Loading...
HomeMy WebLinkAbout03060224 Plan Revision 10/3/03sp¢cifiecl re¥i trial, or Institutional: New Structures, Additions. Permit #: 03060224 Date: 07/14/2003 Structures : 9750 GRAY RD INDIANAPOLIS IN 46280 Zoning: Flood Zone N PROPERTY OWNER INFORMATION.: Name: Ph. #: 8047470422 Fax #: 8049354595 Street Address: 9750 GRAY RD CARMEL, tN 46033 CONTRACTOR INFORMATION: Name: T.D, FARRELL CONSTRUCTION Ph. #: (770) 754-3110 Fax #: Email: Street Address: 1360 UNION HILL RD, BLDG 12 ALPHARRETTA, GA 30004 P umber s Name: Codes for Project: Lot Split: N ~IEW : COMMERCIAL NEW STRUCTURE AKERS ON 7131/03, LOCAL CONTACT IS GEOFF AT 818-0685. ~ O~~~ber:~e to the to determine whether the changes need State approval, Jeff and/or Jim B. will make that determination. - Additionally, many of the changes are cosmetic but it c~nnot be determined Eom their cover letter whether or not ihey've submitted this Addendum ]~3 to ~hat office, Same for the Engineer's office. The cover letter and these notes will be given to Jeff and he will direct the nex~ moves. Per JK: Addendum release will be conditional to conforming to the sign ordinance. CARMAX AUTO SUPERSTORE (PlUmber TBA prior to PJI) Prs-submittal meeting Thurs June 26 2003. Project will be an auto sales facility~ Docket numbers 46-02 DP, 47-02 PP TAC in March & April 2002 Indy Wtr Carmel seWer, zoned B-3. Letters of Grant on fie RE improvements BILL MARCINEK Water Service by: INDPLS County Well Permit #: Sewer Service by: CARMEL County Septic Permit #: Foundation Type: Estimated Cost of Construction:6815647 Sump Pump: N Manufactured Trusses: N Usage Class: COM Construction Type: State Design Release #: 294595 Square Footage: 58477 ~rl~ SPARKMAN COM. IND. INST CIO 43450 EWADDACC 9720.32 ARCHITECT September 19, 2003 Mr. Jim Blanchard Deputy Building Commissioner Building & Code Enforcement City of Carmel Department of Community Services One Civic Square Carmel, Indiana 46032 Re.' CarMax Indianapolis Addendum Number Three to the permit drawings Mr. Blanchard, sAttached please find a copy of Addendum Number Three to the permit drawings. Per our pre- ubmittal meeting these drawings have not yet been submitted to the State for approval, you indicated that you would review any changes to determine if submittal to the State was necessary. Please advise as soon as possible if we should submit these drawings to the State so not to impact our construction schedule. If you have any questions, please do not hesitate to contact either Klm Ferraro or myself. Sincerely, TERRY L HERR ARCHITECT Earl M. Smith Project Manager cc: Ned Sparkman - IDI P 770.569.1706 F 770.569.J706 3000 ROYAL BOULEVARD SOUTH ALPHARETTA, GEORGIA 30022 · 20-01024.02 STORE NO. 7144 09 Sept 03 00906 BULLETIN NUMBER TWO FROM: TERRY L. HERR ARCHITECT 3000 Royal Blvd South Alpharetta, Georgia 30022 (770) 569-1706 TO: T.D. Farrell Construction, Inc. 1360 Union Hill Road Building 12 Alpharetta, Georgia 30004 770.754.3110 Ned Sparkman, IDI Dan Bickett, CARMax Plan Distribution List - for Change Bulletin SUBJECT: CARMax - Indianapolis, IN CAP, Max Store No. 7144 n accordance with Section 01035 - Modification Procedures please submit an itemized quotation for the changes in the Contract Sum and J or adjUstments in Contract Time incidental to the proposed modifications to the Contract Documents described herein. This is NOT A CHANGE ORDER or a direction to proceed with the work described herein. This Bulletin consists of nine (9) pages. I. PROJECT MANUAL None DRAWINGS item 6-01 Item 6-02 II. stitute the revised attached sheet. 1. Updated Drawing Index [clarification] C3 S te P an - 19 Aug 03 - Per C ty Comments Delete the above referenced sheet in ds entirety and substitute the rev sed attached sheet. 1. Revised Masonry Wall height to be 8'-0" [city comments] - Note: Field Order 13 ha~ revised this 2 Rev sed center curb to be grass not concrete [city comments] 3 Rev sed note for power pole relocation [city comments] 4. Moved aspha t path to be ocated 1 off of the Right of Way me [city commentsl 5. Added dimension around building for clarity [city comments] 6. Added approximate location of Force Main [city comments] BULLETIN NUMBER TWO 00906 - 1 20-01024.02 STORE NO, 7144 09 Sept 03 Item 6-03 C4 Site Plan - 19.Aug.03 - Per City Comments ~eele-~e th-~above referenced sheet in ts entirety and substitute the revised attached sheet. Revised Masonry Wall height to be 8'-0" [city comments - Note: Field Order 13 has revised this 2 Revised center curb to be grass, not concrete [city comments] 3. Revised note for power pole relocation [city comments] 4. Moved asphalt path to be located 1' off ofthe Right of Way line [city comments] 5. Revised path size where itties to existing path at SW corner [city comments] 6 Added dimensions around build ng for clarity [city comments] 7. Added approximate location of Force main [city comments] 8. Revised curb around island at 96~h Street entrance to be straight curb [city comments] item 6-04 C5 Gradin Plan - 19,Aug.03 - Per City Comments Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added note on swale grading [city comments] 2. Added approximate location of Force Main [city comments] 3. Added note for West side of property noting that existing grading changed [city comments] 4. Revised legend