HomeMy WebLinkAbout03060224 Plan Revision 10/3/03sp¢cifiecl re¥i
trial, or Institutional: New Structures, Additions.
Permit #: 03060224
Date: 07/14/2003
Structures
: 9750 GRAY RD INDIANAPOLIS IN 46280
Zoning: Flood Zone N
PROPERTY OWNER INFORMATION.:
Name:
Ph. #: 8047470422 Fax #: 8049354595
Street Address: 9750 GRAY RD CARMEL, tN 46033
CONTRACTOR INFORMATION:
Name: T.D, FARRELL CONSTRUCTION
Ph. #: (770) 754-3110 Fax #: Email:
Street Address: 1360 UNION HILL RD, BLDG 12 ALPHARRETTA, GA 30004
P umber s Name:
Codes for Project:
Lot Split: N
~IEW : COMMERCIAL NEW STRUCTURE
AKERS ON 7131/03, LOCAL CONTACT IS GEOFF
AT 818-0685. ~
O~~~ber:~e to the
to determine whether the changes need
State approval, Jeff and/or Jim B.
will make that determination. -
Additionally, many of the changes are
cosmetic but it c~nnot be determined
Eom their cover letter whether or not
ihey've submitted this Addendum ]~3 to
~hat office, Same for the Engineer's
office. The cover letter and these
notes will be given to Jeff and he will
direct the nex~ moves.
Per JK: Addendum release will be
conditional to conforming to the sign
ordinance.
CARMAX AUTO SUPERSTORE
(PlUmber TBA prior to PJI)
Prs-submittal meeting Thurs June 26
2003. Project will be an auto sales
facility~ Docket numbers 46-02 DP,
47-02 PP TAC in March & April 2002
Indy Wtr Carmel seWer, zoned B-3.
Letters of Grant on fie RE improvements
BILL
MARCINEK
Water Service by: INDPLS
County Well Permit #:
Sewer Service by: CARMEL
County Septic Permit #:
Foundation Type:
Estimated Cost of Construction:6815647
Sump Pump: N
Manufactured Trusses: N
Usage Class: COM
Construction Type:
State Design Release #: 294595
Square Footage: 58477
~rl~
SPARKMAN
COM. IND. INST CIO 43450
EWADDACC 9720.32
ARCHITECT
September 19, 2003
Mr. Jim Blanchard
Deputy Building Commissioner
Building & Code Enforcement
City of Carmel
Department of Community Services
One Civic Square
Carmel, Indiana 46032
Re.'
CarMax Indianapolis
Addendum Number Three to the permit drawings
Mr. Blanchard,
sAttached please find a copy of Addendum Number Three to the permit drawings. Per our pre-
ubmittal meeting these drawings have not yet been submitted to the State for approval, you indicated
that you would review any changes to determine if submittal to the State was necessary. Please advise
as soon as possible if we should submit these drawings to the State so not to impact our construction
schedule.
If you have any questions, please do not hesitate to contact either Klm Ferraro or myself.
Sincerely,
TERRY L HERR ARCHITECT
Earl M. Smith
Project Manager
cc: Ned Sparkman - IDI
P 770.569.1706 F 770.569.J706 3000 ROYAL BOULEVARD SOUTH ALPHARETTA, GEORGIA 30022
· 20-01024.02 STORE NO. 7144 09 Sept 03
00906 BULLETIN NUMBER TWO
FROM: TERRY L. HERR ARCHITECT
3000 Royal Blvd South
Alpharetta, Georgia 30022
(770) 569-1706
TO: T.D. Farrell Construction, Inc.
1360 Union Hill Road
Building 12
Alpharetta, Georgia 30004
770.754.3110
Ned Sparkman, IDI
Dan Bickett, CARMax
Plan Distribution List - for Change Bulletin
SUBJECT: CARMax - Indianapolis, IN CAP, Max Store No. 7144
n accordance with Section 01035 - Modification Procedures please submit an itemized quotation for
the changes in the Contract Sum and J or adjUstments in Contract Time incidental to the proposed
modifications to the Contract Documents described herein.
This is NOT A CHANGE ORDER or a direction to proceed with the work described herein.
This Bulletin consists of nine (9) pages.
I. PROJECT MANUAL
None
DRAWINGS
item 6-01
Item 6-02
II.
stitute the revised
attached sheet.
1. Updated Drawing Index [clarification]
C3 S te P an - 19 Aug 03 - Per C ty Comments
Delete the above referenced sheet in ds entirety and substitute the rev sed
attached sheet.
1. Revised Masonry Wall height to be 8'-0" [city comments]
- Note: Field Order 13 ha~ revised this
2 Rev sed center curb to be grass not concrete [city comments]
3 Rev sed note for power pole relocation [city comments]
4. Moved aspha t path to be ocated 1 off of the Right of Way me [city
commentsl
5. Added dimension around building for clarity [city comments]
6. Added approximate location of Force Main [city comments]
BULLETIN NUMBER TWO 00906 - 1
20-01024.02 STORE NO, 7144 09 Sept 03
Item 6-03 C4 Site Plan - 19.Aug.03 - Per City Comments
~eele-~e th-~above referenced sheet in ts entirety and substitute the revised
attached sheet.
