Loading...
HomeMy WebLinkAboutA22Ilt" Gap to Have fib" Eased Edges On 4 Corners And Top Edge Stopp In All Horizontal Rolls and All Red Oak Blocking w/ Two Pieces of Red Oak (Both Places To Be Notchad Around Rolls/Blocking) —� 1.4 R15ER EXTEN51ON (See Plan 5:A5) lit" s Handrail To Hove 44" Eased Edge (Top Roll Only) O i N m 25 1.5 SECTION I" sq. Rolls (ty 5GALE: III " = 1' -O" 1.5 POST GAP 5C ALE: 5" =I '-0 " and Secure Ilavarad Corner_ :;Prizontals »cA IG. co, rI %" (actual) Red Oak (2) 2x6s Secured Into Existing Floor Joists o b'-O" ox.. (See 2:Alb) and Blocked as Raq'd It" (actual) Red Oak Blocking Between Horizontal Balls (See Elevation Below) It" Blocking - Align W Face of Exist. Drywall) Red Oak Gap Above See 15 at Left 1.4 POST PLAN SCALE: 3 "= I' -O" 2 SIDE ELEV. 50 ALE: It " =1' -O" / &UARI7RA I L i7r=TA I LS SEE DRAWIN65 on Balcony and cgs - See 2:AI5 X E o _ dt oL 0-o i �ly oV It FL F 3ae1.3) 000 Q_tL M o =' I� Out and Patch Existing Drywall As Required For New Varticols 1.1 FRONT ELEV. 5GALE: I It "= I' - O" C A L L A H A N A S S 0 C I A T- E S A R C H I T E C T U R E I P L A N N I N G KEVIN CALLAHAN, A.I.A. Circle Tower Suite 1400 55 Monument Circle Indianapolis, Indiana 46204 317 -637 -1570 A Professional Corporation •a� VEF C,41 * ( 4297 STATE OF ;V W V i v ti h V O M N b 00 t� �v O e v. Q N W V E-. W cY, E-, �o W ry d- N ti ISSUE DATE: AUGUST 26, 1993 REVISION • DATE P4 W H Z § T W 0 0 H W C W E� r' G4 C7 PROJECT 93- 0016 -00 SHEET N0. C C or AOZMTWTLWAL Qc 1N3 UNDER PEN&TY OF 1AW �NLARG�L7 �''LANS / I��TAILS