Loading...
HomeMy WebLinkAboutA10M IS &I AN " ° le Two - Hundred (200) Thus Q CONNECTOR =SETA I L Q SCALE: 3' = 1' -0' HEAVY DUTY RED OAK VENEER 2' -4' Solid Red Oak Connectors Wo vinyl Glides Per Connector 21 -41 t's' Eased Edge on All Corners �—� vinyl Glides a each corner varies 41° plan 4' Two - Hundred Thirty -Five (255) Thus (11) MODULAR RISERS TDSCALE: 1' = 1' -0' HeaA Dutyy Red Oak veneer over 14' Pic,Jwood w/ Corner Blocking 31/2' Paper -Faced Batt tnsulatlon V2' Plywood Bottom a 5APT I STR`i' =SETA I L SCALE: 11/2' One -Piece Pre- Manufactured Fiberglass Tub w/ Multiple Piece Reinforced Cover by Mfgr. - See 7:A10 for Tub Configuration Sealant Bead 2x4 Treated Wood Stud Half -Wall a 16'0c w/ I /2' Plywood Sheathing Both Sides (typ) and No' Type 'X' Gyp. Bd. Front Face (Wrap Over Top of Wall) Stop Gyp Bd (Wrap w/ L -Bead) and Plywood at Top of Base 3/4'x4' Red Oak Base New 3/4' Plywood Door w/ Carpet Wrap to Match Risers (Provide Continuous Piano Hinge and Lockable Hasps) - Provide New 2' -6' x 11/24, Wood Hanger Rods w/ 4'0 Meta 1 End Flanges (verify Length to Correspond to Existing Stud Spacing Notch Existing 2x's To Receive (2) 1I /2'0 Wood Rods (Offset / Notches as Shown) J Provide 'False Bottom' I /2' Plywood Deck Above Existing Ductwork vertical Framing Members To Run Down To Sole Plate - NOTE: 4 of Sole Plate Must Be Located on 4 Existing Rafters Below Remove (and Replace) Existing Plywood Deck - Fill Plenum w/ 5i/2' Paper -Faced Batt Insulation / SOLE PLATE I7EtA I L d NO SCALE — Premanufactured Metal Hanger Rod Shelf Brackets a Same Spacing As Exist. Studs 'Extend Top Plate as Req'd For New Doors to Clear Rod Flanges 51/2' Paper -Faced Batt Insulation Under All Treads and Risers RISER FRAMING: Use 2x6 Hrz and 2x4 Vrt Framing Members w/ All vertical Members Extending Down To Sole Plates (See 8:A5 For Sole Plate Detail) 71 3/4' Plywood Deck n__1 (Glued and Screwed) Remove Existing Plywood Decking And Fill Plenum w/ 5i/2' Paper -Faced Batt Insulation - P AMPHITHEATER SECTION SCALE: I/4 3/4'x5' Red Oak Wood Plank Flooring (To Receive Tung Oil Finish) - Install Over Wax Paper Slip Sheet to Prevent Squeaks (See Plan Below for Plank Direction) Platform to Be 3/4' T4G Plywood Glued 4 Screwed to 2x6 Floor Framing (See Framing Plan Below) Install 51/2' Paper -faced Batt Insulation in Plenum and Adhere (1) Layer %' type 'X' Gyp. Bd. To Bottom of Rafters for 1 Hour Rating 2x4 Wood Framed Crlp Walls a 3' -0' o c. (See Plan Below) Storage Area For Modular Wood Risers (See 7:A10) Q PLATFORM SECTION SCALE: 1r2 = m NOTE: eq '1 a 4 2x4 Crip Walls (Studs a 16'o.c.) Angled wall In middle of fiberglass baptistry s 3' -0' oz. (See Dims.) F ' -0' tub will be built as a trip wall until tub is in 2x6 Floor Joists a 16'0.c. place (consistent w/ detail above. Upon place- w/ Gross Bracing at Grtp Walls - ment of tub, wall shall continue up in same plane See Section Above to finished height. r F 2x6 Rim Joist P TU5 GOT I CGURATI ON d'0 ENLAR6ErP PLAN / PLATFORM FRAMING *D SCALE: 1/8' I' -0' SCALE: 1/8' 1' -0' SCALE: 1/8' .a C A L L A H A N A S S 0 C I A T- E S A R C H I T E C T U R E /PLAN N I N G KEVIN CALLAHAN, A.I.A. Circle Tower Suite 1400 55 Monument Circle Indianapolis, Indiana 46204 317- 637 -1570 A Professional Corporation VEE I `itilr��'i Pp1S TFR 411 :. 4297 =, c ' STATE OF .f V r:• %Hn I A N P_.� : . +r lam. 0 N -V VV„ — 94 00 t� rn N a W �O V) H (4440) z 0 Q W N � W 0 � H V W ►-a P4 ►--I W W Er �o E� W N N ti (**a) ISSUE DATE: AUGUST 26, 1993 REVISION • DATE PROJECT 93- 0016 -00 -r - SHEET NO. I AM .. . Qc 1993 UNDER PENALTY OF LAW ZETA I LS .t