Revised Masonry Wall height to be 8'-0" [city comments
- Note: Field Order 13 has revised this
2 Revised center curb to be grass, not concrete [city comments]
3. Revised note for power pole relocation [city comments]
4. Moved asphalt path to be located 1' off ofthe Right of Way line [city
comments]
5. Revised path size where itties to existing path at SW corner [city
comments]
6 Added dimensions around build ng for clarity [city comments]
7. Added approximate location of Force main [city comments]
8. Revised curb around island at 96~h Street entrance to be straight curb [city
comments]
item 6-04
C5 Gradin Plan - 19,Aug.03 - Per City Comments
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added note on swale grading [city comments]
2. Added approximate location of Force Main [city comments]
3. Added note for West side of property noting that existing grading changed
[city comments]
4. Revised legend for sanitary structure for clarity [city comments]
5. Revised swale North of G~ay Road entrance [city comments]
Item 6-05
C6 Gradin ~ Plan_ - 19.Aug.03 - Per City Comments
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added note on swale grading [city comments]
2. Added approximate location of Force Main [city comments]
3. Added note for West side of property noting that existing grading changed
[city comments]
4. Revised egend for san tary structure for c arity [city comments]
5. Revised grading around pond and at southwest corner of pond [city
comments]
Item 6-06
~ - 19.Aug,03 - Per City Comments
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added note for west side of property noting that existing grading changed
[city comments]
2. Revised legend for sanitary structure for clarity [city comments]
3. Added approximate location of Force Main [ci~ comments]
4. Added ir~formation for the boring of the waterline under Gray Road [city
comments]
5. Added Storm Sewer note [city comments
6. Revised sanitary line to the south and the san connection to the west [city
comments]
BULLETIN NUMBER TWO 00906 - 2
20-01024.02 STORE NO. 7144 09 Sept 03
7. Revised STR 130, 131,132,133 locations and pipe from 133 to 143 [city
comments]
8. Revised note for power pole relocation [city comments]
9. Revised TC's and inverts on Structure Data Table as needed [city
comments]
10. Revised off-site Structures to be manholes, not inlets [city comments]
Item 6-07 C~ - 19.Aug.03 - Per City Comments
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added note for west side of property noting that existing grading cnanged
[city comments]
2. Revised legend for sanitary structure for clarity [city comments]
3. Added approximate location of Force Main [city comments]
4. Added Storm Sewer note [city comments]
5. Revised sanitary line to the south and the san connection to the west [city
comments]
6. Revised note for power pole relocation [city comments]
7. Revised structures 190, 191,192, 193 and pipes [city comments]
Item 6.08
C9 Off Site Storm Water Extension - 19.Aug.03 - Per City Comments
Del~t in its entirety and substitute the revised
attached sheet.
Item 6-09
1. Revised Structures 196, 197, 198, 199 and End Section and pipes [city
comments]
2. Added Storm Sewer note [city comments]
3. Revised notes about existing ground survey and drive replacement note
[city comments]
4. Revised utility pole relocation note [city comments]
5. Added Carmel Creek Flood information [city comments]
6. Revised the amount of Rip Rap required [city comments]
7. Added a note noting that ground to the north has changed since survey
[city comments]
8. Added location of asphalt path in area [city comments]
9. Added note about replacing path as required with storm placement [city
comments]
10. Revised Structure [city comments]
- 19.Aug.03 - Per City Comment
D~d sheet in its entirety and substitute the revised
attached sheet.
1. Added milling and resurfacing on Gray Road [city comments]
2 Added notes on traffic coordinat on [city comments]
3. Added sign along 96~h Street [city comments]
4, Added dimensions for 96th Street entrance [city comments]
Item 6-10 C10A Maintenance of Traffic - 19.Aug.03 - Per City Comments
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1 Added Maintenance of Traffic notes [city comments]
BULLETIN NUMBER TWO 00906 - 3
· 20-01024.02 STORE NO. 7144
09 Sept 03
2. Added s~gnage along 96~ Street [city comments]
3. Revised merge sign on 96th Street [city comments]
Item 6-11 C11_ Erosion- Control Plan - 19.Aug.03 - Per City Comments
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1 Modified inlet protection to match structures that moved [city comments]
Item 6-12 C12 Erosion Control Plan - 19.^ug.03 - Per City Comments
Delete the above referenced sheet in its entirety aha substitute the revised
attached sheet.
1. Modified inlet protection to match structures that moved [city comments]
Item 6-13 C13 Construction Details - 19.Aug.03 - Per City Comments
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added Indianapolis Water detail for pipe encasement [city comments]
Item 6-14 C15 Construction Details- 19.Aug.03 - Per City Comments
ed sheet in its entirety and substitute the revised
attached sheet.
