Loading...
HomeMy WebLinkAboutT7821`Ypi� !�_ftMi !Ye C61,`1 ; dtllehS. fk,'S ;SeCt'fLO, Vie tx r3u t': t e;4.t� '_ F01 mbecles: ofmds md diarp �bae_ti. JOINT TRENCHING Scale = 1/8 " =1' MIN 6 "D v 36" - LENGTH I 36" - DEPTH HAND HOLE SIDE VIEW Scale = NONE Gs, CONDUIT SLAB Scale = NONE *f 24" WIDTH 2 -4" AFF BS IN BUILDING 4 36" LENGTH ► CONDUIT BENDS OU SIDE HOLES Scale = NONE HAND 36" - LENG 400' ELEVATIO N-x 36" - DEPTH A I 36 "- LENGTH ELEVATION = X -1B' 36" -DEPTH 36" - LENGTi ELEVATIO 400 ELEVATION �5 - LENGTH - N =X TOP OF =X CONDUIT 24 36" - DEPTH 30- BELOW 36" - DEPTH U 36" - LENGl14- - - -___ -- -- 400' ELEVATIO 36" - LENGTH N - X ELEVATION = 36" - DEPTH X24- 36" -DEPTH B 36" - LENG 400' - ELEVATIO 36" - LENGTH N - X ELEVATION = 36" - DEPTH X-zar 36" -DEPTH CONDUIT INSTALLATION Scale = NONE 36 "- LENGTH NOTES: NOTES: 1. WHERE POSSIBLE INSTALL CONDUITS TO DRAIN INTO HAND HOLES 2. CONDUITS SHALL BE INSTALLED AT A MINIMUM OF 24 -30" DEPTH TO THE TOP OF THE CONDUIT AT MINIMUM DEPTH OF RUN 3. IN MAIN CONDUIT RUNS, WHERE POSSIBLE, SLOPE OF THE CONDUIT SHALL BE 6" PER 100' AND MAY SLOPE FROM THE MIDDLE TO BOXES AT BOTH ENDS (SEE "A" ABOVE) 4. WHEN BOX MOUNTING ELEVATIONS WILL CAUSE SLOPE BETWEEN BOXES NATURALLY EQUAL TO .5% GRADE (6" PER 100'), NO FURTHER SLOPE WILL BE REQUIRED (SEE "B" ABOVE) 5. ALL CONDUITS SHALL BE MULTI - CHANNEL CONDUIT WITH PULL STRINGS IN EACH CHANNEL, EQUIPPED WITH MULTIBLE INNER -DUCTS WITH PULL ROPES IN EACH, OR EQUIPPED WITH MAXCELL FLEXIBLE INNER -DUCT SYSTEM WITH PULL ROPE IN EACH CHANNEL. 6. PATHWAY ALTERATION REQUIRED TO AVOID OBSTRUCTIONS IN THE CABLE PATHWAY SHALL UTILIZE VERY LONG SWEEPS OR ADDITIONAL HAND HOLES WILL BE REQUIRED (SEE "C" ABOVE) 7. NO MORE THAN 180 DEGREES OF BENDS BETWEEN HAND HOLES WITH PTH SPLICING TYPE 5 AN UNDERGROUND VAULT. HAND —HOLE SIZING AND CONFIGURATION Scale: 1/2" = 1' GENERAL NOTES: TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 WITH SPLICING TYPE 3 TYPE 7 UP TYPE 1 TYPE 1 PROPOSED ENCLOSURt3; Vtl-tlF Y rINAL LUL;A I IUNS UN >> A • B- LENGTH ► C 24" SITE. 36" 36" 36" 2) ALL CONDUITS TRADE SIZE 4" UNLESS OTHERWISE 48" 36" 36" SPECIFIED TOP 48" 3) CONDUITS ENTERING AN END OR SIDE REQUIRE THE 36" 48" 42" ADJACENT ENDS OR SIDES TO BE A MINIMUM OF 36" DEPTH 4) BOXES WHERE SPLICING MAY BE REQUIRED SHALL ADD END 12" TO THE LENGTH OF THE ADJACENT ENDS AND /OR I ., SIDES SIDE 5) CONDUITS STACKED (NOT ENTERING HORIZONTALLY) L.414 gx WILL REQUIRE AN ADDITIONAL 6" OF DEPTH FOR EACH /A- ROW DTH 6) MAXIMUM QUANTITY OF DUCTS ENTERING ONE SIDE OF A HAND -HOLE SHALL BE 6' LARGER QUANTITIES REQUIRE . AN UNDERGROUND VAULT. HAND —HOLE SIZING AND CONFIGURATION Scale: 1/2" = 1' GENERAL NOTES: TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 WITH SPLICING TYPE 3 TYPE 7 UP TYPE 1 TYPE 1 1) FIELD VERIFY ALL UTILITIES, STRUCTURES, AND OBSTRUCTIONS ALONG PLANNED ROUTE. 2) UTILITY MARKING SERVICES SHALL BE NOTIFIED PRIOR TO WORK BEING PERFORMED. 