Loading...
HomeMy WebLinkAboutEP601Pi N M 0 00 0 0 N O coo m 0 CID _ w N N g rn �m T 0 Ua U� Lv N g Sri co 1g �o iu E z� �s LL CL Voltage: Amps: 225/480 PANEL "C P 1 " Bu's: Copper Phase: 3 Mounting: Surface Wire: 4 Location: Remarks <Load (KW)> Cir. No. 20 AMP 1 Pole U.O.N. Cir. No. <Load (KW)> Remarks Light Rec. Heat A/C Equip. Other Other Equip. A/C Heat Rec. Light Transformer 73" 3 400 Metering Tap Box #3 3 #4,1 #8,1 "C. GF -DP-4 3 1 125 3#3,1 #8,1 1 /4 "C. 2 3 90 Garage Ventilation Fan (EF -MB -1) 3.3 Note: Provide shunt trip for over - current devices. Shunt -trip shall activate if fans detect smoke and shutdown. Report to fire alarm panel. Generator Room Recepta UH -3 3 4 5 6 UH -2 .5 3 .8 Garage Equipment Room Lighting F5 6 7 8 .8 PA01 Receptacle Spare Spare Spare Spare Spare 9 10 5 5 6 7 8 1.5 Garage Equipment Room Lighting 11 12 Spare Spare Spare Spare Receptacle 11 U H -3 Transformer 72" 7 8 9 10 2.8 Receptacle 13 14 Spare Spare Spare Spare 10 13 U H -3 15 9 10 11 12 3.3 Receptacle Receptacle UH -3 Spare Spare Spare Spare 10 15 16 11 11 12 13 14 Spare Spare Receptacle 2.6 Spare Spare Spare Spare 11 17 18 13 13 14 15 16 Spare Receptacle Receptacle Spare Spare Spare Spare 19 20 15 15 16 17 18 Legend Spare Spare HC Power Operated Doi Spare Spare Spare Spare 21 22 17 17 18 19 20 Total Spare Spare Spare Spare Spare Spare Spare 2.1 23 24 19 19 20 21 22 Equip. Spare Spare Spare Spare Spare Spare Spare 1.8 25 26 21 21 22 23 24 Spare Spare Spare Spare Spare Spare Space 2.3 27 28 23 23 24 25 26 Spare Spare Spare Spare Space Space Space 2.6 29 30 Connected load (KW) 25 26 27 28 4.4 Spare Space 1.3 Space Space Space Space 1.2 31 32 .5 27 28 29 30 Legend Space Space Calculated ± Space Space Space Space A/C 33 34 Total 29 30 31 32 Space Space Space Space Space Space 35 36 31 32 33 34 Space Space Space Space Space Space 37 38 33 34 35 36 Space Space Space Space Space Space 39 40 35 36 37 38 10.0 Space 4.2 Space Space Space Space 14.9 41 1.5 37 38 39 40 4.2 Space Demand load (KW) Space Space Space Space 1.5 Legend Total Demand (KW) Feeder 39 40 41 42 Heat A/C Equip. Other Space Space Space 3.9 7.2 24.9 1 4.2 41 42 Connected load (KW) Total Demand (KW) Feeder Calculated t 3.3 Light Space Heat A/C Equip. Other Total Fed From: Wire Size: Conduit: Total Demand Amps = 88+ Demand load (KW) A/C 7.5 Other 3.3 1.6 31.5 Legend Total Demand (KW) Feeder Calculated t = 1 Pole = 2 Pole = 3 Pole Light Rec. Heat A/C Equip. Other Total I Fed From: Wire Size: Conduit: Total Demand Amps = 4± Legend Total Demand (KW) 3.3 Calculated t = 1 Pole = 2 Pole = 3 Pole Light 3.3 Voltage: 120/208 �� �� Main: 200 Amp Main Circuit Breaker Amps: 225 PANEL CP1 A Bus: Copper Phase: 3 Mounting: Surface Wire: 4 Location: Remarks <Load (KW)> Cir. No. 20 AMP 1 Pole U.O.N. Cir. No. <Load (KW)> Remarks Light Rec. Heat A/C Equip. Other Other Equip. A/C