HomeMy WebLinkAboutA21C
/ RAKE I:)ETAI L (YSEST PORMERS)
Q
5GALE: III" = 1' -O"
Ridge Vent w/ Roof
Deck Gut as per Mfgr's
Recommendations
,I .FS. Over
In Exterior Gyps m
neathing Direct Admwed
2 Gable Truss (Typical Both
Ides of Canopy)
E.I.FS. Soffit w/ Formed Drip Edge
Ridge Vent w/ Roof
Deck Gut as per Mfgr's
Recommendations
SEE I:A21 FOR TYPICAL
NOTES AND MATERIALS
Truss w/ 2x8
okers a 24" oc
8' -1%" off (TME)
Truss Bearing
R -30 Batt Insul
W 2x Blocking
Between Trusse
Insulation Baff14
2 Layers %" &i
Ceiling (I Hr Ra
4" Vinyl Cove E
(Or Red Oak -
Room Finish Scl
Carpet or VCT
RF5 - See Stn
For Slab Gonst
0' -0" (8"13.43 TME)
Finish Floor
Concrete 51ar
Compacted FI
2" Rlgld Insulot
" ^"� GONSTRtJGTION:
Year, 3-Tab, Self- 5ealing
*halt Shingle (Color TME)
-ayer 30# Roofing Felt
Plywood Sheathing w/ Clips
NOTES THI5 DRAWIN&
ARE TYPICAL BOTH
WALL 5ECTION5 UNLESS
NOTED OTHERWISE
,ianufactured Press -Plate
I Trusses (Slope THE - See A7)
w (Profile To Match
Ing)- Primed and Painted
for By Architect
Inuous Treated 2x w/ Ix
r Redwood or Cedar
10 Bd. - PRIMED
DES PRIOR TO
kLLATION (Profile
patch Existing (TME))
In= Soffit Vent THE
ler Course THE -
Elevations AI6
GAL WALL GONSTRUGTION:
6� Bd
6 Metal 5tuds a 16" ox-
SW R -21 Batt Insulation
Exterior 6rade Plywood Sheathing
Infiltration Barrier
Ivanized Wall Ties ® 16" o.c.
- Iz./Vert.
Space
du ar Brick Veneer
Aor To Match Existing)
ugh -Wall Flashing
I"a24'oc.
&rout Behind
-iing
Downspouts Into Perimeter
cage Tile w/ 6" PVC
Connectors
fide Minimum of 12"
brave l Fill to
n 12" of Finish
is - Typical all
s
tax' Filter Cloth
pproof ing w/ Gant
erforated Foundation
n Tile
___ Structural for
Footing/Foundotion
P RAKE I;�ETA I L ( CANOPY ) iNALL SECTION (RAKE) VNALL SECTION (EAN/F.)
Q.D 50 ALE: IIt" = I' -0" 5GALE: 3/4" = 1' -O" 5GALE: 3/4" = I' -O"
C
A
L L
A H
A
N
A
S
S O C
I A T-
E
S
A R
C H
I T E C T U R
E I P L A N
N I
N G
KEVIN CALLAHAN, A.I.A.
Circle Tower Suite 1400
55 Monument Circle
Indianapolis, Indiana 46204
317 -637 -1570
A Professional Corporation
�r No. �a:s
4291
STATE OF 1
W
U
I'
r �
N
'o
Il-
00
t�
�ry
N
O
110
V�
r
ti
h
C�
ti
Q
N
I�
V
E-.
W
E-.
E-.
�o
E�
w
v-
N
ISSUE DATE:
AUGUST 26, 1993
REVISION • DATE
tx
W
H
V)
0
W
to
H
W
a
W
H
mot;
PROJECT 93- 0016 -00
SHEET N0.
0" AXON"ZTURAL
Qc 1993 UNDER PENALTY OF LAW
V�IALL S�GTIONS and 1'��TAILS