Loading...
HomeMy WebLinkAboutT602TUNNELL PATHWAY SYSTEM (TYPICAL Scale = NONE 4 "X6" PLASTIC FIBER -,.,12 in. DUCT WITH HINGED n COVERII 4" X 6" FIBER DUCT WITH HINGED COVER 4 in. HOT DIPPED u ` GALVANIZED LADDER RACK 16 x 8 x 54" Pull boxes 1 5/8" HOT DIPPED GALVANIZED STRUT (PROVIDED BY PLUMBING CONTRACTOR ON 5' CENTERS ALONG THIS WALL) ITY SEE ENLARGED FLOORPLAN FOR CONTINUATION 830.25' GALVANIZED LADDER RACK (TYPICAL) TUNNEL CEILING SEE DETAILS BOLT -ON GALVANIZED 9" POSTS A 4" X/6" FIBER DUCT WITH HINGED COVER 4 in. PULL BOX 4" PVC SCHEDULE 40 i CONDUIT INSTALLED INSIDE ANGLE WALL BRACKET i HOT DIPPED ' GALVANIZED ANGLED WALL BRACKET FOR 94 in. 18" LADDER RACK III 60 in. TUNNEL FLOOR TUNNELL PATHWAY SYSTEM (TYPICAL) Scale = NONE TELECOMMUNICATIONS BACKBONE DIAGRAM Scale - NONE TUNNEL CEILING 4 "X6" PLASTIC FIBER TUNNEL FLOOR TUNNELL PATHWAY SYSTEM (TYPICAL Scale = NONE AV- I 4 in. J 4 in. 7y 4 in. J w z Z -- OVERHEAD VIEW OF INTERSECTION ELEVATION 825.58' 4" X 6" FIBER DUCT 4" CONTINUOUS CONDUIT FROM BUILDING ENTRANCE TO MAIN EQUIPMENT ROOM Scale= NONE /4" PVC SCHEDULE 40 CONDUIT INSTALLED WITH STRAPS TO i� TRANSITION 24" STRUT LADDER RACK TO 18" i i TUNNEL CEILING 4 "X6" PLASTIC FIBER / 16 x 8 x 60" Pull boxes DUCT WITH HINGED COVER i L PULL BOX - -- - -52 in. _- 72 in. 4" X 6" FIBER DUCT WITH HINGED COVER U HOT DIPPED GALVANIZED ANGLED 62.4097 in. WALL BRACKET FOR 18" LADDER RACK HOT DIPPED GALVANIZED LADDER 0ArV TUNNELFLOOR BRANCH TUNNEL TO BUILDING "B" (TYPICAL OF BRANCH TUNNELS) i 1 5/8" HOT DIPPED GALVANIZED STRUT TUNNELL PATHWAY SYSTEM (TYPICAL) Scale = NONE Sizing Pull Boxes Use Table 5.8 to size pull boxes (for building interior) Table 5.8 Pull box sizing Conduit Width Increase for Trade Additional Size Width Length Depth Conduit mm (in) mm (in) mm (in) mm (in) mm (in) 27 (1) 101 (4) 406 (16) 76 (3) 51 (2) 35 (1 -1/4) 152 (6) 508 (20) 76 (3) 76 (3) 41 (1 -1/2) 203 (8) 686 (27) 101 (4) 101 (4) 50 (2) 203 (8) 914 (36) 101 (4) 127 (5) 63 (2 -1/2) 254 (10) 1067 (42) 127 (5) 152 (6) 78 (3) 305 (12) 1220 (48) 127 (5) 152 (6) 91 (3 -1/2) 305 (12) 1370 (54) 152 (6) 152 (6) 100 (4) 381 (15) 1525 (60) 203 (8) 203 (8) NOTE: CONDUITS OF TRADE SIZE 2" AND LARGER SHALL HAVE A BEND RADIUS AT LEAST 10 TIMES THE INTERNAL DIAMETER OF THE CONDUIT BACKBONE PATHWAY NOTES (THIS DETAIL) 1) TUNNELS HAVE PATHWAY FOR COMMUNICATIONS CABLING; SEE DETAIL B/T -602. 2) NO MORE THE 180 DEGREES OF BENDS WITHOUT PROPERLY SIZED ACCESSIBLE PULL BOXES (SEE FLOORPLAN FOR APPROXIMATE CONDUIT ROUTES. COORDINATE WITH OTHER TRADES AND THE CONSTRUCTION MANAGER. 3) THIS DIAGRAM IS INTENDED TO SHOW BACKBONE PATHWAYS REQUIRED BETWEEN MAJOR TERMINATION POINTS IN THIS PROJECT. THIS DIAGRAM IS NOT INTENDED TO INDICATE EXACT ROUTING OR LOCATIONS. UTILIZE DETAIL DRAWINGS AND FLOORPLANS FOR ADDITIONAL INFORMATION. 4) NOT USED THREE 4" CONDUITS Q_C FROM FLOOR OF 1. TRA1 C TO ER -DP NORTH WALL 2' 3. 4. 5. 6. 7. 8. 9. 10. D" 11. :ONDUIT PATHWAY LEGEND: (THIS DETAIL) %" TRADE SIZE CONDUITS 1" TRADE SIZE CONDUITS 1.25" TRADE SIZE CONDUITS 1.5" TRADE SIZE CONDUITS 2" TRADE SIZE CONDUITS 3" TRADE SIZE CONDUITS 4" TRADE SIZE CONDUITS CABLE ROUTING IN OPEN TOP CABLE SUPPORT ABOVE ACCESSIBLE CEILING SEE DETAIL A SHEET T -003 4" SLEEVED FLOOR PENETRATIONS COMBINATION OF CONDUITS, SLEEVES, AND OPEN TOP CABLE SUPPORTS; SEE FLOORPLAN FOR DETAILS LADDER RACK; SIZE AS INDICATED 4" GRC CONDUIT SLEEVES TO 6" AFF IN TR -BO ABOVE BOLT -ON GALVANIZED 9" POSTS i I i ! I I ,I CARMELI 11Y C_E.N T E.R PEDCOR DESIGN GROUP TECH � �..� i. i­­) Ii1 i ;Iliil i2jl u, DYN 9 10` Ea„ 56t1i Sit =rot SUFE 2150 i�ai2ir1NAPtOUS. IN 46: -16 317 52 4.53.3'8 317.524 6339 FAX y,,, !,iAe,hdvn.net P E D C O R a* at,451-4 DEVELOPMENT CO. Air' S F;: 3 -t� ct `;uwlIh::;- ;D6-1! 28 BACKBONE PATHWAY DIAGRAM T 6 0 9iqw N � M u x- ate, •f,. oe ..� F--ma- s - r�.. i "aSA ivy T� x� kayo= r Air' S F;: 3 -t� ct `;uwlIh::;- ;D6-1! 28 BACKBONE PATHWAY DIAGRAM T 6 0 9iqw