Loading...
HomeMy WebLinkAbout06120009.111. PREPARE SOIL BEFORE INSTALLING BLANKETS, 4. THE EDGES OF PARALLEL BLANKETS MUST BE INCLUDING APPLICATION OF LIME, FERTILIZER, AND STAPLED WITH APPROXIMATELY 2" OVERLAP. SEED. NOTE: WHEN USING CELL —O —SEED, DO 5. WHEN BLANKETS MUST BE SPUCED DOWN THE NOT SEED PREPARED AREA. CELL —O —SEED MUST SLOPE, PLACE BLANKETS END OVER END BE INSTALLED WITH PAPER SIDE DOWN. (SHINGLE STYLE) WITH APPROXIMATELY 6" 2. BEGIN AT THE TOP OF THE SLOPE BY OVERLAP. STAPLE THROUGH OVERLAPPED AREA, ANCHORING THE BLANKET IN A 6" DEEP X 6" APPROXIMATELY 12" APART. WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. REFER TO GENERAL STAPLE PATTERN 3. ROLL THE BLANKETS DOWN THE SLOPE IN THE GUIDE EC -14 FOR CORRECT STAPLE DIRECTION of THE WATER FLOW. PATTERN RECOMMENDATIONS. SLOPEIN� LL ATION GUIDE EC -15 NO SCALE 3 6 X� 6' 3' A X 1 STAPLES PER SQ. YD. �mY 3' 1 —�1.5' — 3' �1 X 4' X LK 3' --•I X X C X X X 1.5 STAPLES PER SQ. YD. 2 STAPLES PER SQ. YD. 300 275 250 225 0 200 175 150 125 100 75 50 25 ft XI -20-- X X X X X X X D X X X 3.5 STAPLES PER SQ. YD. 4:1 3:1 2:1 SLOPE GRADIENT STAPLE PATTERN GUIDE EC-14 NO SCALE DRIPLINE — DRIPLINE 1:1 LOW MED /HIGH FLOW FLOW CHANNEL CHANNEL AND SHOREUNE ORANGE PLASTIC FENCING INSTALLED AT THE DRIPUNE TREE AND SHRUB PRESERVATION WITH TEMPORARY FENCING LS-15 NO SCALE ORANGE PLASTIC FENCE SHALL COMPLETELY SUROUND THE DRIPLINE OF THE VEGETATION. THE DRIPLINE IS THE FURTHEST OUTREACHING OF THE BRANCHES. II l Y T t_ -- _ � T _= TREE AND SHRUB PRESERVATION WITH TEMPORAY FENCING LS -15A NO SCALE STEP 1: EXCAVATE A 6' X 4' DEEP TRENCH — '`•,rte - �' 6' STEP 3: 4' STEP 2: L'T FABRIC TO STAKES AND BURY 2' X 2' ' INTO THE TRENCH � STAKES I, -I��/ NON -WOVEN HEAVY DULY FABRIC ' DRIVE STAKES IN TRENCH '' NON -WOVEN HEAVY Dt1TY FABRIC TO ATTATCH SILT FENCE STEP 4: r- SILT FENCE SOIL ..+ FLOW - ri PLAN a ,f SECTION -' 2" x 2" STAKE 2.5' MAINTENANCE 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE. SILT FENCE BARRIER INSTALLATICIN EC-2 NO SCALE PRE FABRICATED BAG NON WOVEN FILTER FABRIC PAVEMENT INLET PRE FABRICATED BAG NON WOVEN FILTER FABRIC CHAIRBACK CURB INLET PRE FABRICATED BAG NON WOVEN FILTER FABRIC ROLL CURB INLET MAINTENANCE NOTES 1. BAGS SHALL BE INSPECTED AFTER EVERY STORM EVENT AND WEEKLY TO MAKE SURE THEY ARE IN PROPER WORKING CONDITION. 2. SEDIMENT SHOULD BE REMOVED AND RETURNED TO PLACE OF ORIGIN AFTER EVERY STORM EVENT. 