GENERAL NOTES
The performance of work indicated shall comply with all State and Local
Regulations and the Contractor shall obtain the necessary permits indicating
compliance.
See Situation Survey, Drawing L141, for existing conditions and Benchmark
data.
It shall be the responsibility of the general contractor to bear any and all
expenses to remove, relocate, and /or modify, in anyway, all unknown
subdrains and utilities, public or private. It further shall be the
responsibility of the general contractor to verify with each utility whose
responsibility it is to remove, relocate, and /or modify such utilities
existing or proposed by these plans, or future utilities proposed by others.
The utilities and subdrains indicated on these plans may not be a complete
inventory of all the existing utilities present. The location and size of
these utilities are approximate based on information gathered or supplied to
CSO /Architects. CSO /Architects shall not be liable for any incorrect or
misleading utility information indicated or not indicated on these plans.
Prior to commencing construction, the contractor shall verify existing
conditions and advise the architect of discrepancies which may affect the
proposed design.
Strip topsoil from entire,site to be disturbed by construction operations or
material storage and stockpile where directed.
Unless otherwise indicated, strip vegetation within the construction limit
line and dispose of off -site.
` Pipe lengths indicated are for hydraulic design purposes only and thc-
contractor shall be responsible for actual lengths required to complete the
installation as indicated.
Remove all site appurtenances not otherwise indicated to remain or necessary
for the continuous operation of existing facilities.
Removal of existing asphalt pavement indicated oa plans shall
include all aggregate base and subbase materials. Saw cut all
areas. All cuts shall be clean, neat and true to line. Remove
all non - organic or toxic matter that would interfere with proposed
planted materials. Replace excavated area with a minimum of 4" of
approved topsoil.
All areas where the existing pavement or pavements are damaged
during construction from traffic by the "General Contractor,
Subcontractor or Suppliers, these areas shall be reconstructed and
paved at least to its original condition after the construction
work is completed.
LEGEND
PROPOSED BULDM
T--I- 7T NEW CONCRETE WALK
INTEGRAL CONCRETE CURB
EXISTING CONSTRUCTION TO BE Fee MED
EXISTING TOPO LINE ALTERED BY NEW CONSTRUCTION
--��o- — — EXISTING TOPO LINE TO REMAIN UNDISTURBED
i O PROPOSED FINISHED GRADE TOPO LINE
NE
r¢Ie.N -t EXISTING SPOT ELEVATION
' d1° PROPOSED SPOT ELEVATION
It,N. PIPE INVERT ELEVATION
T�•L PROPOSED TOP OF CURB ELEVATION
PROPOSED TOP OF WALL ELEVATION
PROPOSED DITCH FLOW LINE ELEVATION
-- -�_' --� PROPOSED STORM SEWER
PROPOSED SUBDRAIJ
0
0
CIO
,
«�oa ui worts rapunw ra rerun psnorrnanc. ana
traOn�tni b b o) tM b or tM Cor►
y«t«.I aoopa
dlcN�d a dacribW, tna halo oontracta's
atoll tumlah all own ragttMad for "* Pr W
�cution and contpwtlon of ttra work
0)
W N ;
x
U
2
U
W
U.
J
Z
Q
H
N
It
x
U
x
0
z
a
Q
Z
a
0
Z
N%
J
W
W
W
r
T
16
��,, Q`� • •GAS' q•`�i�l► •►
19359
STATE OF I
r,0�F� •aN01 AN
s/0 lA
CERTIFIED BY
SHEET NO
L103
OF SHEETS
NO
FILE
92217-x►
.STORM • STRUCTURE SCHEDULE
l.ler
STPJ,::�;NF& T'(t
I& Id.
I OV, OL'r -
(ZIM EL.
b9_T;4L
Oftt i �:qT
a1 p4:s WLer
40 eLJI3o d
".lo
1211 C &x2,40
805. to
II/L05
tZAhOI -4
2t
GURrb ourr
4I'QkO 9
AWS-10
805.15
II/L106
TZ- V'POI -1,1
t-
5- Jv c7160
12" W P. fiepI, 10
—
12/ L106
4
aw�00 �r�
4j' 1yc- S 7 &)7t-V
/LIo
c,,
tiro .w4�L.L
4' jNG y./•
7°X,.aD
—
17 1LICE
�r
r- j" I P48'T
411 A,JIUt*Alr!
>cj,701
M" F,,--r IJ. 80&70
s I I,-w
I I/ L109
(2 -W30 1- N
7•
cJRB INLET
4"Q= F44
9W7r70
12" pef W Barg%%
".10
I1 11-10b
R 3;01-4
A.
C-id E IoLt•
¢r, NIJ
800,w
I r, " i svJ 7 &,4:% f o
E02W
9 /LIDS
R-'tM A
12 �zr-r #el
B�aCd
0)
e4ze IoLvT
4F
Kr 5 7°�•�
ao2.o6
II /Lim
R- 'KoI -N
10.
u,1r-m INLET
41 SOBt�IO
79tI`.So
15a 14r-p s 797,30
S00600
' 11 /1Jo*
la- %01 -N
H.
7a,90
=S
1 �
�t�TT�fi' I�L�
-
6 ii
7X 70
n
caPfl ►NLr M4196M
41 5+.1100,6 0 7%cr
-274 rcp S ?c)S.20
st °�
13/Liob
- •3eI�,tl.
15' 1 pcf Is
797.80
1SU IZe-r 0
-MIG
I'S
-5,�—TW*J
27 a F. 14
7°440
—
12/Lk*
_uJRrp IOLCT - --
ik 4ij -o(%A#j
810,7:.
124120.E tvv Ao&ao
sivn
I1 /Uab
R- 's5o1 -N
-* --
OUTTrfi INLrOT -
-- 411 SJnsr)RAO
6o2,aic• .
1 y," izc4- S ao'a.w
Su4,?o
t)/l.i06
IZ-3415A)A-dWAIC
_ �--
CKkTTS,1?. 10 LET _
4.� 'e,05CRA10
w2mo
120 9W. 30
#&4.0.�o
0)/LICE
"13%Ad W►T&. .
- 17,
E J a 4WT
('Lr 1�P I;
1g1. Io
—
12�t.los
CuFb IO.LT tTP5- 21
12a prq -0 7°17,*
' 6AW
I S/Lift
K -S1445
.ralJ
12� f�cP �1
7°17r10
,
«�oa ui worts rapunw ra rerun psnorrnanc. ana
traOn�tni b b o) tM b or tM Cor►
y«t«.I aoopa
dlcN�d a dacribW, tna halo oontracta's
atoll tumlah all own ragttMad for "* Pr W
�cution and contpwtlon of ttra work
0)
W N ;
x
U
2
U
W
U.
J
Z
Q
H
N
It
x
U
x
0
z
a
Q
Z
a
0
Z
N%
J
W
W
W
r
T
16
��,, Q`� • •GAS' q•`�i�l► •►
19359
STATE OF I
r,0�F� •aN01 AN
s/0 lA
CERTIFIED BY
SHEET NO
L103
OF SHEETS
NO
FILE
92217-x►