1. Added straight curb detail [city comments]
Item 6-15 STP- I Gradin Plax - 19.Aug.03 - Per City Comments
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Revised structures as noted above [city comments]
Item 6-16 STP - 2~ - 19.Aug.03 - Per City Comments
Delete the above referenced sheet in its entirety and substitute the rewsed
attached sheet.
1. Revised structures as noted above [city comments]
Item 6-17 STP- 3 Gradin~ Plan -19.Aug.03 - Per City Comments
Delete the above referenced sheet in its entirety and substitute the rewsed
attached sheet.
1. Revised structures as noted above [city comments]
Item 6-18 STP- 4 Gradin= Plan_- 19.Aug.03 - Per City Comments
Delete the above referenced sJ~eet in its entirety and substitute the revised
attached sheet.
1. Revised structures as noted above [city comments]
item 6-19 STP - 5 Gradin Plan - 19.Aug.03 - Per City Comments
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
BULLETIN NUMBER TWO 00906 - 4
' 20-01024.02
STORE NO. 7144
09 Sept 03
Item 6-20
Item 6-21
Item 6-22
Item 6-23
Item 6-24
Item 6-25
Item 6-26
Item 6-27
1. Revised structures as noted above
STP - 6 Gr da in - Plan~ ~ 19.Aug,03 - Per City Comments
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Revised structures as noted above [city comments]
STP - 7 Gradin Plan - 19.Aug.03 - Per City Comments
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Revised structures as noted above [city comments]
A1 0. Architectural Site Jan
1
2. Revised Transformer location [RFI 32]
A2.1 Service Floor Pla
1 Section marker at Break Room should read: 33/A4.4 [desigr coordination]
2, Revised electrical transformer location [RFI 32]
D~ferenced sheet in its entirety and substitute the revised
attached sheet.
1. Rev sed dimensions for doors at FQC [design coordination
2. Revised site wall he ght to 6'-0' [prototype change]
A2.3 Enlar ed Floor Plans
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Revised toilet accessories at Men's and Women's Service Restrooms
[clarification]
A2 4 F n sh Foor Pan
Delete the above referenced sheet m its entirety and substitute the rewsed
attached sheet.
1. Revised floor material legend and notes for clarity [clarification]
A2.5 Relfected Ceilin Plan
Delete the above referenced Sheet in its entirety and substitute the revised
attached sheet.
1. Revised Fighting and hose reel dimension locations in FQC [design
coordination]
BULLETIN NUMBER TWO 00906 - 5
20-01024.02 STORE NO. 7144 09 Sept 03
Item 6-28
Item 6-29
Item 6-30
Item 6-31
Item 6-32
Item 6-33
Item 6-34
A2.6 Roof Plan_
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added 28'-0' w~de' 'doghouse behind' Presentation Lanes parapet for
Service Signage [design coordination]
2. Added cricket at Presentation Lanes [design coordination1
A3.0 Exterior Elevations
Delete the above referenced sheet in its entirety and substitute the rev sed
attached sheet.
1 Revised exterior elevations at CMU to show painted 'soffit' to match EIFS
[design coordination]
2. Centered Service sign at Presentation Lanes above northern door [CAP, Max
request]
A4.3 Wall Sections and Details
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added dog house detail for Service signage at Presentation Lanes [design
coordination]
A4, 5 FQC Wall Sedions and Details
~n its entirety and substitute the revised
attached sheet.
1. Revised height at site wall [prototype change]
S2.0 Overall Foundation Plan
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. FQC Foundation Plan - doors along the east and West have moved 4"
south [design coordination]
2. FQC Foundation Plan, Pilasters between doors 200A/E and 200B/D have
been centered between the two doors [design coordination]
S2.5 Foundation Sections
~ced sheet in its entirety and substitute the revised
attached sheet.
1. Details' C & E - top of wall changed to 6'-0' max [prototype change]
S3.0Overall Roof Framin Plan
Delete the above referenc~ed sheet in its entirety and substitute the revised
attached sheet.
FQC Foundation Plan - doors along the east and West have moved 4"
south [design coordinationl
FQC Foundation Plan - Pilasters between doors 200A/E and 2008/D have
been centered between the two doors [design coordination]
BULLETIN NUMBER TWO 00906 - 6
· 20-01024.02
Item 6-35
Item 6-36
Item 6-37
Item 6-38
Item 6-39
Item 6-40
Item 6-41
STORE NO. 7144
09 Sept 03
EO~cal Le ends and Schedule
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Revised catalog number for fixture ~/pe EF to agree with shop drawings
[clarification[
2. Revised finish to be dark bronze for fixture types OLA, OLB. OLC and OLG
to agree with shop drawings [clarification(
E1.1 Site Powe~ STS Plan~
Delete the above referenced sheet in its entire~y and substitute the revised
attached sheet.
1. Relocated communications pull box IRF127(
E2.0Sa~esAreaLi htin Plan
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added legend note 14 ]RFI 30]
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added iunction box for signage ]RFI 30]
2. Revised lighting in FQC [design coordination(
E4._3 STS Details
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Revised detail 2/E4.3 [RF125]
E6.1 Panelboard Schedules
~d sheet in its entirety and substitute the revised
attached sheet.
