HomeMy WebLinkAboutEP200BG G.5 H H.5 J J.05 J.1 K 5 OL L5 L9 M M5 M.9 N.5 P P., I
I I I I I I I I Panel "E42"
feeder down to _ _ —
t 75KVA UPS
Main
1 3 �° �� 11 Pa I I I �Swiich /Distribution
-i F _ I RAC -9
I I
(2)4 "C. with plillwire for future
Hotel elevator distribution
Si Ir
8 11
� � o
I L�
I I I I I I I I I
I I I I I I I I I
II II TL
Ir— I I
I I I I I I I I I I II II I
�I II
II II
4 II
II II
I I I I I I II II I I
_ 1 H,
_TT_r_9 L
II II
O 0
II II
II II
I I
'111 I —
I _
1+8.
a
0
S
F
U)
S
N
°o
N _
CL
Lu
N
g rn
�m
rn I I I
B
Ua
U
Z� I
$ o
as n
II II
II II
unnel
II II
II II
—
II II
II II
II II
II II
I I
II II
II II
II II + "
II II
II II
I I I II
II II
II II
II II
II II
II Il
II II
II II
II II
I I II II I
II II
II II
PT�
i
s
— I EM3 -14
�-
9
O
2 R.3 .5 R.6 S
I I I I I I I
b"'t
I I I I I I I
I
28.9
I II I I I
I I I I I I 28.3
�J
I II I I I
z1.a
w
or
W � AR E L
LL1 % E CITY CENTER
Z
– PEDCOR DESIGN GROUP
Z% a Architecture / Project Managment:
W • Carmel, Ind Drive
Indiana 46032
j– 317.705.7979 (phone)
Hj ° 317.705.7980 (fax)
J1..
yID . •.......�iFs'
Z - : ;F,G\STERF�
w �O ••:� /=
_ J
V _ •No. 13968 'r o
V/ 0 :" STATE ;• _
,S •.•� ND OF
�� P •' �?:
UJ
O 1 U
i 11 MO
O1
3 11
ESafety plans for fire rated structure(s). Provide proper fire
hese locations, refer to specifications. All penetrations
structure to exterior plaza level shall have a 3 hour fire
Fabove
or shall coordinate with all trades with conduit/power feeder
nd sanitary/water /storm piping and fire protection lines to
y conflicts of installation. Overhead conduit and power to be
high to structure as possible. All work must be above 10' -6"
nished garage floor including all clevises and brackets to
onduit, fittings and fixtures. Refer to details #2, #3, and #4 on
700 for typical conduit routing.
Note:
Contractor shall refer to "T" series sheets for additional conduit,
junction box, rough -in installation and grounding for low voltage
systems including phone, IT, security and sound system as required.
Contractor shall have all costs, material and labor included in the bid
proposal associated with the Technology Plans.
KEY PLAN
SCALE:NTS
PLAN NORTH
Developer:
P E D C O R
DEVELOPMENT CO.
Project:
C
>=CU
i 0
r � E
CU
W L
� U
U)
" 15
/–Future RAM NOTES:
Electrical
Room above I I I A. All 120 volt, 20 amp circuits over 100' in length shall be #10 AWG,
over 160' in length shall be #8 AWG, and over 275' in length shall be
#6 AWG.
18
B. All 277 volt, 20 amp circuits over 200' in length shall be #10 AWG, BID SET
over 275' in length shall be #8 AWG, and over 400' in length shall be
(3)4 "C. up to I I I AWG R 1 03
"MS -AA" ROW C. Contractor shall coordinate with all other trades to avoid conflicts of
inel "EM3A" 15 R space.
Issue Date Drawn By Checked By
D. Contractor shall coordinate the exact location of all devices with all 11/21/07 GMH 5LH
other trades prior to rough -in. Exact location to be determined in the
field. Revisions:
S _ — 77 E. Refer to sheet EP700 for symbols and details. P.103.ADD.001 03 -14 -08
++ _ — — 16.9 P.104.1311.001 05 -16 -08
F. Refer to sheet EP700 for light fixture schedule.
1 1/4 "C. I G. Refer to sheet EP601 for panel schedules. Construction Set 06 -20 -08
II' II II
Q I H. Contractor shall coordinate with the mechanical and plumbing
1
contractors for exact locations of equipment prior to rough -in.
7
_ ,6.,
+6 PLAN NOTES:
OContractor shall provide and install a disconnect switch with time
delay fusing for elevator equipment. Provide with shunt -trip for recall. Project Number:
Connect recall to FA system as required. Provide a mechanical aux.
contact for battery lowering. Coordinate exact location with elevator
installer prior to rough -in. Refer to schedule for over - current size. 0502.01
OCommunications conduit to wrap garage ceiling and structure. Refer
to "T" series sheets for detailed information. Sheet Title:
— O Communications junction box near ceiling structure. Refer to "T" Garage Level
Power
series sheets for detailed information.
OCircuit(s) will originate from a Future "House Panel ". Garage Plan
OContractor shall provide and install heat tracing for storm, waste and Sheet Number:
water lines as shown. Heat trace shall be like Thermon #8- FLX -2,
with line sensing thermostat #N4X -40. Provide fusible switch where
more than one run is on a circuit.
SProvide a 3/4" conduit with pullwire for fan control to nearest
communications junction box. S
14 15 Contractor shall install conduit tight to ceiling and structure in retail 4 ,
13.9 O areas to maximise available ceiling heights for future tenants. J
a ra a Level owe r Ian
Y6 "_1. -0" N
EP200B