Loading...
HomeMy WebLinkAbout0495.93.17rr 00 cl- �i I m R Q I Q, A 0 0 6 r STABILIZATION PRACTICE: JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT, OCT. NOV. DEC. PERMANENT A • //// l / %// • •/ I / ► SEEDING DORMANT B B SEEDING - - TEMPORARY C D ' SEEDING E • / / / 1 / / / • 1 - F•• • ///// I /////• SOD - - G MULCHING - - - - A = TITAN TURF TYPE TALL FESCUE 809, SR 4000 PERENNIAL RYE-GRASS 109, KENTUCKY BLUEGRASS 98185 109 PLUS 2 TONS OF STRAW MULCH/ ACRE APPLY MIXTURE AT A RATE OF 2 LBS. PER 1000 SQ.FT. B = KENTUCKY BLUEGRASS 309, CREEPING RED FESCUE 709, PLUS 2 TONS OF STRAW MULCH/ ACRE APPLY MIXTURE AT A RATE OF 2 LBS. PER 1000 SQ.FT. C = SPRING OATS 3 BUSHEL PER ACRE D = WHEAT OR RYE 2 BUSHEL PER ACRE E = ANNUAL RYE-GRASS (I LB. PER 1000 SQ. FT ) F = SOD G = STRAW MULCH (90 LBS. PER 1000 SQ.FT) • / I / • IRRIGATION NEEDED DURING JUNE, JULY, AND / OR SEPTEMBER. • • IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD SEEDING SCHEDULE NTS EROSION CONTROL REQUIREMENTS FOR COMPLIANCE WITH IDEM'S GENERAL PERMIT FOR CONSTRUCTION 1. THE EROSION CONTROL MEASURES INCLUDED IN THIS PLAN SHALL BE INSTALLED PRIOR TO INITIAL LAND DISTURBANCE ACTIVITIES OR AS SOON AS PRACTICAL. SEDIMENT SHALL BE PREVENTED FROM DISCHARGING FROM THE PROJECT SITE BY INSTALLING AND MAINTAINING SILT FENCE, STRAW BALES, SEDIMENT BASINS, ETC. AS SHOWN ON THIS PLAN. IF SHOWN ON THIS PLAN, ENERGY - DISSIPATION DEVICES OR EROSION CONTROL AT THE OUTFALL OF THE STORM SEWER SYSTEM SHALL BE INSTALLED AT THE TIME OF THE CONSTRUCTION OF THE OUTFALL. THE PROPOSED DETENTION BASIN SHALL BE UTILIZED AS A SEDIMENT BASIN DURING CONSTRUCTION FOR AS LONG AS PRACTICAL. 2. THE CONTRACTOR SHALL CONTROL WASTES, GARBAGE, DEBRIS, WASTEWATER, AND OTHER SUBSTANCES ON THE SITE IN SUCH A WAY THAT THEY SHALL NOT BE TRANSPORTED FROM THE SITE BY THE ACTION OF WINDS, STORM WATER RUNOFF, OR OTHER FORCES_ PROPER DISPOSAL OR MANAGEMENT OF ALL WASTES AND UNUSED BUILDING MATERIALS, APPROPRIATE TO THE NATURE OF THE WASTE OR MATERIAL, IS REQUIRED. 3. PUBLIC OR PRIVATE ROADWAYS SHALL BE KEPT CLEARED OF ACCUMULATED SEDIMENT. BULK CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE POINT OF LIKELY ORIGIN OR OTHER SUITABLE LOCATION. 4. ALL ON -SITE STORM DRAIN INLETS SHALL BE PROTECTED AGAINST SEDIMENTATION WITH STRAW BALES, FILTER FABRIC, OR EQUIVALENT BARRIERS AS SHOWN ON THIS PLAN. 5. EXCEPT AS PREVENTED BY INCLEMENT WEATHER CONDITIONS, ALL DISTURBED AREAS LEFT INACTIVE FOR SEVEN OR MORE DAYS SHALL BE STABILIZED BY SEEDING, SODDING, MULCHING, COVERING, OR BY OTHER EQUIVALENT EROSION CONTROL MEASURES. 