1. Revised panel schedule SLB, circu t 35. [RFI 301
2. Changed circuit breaker size on panel schedule LC, circuit 16. [Prototype
change]
3. Revised panel schedules to agree with shop drawings: SLA, SLB, HA, HB
(sect 2) HC (sect 1 & 2), LA (~ect 1 & 2), LB (sect 1 & 2) and LC [sect. 1)
]design coordinat on]
E6.2 Panelboard Schedules
~d sheet in its entirety and substitute the revised
attached sheet.
1. Changed circuit breaker s ze on panel schedule LCP, c rcuit 55; LCPA
circui~ 13; LCPB, circuit 25. [items left off from may PE Log]
2. Revised panel schedules to c~gree with shop drawings; LD (sect. 1 & 2) LF
(sect. 1 & 2), LG (sect 1 & 2), and LCPA. [d~sign coordination1
BULLETIN NUMBER TWO 00906 - 7
' 20-01024.02
STORE NO. 7144
09 Sep! 03
III. ATTACHMENTS
PRO_ JECT MANUAL
None
DRAW_INGS
Gl.0 Cover Sheet, Drawing ndex and M sc nformat on
C1 Cover Sheet- 19.Aug.C~3 - Per City Comments
C2 Specifications- 19.Aug.03 - Per City Comments
C3 Site Plan - 19.Aug.03 - Per City Comments
C4 Site Plan - 19.Aug.03 - Per City Comments
C5 Grading Plan - 19.Aug.03 - Per City Comments
C6 Grading Plan - 19.Aug.03 - Per City Comments
C7 Utility Plan - 19.Aug.(~ - Per City Comments
C8 Utili~ Plan - 19.Aug.03 - Per City Comments
C9 Off Site Storm Water Extension - 19.Aug.03 - Per City Comments
C10 96th Street and Gray Road Entrance Plan - 19.Aug.03 - Per C ty Comments
CIOA Maintenance of T~affic - 19.Aug.03 - Per City Comments
C11 Erosion Control Plan - 19.Aug.03 - Per City Comments
C12 Erosion Control Plan - 19.Aug.03 - Per Ci~ Comments
C 13 Construction Details - 19.Aug.03 - Per City Comments
C-13a Construction Details - 19.,~ug.03 - Per ~ ty Comments
C 13b Construction Details - 19.Aug.03 ~ Per City Comments
C14 Construction Details - 19.Aug.03 - Per City Comments
C 15 Construction Details - 19.Aug.03 - Per Ci~ Comments
STP- 1 Grading P an - 19 Aug.0~ - Per City C~mments
STP- 2 Grading Plan- 19,Aug.03 - Per City Comments
STP- 3 Grading Plan- 19.Aug.03 - Per City Comments
STP - 4 Grad!ng Plan - 19,Aug.03 - Per City Comments
STP - 5 Grading Plan - 19.Aug.03 - Per Ci~ Comments
STP - 6 Grading Plan - 19.Aug.03 - Per Ci~ Comments
STP- 7 Grading Plan - 19.Aug.03 - Per Ci~ Comments
Al.0 Architectural Site Plan
r Plan
· Details
g Plan
Details
A4,5 Sections and Details
S2.0 Foundation Plan
S2.5 F
S3.0 Overall Roof Framing Plan
EO.1 Electrca Legendsand Schedule
E1.1 Site Power/STS Plan
E2.0 Sales Area Lighting P an
E2.2 FQC & Presentation Lanes Lighting Plans, Details
BULLETIN NUMBER TWO 00906 - 8
· '' 20-01024.02
STORE NO. 7144
09 Sept 03
E4.3 STS Details
E6 1 Pane board Schedules
E6.2 Panelboard Schedules
(9 pages)
END OF BULLETIN NUMBERTWO
BULLETIN NUMBER TWO 00906 - 9
RE: CARMax Indianapolis
TO: Geoff Marcenik
FROM: Kim Ferraro
#7144
ARI~H IT~
Along with this transmittal are two add tional sets of Addendum Three Documents {per the City record- Change Bulletin 2 per
our changes). These documents need to be submitted to the City for their review.
Also along with these documents is a letter from Earl to Jim Blanchard. This letter also needs to be included in your submittal.
Please let me know when you have submitted these documents and if you are contacted with their approved release.
Thanks.
Klm
of item
This message and its attachments are intended to be received only by the addressee shown above, fyouarenottheaddresseeandyouarenotresponsble
for delivering messages to the addressee, you have received it by mistake. No privilege or confidence is intended to be waived by the transmission of this
messc~e. We request you not to review or copy this material. Please notify us by collect call at the number below. Thank you for your help.
