Loading...
HomeMy WebLinkAboutS2.08I C14 C-4 0 C-4 1 cv CL N) O.P.C. 4 ATRIUM FRAMING 1-1-AN NOTES: CN 1. SEE 85.01 FOR STRUCTURAL NOTES 4 DESIGN DATA. 00 00 2. ALL CONTRACTORS ARE REQUIRED TO COORDINATE THEIR WORK WITH ALL DISCIPLINES 4- TO AVOID CONFLICTS. THE MEC44ANICAL, .. 0 0 ELECTRICAL, AND PLUMBING ASPECTS ARE NOT • • IN THE SCOPE OF THESE DRAWINGS. THEREFORE, UI ALL REQUIRED MATERIALS AND WORK MAY NOT BE INDICATED. 4� C) 3. ALL ELEVATIONS ARE REFERENCED FROM THE FIRST FLOOR FF. ELEVATION 40'-0'. 4. TOP OF STEEL (T/8) IN THE OP.C. AND ATRIUM 1 +-) M SHALL BE 6' BELOW T/SLA5, U.N.0- r N 5. PLAN LEGEND: I F.F. DENOTES FINISH FLOOR T/X' DENOTES TOP OF STEEL, WALL, PIER ETC- S.E. DENOTES SLAB EDGE MEAS. FROM BEAM C DENOTES ARCH. WALL LINE NUMBER OF 3/4' DIA X 41/2' W L STEEL BEAM SIZE-7 SHEAR CONNECTORS UNIFORMLY SPACED ALONG FULL LENGTH OF BEAM LUI8X35 Oa) T it > R DENOTES BEAM REACTION, IN KIPS TO BE USED FOR CONNECTION Id oa . 0 DESIGN OF SHEAR CONNECTION BY STEEL FABRICATOR. � I tw; NOTE: THE ENGINEER RETAINS THE RIGHT TO REQUEST OUTLINE OF I i I +'3 1 I ADDITIONAL BOLTS DURING SHOP DRAWING REVIEW. ELEVATOR 12 13 5401 -- -- --- - - - -- - - -- - j I I + j i i ! cfJ — �- - --- -----_—_ — - - - - -� I - -�- -- — - -- —; I -- -- — — -- - -- - - - - -- — -- - -- - - - -- — -- - - -- ' \ - j \ I J I ! — r - -- I -� -- -- - -- -- - - - - -- {I — — -- - - - - -- —+ i I - - - -- - -- 1 I ! _ I J OVERRIDE BELOW $410 54I 1- 0 DENOTES TYPE 2, wRrnIGiy MOMENT CONNECTIONS. iop S-407 SEE TYPICAL DETAILS ON 5405. u uwj I 3E,(14-10-14) -1 - — — — — — — — — — — — 4- - - - - ----- - - - Luj Fri R%362% U18X40(14-iO 14) Ll 8X40(14 -, .0 14) eX,40(14-10 .14) 8,40"! 1 100%. R=22EK F_ -."I R=22.OK 22 0K N X x F_ + 7 14 SL. jq_Oj�:. 1 4 5z. UJIBX24 -!-- I I "Cad E-L-Eyo-ATOR _04- t_� 11401ST BEAT Uro)',26(14) LU'laX40(8-ro-b- LUl&X40(8-ro-(o-i "o X x L 13 ISIX50 I I I I j !�+ UJWo =(8-8) 0 C14 54 OUTLINE OF ELEVATOR W18 la 3508) @ LU14X2 2(2q) Rz llfoK OVERRIDE IBELOUJ-14 x x x C14 UJ12)<14(0) x co (0 01 x cf) x X x x x x WSX24 I I ELEVATOR IQ 1401ST BEAM Of�EN x 1401ST 2 WSX24 540, 04 5Eo4m+,T-Y Uj/ > ELEV. LIER 5411 k SHAFT Soo, �LEV MEC s 0 -!Otl4) -10 14) L48X50(14 ax5o(14 Uila 35(14) Lula LU co R=34_5K R = 34—1,K LLIOX50(14-10 14) 1 — — , — — — — -- oil L N 0 1% R = 34.5K r k4 — ----- LulaX35( la) -_- - - - - -- 07 CIA OPEN OPEN n, x x x X x x 41/21 C �)NCRETE SL AB LU/ x x L3X3X'/4 KICKERS T 1/4 roXro-L r2.IXUJ2.i W.W.F. OVER 3 1=0 INTS LIMIT &F. HOUR 11/2', bB C FA PTZ). COt IPCS!TE sPRA I pRoor-i METAL FLO �)R DECK (T, DTAL Y= ro') 3 (NO P4iN' - 1ON BEAMS U-NS WSLAB +42'-01 COL 5407 Uf 8X50(14-10 14) 48X50(14-10 14) 18X50(14-!0 14) LulaX46 6L-6 -8 - - - ." *k R= 34.5K ­Rx 0 6* 40 x CN X WlIX14(0) LU C'4 ! C14 2�z QQ -t CIA LEI C x x cq x X x fj d) X 0) X W12x (20) TAIR\ Uro>r26(14) 4F T- - - -- _ --!- _ L x R-22.OK R=22.OK R=22-0< x 0. Sol 8X40(14 -10 14) I 8X40(114-10114) U$8X40(14-10,-14) A# - – – – – – – – – – – – – – – LulaX35(14-10-14 ) — — — — — — — — — — — — — -- — 7 -1.2 5410 401 11/2' 160 ATION JOINT 4V DA _1 - 6411 VIDE t-115C. rAN b LES, ETC. FOR r9F�' r su ORT OF ELEV. L AT TOP OF SHAFT c"pc 22'� ON 22'1-0' .ZV _u 7 3 EQ. SPA i CES 3 Ea. SPACES 4) 3 EQ. SPACES 3 EQ. SP4,CE5 O.P.C. ROOF F SCCALE RAMING PLAN Le Mon KEY PLAN U" cd a- (` 0 a- co N < 7@ V� >Z D i im 5= < w ca >OZZ LL U_ W C cf) o a- l) _j 0 C\l (L 0 I < c cl z z Z W r_j G�2 CO 0 CS g:L4 0 a{.-4 r– MAIN ROOF FR S2008