6. THIS EROSION CONTROL PLAN SHALL BE IMPLEMENTED ON ALL DISTURBED AREAS WITHIN THE CONSTRUCTION SITE. ALL MEASURES INVOLVING EROSION CONTROL PRACTICES SHALL BE INSTALLED UNDER THE GUIDANCE OF QUALIFIED PERSONNEL EXPERIENCED IN EROSION CONTROL, AND FOLLOWING THE PLANS AND SPECIFICATIONS INCLUDED HEREIN. 7. DURING THE PERIOD OF CONSTRUCTION ACTIVITY, ALL SEDIMENT BASINS AND OTHER EROSION CONTROL MEASURES SHALL BE MAINTAINED BY THE CONTRACTOR. AT THE COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL COORDINATE THE TRANSFER OF MAINTENANCE RESPONSIBILITI TIES, REQUIRED, WITH THE OWNER. MAINTENANCE SHALL BE IN ACCORDANCE WITH CHAPTER 7 OF THE SOIL CONSERVATION SERVICE MANUAL "WATER MANAGEMENT AND SEDIMENT CONTROL FOR URBANIZING AREAS ". 8. ALL EROSION CONTROL PRACTICES SHALL BE IN ACCORDANCE WITH THE INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS FROM THE DIVISION OF SOIL CONSERVATION, INDIANA DEPARTMENT OF NATURAL RESOURCES. STEEL POST -� 5' TYP. A B C I FILL SLOPE- E ?-- FILTER FABRIC 10" 12" .13 1.9' 1.0' 42" 15" 12" 15" .19 2.3' 1.0' 42" 18" 15" I N I 25 1.2' 42" - TTI I- 10" MAX. 18" D_ .40 2.8' 1.4' r I 21 " / FILTER FABRIC .53 ANCHOR FILTER PER 42" 27" MANUFACTURER 27" .68 - RECOMMENDATION 42" 30' 27" i .85 3.5' 1.9' - GROUND LINE 30" 33" 1.04 3.8' 2.0' 42" - t r ',. :- c.asl.it+� -L - - -- -I i ll l`- -iTi'- rl I �Lfi-- -;-- - - - - -- Ili III li I i i I I' lil- I ----- - - - - -- �1. , II , I III III -II I ! I 36" 1.241 Li Li TEMPORARY SILT FENCE 21' 42" 42" NTS 24" WIRE SCREEN co I I o <u C- �� n� INDICT 903.02 -N0 8 � FABRICATED BEND v 1 r 1 1 1 1 1 � b -� a D � I CONCRETE BASE - ANTI - VORTEX PLATE F = DIA. TRASH COLLECTOR PERFORATED STAND PIPE DIA. =DIA. OF OUTFLOW PIPE HEADWALL TO BE INSTALLED AFTER ALL DISTURBED AREAS ARE STABILIZED. TEMPORARY STANPIPE TO BE REMOVED BEFORE CONSTUCTION OF HEADWALL. 1 I m ; 2' <r -- - - - - -- "_ STAND PIPE DISCHARGE TO BE ONE SIZE SMALLER THAN OUTFLOW PIPE #4'S REBAR ANCHOR TEMPORARY STANDPIPE DETAIL NTS CONSTRUCTION OF A STRAW BALE BARRIER 2) PLACE AND STAKE 1) EXCAVATE THE STRAW BALES TRENCH FLOW 3) WEDGE LOOSE STRAW BETWEEN BALES p -BALE WIDTH I- 4A� q DITCH 4) BACKFILL AND COMPACT THE EXCAVATED SOIL PLAN VIEW r 1.� NOTE: 3 ROWS OF STRAW BALES AT EACH LOCATION DETENTION OUTFLOW PIPE DIMENSIONS PIPE CONC. BASE DIA. A B C CY D E F 12" 10" 12" .13 1.9' 1.0' 42" 15" 12" 15" .19 2.3' 1.0' 42" 18" 15" 18" .29 25 1.2' 42" 21 " 18" 21 " .40 2.8' 1.4' 42" 24" 21 " 24" .53 3.0' 1.6' 42" 27" 24" 27" .68 13' 1.7' 42" 30' 27" 30" .85 3.5' 1.9' 42" 33" 30" 33" 1.04 3.8' 2.0' 42" 36" 33" 36" 1.241 4.0' 21' 42" 42" 21 " 24" 1.6 4.5' 2.1' 42" 48" 42" 48" 2.1 5.0' 2.3' 48" CROSS- SECTION OF A PROPERLY