TD Farrell
y Road
Priority Fed Ex
317.818.1095
STORE NO. 7144 09 Sept 03
III. ATTACHMENTS
PROJECT MANUAL
JNone
DRAWINGS
G1 0 Cover Sheet Drawing Index and Misc, Information
C1 Cover Sheet - 19.Aug.l~3 - Per City comments
C2 Specifications - 19.Aug.03 - Per City Comments
C3 S te Plan - 19 Aug 03 - Per City Comments
C4 Site P an - 19.Aug 03 - Per C ty Comments
C5 Grading Plan - 19.Aug.03 - Per City Comments
C6 Grading Plan - 19.Aug.03 - Per City Comments
C7 Utility Plan - 19,Aug.03 - Per City Comments
C8 Ut I ty Plan - 19.Aug.03 - Per City Comments
C9 Off ~ite Storm Water Extension - 19.Aug.03 - Per City Comments
C 10 96 Street and Gray Road Entrance Plan - 19,Aug.03 - Per City Comments
C 10A Maintenance of Traffic - 19.Aug.03 - Per City Comments
C11 Eros on Contro P an - 19 Aug.03 - Per City C~mments
C12 Erosion Control Plan- 19.Aug.03 - Per City Comments
C13 Construction Details- 19,Aug.03 - Per City Comments
C-13a Construction Details - 19.Aug.03~'~c~::ity Comments
C13b Construction Deta s - 19,Aug 03 - Per City Comments
C]4 Construction Deta Is - 19,Aug,03 - Per City Comments
C15 Construction Details - 19.Aug.03 - Per City Comments
STP - 1 Grading Plan - 19.Aug.03 - Per City C(~mments -
STP - 2 Grading Plan - 19.Aug.03 - Per City Comments
STP - 3 Grading Plan - 19 Aug.03 - Per City Comments
STP - 4 Grading Plan - 19.Aug.03 - Per City Comments
STP - 5 Grading Plan - 19.Aug.03 - Per Ci~/Comments
STP - 6 Grading Plan - 19,Aug.03 - Per City Comments
STP - 7 Grading Plan - 19.Aug.03 - Per City Comments
A1.0 Arch tectural Site Plan
A2.1 Service Floor Plan
A2..2 FQC,Carwash,& Dumpster Details
A2.3 En arged Floor Plans
A2.4 Finish Floor Plan
A2.5 Reflected Ceiling Plan
A2.6 Roof Plan
A3.0 Exterior Elevations
A4.3 Wall Sections and Details
-A4~5 FQC Wa Sections and Details .....
S2.0 ~Dvera Foundation Plan
S2,5 Foundation Sections
S3.0 Overall Roof Framing Plan
E0.1 E ectrical Legends an~l Schedule
E1,1 Site Power / STS P an
E2.0 Sales Area Lighting Plan
E2.2 FQC & Presentation Lanes Lightin~ Plans, Details
BULLETIN NUMBER TWO 00906 - 8
20-01024.02 STORE NO. 7144 01 OCT 03
00907
BULLETIN NUMBER THREE
FROM:
TERRY L. HERR ARCHITECT
3000 Royal Blvd South
Alpharefla. Georgia 30022
(770) 569-1706
TO:
T.D. Farrell Construction, Inc.
1360 Union Hill Road
Building 12
Alpharefla, Georgia 30004
770.754.3110
Ned Sparkman, IDI
Dan Bickett, CARMax
Plan Distribution List- for Change Bulletin
SUBJECT: CARMax - Indianapolis, IN CARMax Store No. 7144
In accordance with Section 01035 - Modification Procedures, please submit an itemized quotation for
the changes in the Contract Sum and / or adjustments in Contract Time incidental to the proposed
modifications to the Contract Documents described herein.
This is NOT A CHANGE ORDER or a direction to proceed with the work described herein.
This Bulletin consists of eight (8) pages.
I. PROJECT MANUAL
Item 7-01
Section 16630 - Transient Voltage Surge Suppression (TVSS) System
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Change the contact information for the TVSS system to Grey Gate, Inc.
[prototype change]
II. DRAWINGS
Item 7-02
G1 ~ Index and Misc. Informa_tion
Delete the above referenced sheet in its entirety and su--~stitute the revised
attached sheet.
1. Updated Drawing Index [clarification]
Item 7-03
C3 Site Plan
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet
1. Revised curb and transformer location at Presentation Lanes and
transformer WIP/Customer Lot entrance [prototype change]
BULLETIN NUMBER THREE 00907
20-01024.02 STORE NO. 7144 01 OCT 03
Item 7-04
Item 7-05
Item 7-0~
Item 7-07
Item 7-08
Item 7-09
Item 7- 10
Item 7~11
C4 Site Plan
~bove referenced sheet in ifs entirety and substitute the revised
attachert sheet.
1. Revised transformer location at sales lot entrance [prototype change]
C5 Gradin Plan
Delete the above referenced sheet in :ts entirety and substitute the revised
attached sheet.
