Loading...
HomeMy WebLinkAbout0495.93.3a i 0 J I i I j f i I f ! l 1 t I I rn O. n v I c EXTEND TO FERTIG LEGAL DRAIN \ C \ 1, — 1 S I �FFT ENLARGEMENT AREA DON'T DIG BLIND 1- 800 - 382 -5544 CALL TOLL FREE 60' BLDG. SETBACK N O O OLD MERIDIAN STREET R/W - CONSTRUCTION LIMITS RA R/W NOTES. 1 . } ALL DISTURBED AREAS TO BE SEEDED AFTER FINISH GRADING, UNLESS OTHERWISE NOTED SEEDING SHALL BE REQUIRED BETWEEN THE PROPOSED SIDEWALK AND LANE WIDENING 2 ) PROVIDE POSITIVE DRAINAGE IN ALL AREAS, PAVING CONTRACTOR SHALL TEST FOR ANY BIRD BATH CONDITIONS AFTER INSTALLATION AND CORRECT 3.) PROVIDE SMOOTH TRANSITION FROM NEW AREAS TO EXISTING FEATURES AS NECESSARY 4) ALL AREAS WHERE PROPOSED ASPHALT PAVEMENT MEETS THE EXISTING PAVEMENT THE EXISTING PAVEMENT EDGE SHALL BE PROPERLY SEALED WITH A TACK COAT MATERIAL. 5.) THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHILE EXCAVATING AROUND EXISTING TREES SO NOT TO DISTURB AND TO MINIMIZE OR ELIMINATE DAMAGE TO ROOT SYSTEM. 6.) THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS AND /OR UTILITY COMPANIES SO NOT TO CAUSE DAMAGE. 7.) ALL NEW SEEDED AND /OR PLANTING AREAS SHALL HAVE A MINIMUM OF 4" OF TOP SOIL. SOIL SHALL COMPLY AND MEET INDIANA STATE HIGHWAY STANDARDS AND SPECIFICATIONS, LATEST EDITION. THE EXCAVATING CONTRACTOR OR LANDSCAPING CONTRACTOR SHALL INSTALL THE FINISH GRADE AT 1/2" BELOW PAVEMENTS WHEN SHEET DRAINAGE IS PROPOSED ACROSS THAT SEEDED AREA. 8) ALL AREAS WHERE THE EXISTING PAVEMENT OR PAVEMENTS ARE DAMAGED DURING CONSTRUCTION FROM TRAFFIC BY THE GENERAL CONTRACTOR, SUBCONTRACTORS, OR SUPPLIERS THESE AREAS SHALL BE RESURFACED OR RECONSTRUCTED AT LEAST TO THEIR ORIGINAL CONDITION AFTER THE CONSTRUCTION WORK IS COMPLETED 857 M - - -- LEGEND O F•- EXISTING PROPOSED 3 w Z O In 0 u STORM INLET ■ N w 00 O CC N p U-) N M N ( N 0 STORM MANHOLE j� Q k -- 7 -- - � • w CONTOUR LINE O r- j J N13vz � O 11 O SPOT ELEVATION 70. OR 749. ZpwCw� Cori Q 00 a J Q 0 Li I Q Z I O uix O M PROPOSED PAVEMENT Z ct z � 0 U) i z O Q O i t Q' O 0 w ° U) in 0 U O >� 0 0 0 a' J z O cp 0 0 i a. II li lo D 0 I Q \ " N CJ c A HOLEY MOM" o .- N M — 1 S I �FFT ENLARGEMENT AREA DON'T DIG BLIND 1- 800 - 382 -5544 CALL TOLL FREE 60' BLDG. SETBACK N O O OLD MERIDIAN STREET R/W - CONSTRUCTION LIMITS RA R/W NOTES. 1 . } ALL DISTURBED AREAS TO BE SEEDED AFTER FINISH GRADING, UNLESS OTHERWISE NOTED SEEDING SHALL BE REQUIRED BETWEEN THE PROPOSED SIDEWALK AND LANE WIDENING 2 ) PROVIDE POSITIVE DRAINAGE IN ALL AREAS, PAVING CONTRACTOR SHALL TEST FOR ANY BIRD BATH CONDITIONS AFTER INSTALLATION AND CORRECT 3.) PROVIDE SMOOTH TRANSITION FROM NEW AREAS TO EXISTING FEATURES AS NECESSARY 4) ALL AREAS WHERE PROPOSED ASPHALT PAVEMENT MEETS THE EXISTING PAVEMENT THE EXISTING PAVEMENT EDGE SHALL BE PROPERLY SEALED WITH A TACK COAT MATERIAL. 5.) THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHILE EXCAVATING AROUND EXISTING TREES SO NOT TO DISTURB AND TO MINIMIZE OR ELIMINATE DAMAGE TO ROOT SYSTEM. 6.) THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS AND /OR UTILITY COMPANIES SO NOT TO CAUSE DAMAGE. 7.) ALL NEW SEEDED AND /OR PLANTING AREAS SHALL HAVE A MINIMUM OF 4" OF TOP SOIL. SOIL SHALL COMPLY AND MEET INDIANA STATE HIGHWAY STANDARDS AND SPECIFICATIONS, LATEST EDITION. THE EXCAVATING CONTRACTOR OR LANDSCAPING CONTRACTOR SHALL INSTALL THE FINISH GRADE AT 1/2" BELOW PAVEMENTS WHEN SHEET DRAINAGE IS PROPOSED ACROSS THAT SEEDED AREA. 8) ALL AREAS WHERE THE EXISTING PAVEMENT OR PAVEMENTS ARE DAMAGED DURING CONSTRUCTION FROM TRAFFIC BY THE GENERAL CONTRACTOR, SUBCONTRACTORS, OR SUPPLIERS THESE AREAS SHALL BE RESURFACED OR RECONSTRUCTED AT LEAST TO THEIR ORIGINAL CONDITION AFTER THE CONSTRUCTION WORK IS COMPLETED 857 M - - -- - -858 ii i C m ra N M I i2 O F•- 3 w Z O In 0 0 _0 c WZ �Q w 00 O CC N p U-) N M N ( N Q� N t\ j� Q k 00 I • w W O r- j J N13vz � O 11 O U Z ZpwCw� Q 00 a J Q 0 Q Z J uix O M Ui Z ct z � 0 3 z O o LL- O U t Q' O 0 w ° U) in 0 U O w � a' LA rn i I Q \ N ►7 A o .- N M Z N M I O F•- C Z O In 0 0 _0 c WZ �Q 00 O CC N p U-) N M N ( N Q� N t\ j� Q k 00 I • W O r- J � O 11 O U Z O F- 00 a J Q 0 Q Z J O °� Ui Z O O 0 z O OY O U w Q' V U LL U) in 0 U O O y W A A N co) F•- C V) In 0 0 _0 c WZ �Q 00 Q> CC N p U-) N O � `- d • � ( N Q� N t\ j� Q k Z . • W O �� J � _ Lill DATE: FEBRUARY 1993 O z 1— bi C3 Lli cn_ co) F•- Z V) WZ �Q Z p CC w C' C ? a. k Z . 7—) W O �� J � _ O U Z O F- 00 a J Q 0 W Z J O °� Q Z U O 0 z O ~ V� LL ~ U V LL �U O DATE: FEBRUARY 1993 O z 1— bi C3 Lli cn_