Loading...
HomeMy WebLinkAboutS5EL. = 862' -4" 1'/2" 0 6' '/4" 1'/2" 0 6" I SECTION 5 1" = 1' -0" S2 I PROVIDE SLIP CRITICAL BOLTS FOR ALL TOP t BOTTOM CLIP ANGLE TO BEAM CONNECTIONS + f++ + + I + BEAM, SEE PLAN — . I DETAIL B 1' = 1' -0" S3 L3x3x' /4 "AT 10'- 0 "o.c. MAX. L4x4x5 /,x0' -8 "LG. T & B (TYP.) W10 COLUMN W10 COLUMN BEAM, SEE PLAN SECTION 4 1" = 1' -0" 12 Q 12 VARIES wy. I AARIES �I V 2' -0" SEE PLAN L"X "x4 "xY2 3/4 w CLR. ICI CONT. ; ";.. 70xrLow VAEDED STUDS N 3 I4T- 00o.c IfAX JACK a SEE PLM4 FOR F = 250 Ibs._ j BEAM SIZE a N EL. = 862' -4" 1'/2" 0 6' '/4" 1'/2" 0 6" I SECTION 5 1" = 1' -0" S2 I PROVIDE SLIP CRITICAL BOLTS FOR ALL TOP t BOTTOM CLIP ANGLE TO BEAM CONNECTIONS + f++ + + I + BEAM, SEE PLAN — . I DETAIL B 1' = 1' -0" S3 L3x3x' /4 "AT 10'- 0 "o.c. MAX. L4x4x5 /,x0' -8 "LG. T & B (TYP.) W10 COLUMN W10 COLUMN BEAM, SEE PLAN SECTION 4 1" = 1' -0" 12 Q + I + I DETAIL A 1" = 1' -0" S2 PROVIDE SUP CRITICAL BOLTS FOR ALL TOP do BOTTOM CLIP ANGLE TO BEAM CONNECTIONS L7 x 4x 3 /4x 0' -8" LG. T do B (TYP.) SEE PLAN 2' -0" 2' -0" 1'/2" METAL DECK EL. 862' -4" #4 x 4' -0" AT 12 "o.c. EL. = 862' -4" 5/16" WHERE ST, SEE PLAN REQUIRED ///BY PLAN- DESIGN JOISTS, WITH BOTTOM CHORD CONNECTIONS, FOR 1,000# AXIAL LOAD AT BOTTOM CHORD. 6x6– W4.0 xW4.0 WELDED WIRE FABRIC N � N JOIST, SEE PLAN —BEAM, SEE PLAN DO NOT MAKE THIS CONNECTION UNTIL THE CONCRETE SLAB HAS BEEN PLACED I Y� SECTION 3 1" = 1' -0" S2 2" x 6" BLOCKING AT 10' -0" MAX. SPACING--I TRUSS BOTTOM CHORD F = 250 Ibs._ + + BEAM, SEE PLAN I P_ '/2" (N.S. do F.S.) �L- 8 S5 SECTION 8 SECTION 9 3/4" _ ,' -0" S5 3/4" = 1' -0" S3 5" I EL. 862' -4"- -� BENT It OR ANGLE WHERE REQUIRED BY PLAN BEAM, SEE PLAN + + DESIGN JOISTS, WITH BOTTOM CHORD CONNECTIONS, FOR 1,000# AXIAL LOAD AT BOTTOM CH RD. '/16" 2 -12 -1'/2" METAL DECK - 6x6– W4.0 xW4.0 WELDED WIRE FABRIC N – JOIST, SEE PLAN 2" CL.R.— EL. 862' -4� 3 BAR CONT. '/4" BENT PLATE OR ANGLE CELL CLOSURE BY METAL DECK SUPPLIER (DECK TO t OF BEAM) - BEAM, SEE PLAN — (TYP-) DO NOT MAKE THIS CONNECTION UNTIL THE CONCRETE SLAB HAS /ie 2 -12 BEEN PLACED 3/,6 2 -12 3 /i6" 2 -12 1'/2" x '/4" VERTICAL Q L2' /2 x 2'/2 X '/4" CONT. SLOTS 0 2' -0" o.c. 1 SECTION 2 1" = 1' -0" S2 BENT It '/4 x 8'/2 x 31/2 x 0'-5'/2" LG. WITH 4" x '3/,6" VERTICAL SLOTS (TYP.) (TYP.) (TYP-) CONNECTION SHALL BE CAPABLE OF RESISTING THE FORCE (F) SHOWN. PROVIDE WASHERS AND DOUBLE NUTS AND TIGHTEN BOLTS ONLY TO A SNUG TIGHT CONDITION, TO ALLOW FOR DEFLECTION OF THE TRUSS. CONNECTIONS SHALL BE MADE 0 10' -0" o.c. MAX.. 1'/2" x '/4" VERTICAL SLOTS 0 2' -0" o.c.--/ TRUSS BOTTOM CHORD F = 250 Ibs. M BEAM, SEE PLAN I 8 SS SECTION 7 3/4" = 1' -0" S3 5' 12 VARIES �I 2' -0" I� II 3/4 w CLR. ICI �� + I + I DETAIL A 1" = 1' -0" S2 PROVIDE SUP CRITICAL BOLTS FOR ALL TOP do BOTTOM CLIP ANGLE TO BEAM CONNECTIONS L7 x 4x 3 /4x 0' -8" LG. T do B (TYP.) SEE PLAN 2' -0" 2' -0" 1'/2" METAL DECK EL. 862' -4" #4 x 4' -0" AT 12 "o.c. EL. = 862' -4" 5/16" WHERE ST, SEE PLAN REQUIRED ///BY PLAN- DESIGN JOISTS, WITH BOTTOM CHORD CONNECTIONS, FOR 1,000# AXIAL LOAD AT BOTTOM CHORD. 