HomeMy WebLinkAboutX1ALTERNATE 1 E
ALTERNATE 14:
Liturgical Furnishings
and Sanctuary Platforms
ALTERNATE 18:
Delete Red Oak from
Any Applicable Alts.:
a. Sanctuary Platforms
b. Choir Rm. Floor (See Alt. 6)
c. Modular Wood _Risers
+d&
ALTERNATE 14 / 15
ALTERNATE II
ALTERNATE 10:
New Asphalt Shingle
Roof Over Existing;
Repaint Existing Alum.
Fascia, Gutters, Down-
spouts and Soffits
ALTERNATE 10
;- ALTERNATE 9:
. Existing Facade Renovation:
EIFS over Existing Fieldstone
ALTERNATE al
■
- .........
-` ALTERNATE 6:
Folding Door Behind
Sanctuary; Sanctuary Wall;
Choir Room Floor; Choir
`Y Room Modular Rlsers;
Stairs to Choir Room
ALTERNATE &
ALTERNATE E
ALTERNATE 4
ALTERNATE 3:
- Second Level Amphitheater
and Stairs; Welcome Center;
Restrooms; Lounge /Storage
Areas
ALTERNATE 5
ALTERNATE
SASE 51 O
BASE BID:
Multi -Use Room Renovation
and Addition / Classroom
Addition / All Siteraork
/ ALTERNATE / SOHEI;)UL I NCG PLAN
SCALE: 1"=40.0'
C A L L A N A N
A S S O C I A T- E S
A R C H I T E C T U R E / P L A N N I N G
KEVIN CALLAHAN, A.I.A.
Circle Tower Suite 1400
55 Monument Circle
Indianapolis, Indiana 46204
317- 637 -1570
A Professional Corporation
'
No.
4297
(,A STATE OF [V
let �v
LIU
b
t
W
b V)
t--t
Z
q z
w
V)
w
0
V W
W W
Er �
�o
w
N
ISSUE DATE:
AUGUST 26, 1993
REVISION • DATE
PROJECT 93- 0016 -00
SHEET NO.
or
Qc
1"3 UM NA PM&7y OF LAW
CONCEPTUAL ALTERNATE PLA1s