1. Revised curb and transformer location at Presentation Lanes and
transformer WIP/Customer Lot entrance [prototype change]
C6 Gradin. Plan
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
Revised transformer location at sales lot entrance [prototype change]
Delete the above referencea sheet in its entirety and substitute the revised
attached sheet
Revised curb and transformer location at Presentation Lanes and
transformer WIP/Customer Lot entrance [prototype change]
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Revised transformer location at sales tot entrance [prototype change]
C] 3 Construction Details
Delete the above referenced sheet in its entirety and substitute the revised
attached Sheet.
1. Revised knox box detail [prototype change]
C13b Construdion Details
Delete the above referenc~ed sheet in its entirety and substitute the revised
attached sheet,
1. Revised inventory control at Sales lot prototype change]
2. Revised inventory control at Presentation Lanes [prototype change]
3. Revised inventory control at WIP/Customer Lot [prototype change]
A1 ~0 Architectural Site Plan
De~d sheet in its entirety and substitute the revised
attached sheet.
1. Revised inventory control at Sales lot [prototype change]
2. Revised inventory control ar Presentation Lanes [prototype change]
3 Revised inventory control at WIP/Customer Lot [prototype change]
BULLETIN NUMBER THREE 00907 - 2
20-01024.02 STORE NO. 7144 01 OCT 03
Item 7-12 A2.0 Showroom Floor Plan
1. Revise Buyers Office counters [prototype change]
2. Revised internet office View Windows [VW-3) [prototype change]
3 Revised curb and transformer location at Presentation Lanes [prototype
change]
Item 7-13 A2.1 Sery_ice Floor Plan
1, Added 6" radius to production and cosmetic manager counters [prototype
change]
2. Revised Electrical Room door location [RF138]
Item 7-14
A2.3 Enlar- ed Floor Plans_
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Revise Buyers Office counters [prototype change]
2. Revised Internet Office View V~indow~ (VW-3) [prototype change]
3. Added Internet Office elevation [prototype change]
4. Revised counter at Cash Office [prototype change]
Item 7-15
A2~ Reflected Ceilin Plan
Delete the above referenced sheet in its entirety aha substitute the revised
attached sheet.
1, Revised lighting and added lighting to Showroom [prototype change]
2. Revised, lighting and ad,,ded lighting to Parts [prototype change]
3. Added Future Lighting layout [p~ototype chbnge]
Item 7-16
A2.8 Fixture Plan
~ referenced sheet in its entirety and substitute the revised
attached sheet.
1. Revise Buyers Office counters [prototype change]
2. Moved lockers from Corridor 125 to Break room [prototype change]
3. Added round table to LGM [prototype change]
Item 7-17
A2.Sa Fixture Plan
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
t. Revise rack layout in Parts Room [prototype change]
2. Moved lockers from Corridor 125 to Break Room 159 [prototype change]
3. Deleted fixture number for AudioVox [prototype change]
Item 7-18 A4.3 Wall Se_ctions and Details
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
Revised canopy design at Presentation Lanes to include soffit [design
coordination]
BULLETIN NUMBER THREE 00907 - 3
20~01024.02 STORE NO. 7144 01 OCT 03
Item 7-19
Item 7-20
Item 7-21
Item 7-22
Item 7-23
Item 7-24
Item 7-25
Item 7-26
A4.6 Sections Details
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added new Wall Cap detail [prototype change] -1~1~1~, ~
2. Added expansion Jeint detail [prototype change]
A5.0 Door Windows and Schedule
Delet~ in its entirety and substitute the revised
attached sheet.
1. Leop sensors by Door Installer [prototype change]
2. All View Windows are Hollow Metal Frame [prototype change]
3. Revised height oJ VW-3 at Internet Office [prototype change]
A7.0 Interior Elevations
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added Internet Office elevation [prototype change]
A7.1 Interior Elevations
Delet~nced sheet in its entirety and substitute the revised
attached sheet.
1. Revised storefront decal at Kid's Room [prototype change]
2, Revised storefront decal at Presentation Lanes [prototype change]
3. Revised Showroom North elevation [prototype change]
4. Revised Cash Office elevation to reflect counter change [prototype change]
A7.2 Interior Elevations_
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Revised Shelf at Break room to be 20" deep [prototype change]
A7.3 Interior Sections and Details
~t in its entirety and substitute the revised
attached sheet.
1. Revised wall cap al Iowwall [prototype change]
2. Revised TV mounting height [prototype change]
Q1.0 Equ'~-ment Plan~
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Updated Equipment Schedule [prototype change]
2. Revised Equipment numbers at Alignment Lift and Front End Computer
[design coordination]
M3.0 FQC and Presentation Part Plan - HVAC
Delete the above referenced sheet in its entirety and substitute the re~,ised
attached sneer.