6x6– W4.0 xW4.0 WELDED WIRE FABRIC N � N JOIST, SEE PLAN —BEAM, SEE PLAN DO NOT MAKE THIS CONNECTION UNTIL THE CONCRETE SLAB HAS BEEN PLACED I Y� SECTION 3 1" = 1' -0" S2 2" x 6" BLOCKING AT 10' -0" MAX. SPACING--I TRUSS BOTTOM CHORD F = 250 Ibs._ + + BEAM, SEE PLAN I P_ '/2" (N.S. do F.S.) �L- 8 S5 SECTION 8 SECTION 9 3/4" _ ,' -0" S5 3/4" = 1' -0" S3 5" I EL. 862' -4"- -� BENT It OR ANGLE WHERE REQUIRED BY PLAN BEAM, SEE PLAN + + DESIGN JOISTS, WITH BOTTOM CHORD CONNECTIONS, FOR 1,000# AXIAL LOAD AT BOTTOM CH RD. '/16" 2 -12 -1'/2" METAL DECK - 6x6– W4.0 xW4.0 WELDED WIRE FABRIC N – JOIST, SEE PLAN 2" CL.R.— EL. 862' -4� 3 BAR CONT. '/4" BENT PLATE OR ANGLE CELL CLOSURE BY METAL DECK SUPPLIER (DECK TO t OF BEAM) - BEAM, SEE PLAN — (TYP-) DO NOT MAKE THIS CONNECTION UNTIL THE CONCRETE SLAB HAS /ie 2 -12 BEEN PLACED 3/,6 2 -12 3 /i6" 2 -12 1'/2" x '/4" VERTICAL Q L2' /2 x 2'/2 X '/4" CONT. SLOTS 0 2' -0" o.c. 1 SECTION 2 1" = 1' -0" S2 BENT It '/4 x 8'/2 x 31/2 x 0'-5'/2" LG. WITH 4" x '3/,6" VERTICAL SLOTS (TYP.) (TYP.) (TYP-) CONNECTION SHALL BE CAPABLE OF RESISTING THE FORCE (F) SHOWN. PROVIDE WASHERS AND DOUBLE NUTS AND TIGHTEN BOLTS ONLY TO A SNUG TIGHT CONDITION, TO ALLOW FOR DEFLECTION OF THE TRUSS. CONNECTIONS SHALL BE MADE 0 10' -0" o.c. MAX.. 1'/2" x '/4" VERTICAL SLOTS 0 2' -0" o.c.--/ TRUSS BOTTOM CHORD F = 250 Ibs. M BEAM, SEE PLAN I 8 SS SECTION 7 3/4" = 1' -0" S3 5' 12 VARIES SEE PLAN 2' -0" I5 J 3/4 w CLR. AT 12" N TRUSS OR I I 0 N 3 JACK a F = 250 Ibs._ j a N 1'/2" METAL DECK 6x6– W4.0 xW4.0 W W w ix c w WELDED WIRE FABRIC ATTACH THE BOTTOM ( 2 – 2 2 x 6 NAILERS L3x3x' /4 ' AT 10'- 0 "o.c. MAX. � (LOCATE 0 JOIST PANEL POINT.) DO NOT INSTALL THIS BRACE UNTIL THE CONCRETE SLAB (TYP') 1/160 HAS BEEN PLACED L2' /z x 2'/i X '/4" CONT. SECTION 1 1" = 1' -0" S2 Adwmk T F A&Mmdk CONSULTING ENGINEERS Ter Horst, Lamson & Fisk, Inc. 2629 Waterfront Parkway East Drive Suite 100 Indianapolis, IN 46214 Phone: 317 - 328 -1500 Fax: 317 - 328 -9383 Le.e.�.i, :Q No. #87082 - %� •' STATE CF •�NDIAN� Certified By:��44ej4167i��` M W � D I N 1" = 1' -0" S3 w W Cn w0 � a z w J C:dwLLJ < w � U �V W O � � Cn r--t Title: SECTIONS & DETAILS SI oet No.: fM1 t +pp :�� �-Z 0 12 I5 J J TRUSS OR I I 0 N 3 JACK a F = 250 Ibs._ j a N W W w ix c w ATTACH THE BOTTOM ( 2 – 2 2 x 6 NAILERS a CHORD TO THE TOP PLATE WITH A CONNECTION B BEAM, S SEE PLAN o o CAPABLE OF RESISTING 1 1/160 a a THE FORCE F SHOWN 3 3" (TYP.) J J P 0 10' -0" o.c. MAX. (TYP.) s s /i6" N 2 -12 1 6" • 3 /v" 2 -12 •• T ` ` 3 /,." 2 -12 I I m SEE PLAN Z m � � 1'/2" x '/, VERTICAL m 1 d m '" m m V M L2'/2 x 2'/2 X 1/4" CONT. SECTION 6 6