Heat Rec. Light Spare 3 400 Metering Tap Box #3 3 #4,1 #8,1 "C. GF -DP-4 3 1 F 3#3,1 #8,1 1 /4 "C. 2 3 90 Garage Ventilation Fan (EF -MB -1) 3#2,1#6,1 1/4 "C. Note: Provide shunt trip for over - current devices. Shunt -trip shall activate if fans detect smoke and shutdown. Report to fire alarm panel. Generator Room Recepta Spare Spare 4 5 6 UH -2 .5 3 3 4 5 6 7 8 .8 PA01 Receptacle Spare Spare IT Rack 7 Spare 9 10 5 5 6 4.9 8 1.5 Garage Equipment Room Lighting 11 12 Spare Spare Heat Tracing (GFCI) 3.3 Receptacle 11 U H -3 Transformer 72" 7 8 9 .4 2.8 Receptacle 13 14 Spare Spare Heat Tracing (GFCI) 3.3 10 13 U H -3 15 9 10 11 .2 3.3 Receptacle Receptacle UH -3 Spare Spare Heat Tracing (GFCI) 1.0 10 15 16 11 11 12 13 .4 Spare Spare Receptacle 2.6 Spare Spare Heat Tracing (GFCI) 1.0 11 17 18 13 13 14 15 1.2 Spare Receptacle Receptacle Spare Spare Spare 1.0 19 20 15 15 16 17 1.2 Legend Spare Spare HC Power Operated Doi Spare Spare Spare Spare 21 22 17 17 18 19 1.2 Total Spare Spare Spare Spare Spare Spare Spare 2.1 23 24 19 19 20 21 1.2 Equip. Spare Spare Spare Spare Spare Spare Space 1.8 25 26 21 21 22 23 1.2 Spare Spare Spare Spare Spare Space Space 2.3 27 28 23 23 24 25 26 Spare Spare Spare Spare Space Space Space 2.6 29 30 Connected load (KW) 25 26 27 28 4.4 Spare Space 1.3 Space Space Space Space 1.2 31 32 .5 27 28 29 30 Legend Space Space Calculated ± Space Space Space Space A/C 33 34 Total 29 30 31 32 Space Space Space Space Space Space 35 36 31 32 33 34 Space Space Space Space Space Space 37 38 33 34 35 36 Space Space Space Space Space Space 39 40 35 36 2.4 7.2 10.0 Space 4.2 Space Space Space Space 14.9 41 1.5 37 38 10.0 40 4.2 Space Demand load (KW) Space Space 1 14.9 18.7 1.5 Legend Total Demand (KW) Feeder 39 40 Light Rec. Heat A/C Equip. Other Space Space Total Demand Amps = 48± 3.9 7.2 24.9 1 4.2 41 42 Legend Total Demand (KW) Feeder Calculated t = 1 Pole = 2 Pole = 3 Pole Light Space Heat A/C Equip. Other Total Fed From: Wire Size: Conduit: Total Demand Amps = 88+ Connected load (KW) A/C 7.5 Other 31.5 1.6 31.5 Legend Total Demand (KW) Feeder Calculated t �-. = 1 Pole = 2 Pole = 3 Pole 6.5 Rec. Demand load (KW) A/C 7.5 Other Total 1.6 Total Demand Amps = 45± Legend Total Demand (KW) Feeder Calculated t = 1 Pole = 2 Pole = 3 Pole Light Rec. Heat A/C Equip. Other Total Fed From: Wire Size: Conduit: Total Demand Amps = 51 ± 1.6 14.0 15.6 TRANSFORMER SCHEDULE DESIG. KVA DESCRIPTION "T1" 15 480V., 30 to 208V., 30 "72" 30 480V., 30 to 208V., 30 "73" 75 480V., 30 to 208V., 30 MAIN DISTRIBUTION PANEL "MDP -E" 480/277V.5 3 PH., 4 W. MAINS: 2000 AMP MAIN BREAKER: 2000 AMP w /GFCI & Shunt -trip BRANCH BREAKER LOAD SERVED NOTES DESIG. POLES SIZE MDP -E -1 3 1200 Emergency Metering #1 See Riser MDP -E -2 3 1200 Emergency Metering #1 See Riser MAIN DISTRIBUTION PANEL "MS -G" 480/277V., 3 PH., 4 W. MAINS: 