Loading...
HomeMy WebLinkAboutS2.03t r. 4_4 , L-1-T OP.C. 4 ATRIUM FRAMING PLAN NOTES- LEDGE L SEE $501 FOR STRUCTURAL NOTES 4 DESIGN DATA __--T/C0NC. WALL al f 2. ALL CONTRACTORS A RECURED TO COORDINATE THEIR UCW WITH ALL DISCIPLINES TO AVOID CONFLICTS. THE MECHANICAL, ELECTRICAL, AND PLUMBNG ASPECTS AM NOT OE IN THE SCOPE OF THESE DRAWINGS. THEREFORE, ALL MOWNED MATERIALS AND WOW MAY NOT I BE INDICATED. 3. ALL ELEVATIONS ARE REFERENCED FROM THE FIRST FLOOR FF. ELEVATION 40'-0%. E 4. TOP Or STEEL (T/S) IN THE O.P.C. AND ATRIUM SHALL BE W BELOW T/SLAB, U.N.0- v 3 5. PLAN LEGEND- FF. DENOTES FINISH FLOOR T/')<' DENOTES TOP OF STEEL, WALL, PIER ETC- SFE. DENOTES SLAB EDGE MEAS. FROM SEAM 4t, DENOTES ARCH. WALL LINE (P I 3 "0/ NUMBER OF 3/4' DIA X 412' +,I __ I STEEL BEAM SIZE7 L SHEAR CO RS OFSPACED ALONG FULL LENGTH IWAM R-20.0K LUAAI�_/( 16 LUZ> 35(la) X X _. 6.6f 1 4 Aw -4 cz t *14foK R =1 BAOK ELF X LU14 2(8 ul 8X50(114-10 14) jIax40('4-lOt!4) V, 4. , Ul8X50(14-10 14) R=362K R=�9.2< UZX46(8-ro-ro- R=362K R 32.5< c1l R 215K R=143K, T/C.ONC, WALL -0' -6 4 C CRETE 5L A5 W/ &Xro-W.IXILU2.11 LU.W.F4 OVER T/5RICK LEDGE 11/2",18 A. PTD. GO POSTE METAL FLO;IR DECK (TV71AL V=(W) LIMIT OF HOUR 5FIR4y F PROOF /SLAB +0'- X (NO PAIN* ON E3EA '100/ COLT MNIS I U X4&o 8-6-6 ila IEL J_--i R=31fo< 7 N� x `-T /GONG. WALL 9 3 UNIDERSLA5 DUCT 7 3 5 1 ZE 4 LOCA-1`10N TO BE x x M 4' CONCRETE SLAB LU/ NOTE: PROVIDE RECE55ED 6X6-LUI.4XLU1.4 LUILI.F. OVER SLAB IN T+415 BAY FOR FUTURE 6' MIN. GRANULAR FILL 4 DAYLIGHT ;=ROGESSOR. COORD. 6 -MIL VAPOR BARRIER SIZE 4 DEPTH W1 VENDOR 7/SLA5 +0'-0' 4 L G.J. N --- LT� Y NOTE: PROVIDE RECESSED SLAB IN T�iS BAY FOR FUTURE TYPICAL SLAB CONTROL N', JOINT LAYOUT U.N.O. DEPTH W/ VENDOR COLUMN ISOLATION JOINT SEE E)TL. ON 64-02 N. 1 R DENOTES BEAM REACTION, IN KIPS TO 5E USED FOR DESIGN OF 84-EAR CONNECTION 5Y STEEL FABRICATOR. 