3ULLETIN NUMBER THREE 00907 - 4
20-0]024,02 STORE NO. 7144 01 OCT 03
Item 7-27
Item 7-28
Item 7-29
Item 7-30
Item 7-31
1 Revised duct for EF 21 [prototype change]
MS,0 Schedule_- HVAC
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added HVAC General Note ~30 [prototype change]
El.0 Site Li, htin, Plan
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet,
Revised perimeter parking lot lights to be on night light circuit. [prototype
change]
E1.2 Site Electrical Details
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
Relocated power units to secure side of inventory gates, details 1, 2 and 3~
[prototype change]
E2.0Sales Area Li htin Plan
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Reduced number of track lighting fixtures to six. [prototype change]
2. Added 3 track fixtures outside of kids room. [prototype change]
3. Added legend note #15 for future lighting [prototype change]
E2.1 Service Area Li ~htin ~ Plain
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added provisions for future lighting [prototype change]
Item 7-32
Item 7-33
E3.0 Sales Area Power Pla
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Deleted receptacle for printer in LGM. [prototype change]
2. Revised TV mounting height [prototype change]
1:3.1 ServicM Area Power Plan
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Added recemacle at parts receiving counter. [prototype change]
2. Added note to mount all rece~=tacles in parts area at 24" a.f.f, [prototype
change]
BULLETIN NUMBER THREE 00907 - 5
20-01024.02
Item 7-34
Item 7-35
Item 7-36
Item 7-37
Item 7-38
Item 7~39
STORE NO. 7144
01 OCT03
E3.2 FQC & Presentation Lanes Power Plan Details
substitute the revised
attached sheet.
1. Deleted receptacle for refrigerator in FQC building. Added ~vo
receptacles for vending machines. Relocated car wash door activation
control panel. [prototype change]
2. Car Wash changes per Ned Spbrkman email dated 9/17/03 - Revised
locations of car wash utility devices.
E3~ Electrical Details
Delete the above er ferenced sheet in its entirety and substitute the revised
attached sheet,
i. Added detail reference notation to detail 1/E3.3. [prototype change]
2. Revised paint booth electrical requirements on schedule [prototype
change]
E4.0 Sales Area STS Plan
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Deleted data outlet for printer in LGM. [prototype change]
2. Revised TV mounting height. [prototype change]
3. DeJemd date outlet from short wall opposite desk in LGM, [prototype change]
4. Revised general note #12, [prototype change]
E4.1 Service Area STS Plan
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1, Added camera junction box above parts window. [prototype change]
Added data outlet at parts receiving counter. [prototype change]
3. Added note to mount all data outlets in parts area at 24" a.f.f. [prototype
change]
4. Added provismns for future parts systems, [prototype change]
E4.3 STS Details
its entirety and substitute the revised
1. Revised note #3 on detail 9/E4.3 to coordinate quantity of receptacles for
data catch cabinet w th Checkpoint. [prototype change]
2. Revised door alarm junction b~x detail 1/E4.3. [prototype change
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1 Revised main data/pbx room plan and elevations to coordinate with PE Log
sketches. Revised legend notes M, O, P AG and AN; added legend note
AY. [prototype change]
2. Revised legend note Z. [prototype change]
BULLETIN NUMBER TH REE 00907 - 6
20-01024,02
STORE NO. 7144
01 OCT 03
Item 7-40
Item 7-41
E6.1 Panel_board Schedules
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
Revised panelboard schedule LC, circuits 25.27. [prototype change]
2. Revised panelboard schedule HD, circuit 14 circuit breaker size. [prototype
change]
3. Revised panelboard schedule SLA, circuits 9,11, and 21,23; revised
panelboard schedule SLB. circuits 37,39 and 34.36 [prototype change]
E6.2 Panelbo_ard Schedules
Delete the above referenced sheet in its entirety and substitute the revised
attached sheet.
1. Revised panetboard schedule LCPC. circuits 31 and 28 thru 34. [prototype
change]
2. Revised panelboard schedule LF, circuit 35 circuit breaker size. [prototype
change]
3. Revised panelboard schedule LCP, circuit 20. [prototype change]
4. Revised panelboard schedule LCPC. circuits 37 thru 41. [clarification]
III.
ATTACHMENTS
PROJEC_T MANUAL
Section 16630 - Transient Voltage Surge Suppression ['P/SS) System
DRA_WINGS
G1.0 Cover Sheet. Drawing Index and Misc. Information
C3 Site Plan
C4 Site Plan
C5 Grading Plan
C6 Grading Plan
C7 Utility Plan
CB Utility Plan
C13 Construction Details - 19.Aug.03 - Per City Comments
C13b Construction Details
A1.0 Architectural Site Plan
A2.0 Showroom Floor Plan
A2.1 Service Floor Plan
A2.3 Enlarged Floor Plans
A2.5 Reflected Ceiling Plan
A2.8 Fixture Plan
A2.Ba Fixture Plan
A4.3 Wall Sections and Details
A4.6 Sections Details
AS.0 Door WindoWs and Schedule
A7.0 Interior Elevations
A7.1 Interior Elevations
A7.2 Interior Elevations
A7.3 Interior Sedions and Details
Q] .0 Equipment Plan
BULLETIN NUMBER THREE 00907 - 7
20-01024.02
STORE NO. 7144
01 OCT 03
M3.0 FQC and Presentation Part Plar~ ~ HVAC
MS.0 Schedule ~ HVAC
E1.0 Site Lighting Plan
E1.2 Site Electrical Details
E2.0 Sales Area Lighting Plan
E2. I Service Area Lighting Plan
E3.0 Sales Area Power Plan
E3.1 Service Area Power Plan
E3.2 FQC & Presentation Lanes Power Plan, Details
E3.3 Equipment Schedule and Electrical Details
E4.C~ Sales Area STS Plan
E4.1 Service Area STS Plan
E4.3 STS Details
E4.4 Enlarged Main Tel/PBX Room Plan, Elevations
E6.1 Panelboard Schedules
E6.2 Panelboard Schedules
(8 pages)
END OF BULLETIN NUMBER THREE
BULLETIN NUMBER THREE 00907 - 8
RE:
TO:
FROM:
FOR:
CARMax Indianapolis #7144
Jim Blanchard
Klm Ferraro
ARCHITECTS~
Mr. Blanchard,
Attached please find a copy of Addendum Number Four to the perm t drawings. Per our previous submittals, these documents
have not been sent to the State for their review. Please advise as soon as possible if we should submit these :trawings to the
State so not to impact our construction schedule.