3000 AMP MAIN BREAKER: 3000 AMP w /GFCI & Shunt -trip BRANCH BREAKER LOAD SERVED NOTES DESIG. POLES SIZE MS -G -1 3 2000 Main Distribution Panel "MDP -E" 3 #4,1 #8,1 "C. MS -G -2 3 1000 Distribution Panel "EL -DP" Future Elev. Dist. Pnl. MS -G -3 3 400 Metering Tap Box #3 3 #4,1 #8,1 "C. DISTRIBUTION PANEL "GF -DP" 480/277V.9 3 PH., 4 W. MAINS: 400 AMP Main Lug Only BRANCH BREAKER LOAD SERVED NOTES DESIG. I POLES SIZE GF -DP -1 3 90 Garage Ventilation Fan (EF -MA -1) 3 #4,1 #8,1 "C. GF -DP -2 3 90 Garage Ventilation Fan (EF -MA -2) 3 #4,1 #8,1 "C. GF -DP -3 3 60 Garage Ventilation Fan (EF -MA -3) 3 #4,1 #8,1 "C. GF -DP-4 3 90 Garage Ventilation Fan (EF -MA -4) 3#3,1 #8,1 1 /4 "C. GF -DP -5 3 90 Garage Ventilation Fan (EF -MB -1) 3#2,1#6,1 1/4 "C. Note: Provide shunt trip for over - current devices. Shunt -trip shall activate if fans detect smoke and shutdown. Report to fire alarm panel. Voltage: 277/480 Main: M.L.O. �� Amps: 225 PANEL GH1 1" Bus: Copper Phase: 3 Mounting: Surface Wire: 4 Location: Remarks <Load (KW)> Cir. No. 20 AMP 1 Pole U.O.N. Cir. No. <Load (KW)> Remarks Light Rec. Heat A/C Equip. Other Other Equip. A/C Heat Rec. Light Overhead Door 1.0 A/C Heat Rec. 1.4 Service Tunnel Receptacles 1 15 20 50 15 2 4.9 5.0 1.6 Generator Room Recepta UH -1 3 4 5 6 UH -2 .5 3 10.0 4 5 6 7 8 .8 PA01 Receptacle Receptacle Gate IT Rack 7 Spare 9 10 5 5 6 4.9 8 1.5 Garage Equipment Room Lighting 11 12 Receptacle Fire Door Heat Tracing (GFCI) 3.3 Receptacle 11 U H -3 Transformer 72" 2.4 7.2 9 .4 2.8 Receptacle 13 14 TCP Panel(s) Fire Door Heat Tracing (GFCI) 3.3 10 13 U H -3 15 16 10 11 .2 3.3 Receptacle Receptacle UH -3 17 18 Heat Tracing (GFCI) 1.0 10 15 16 11 11 Spare 13 .4 Spare Spare Receptacle 2.6 19 20 Heat Tracing (GFCI) 1.0 11 17 18 13 Spare Spare 15 1.2 Spare Receptacle Receptacle 21 22 Spare 1.0 19 20 15 Spare Spare 17 1.2 Legend Spare Spare HC Power Operated Doi 23 24 Spare Spare 21 22 17 Spare Space 19 1.2 Total Spare Spare Spare 25 26 Spare Spare 2.1 23 24 19 Space Space 21 1.2 Equip. Spare Spare Spare 27 28 Spare Space 1.8 25 26 21 Space Space 23 1.2 Spare Spare Spare 29 30 Space Space 2.3 27 28 23 Space Space 25 26 Spare Spare Spare 31 32 Space Space 2.6 29 30 Connected load (KW) Space Space 27 28 4.4 Spare Space 1.3 33 34 Space Space 1.2 31 32 .5 Space Space 29 30 Legend Space Space Calculated ± 35 36 Space Space A/C 33 34 Total Space Space 31 32 Space Space 37 38 Space Space 35 36 Space Space 33 34 Space Space 39 40 Space Space 37 38 Space Space 35 36 Space Space 41 42 Space Space 39 40 Space 36 2.4 7.2 10.0 Space 4.2 j Connected load (KW) Space Space Space 14.9 41 1.5 2.4 7.2 10.0 40 4.2 Space Demand load (KW) Space Space 1 14.9 18.7 1.5 Legend Total Demand (KW) Feeder Calculated t = 1 Pole = 2 Pole = 3 Pole Light Rec. Heat A/C Equip. Other Total Fed From: Wire Size: Conduit: Total Demand