41 'TE NO TE: THE ENGINEER RETAINS THE RIGHT TO REQUEST '1/,T T%/ TIT T �7__ A CONCRETE 4' CON SLA�B" LU/ 6X6-UJI.4XUJI4,4 Ullll -. OVER ADDITIONAL MOLTS DURING SHOP DRAWMi REVIEW. /J/ ro -IX GRANULAR FILL 4 DENOTES TYPE 2, SEMI -RIGID MOMENT CONNECTIONS. SEE TYPICAL DETAILS ON 6405. V$% (�)R, 64-11L VAP'54RRIER T/51_AB FOUNDATION WALL _17 141' AFT 7 (14 4 — R-36.2K t I - --rte -- DENOTES C.I.P. CONCRETE PIER C14 14 &C. -1- 10 SL. Im 14 --vrAS op—d --rJS sp—d wanN OR FOUNDATION UliL_1 t r. 4_4 , L-1-T OP.C. 4 ATRIUM FRAMING PLAN NOTES- LEDGE L SEE $501 FOR STRUCTURAL NOTES 4 DESIGN DATA __--T/C0NC. WALL al f 2. ALL CONTRACTORS A RECURED TO COORDINATE THEIR UCW WITH ALL DISCIPLINES TO AVOID CONFLICTS. THE MECHANICAL, ELECTRICAL, AND PLUMBNG ASPECTS AM NOT OE IN THE SCOPE OF THESE DRAWINGS. THEREFORE, ALL MOWNED MATERIALS AND WOW MAY NOT I BE INDICATED. 3. ALL ELEVATIONS ARE REFERENCED FROM THE FIRST FLOOR FF. ELEVATION 40'-0%. E 4. TOP Or STEEL (T/S) IN THE O.P.C. AND ATRIUM SHALL BE W BELOW T/SLAB, U.N.0- v 3 5. PLAN LEGEND- FF. DENOTES FINISH FLOOR T/')<' DENOTES TOP OF STEEL, WALL, PIER ETC- SFE. DENOTES SLAB EDGE MEAS. FROM SEAM 4t, DENOTES ARCH. WALL LINE (P I 3 "0/ NUMBER OF 3/4' DIA X 412' +,I __ I STEEL BEAM SIZE7 L SHEAR CO RS OFSPACED ALONG FULL LENGTH IWAM R-20.0K LUAAI�_/( 16 LUZ> 35(la) X X _. 6.6f 1 4 Aw -4 cz t *14foK R =1 BAOK ELF X LU14 2(8 ul 8X50(114-10 14) jIax40('4-lOt!4) V, 4. , Ul8X50(14-10 14) R=362K R=�9.2< UZX46(8-ro-ro- R=362K R 32.5< c1l R 215K R=143K, T/C.ONC, WALL -0' -6 4 C CRETE 5L A5 W/ &Xro-W.IXILU2.11 LU.W.F4 OVER T/5RICK LEDGE 11/2",18 A. PTD. GO POSTE METAL FLO;IR DECK (TV71AL V=(W) LIMIT OF HOUR 5FIR4y F PROOF /SLAB +0'- X (NO PAIN* ON E3EA '100/ COLT MNIS I U X4&o 8-6-6 ila IEL J_--i R=31fo< 7 N� x `-T /GONG. WALL 9 3 UNIDERSLA5 DUCT 7 3 5 1 ZE 4 LOCA-1`10N TO BE x x M 4' CONCRETE SLAB LU/ NOTE: PROVIDE RECE55ED 6X6-LUI.4XLU1.4 LUILI.F. OVER SLAB IN T+415 BAY FOR FUTURE 6' MIN. GRANULAR FILL 4 DAYLIGHT ;=ROGESSOR. COORD. 6 -MIL VAPOR BARRIER SIZE 4 DEPTH W1 VENDOR 7/SLA5 +0'-0' 4 L G.J. N --- LT� Y NOTE: PROVIDE RECESSED SLAB IN T�iS BAY FOR FUTURE TYPICAL SLAB CONTROL N', JOINT LAYOUT U.N.O. DEPTH W/ VENDOR COLUMN ISOLATION JOINT SEE E)TL. ON 64-02 N. NOTE: 5L.145Ti41c<'iIE65 VARIES fRot-I'L41-1, -EASTWARD SEE SECTION-5/10N 54.03 LIN T --gill 8403 F.F. DENOTES FINISH FLOOR TI-X' DENOTES TOP OF FOOTING, WALL, PIER, ETC_ C.J. DENOTES SLAB CONTROL JOINT PI DENOTES CONCRETE PIER 4 TOP OF PIER ELEVATION BELOW 40-0'. /Al DENOTES RECESSED SLAM, COORD. LIMITS LU,'ARCH. FLOOR i PLAN 4 ROOM FN!SH SCHEDULES 1 R DENOTES BEAM REACTION, IN KIPS TO 5E USED FOR DESIGN OF 84-EAR CONNECTION 5Y STEEL FABRICATOR. 