3. USE CARE WHEN REMOVING SEDIMENT FILLED BAGS TO PREVENT DROPPING INTO STORM STRUCTURE. DO NOT DUMP SEDIMENT INTO STORM STRUCTURE. EC -24 NO SCALE INLET SILT BARRIER 3' DIAMETER 6 °x6" 10 10 GAUGE WIRE 3' HIGH ANCHOR TO GRATE NON WOVEN FILTER FABRIC YARD CASTING #4 GAGE WIRE GRASS SILT PROTECTION FOR DITCH GRATE (NEENAH R- 4:542) CASTINGS. TUCK FILTER FABRIC 'JR EQUIVALENT UNDER CASTING MAINTENANCE 1. INSPECT THE STRUCTURE AFTER EACH STORM EVENT. 2. REMOVE ACCUMULATED SEDIMENT AND MAKE NEEDED REPAIRS IMMEDIATELY. 3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABIUZED, REMOVE AND PROPERLY DISPOSE OF ALL CONSTRUC11ON MATERIAL AND SEDIMENT AND STABILIZE. YARD GRATE SILT BARRIER EC -8A NO SCALE oa °a #2 STONE R ;c J GEOTE)MLE FABRIC TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT 6° �IIN.�Q WHERE WETNESS IS ANTICIPATED) TEMPORARY CONSTRUCTION ENTRANCE EC-30 NO SCALE SEASONAL SOIL PROTECTION CHART Stabilization— -- - -- -- - -- -- - -- -- -- - -- -- - -- -- Practice: JAN. FEB. MAR APR MAY JUN JUL. AUG SEP OCT. NOV DEC Permanent Seeding Dormant. g Seeding ------ -• - - -- -- - -- -- - -- -- - -- - - - - -- - -- -- - -- -- Temporary E // /1/ / Seeding Sodding Mulching A = KENTUCKY BLUEGRASS 40 Ibs /acre: CREEPING RED FESCUE 40 Ibs /acre; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYE GRASS 20 Ibs /acre. B = KENTUCKY BLUEGRASS 60 Ibs /acre; CREEPING RED FESCUE 60 Ibs /acre; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYE GRASS 30 Ibs /acre. C = SPRING OATS 3 BUSHEL /ACRE. D = WHEAT OR RYE 2 BUSHEL /ACRE E = ANNUAL RYE GRASS 40 Ibs /acre. (1 lb/1000 sq. ft.) F = SOD G = STRAW MULCH 2 TONS /ACRE * /I /* = IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER. ** = IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD. C B C C B C D A 0 a_ A B B 4:1 3:1 2:1 SLOPE GRADIENT STAPLE PATTERN GUIDE EC-14 NO SCALE DRIPLINE — DRIPLINE 1:1 LOW MED /HIGH FLOW FLOW CHANNEL CHANNEL AND SHOREUNE ORANGE PLASTIC FENCING INSTALLED AT THE DRIPUNE TREE AND SHRUB PRESERVATION WITH TEMPORARY FENCING LS-15 NO SCALE ORANGE PLASTIC FENCE SHALL COMPLETELY SUROUND THE DRIPLINE OF THE VEGETATION. THE DRIPLINE IS THE FURTHEST OUTREACHING OF THE BRANCHES. II l Y T t_ -- _ � T _= TREE AND SHRUB PRESERVATION WITH TEMPORAY FENCING LS -15A NO SCALE STEP 1: EXCAVATE A 6' X 4' DEEP TRENCH — '`•,rte - �' 6' STEP 3: 4' STEP 2: L'T FABRIC TO STAKES AND BURY 2' X 2' ' INTO THE TRENCH � STAKES I, -I��/ NON -WOVEN HEAVY DULY FABRIC ' DRIVE STAKES IN TRENCH '' NON -WOVEN HEAVY Dt1TY FABRIC TO ATTATCH SILT FENCE STEP 4: r- SILT FENCE SOIL ..+ FLOW - ri PLAN a ,f SECTION -' 2" x 2" STAKE 2.5' MAINTENANCE 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABIUZE. SILT FENCE BARRIER INSTALLATICIN EC-2 NO SCALE PRE FABRICATED BAG NON WOVEN FILTER FABRIC PAVEMENT INLET PRE FABRICATED BAG NON WOVEN FILTER FABRIC CHAIRBACK CURB INLET PRE FABRICATED BAG NON WOVEN FILTER FABRIC ROLL CURB INLET MAINTENANCE NOTES 1. BAGS SHALL BE INSPECTED AFTER EVERY STORM EVENT AND WEEKLY TO MAKE SURE THEY ARE IN PROPER WORKING CONDITION. 