Amps = 48± 3.9 7.2 24.9 1 4.2 41 40.2 Voltage: 120/208 Main: M.L.O. �� Amps: 225 PANEL IT �� Bus: Copper Phase: 3 Mounting: Surface Wire: 4 Location: E.F. - PA02 Remarks <Load (KW)> Cir. No. 20 AMP 1 Pole U.O.N. Cir. No. <Load (KW)> Remarks Light Rec. Heat A/C Equip. Other Other Equip. A/C Heat Rec. Light IT Rack 1.0 A/C Heat Rec. 4.9 Service Tunnel Receptacles 1 30 [g30 30 30 125 40 30 2 4.9 1.0 1.6 Generator Room Recepta IT Rack 3 4 IT Rack 2.6 1.0 .5 3 4.9 4 5 6 4.9 .8 PA01 Receptacle Receptacle Gate IT Rack 7 8 IT Rack .5 5 5 6 4.9 8 9 10 .8 1.0 Receptacle Fire Door Heat Tracing (GFCI) (GFCI) Heat Tracing Receptacle 11 12 7 1.0 8 9 .4 Spare Receptacle Receptacle 3.4 TCP Panel(s) Fire Door Heat Tracing (GFCI) 1.0 10 13 14 9 1.0 10 11 .2 Spare Receptacle Receptacle 3.2 Emergency Call Station Fire Damper Heat Tracing (GFCI) 1.0 10 15 16 11 11 12 13 .4 Spare Spare Receptacle 2.6 PTZ Camera EF -MA -2 Control Heat Tracing (GFCI) 1.0 11 17 18 13 13 14 15 1.2 Spare Receptacle Receptacle Fire Door EF -MA -3 Control Spare 1.0 19 20 15 15 16 17 1.2 Legend Spare Spare HC Power Operated Doi Fire Door EF -MA-4 Control Spare Spare 21 22 17 17 18 19 1.2 Total Spare Spare Spare Fire Door EF -MB -1 Control Spare Spare 2.1 23 24 19 19 20 21 1.2 Equip. Spare Spare Spare Fire Door Spare Spare Space 1.8 25 26 21 21 22 23 1.2 Spare Spare Spare Fire Door Spare Space Space 2.3 27 28 23 23 24 25 26 Spare Spare Spare Spare Spare Space Space 2.6 29 30 Connected load (KW) 25 26 27 28 4.4 Spare Space 1.3 Spare Spare Space Space 1.2 31 32 .5 27 28 29 30 Legend Space Space Calculated ± Spare Spare Space Space A/C 33 34 Total 29 30 31 32 Space Space Spare Space Space Space 35 36 31 32 33 34 Space Space Space Space Space Space 37 38 33 34 35 36 Space Space Space Space Space Space 39 40 35 36 37 38 Space Space Space Space Space Space 41 42 37 38 39 40 Space Space Space Space 18.7 42 Connected load (KW) 263 12.8 39 40 41 11 d (KW) 2.6 Space 18.7 Space Demand load (KW) 1.0 12.8 1 41 42 Legend Total Demand (KW) Feeder Calculated t = 1 Pole = 2 Pole = 3 Pole Light Rec. Heat A/C Equip. Other Total Fed From: Wire Size: Conduit: Total Demand Amps = 88+ Connected load (KW) A/C 7.5 Other 31.5 1.6 31.5 Voltage: Amps: 225/208 PANEL Main: "EM3A" Bus: C op Amp p M.C.B. Phase: 3 Mounting: Surface Wire: 4 Location: Power & Dist. Room - PA17 Remarks <Load (KW)> Cir. No. 20 AMP 1 Pole U.O.N. Cir. No. <Load (KW)> Remarks Light Rec. Heat A/C Equip. Other Other Equip. A/C Heat Rec. Light Gate 1.0 A/C Heat Rec. .5 Service Tunnel Receptacles 1 30 30 30 125 40 30 2 .5 1.0 1.6 Generator Room Recepta Gate Gate 2 2.6 1.0 .5 3 3 4 (GFCI) Heat Tracing .2 1.8 .8 PA01 Receptacle Receptacle Gate 6 (GFCI) Heat Tracing .5 5 5 6 7 8 Spare .5 .8 1.7 Receptacle Fire Door Heat Tracing (GFCI) (GFCI) Heat Tracing 8 1.2 7 7 8 9 .4 Spare 1.0 3.4 TCP Panel(s) Fire Door Heat