Loading...
HomeMy WebLinkAbout06120009.151 32' -6' LOADING: LIVE LOAD 125 LB SQ FT DEAD LOAD 15 LB SQ FT C 65' -0' �� rr —6' %' T&G 24/16 APA RATED STURDI FLOOR SYSTEM — FOR ATTACHMENT SCREW do GLUE SHEATHING TO JOISTS — SEE 02/S404 A a �W U a W r,1 u T OUTSIDE FACE OF MA U D m T --- LOCATION OF VERTICAL POST LOCATIONS FOR FULL HEIGHT +(9'- 1146 ") WIRE MESH PARTITIONS — VERIFY 32' —W LOCATIONS w/ ARCH & OF BLOCK WALL SUPPLIER MEZZANINE FRAMING PLAN SCALE. 16' = 1' -0' T O' 1' 2' 4' 8' 16' PLAN NOTES 1. ELEVATIONS (t), ARE FROM NOMINAL FIRST FLOOR ELEV +(0' -0'), SEE CIVIL DRAWINGS. 2. SEE S401 FOR GENERAL NOTES AND SCHEDULES. 3. SEE ARCH DWGS FOR ALL DIMENSIONS NOT SHOWN. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION AND NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES IMMEDIATELY. 4. COORDINATE DECK OPENINGS - EXACT SIZE AND LOCATION WITH MECH CONTRACTOR AND EQUIPMENT SUPPLIER. 5. ----- = FLOOR DECKING. 6. JOISTS MUST BE BRACED LATERALLY AT ENDS BY MEANS OF BLOCKING. 7. ALL MASONRY OPENINGS, NEW AND EXISTING, NOT NOTED OR SPECIFICALLY DETAILED IN SECTION ARE TO BE LINTEI.ED AS PEP MASONRY SCHEDULES SHOWN ON SHEET S401, UNO. 8. _-______= INDICATES BEARING WALL. i F- llip, CONSULTANTS fill, o �AE ua O d �fE o m 0 I N dam' w Q: Z — a z zcn Q Z X 4) uI¢? °FO= Q 4. a �Va3�ir N V zCav=ia w N cn 1� x -j000z N ^ p 05zzzao n_ Q QUJJC� JIY I� ZQ 04 W 00 *0000 000 Z n M i N N C C w U N .0 U L Q Z C� Z Q W 0 U- q � W cy Q LL- V w U z Z �U' Z C) M� a Q � U N W � W V .��A w No. 860325 STATE OF ���i �MD 1 AMR•' • � ��� c o� e� RCL, KLS ard.a � MPP em*&� CRM AS NOTED S 201 °i 10/06/06 R*dm" ME126125 III ��! till icl M�I�IIII�I ��l1 OUTSIDE FACE OF MA U D m T --- LOCATION OF VERTICAL POST LOCATIONS FOR FULL HEIGHT +(9'- 1146 ") WIRE MESH PARTITIONS — VERIFY 32' —W LOCATIONS w/ ARCH & OF BLOCK WALL SUPPLIER MEZZANINE FRAMING PLAN SCALE. 16' = 1' -0' T O' 1' 2' 4' 8' 16' PLAN NOTES 1. ELEVATIONS (t), ARE FROM NOMINAL FIRST FLOOR ELEV +(0' -0'), SEE CIVIL DRAWINGS. 2. SEE S401 FOR GENERAL NOTES AND SCHEDULES. 3. SEE ARCH DWGS FOR ALL DIMENSIONS NOT SHOWN. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION AND NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES IMMEDIATELY. 4. COORDINATE DECK OPENINGS - EXACT SIZE AND LOCATION WITH MECH CONTRACTOR AND EQUIPMENT SUPPLIER. 5. ----- = FLOOR DECKING. 6. JOISTS MUST BE BRACED LATERALLY AT ENDS BY MEANS OF BLOCKING. 7. ALL MASONRY OPENINGS, NEW AND EXISTING, NOT NOTED OR SPECIFICALLY DETAILED IN SECTION ARE TO BE LINTEI.ED AS PEP MASONRY SCHEDULES SHOWN ON SHEET S401, UNO. 8. _-______= INDICATES BEARING WALL. i F- llip, CONSULTANTS fill, o �AE ua O d �fE o m 0 I N dam' w Q: Z — a z zcn Q Z X 4) uI¢? °FO= Q 4. a �Va3�ir N V zCav=ia w N cn 1� x -j000z N ^ p 05zzzao n_ Q QUJJC� JIY I� ZQ 04 W 00 *0000 000 Z n M i N N C C w U N .0 U L Q Z C� Z Q W 0 U- q � W cy Q LL- V w U z Z �U' Z C) M� a Q � U N W � W V .��A w No. 860325 STATE OF ���i �MD 1 AMR•' • � ��� c o� e� RCL, KLS ard.a � MPP em*&� CRM AS NOTED S 201 °i 10/06/06 R*dm" ME126125