2. SEDIMENT SHOULD BE REMOVED AND RETURNED TO PLACE OF ORIGIN AFTER EVERY STORM EVENT. 3. USE CARE WHEN REMOVING SEDIMENT FILLED BAGS TO PREVENT DROPPING INTO STORM STRUCTURE. DO NOT DUMP SEDIMENT INTO STORM STRUCTURE. EC -24 NO SCALE INLET SILT BARRIER 3' DIAMETER 6 °x6" 10 10 GAUGE WIRE 3' HIGH ANCHOR TO GRATE NON WOVEN FILTER FABRIC YARD CASTING #4 GAGE WIRE GRASS SILT PROTECTION FOR DITCH GRATE (NEENAH R- 4:542) CASTINGS. TUCK FILTER FABRIC 'JR EQUIVALENT UNDER CASTING MAINTENANCE 1. INSPECT THE STRUCTURE AFTER EACH STORM EVENT. 2. REMOVE ACCUMULATED SEDIMENT AND MAKE NEEDED REPAIRS IMMEDIATELY. 3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABIUZED, REMOVE AND PROPERLY DISPOSE OF ALL CONSTRUC11ON MATERIAL AND SEDIMENT AND STABILIZE. YARD GRATE SILT BARRIER EC -8A NO SCALE oa °a #2 STONE R ;c J GEOTE)MLE FABRIC TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT 6° �IIN.�Q WHERE WETNESS IS ANTICIPATED) TEMPORARY CONSTRUCTION ENTRANCE EC-30 NO SCALE SEASONAL SOIL PROTECTION CHART Stabilization— -- - -- -- - -- -- - -- -- -- - -- -- - -- -- Practice: JAN. FEB. MAR APR MAY JUN JUL. AUG SEP OCT. NOV DEC Permanent Seeding Dormant. g Seeding ------ -• - - -- -- - -- -- - -- -- - -- - - - - -- - -- -- - -- -- Temporary E // /1/ / Seeding Sodding Mulching A = KENTUCKY BLUEGRASS 40 Ibs /acre: CREEPING RED FESCUE 40 Ibs /acre; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYE GRASS 20 Ibs /acre. B = KENTUCKY BLUEGRASS 60 Ibs /acre; CREEPING RED FESCUE 60 Ibs /acre; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYE GRASS 30 Ibs /acre. C = SPRING OATS 3 BUSHEL /ACRE. D = WHEAT OR RYE 2 BUSHEL /ACRE E = ANNUAL RYE GRASS 40 Ibs /acre. (1 lb/1000 sq. ft.) F = SOD G = STRAW MULCH 2 TONS /ACRE * /I /* = IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER. ** = IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD. 0 n 0 a_ V) w � w w � z tw- w _ U) z c� W 0 �wW w �ZWZ>I- UC7Q�no l`__ UJ V) U j z z z Q N a a —a�— 00 rn T` O� U I N � Q 00 N ^. Q 0 < r- Cl�Z — .o- Qn Z = Q Q Q LL af V U 0::i 0 Na_ r.0 I Q 1 Q N W 000 Z M N C 0) C W a�f N Y U W Q J � N H w —� N Ur, O wS O U- q :D Q o�c w OZ v' U � o ZO Q U Z U� W < 0 Z Q to a U c U.J + CERTIFIED BY: nnto - b- OIL — paeren�o�o�s *0 1 u C; p ♦ ♦ -0` 10404538 70 STATE OF w O S�� <_1 ♦ ♦♦ ,��Baoeerne��J,, Drawn By: M. WAGNER Checked By. K. COLLINS Quality Assurance: T.SCHELLENBERGER Scale: 0 Scale: 1' = NA' Sheet C402 Date 10 -06-08 Project Number 0990488 -10101