Tracing (GFCI) Spare 10 1.2 9 9 10 11 .2 Spare .5 .6 3.2 Emergency Call Station Fire Damper Heat Tracing (GFCI) Spare 10 .6 11 11 12 13 .4 Spare 1.0 1 0 2.6 PTZ Camera EF -MA -2 Control Heat Tracing (GFCI) Spare 11 12 .5 13 13 14 15 1.2 .8 Receptacle Fire Door EF -MA -3 Control Spare Spare Demand load (KW) .5 15 15 16 17 1.2 Legend 2.8 - HC Power Operated Doi Fire Door EF -MA-4 Control Spare Spare = 1 Pole = 2 Pole = 3 Pole .5 17 17 18 19 1.2 Total - Legend Spare Fire Door EF -MB -1 Control Spare Spare 2.1 Calculated t .5 19 19 20 21 1.2 Equip. Other Total Spare Fire Door Spare Spare Space 1.8 1.2 .4 21 21 22 23 1.2 2.2 Spare Fire Door Spare Space Space 2.3 23 23 24 25 26 1.9 Spare Spare Spare Space Space 2.6 2.8 Connected load (KW) 25 26 27 28 4.4 1.1 1.3 Spare Spare Space Space 1.2 Demand load (KW) .5 27 28 29 30 Legend Total Demand (KW) Feeder Calculated ± Spare Spare Space Space A/C Equip. Other Total 29 30 31 32 3.2 Spare Space Space Space 31 32 33 34 Space Space Space Space 33 34 35 36 Space Space Space Space 35 36 37 38 Space Space Space Space 8.9 37 38 39 40 Space Space Space Space 42 263 8.0 39 40 41 42 d (KW) 2.6 Space Space Space 1.0 1 9.9 41 42 Connected load (KW) 1 12.0 1 1 10.9 1.6 Space Legend 1.0 1 9.9 = 1 Pole = 2 Pole = 3 Pole 6.5 Rec. Connected load (KW) A/C 7.5 Other 10.9 1.6 Total Demand Amps = 112± Legend Total Demand (KW) Feeder Calculated t �-. = 1 Pole = 2 Pole = 3 Pole 6.5 Rec. Demand load (KW) A/C 7.5 Other Total 1.6 Total Demand Amps = 45± Legend Total Demand (KW) Feeder Calculated t = 1 Pole = 2 Pole = 3 Pole Light Rec. Heat A/C Equip. Other Total Fed From: Wire Size: Conduit: Total Demand Amps = 43± 1.6 14.0 15.6 Voltage: 277/480 Main: M.L.O. Amps: 225 PANEL �� EM3 91 Bus: Copper Phase: 3 Mounting: Surface Wire: 4 Location: Power & Dist. Room - PA17 Remarks <Load (KW)> Cir. No. 20 AMP 1 Pole U.O.N. Cir. No. <Load (KW)> Remarks Light Rec. Heat A/C Equip. Other Other Equip. A/C Heat Rec. Light Power & Dist. Room Lighting 1.0 A/C Heat Rec. 1.8 Service Tunnel Receptacles 1 30 30 30 125 40 30 2 12.0 1.0 1.6 Generator Room Recepta Transformer "T3" (GFCI) Heat Tracing 2 2.6 1.0 .5 3 3 4 (GFCI) Heat Tracing .2 1.8 1.2 PA01 Receptacle EA2 Elevator Pit 5 6 (GFCI) Heat Tracing 2.5 5 6 Spare 7 8 Spare .5 .1 1.7 EA3 Elevator Pit .1 Heat Tracing (GFCI) (GFCI) Heat Tracing 8 3.0 7 8 8 9 10 Spare 1.0 3.4 EA12 Elevator Pit .1 Heat Tracing (GFCI) Spare 10 9 10 10 11 12 Spare .5 .6 3.2 EA12 Elevator Cab Lighting 1.0 Heat Tracing (GFCI) Spare 10 11 12 12 13 14 Spare 1.0 1 0 2.6 EA12 Elevator Receptacle Receptacle Heat Tracing (GFCI) Spare 11 12 13 14 14 15 16 .8 Receptacle Receptacle 1.2 Spare Spare Demand load (KW) 15 16 16 17 18 Legend 2.8 - HC Power Operated Doi Spare Fire Door Spare Spare = 1 Pole = 2 Pole = 3 Pole Light 17 18 A/C 19 20 Total - Legend Spare Spare = 3± Spare Spare 2.1 Calculated