3) ALL TRENCHES DEEPER THAN 5' SHALL HAVE SIDE WALLS SHORED, SHEETED, BRACED OR OTHERWISE SUPPORTED PER OHSA REQUIREMENTS UNLESS THE SIDE WALLS ARE CUT TO A SLOPE OF 12" HORIZONTALLY FOR EACH 24" VERTICALLY. 4) MINIMUM BEND RADII SHALL BE OBSERVED (FOR CONCRETE ENCASEMENT, COMPACTED FILL, OR DIRECTIONALLY BORED). 5) %" NYLON PULL ROPES SHALL BE INSTALLED IN EACH DUCT AND TIED OFF AT EACH PULLING SPACE. 6) DUCTS ROUTED UNDER PUBLIC ROADWAYS SHALL BE DIRECTIONALLY BORED. 7) DIRECTIONALLY BORED DUCTS UNDER ROADWAYS SHALL BE AT A MINIMUM 6' DEPTH TO DISPERSE LIVE LOADS OR SHALL BE INSTALLED IN A STEEL CASING WITH SAND BACKFILL. 8) ALL CONDUITS ENTERING A BUILDING OR TUNNEL SHALL SLOPE UPWARD AT LEAST 1 PERCENT FROM THE LAST PULL BOX/UTILITY VAULT. 9) ALL DUCTS ENTERING A FACILITY SHALL BE EQUIPPED WITH PROPERLY SIZED DUCT PLUGS. 10) ALL OSP CABLE INSTALLED IN DUCTS SHALL BE PULLED UTILIZING PROPERLY SELECTED BREAK -AWAY SWIVEL EYES TO AVOID CABLE TWISTING AND DAMAGE. 11) ALL UNDERGROUND CONDUIT ROUTES SHALL BE INSTALLED WITH A #6 COPPER (OR EQUIVALENT) LOCATE CONDUCTOR CONTINUOUSLY ALONG THE ENTIRE PATH. CONDUCTOR SHALL NOT BE CONNECTED WITHIN A FACILITY AT EITHER END. CARMEL Ap DIMENSIONS >> A B C 24" 36" 36" 36" 36" 36" 24" 48" 36" 36" 48" 36" 48" 48" 36" 36" 48" 42" 1) FIELD VERIFY ALL UTILITIES, STRUCTURES, AND OBSTRUCTIONS ALONG PLANNED ROUTE. 2) UTILITY MARKING SERVICES SHALL BE NOTIFIED PRIOR TO WORK BEING PERFORMED. 3) ALL TRENCHES DEEPER THAN 5' SHALL HAVE SIDE WALLS SHORED, SHEETED, BRACED OR OTHERWISE SUPPORTED PER OHSA REQUIREMENTS UNLESS THE SIDE WALLS ARE CUT TO A SLOPE OF 12" HORIZONTALLY FOR EACH 24" VERTICALLY. 4) MINIMUM BEND RADII SHALL BE OBSERVED (FOR CONCRETE ENCASEMENT, COMPACTED FILL, OR DIRECTIONALLY BORED). 5) %" NYLON PULL ROPES SHALL BE INSTALLED IN EACH DUCT AND TIED OFF AT EACH PULLING SPACE. 6) DUCTS ROUTED UNDER PUBLIC ROADWAYS SHALL BE DIRECTIONALLY BORED. 7) DIRECTIONALLY BORED DUCTS UNDER ROADWAYS SHALL BE AT A MINIMUM 6' DEPTH TO DISPERSE LIVE LOADS OR SHALL BE INSTALLED IN A STEEL CASING WITH SAND BACKFILL. 8) ALL CONDUITS ENTERING A BUILDING OR TUNNEL SHALL SLOPE UPWARD AT LEAST 1 PERCENT FROM THE LAST PULL BOX/UTILITY VAULT. 9) ALL DUCTS ENTERING A FACILITY SHALL BE EQUIPPED WITH PROPERLY SIZED DUCT PLUGS. 10) ALL OSP CABLE INSTALLED IN DUCTS SHALL BE PULLED UTILIZING PROPERLY SELECTED BREAK -AWAY SWIVEL EYES TO AVOID CABLE TWISTING AND DAMAGE. 11) ALL UNDERGROUND CONDUIT ROUTES SHALL BE INSTALLED WITH A #6 COPPER (OR EQUIVALENT) LOCATE CONDUCTOR CONTINUOUSLY ALONG THE ENTIRE PATH. CONDUCTOR SHALL NOT BE CONNECTED WITHIN A FACILITY AT EITHER END. CARMEL Ap P E D C O R DEVELOPMENT CO. r- e w 40r- 4, 'r a �e _e N I D Y N i t I'�• i �\ i;!n 91.0. East 56t'h Street SUI C 21150 !NDANIAPQU i. 1N 462!F 31: '.5=24.6 ;3S 31 7.52'1.6.,39 1=£ +X :ter P E D C O R DEVELOPMENT CO. r- e w 40r- 4, 'r a �e _e N am OSP UNDERGROUND PATHWAY DETAILS :ter 7- _ -z s 's w.--.x-3M I ., L.414 gx am OSP UNDERGROUND PATHWAY DETAILS