHES.
II
l
Y
T t_ -- _ � T
_=
TREE AND SHRUB PRESERVATION
WITH TEMPORAY FENCING
LS -15A NO SCALE
STEP 1:
EXCAVATE A 6' X 4' DEEP
TRENCH —
'`•,rte - �'
6'
STEP 3:
4'
STEP 2:
L'T FABRIC TO STAKES AND BURY 2' X 2'
' INTO THE TRENCH � STAKES
I, -I��/ NON -WOVEN HEAVY
DULY FABRIC
'
DRIVE STAKES IN TRENCH '' NON -WOVEN HEAVY
Dt1TY FABRIC
TO ATTATCH SILT FENCE
STEP 4:
r-
SILT FENCE
SOIL ..+
FLOW - ri
PLAN
a ,f
SECTION -'
2" x 2" STAKE
2.5'
MAINTENANCE
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED
PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS
CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING
THE DISTURBED AREA TO GRADE, AND STABIUZE.
SILT FENCE BARRIER INSTALLATICIN
EC-2 NO SCALE
PRE FABRICATED BAG
NON WOVEN FILTER FABRIC
PAVEMENT INLET
PRE FABRICATED BAG
NON WOVEN FILTER FABRIC
CHAIRBACK CURB INLET
PRE FABRICATED BAG
NON WOVEN FILTER FABRIC
ROLL CURB INLET
MAINTENANCE NOTES
1. BAGS SHALL BE INSPECTED AFTER EVERY STORM EVENT AND WEEKLY
TO MAKE SURE THEY ARE IN PROPER WORKING CONDITION.
2. SEDIMENT SHOULD BE REMOVED AND RETURNED TO PLACE OF ORIGIN
AFTER EVERY STORM EVENT.
3. USE CARE WHEN REMOVING SEDIMENT FILLED BAGS TO PREVENT
DROPPING INTO STORM STRUCTURE. DO NOT DUMP SEDIMENT INTO
STORM STRUCTURE.
EC -24 NO SCALE
INLET SILT BARRIER
3' DIAMETER 6 °x6" 10 10 GAUGE WIRE
3' HIGH ANCHOR TO GRATE
NON WOVEN
FILTER FABRIC
YARD CASTING
#4 GAGE WIRE GRASS
SILT PROTECTION FOR DITCH GRATE
(NEENAH R- 4:542) CASTINGS. TUCK FILTER FABRIC
'JR EQUIVALENT UNDER CASTING
MAINTENANCE
1. INSPECT THE STRUCTURE AFTER EACH STORM EVENT.
2. REMOVE ACCUMULATED SEDIMENT AND MAKE NEEDED REPAIRS IMMEDIATELY.
3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABIUZED, REMOVE
AND PROPERLY DISPOSE OF ALL CONSTRUC11ON MATERIAL AND SEDIMENT
AND STABILIZE.
YARD GRATE SILT BARRIER
EC -8A NO SCALE
oa °a #2 STONE
R
;c
J
GEOTE)MLE FABRIC TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT 6° �IIN.�Q
WHERE WETNESS IS ANTICIPATED)
TEMPORARY CONSTRUCTION
ENTRANCE
EC-30 NO SCALE
SEASONAL SOIL PROTECTION CHART
Stabilization— -- - -- -- - -- -- - -- -- -- - -- -- - -- --
Practice: JAN. FEB. MAR APR MAY JUN JUL. AUG SEP OCT. NOV DEC
Permanent
Seeding
Dormant. g
Seeding
------ -• - - -- -- - -- -- - -- -- - -- - - - - -- - -- -- - -- --
Temporary E // /1/ /
Seeding
Sodding
Mulching
A = KENTUCKY BLUEGRASS 40 Ibs /acre: CREEPING RED FESCUE
40 Ibs /acre; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL
RYE GRASS 20 Ibs /acre.
B = KENTUCKY BLUEGRASS 60 Ibs /acre; CREEPING RED FESCUE
60 Ibs /acre; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL
RYE GRASS 30 Ibs /acre.
C = SPRING OATS 3 BUSHEL /ACRE.
D = WHEAT OR RYE 2 BUSHEL /ACRE
E = ANNUAL RYE GRASS 40 Ibs /acre. (1 lb/1000 sq. ft.)
F = SOD
G = STRAW MULCH 2 TONS /ACRE
* /I /* = IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER.
** = IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD.
0
n
0
a_
V)
w �
w
w
� z
tw- w
_ U) z
c� W 0
�wW w
�ZWZ>I-
UC7Q�no
l`__ UJ V)
U j z z z Q N
a a
—a�—
00
rn
T`
O�
U I
N �
Q 00 N
^.
Q
0 < r-
Cl�Z — .o-
Qn
Z
= Q Q
Q LL
af V U
0::i
0
Na_ r.0
I Q
1 Q N W
000
Z
M
N
C
0)
C
W
a�f
N
Y
U
W
Q
J
�
N
H
w —�
N
Ur,
O
wS
O U-
q :D Q
o�c w
OZ
v'
U
� o
ZO Q
U Z
U�
W
<
0 Z
Q
to a
U
c
U.J
+
CERTIFIED BY: nnto - b- OIL —
paeren�o�o�s
*0 1 u C; p
♦ ♦
-0` 10404538
70 STATE OF w
O
S�� <_1 ♦ ♦♦
,��Baoeerne��J,,
Drawn By:
M. WAGNER
Checked By.
K. COLLINS
Quality Assurance:
T.SCHELLENBERGER
Scale:
0 Scale: 1' = NA'
Sheet
C402
Date
10 -06-08
Project Number
0990488 -10101