t 1.2 19 20 Rec. 21 22 Equip. Other Total Spare Spare Fire Damper Spare Space 1.8 1.2 .4 21 22 22 23 24 2.2 Spare Spare Spare Space Space 2.3 23 24 24 25 26 1.9 Spare Spare 1.3 Space Space 2.6 2.8 Connected load (KW) 25 .5 27 28 4.4 1.1 1.3 2.8 Spare Space Space 1.2 Demand load (KW) .5 27 28 29 30 Legend Total Demand (KW) Feeder Calculated ± = 1 Pole = 2 Pole = 3 Pole Light Space Space A/C Equip. Other Total Fed From: Wire Size: Conduit: Total Demand Amps = 36± 31 32 3.2 12.9 Spare Space Space 31 32 33 34 Spare Spare Space Space 33 34 35 36 Spare Spare Space Space 35 36 37 38 Spare Space Space Space 8.9 37 38 39 40 Space Space Space Space 42 263 8.0 39 40 41 42 d (KW) 2.6 Space Space Space 1.0 1 9.9 41 42 Connected load (KW) 1 12.0 1 1 10.9 1.6 Space Legend 1.0 1 9.9 = 1 Pole = 2 Pole = 3 Pole 4.3 Rec. Demand load (KW) A/C 12.0 Other 10.9 1.6 Total Demand Amps = 112± Legend Total Demand (KW) Feeder Calculated t �-. = 1 Pole = 2 Pole = 3 Pole Light Rec. Heat A/C Equip. Other Total Fed From: Wire Size: Conduit: Total Demand Amps = 45± 1.0 1.6 20.8 Calculated t 14.0 Light 37.4 GFCI = Provide GFCI rated circuit breaker. Voltage: 120/208 �� �� Main: 100A Main Circuit Breaker Amps: 100 PANEL G H 1 A Bus: Copper Phase: 3 Mounting: Surface Wire: 4 Location: Generator Room PP3 Remarks <Load (KW)> Cir. No. 20 AMP 1 Pole U.O.N. Cir. No. <Load (KW)> Remarks Light Rec. Heat A/C Equip. Other Other Equip. A/C Heat Rec. Light Block Heater Equip. A/C Heat Rec. 1.8 Service Tunnel Receptacles 1 Service Tunnel Lighting 2 .8 1.7 1.0 1 Generator Room Recepta Battery Charger 25 2 1.0 .5 3 4 Spare Service Tunnel Night Lighting .2 .6 1.2 PA01 Receptacle EA2 Elevator Pit .1 .5 Spare .5 5 6 Spare Spare 6 Spare .5 .1 EAi Elevator Pit EA3 Elevator Pit .1 .5 7 8 7 8 8 Spare Spare Spare 1.0 EAi Elevator Cab Lightir EA12 Elevator Pit .1 .5 8 10 9 10 10 Spare Spare .5 .6 EA1 Elevator Receptacl EA12 Elevator Cab Lighting 1.0 .6 9 10 11 12 12 Spare Spare 1.0 1 0 Receptacle EA12 Elevator Receptacle Receptacle .5 .8 11 12 13 14 14 1.2 .8 Receptacle Receptacle 1.2 .8 .8 Demand load (KW) 15 16 16 .5 .6 Legend 2.8 - HC Power Operated Doi Spare Fire Door 1.2 Calculated t = 1 Pole = 2 Pole = 3 Pole Light 17 18 A/C Equip. Other Total - Legend Spare Spare = 3± Feeder 1.2 2.1 Calculated t 1.2 19 20 Rec. Heat A/C Equip. Other Total Spare Spare Fire Damper Total Demand Amps = 4± 1.8 1.2 .4 21 22 22 1.2 2.2 Spare Spare Spare 2.3 23 24 24 1.9 Spare Spare 1.3 2.8 2.6 2.8 Connected load (KW) 25 .5 1 1 4.4 1.1 1.3 2.8 Spare 2.8 1.2 Demand load (KW) .5 27 28 4.4 1.1 Legend Total Demand (KW) Feeder Calculated ± = 1 Pole = 2 Pole = 3 Pole Light Rec. Heat A/C Equip. Other Total Fed From: Wire Size: Conduit: Total Demand Amps = 36± 2.4 7.2 3.2 12.9 Voltage: 120/208 Amps: 60 Phase: 3 Wire: 4 Remarks �� �� PANEL EM2A Main: 60 Amp M.C.B. Bus: Copper Mounting: Surface Location: Service Tunnel Remarks Remarks <Load (KW)> Cir. No. 20 AMP 1 Pole U.O.N. Cir. No. Cir. No. <Load (KW)> <Load (KW)> ( ) Remarks Light Rec. Heat A/C Equip. Other Other Equip. A/C Heat Rec. Light Service Tunnel Receptacles Light Service Tunnel Lighting 1.2 .8 1.7 1 3.9 2 25 2 .5 1.2 Spare Spare Service Tunnel Night Lighting .2 1.2 3.3 3 4 4 Spare .5 5 Spare Spare 6 Spare 1.4 4.1 Receptacle 5 6 7 8 7 8 Spare Spare Spare 3.6 Fire Alarm Control Panel Receptacle 7 8 10 9 10 Spare Spare .6 2.5 Receptacle Receptacle .6 9 10 11 12 Spare Spare Spare 1 0 2.9 PTZ Camera Receptacle 2.4 .8 11 12 13 14 1.2 Spare 1 0 Emergency Call Station 1.2 3.2 .8 Demand load (KW) Connected load (KW) 15 16 1.2 .6 Legend 2.8 - Feeder Card Readers Fire Door 1.2 Calculated t = 1 Pole = 2 Pole = 3 Pole Light Demand load (KW) Heat A/C Equip. Other Total - Legend Total Demand (KW) = 3± Feeder 1.2 2.1 Calculated t 1.2 = 1 Pole = 2 Pole = 3 Pole Light Rec. Heat A/C Equip. Other Total Fed From: Wire Size: Conduit: Card Readers Fire Damper Total Demand Amps = 4± 1.8 1.2 .4 21 22 1.2 Voltage: 277/480 Amps: 60 Phase: 3 Wire: 4 Remarks �� �� PANEL EM2 Cir. No. Main: M.L.O. Bus: Copper Mounting: Surface Location: Service Tunnel Remarks <Load (KW)> <Load ( KW)> Cir. No. 20 AMP 1 Pole U.O.N. Cir. No. A/C <Load (KW)> ( ) Other Other Remarks Light Rec. Heat A/C Equip. Other Other Equip. A/C Heat Rec. Light Service Tunnel Lighting 30 30 30 30 .8 1.7 3.9 1 25 2 .5 1.2 3 Transformer "T1" Service Tunnel Night Lighting .2 1.2 3.3 Receptacle 3 4 Spare .5 5 6 5 6 Spare 1.4 4.1 Receptacle Receptacle 3.8 7 8 7 8 Spare Spare 3.6 Fire Alarm Control Panel Receptacle .8 9 10 9 10 Spare Spare .6 2.5 Receptacle Receptacle .6 11 12 11 12 Spare 1 0 2.9 PTZ Camera Receptacle 2.4 .8 Connected load (KW) 13 14 1.2 1 0 Emergency Call Station Receptacle 3.2 .8 Demand load (KW) 15 16 1.2 .6 Legend 2.8 Total Demand (KW) Feeder Card Readers Fire Door 3.9 Calculated t = 1 Pole = 2 Pole = 3 Pole Light Rec. Heat A/C Equip. Other Total Fed From: Wire Size: Conduit: Total Demand Amps = 3± 1.0 1.2 2.1 1.2 2.2 Voltage: 120/208 �� �� Main: 225 Amp M.C.B. Amps: 225 PANEL E M 1 A Bus: Copper Phase: 3 Mounting: Surface Wire: 4 Location: Generator Room - PP3 Remarks <Load (KW)> Cir. No. 20 AMP 1 Pole U.O.N. Cir. No. <Load (KW)> Remarks Light Rec. Heat A/C Equip. Other Other Equip. A/C Heat Rec. Light Gate 3.9 .5 1 30 30 WConnected 30 30 30 30 2 1.7 3.9 E F -PA01 Gate 3.9 .5 3 4 1.2 3.3 Receptacle Gate 3.8 .5 5 6 1.4 4.1 Receptacle Receptacle 3.8 1.0 7 8 1.0 3.6 Fire Alarm Control Panel Receptacle .8 1.2 9 10 .6 2.5 Receptacle Receptacle .6 1.0 11 12 .6 2.9 PTZ Camera Receptacle 2.4 .8 13 14 .2 2.9 Emergency Call Station Receptacle 3.2 .8 15 16 .6 2.8 Card Readers Fire Door 3.9 1.2 17 18 .5 2.8 EF -MA -1 Control Fire Door 2.1 1.2 19 20 .4 2.9 Card Readers Fire Damper 1.8 .4 21 