41 'TE NO TE: THE ENGINEER RETAINS THE RIGHT TO REQUEST '1/,T T%/ TIT T �7__ A CONCRETE 4' CON SLA�B" LU/ 6X6-UJI.4XUJI4,4 Ullll -. OVER ADDITIONAL MOLTS DURING SHOP DRAWMi REVIEW. /J/ ro -IX GRANULAR FILL 4 DENOTES TYPE 2, SEMI -RIGID MOMENT CONNECTIONS. SEE TYPICAL DETAILS ON 6405. V$% (�)R, 64-11L VAP'54RRIER T/51_AB FOUNDATION WALL 141' AFT (14 4 — R-36.2K t I - --rte -- DENOTES C.I.P. CONCRETE PIER 14 &C. -1- 10 SL. Im 14 --vrAS op—d --rJS sp—d wanN OR FOUNDATION UliL_1 "cod T_ T -__. -FOLINDATINON PLAN NOTES: 4. SEE 5401 FOR TYPICAL FOLIND-47ON SECTIONS 4 4 AND PIER DETAILS. ;7r 5 PLAN LEGEND: NOTE: 5L.145Ti41c<'iIE65 VARIES fRot-I'L41-1, -EASTWARD SEE SECTION-5/10N 54.03 LIN T --gill 8403 F.F. DENOTES FINISH FLOOR TI-X' DENOTES TOP OF FOOTING, WALL, PIER, ETC_ C.J. DENOTES SLAB CONTROL JOINT PI DENOTES CONCRETE PIER 4 TOP OF PIER ELEVATION BELOW 40-0'. /Al DENOTES RECESSED SLAM, COORD. LIMITS LU,'ARCH. FLOOR i PLAN 4 ROOM FN!SH SCHEDULES i i � � j cm \ ! KEY PLAN x \X 22'10' 22`�-Ol 25'-0' 25'-0' 25'-0 251-01 -01 �b4 O.P.C. 1ST FLOOR FRAMING PLAN SCALE 0 r1r) z m 00 00 4-) o 3 (D 0 2 cf) g zU o cb 9L o of �W 5 �a co co a0 co z < C o z 0 _j > < 5 _j Z m 50-- w z �Uz? U_ W U_ (L _j 0 00 _j C-4 (L Samoa z z C) wiz as -Cl C\.2 U CO 4 ...... . . cn wt �7 FIRST FLOOR FRAMING-OPC ! S200311 DENOTES CONCRETE MASONRY FOUNDATION WALL �/ I - --rte -- DENOTES C.I.P. CONCRETE PIER OR FOUNDATION UliL_1 DENOTES LINDERSLAB MECHANICAL DUCTWORK ELEVA, QR ;7r 71 1 �Ve c(). X! 12' 'Al 4b --- --- N,N CONNON 7 T- r -4 i i � � j cm \ ! KEY PLAN x \X 22'10' 22`�-Ol 25'-0' 25'-0' 25'-0 251-01 -01 �b4 O.P.C. 1ST FLOOR FRAMING PLAN SCALE 0 r1r) z m 00 00 4-) o 3 (D 0 2 cf) g zU o cb 9L o of �W 5 �a co co a0 co z < C o z 0 _j > < 5 _j Z m 50-- w z �Uz? U_ W U_ (L _j 0 00 _j C-4 (L Samoa z z C) wiz as -Cl C\.2 U CO 4 ...... . . cn wt �7 FIRST FLOOR FRAMING-OPC ! S200311