INSTALLED STRAW BALE COMPACTED SOIL TO PREVENT PIPING STAKED AND ENTRENCHED BINDING WIRE STRAW BALE OR TWINE / PROPER PLACEMENT OF STRAW BALE BARRIER IN DRAINAGE WAY STRAW BALE DETAIL NTS POINTS "A" SHOULD BE HIGHER THAN POINT "B" 2" TO 4' GRAVEL INLE1 2 "x4" GRAVI PLAN "x.4" OR 4 "x4" POST SILT FENCE ATTACHED TO ALL SIDES INTERIOR REINFORCED ON LARGE BOXES WIRE MESH OVER 75' BOXES 2" 0 WEEP HOLE SILT FENCE ATTACHED TO ALL SIDES -° INLET rn -1, 6" TO 8" DROP INLET Q TO 18" DEEPER BOXES -2%4" OR O Ld Q 3: _ o <.. z 6" STONE DEPTH, 0 Q 6 o (MIN) ; z II cn N O z � 00 � o V) Ix a- FLOW w I 1 GRADE ® 1% OR r-) o w AS SHOWN BELOW v 00 LO PLAN > W 50' 25' U W I 01% 0 2% i Z CE PROFILE 1. STONE SIZE SHALL CONFORM TO ASTM D48 Z ccv Ly SIZE #1 (1 1/2" TO 3 1/2" DIA.). w a 2. PERIODIC 2" STONE TOP DRESSING & WASHING W p z AS REQUESTED BY COUNTY /CITY. ~ U TEMPORARY N 0 CONSTRUCTION ENTRANCE DETAIL Q o m NTS 2" TO 4' GRAVEL INLE1 2 "x4" GRAVI PLAN "x.4" OR 4 "x4" POST SILT FENCE ATTACHED TO ALL SIDES INTERIOR REINFORCED ON LARGE BOXES WIRE MESH OVER TOP -DEEP BOXES 2" 0 WEEP HOLE SILT FENCE ATTACHED TO ALL SIDES -° INLET rn -1, 6" TO 8" DROP INLET 12" TO 18" DEEPER BOXES -2%4" OR 4"x4" POST ELEVATION SIDE VIEW VIEW SHOWING INLET ')TRUCTION SAME AS ABOVE) NOTE: NO HOLES NEEDED ON BOXES MADE OF BOARDS SPACED 2" APART. 2" HOLES APPROX. 6" VERTICAL -6" HORIZONTAL ON PLYWOOD BOXES. SILT FENCE FABRIC ATTACHED TO ALL SIDES OF BOX. (COARSE WEAVE) GA/pAm DIMENSIONS OF BOX WILL VARY ACCORDING TO THE SIZE OF INLET AND '0 DEPTH OF BASE. USE WIRE MESH OVER TOP OF DEEP BOXES, S DQeq��i? SILT BOXES TO BE LOCATED AT EACH CATCH BASIN. G1STF-0, i No. G; - f SILT BOX DETAIL StATE OF OR EQUIVALENT so : kt = tif NTS ...I A. NN 0 0 r 0 w A • Li I I i Q I u� rn Z aQ � Ld z C) Q n - 6 co o ; z >_" �- I Z z � 00 � 1 Ix 0 w z I 1 c/ r-) o w Q v 00 LO N > W > w U W I N i Z CE C)f 0 � Z ccv Ly M w a � W p z w ~ U N 0 O Q o m U W O O O :r_ r1l)IL_ Q' w A F- 0 w 0 W 0 w N (n (n (n (n 0 00 1 0 Ln o 0 i � 0 w � o z 0 0 r 0 w A • Li Q u� rn Z aQ � Ld J C) Q n - 6 co o ; z >_" �- I Z z � 00 Q 1 Ix 0 z I w c/ r-) o 00 Q J 00 LO N r- V W a- N w Z o w 0 W 20 Z ccv rn M a � W O Q I-- H Ld ~ U N U X LA- U I I :r_ r1l)IL_ Of w A F- - w J 0 00 1 0 Ln o 0 0 0 r 0 w A • Li Q Z aQ � Ld J C) Q n - Ln c 1 r o ; z >_" �- O Z 02 � 00 Q =° Ix 0 z 0 w c/ r-) o rn O J 00 LO N r- V W a- N w Z < 0 W 20 Z ccv rn r� � W O Q I-- H Ld N N U X Q :r_ r1l)IL_ A • Fj: O °a ----------- FILE NO. O Z w C5w a Z aQ Ld J 0 ' � n - c 1 r ; z >_" �- a H 0 02 � 0 WZ =° Ix 0 z 0 0 ~ 0, (� co = Z 0 V W I- o w Z �cr) 0 W 20 Z ccv U cr Z� 00 W W I-- H Ld > U FILE NO. O Z w C5w