22 2.2 Spare Spare 2.3 23 24 1.9 Spare Spare 2.6 25 26 1.4 Spare Spare 1.2 27 28 Spare Spare 29 30 Spare Spare 31 32 Spare Spare 33 34 Spare Spare 35 36 Spare Space 8.0 8.9 37 38 2.6 Space Space 40 42 263 8.0 39 40 8.9 d (KW) 2.6 Space Space 24.6 26.3 8.0 10.0 41 42 1 Demand load (KW) 1 2.6 12.6 Space Legend Total Demand (KW) 4.8 Calculated t = 1 Pole = 2 Pole = 3 Pole 4.3 Rec. 1 Connected load (KW) A/C 4.6 Other Total 3.2 Total Demand Amps = 112± 50.9 8.0 4.8 11.5 4.3 93.0 1 Demand load (KW) 4.6 3.2 Legend Total Demand (KW) Feeder Calculated t = 1 Pole = 2 Pole = 3 Pole Light Rec. Heat A/C Equip. Other Total Fed From: Wire Size: Conduit: Total Demand Amps = 47± 8.0 8.9 16.9 277/480 PANEL "EM1" BuMain: s: Copper Phase: 3 Mounting: Surface Wire: 4 Location: Generator Room - PP3 Remarks <Load (KW)> Cir. No. 20 AMP 1 Pole U.O.N. Cir. No. <Load (KW)> Remarks Light Rec. Heat A/C Equip. Other Other Equip. A/C Heat Rec. Light * Garage Level Lighting 3.9 1 30 30 WConnected 30 30 30 30 2 3.9 Garage Level Lighting • * Garage Level Lighting 3.9 3 4 3.3 Garage Level Lighting • Garage Level Lighting 3.8 5 6 4.1 Garage Level Lighting * Garage Level Lighting 3.8 7 8 3.6 Garage Level Lighting Transformer Courtyard Lighting .8 9 10 2.5 Ramp Lighting * North Entrance Lighting .6 11 12 2.9 East Entrance Lighting * North Entrance Lighting 2.4 13 14 2.9 East Entrance Lighting • • Garage Level Lighting 3.2 15 16 2.8 Heat Tracing (GFCI) * Garage Level Lighting 3.9 17 18 2.8 Heat Tracing (GFCI) (GFCI) Heat Tracing 2.1 19 20 2.9 Heat Tracing (GFCI) (GFCI) Heat Tracing 1.8 21 22 2.2 Heat Tracing (GFCI) (GFCI) Heat Tracing 2.3 23 24 1.9 Heat Tracing (GFCI) (GFCI) Heat Tracing 2.6 25 26 1.4 East Entrance Lighting (GFCI) Heat Tracing 1.2 27 28 Spare Spare 29 30 Spare Spare 31 32 Spare Spare 33 34 Spare Spare 35 36 Spare Transformer 73" 8.0 8.9 37 38 2.6 Jockey Pu mp 40 42 263 8.0 10.0 8.9 d (KW) 2.6 12.6 24.6 26.3 8.0 10.0 8.9 1 Demand load (KW) 1 2.6 12.6 24.6 Legend Total Demand (KW) Feeder Calculated t = 1 Pole = 2 Pole = 3 Pole Light Rec. Heat A/C Equip. Other Total Fed From: Wire Size: Conduit: Total Demand Amps = 112± 50.9 8.0 22.6 11.5 93.0 " = Provide switch rated circuit breaker. GFCI = Provide GFCI rated circuit breaker. a E a- 0 m U U w U CIS t U CAR E CITY CENTER PEDCOR DESIGN GROUP Architecture / Project Managment: 335 Ridgepoint Drive Carmel, Indiana 46032 317.705.7979 (phone) 317.705.7980 (fax) O�� •��G\STEREO•.�. No. 13968 0. STATE p OF �• • iND ANP .' Developer: P E D C O R (a awAw DEVELOPMENT CO. W F- Z W U H U J W a U Project: C� Z Y Q T_ w Q z a ^r W I..L BID SET P.103 ICU lC .CU C N E L U Issue Date Drawn By Checked By 11/21/07 ALB SLFi Revisions: P.108.ADD.001 03 -14 -08 P .104. P R.001 05 -16 -08 Construction Set 06 -20 -08 Project Number: 0502.01 Sheet Title: Electrical Panel Schedules Sheet Number: 1 P(i01 J