If you have any questions, please do not hesitate to contad either Earl Smith or myself.
Thankyou,
--~escription
Full size, Full set - Addendum Four (CB3)
narrative
copies
3
0 be received oflJy by the at,tire,see shown above, If you are not the addressee and you are no~ responsible
privilege or confidence is in~enaecl to oe waived by the transmission of this
message. We request you not to rewew or copy th s mater a Please notify us by collect call at The number below. Thank you for your help.
Klm Ferraro
=rci
e Enforcement
Department of Community Services
CA _R~Aax lndian~
2
__ Rush Courier 317 B18.109~
Ned Saarkman
File
PI~AR~TT 0022 770.569
ENCOMPASS NOTEPAD - 10/03/03
NOTES FOR: 03060224 - Pt
DATE TIME NOTE TEXT
2003-0S-30 12:20:44 CARMAX AUTO SUPERSTORE
(Plumber TBA prior to R/I)
Pre-submittal meeting Thurs June 26,
2003. Project will be an auto sales
facility. Docket numbers 46-02 DP,
47-02 PP, TAC in March & April 2002.
Indy Wtr Carmel Sewer, zoned
Letters ~f Grant on file RE improvemen5s
to the R-O-W of Gray Rd. & 96%h St. and
several commitments regarding the ADLS
approval, specifically the 'large blue
roof .... was reduced d~amatically and
lowered'.
City Engineer's requiremen5s regarding
curb cut approval, sewer availaSility,
plat approval, a~d consent to encroach
all to 5~ considered at July 2nd BPW,
but City Engineer gives go-ahead to
proceed on ~eviewing for building
permit.
Address assigned by W. Akers.
2003-08-27 10:22:44 Per JK: Addendum release will be
conditional to conforming to the sign
ordinance.
2003-09-26 09:39:26
On 9
p(
to det(
Sta
Number Three to the
is was received. We are
.on.
2003-I0-03
1
1.06.44
cosmetic~
or no~
3 to
~he Engineer's
of ette r and these
noEes given to Jeff and he will
direct the nex5 moves.
LINES OF NOTES:
any
PAGE 1
OPERATOR
gs5ahl
slillard
gssahl
slillard
PARCEL ID #: 1614080000015000
LOT & SUBDIVISION:
ADDRESS OF CONSTRUCTION: 9750 GRA~
Township?: 17 Zoning: FIoodZone: N
~PRO~P. ERTY OWNER INFORMATION:
Name:
Ph. ft: 8047470422 Fax #: 8049354595
Street Address: 9750 GRAY RD CARMEL, IN 46033
Name T.D FARRELL CONSTRUCTION
Ph. #: (770) 754-3110 Fax #:
Emalh
Street Address: 1360 UNION HILL RD, BLDG 12 ALPHARRETTA, GA 30004
Plumber's Name.
Codes for Project:
PROJECT NAME:
PERMIT TYPE: COMNEW ; COMMERCIAL NEW STRUCTURE
SPECIAL NOTES/CONDITIONS:
ERSTORE SEE NOTEPAD
IF ED TO LIST INDPLS; 46280, PER BILL
· LOCAL CONTACT IS GEOFF MARCINEK
On 9/24/03, Addendum Number Three to the
are
Jeff and/er Jim B.
Permit #:. 03060224
Date: 07/14/2003
$~r~c~rcs,.4(]d~tfor~, or Accc~sor~ Srr~c~rcs
Lot Split: N
Water Service by: INDPLS
County Well Permit #:
SewerServlce by: CARMEL
CountySepflc Permit #:
Foundation Type: _
Estimated Cost of Construction:6815647
Sump Pump: N
Manufactured Trusses: N
Usage Class: COM
Construction Type:
State Design Release #: 294595
Square Footage: 58477
SPARKMAN
COM. IND INST, C/O 43.50
COM NDINST NEWADDACC
9720~32