HomeMy WebLinkAboutA22Ilt" Gap to Have fib" Eased
Edges On 4 Corners
And Top Edge
Stopp In All Horizontal
Rolls and All Red Oak
Blocking w/ Two Pieces
of Red Oak (Both Places
To Be Notchad Around
Rolls/Blocking) —�
1.4
R15ER EXTEN51ON
(See Plan 5:A5)
lit" s Handrail To
Hove 44" Eased Edge
(Top Roll Only)
O
i
N
m
25
1.5 SECTION
I" sq. Rolls (ty
5GALE: III " = 1' -O"
1.5 POST GAP
5C ALE: 5" =I '-0
"
and Secure
Ilavarad Corner_
:;Prizontals
»cA IG. co, rI
%" (actual) Red Oak
(2) 2x6s Secured Into Existing
Floor Joists o b'-O" ox.. (See
2:Alb) and Blocked as Raq'd
It" (actual) Red Oak
Blocking Between Horizontal
Balls (See Elevation Below)
It" Blocking - Align
W Face of Exist. Drywall)
Red Oak Gap Above
See 15 at Left
1.4 POST PLAN
SCALE: 3 "= I' -O"
2 SIDE ELEV.
50 ALE: It " =1' -O"
/ &UARI7RA I L i7r=TA I LS
SEE DRAWIN65
on Balcony and
cgs - See 2:AI5
X
E
o
_ dt
oL
0-o
i �ly
oV
It FL
F
3ae1.3)
000
Q_tL
M o ='
I�
Out and Patch Existing Drywall
As Required For New Varticols
1.1 FRONT ELEV.
5GALE: I It "= I' - O"
C
A
L L
A H
A
N
A
S
S 0 C
I A T-
E
S
A R
C H
I T E C T U R
E I P L A N
N I
N G
KEVIN CALLAHAN, A.I.A.
Circle Tower Suite 1400
55 Monument Circle
Indianapolis, Indiana 46204
317 -637 -1570
A Professional Corporation
•a� VEF C,41
* ( 4297
STATE OF ;V
W
V
i
v
ti
h
V
O
M
N
b
00
t�
�v
O
e
v.
Q
N
W
V
E-.
W
cY,
E-,
�o
W
ry
d-
N
ti
ISSUE DATE:
AUGUST 26, 1993
REVISION • DATE
P4
W
H
Z
§
T
W
0
0
H
W
C
W
E�
r'
G4
C7
PROJECT 93- 0016 -00
SHEET N0.
C C
or AOZMTWTLWAL
Qc 1N3 UNDER PEN&TY OF 1AW
�NLARG�L7 �''LANS / I��TAILS