for sanitary structure for clarity [city comments] 5. Revised swale North of G~ay Road entrance [city comments] Item 6-05 C6 Gradin ~ Plan_ - 19.Aug.03 - Per City Comments Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added note on swale grading [city comments] 2. Added approximate location of Force Main [city comments] 3. Added note for West side of property noting that existing grading changed [city comments] 4. Revised egend for san tary structure for c arity [city comments] 5. Revised grading around pond and at southwest corner of pond [city comments] Item 6-06 ~ - 19.Aug,03 - Per City Comments Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added note for west side of property noting that existing grading changed [city comments] 2. Revised legend for sanitary structure for clarity [city comments] 3. Added approximate location of Force Main [ci~ comments] 4. Added ir~formation for the boring of the waterline under Gray Road [city comments] 5. Added Storm Sewer note [city comments 6. Revised sanitary line to the south and the san connection to the west [city comments] BULLETIN NUMBER TWO 00906 - 2 20-01024.02 STORE NO. 7144 09 Sept 03 7. Revised STR 130, 131,132,133 locations and pipe from 133 to 143 [city comments] 8. Revised note for power pole relocation [city comments] 9. Revised TC's and inverts on Structure Data Table as needed [city comments] 10. Revised off-site Structures to be manholes, not inlets [city comments] Item 6-07 C~ - 19.Aug.03 - Per City Comments Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added note for west side of property noting that existing grading cnanged [city comments] 2. Revised legend for sanitary structure for clarity [city comments] 3. Added approximate location of Force Main [city comments] 4. Added Storm Sewer note [city comments] 5. Revised sanitary line to the south and the san connection to the west [city comments] 6. Revised note for power pole relocation [city comments] 7. Revised structures 190, 191,192, 193 and pipes [city comments] Item 6.08 C9 Off Site Storm Water Extension - 19.Aug.03 - Per City Comments Del~t in its entirety and substitute the revised attached sheet. Item 6-09 1. Revised Structures 196, 197, 198, 199 and End Section and pipes [city comments] 2. Added Storm Sewer note [city comments] 3. Revised notes about existing ground survey and drive replacement note [city comments] 4. Revised utility pole relocation note [city comments] 5. Added Carmel Creek Flood information [city comments] 6. Revised the amount of Rip Rap required [city comments] 7. Added a note noting that ground to the north has changed since survey [city comments] 8. Added location of asphalt path in area [city comments] 9. Added note about replacing path as required with storm placement [city comments] 10. Revised Structure [city comments] - 19.Aug.03 - Per City Comment D~d sheet in its entirety and substitute the revised attached sheet. 1. Added milling and resurfacing on Gray Road [city comments] 2 Added notes on traffic coordinat on [city comments] 3. Added sign along 96~h Street [city comments] 4, Added dimensions for 96th Street entrance [city comments] Item 6-10 C10A Maintenance of Traffic - 19.Aug.03 - Per City Comments Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1 Added Maintenance of Traffic notes [city comments] BULLETIN NUMBER TWO 00906 - 3 · 20-01024.02 STORE NO. 7144 09 Sept 03 2. Added s~gnage along 96~ Street [city comments] 3. Revised merge sign on 96th Street [city comments] Item 6-11 C11_ Erosion- Control Plan - 19.Aug.03 - Per City Comments Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1 Modified inlet protection to match structures that moved [city comments] Item 6-12 C12 Erosion Control Plan - 19.^ug.03 - Per City Comments Delete the above referenced sheet in its entirety aha substitute the revised attached sheet. 1. Modified inlet protection to match structures that moved [city comments] Item 6-13 C13 Construction Details - 19.Aug.03 - Per City Comments Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added Indianapolis Water detail for pipe encasement [city comments] Item 6-14 C15 Construction Details- 19.Aug.03 - Per City Comments ed sheet in its entirety and substitute the revised attached sheet. 1. Added straight curb detail [city comments] Item 6-15 STP- I Gradin Plax - 19.Aug.03 - Per City Comments Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised structures as noted above [city comments] Item 6-16 STP - 2~ - 19.Aug.03 - Per City Comments Delete the above referenced sheet in its entirety and substitute the rewsed attached sheet. 1. Revised structures as noted above [city comments] Item 6-17 STP- 3 Gradin~ Plan -19.Aug.03 - Per City Comments Delete the above referenced sheet in its entirety and substitute the rewsed attached sheet. 1. Revised structures as noted above [city comments] Item 6-18 STP- 4 Gradin= Plan_- 19.Aug.03 - Per City Comments Delete the above referenced sJ~eet in its entirety and substitute the revised attached sheet. 1. Revised structures as noted above [city comments] item 6-19 STP - 5 Gradin Plan - 19.Aug.03 - Per City Comments Delete the above referenced sheet in its entirety and substitute the revised attached sheet. BULLETIN NUMBER TWO 00906 - 4 ' 20-01024.02 STORE NO. 7144 09 Sept 03 Item 6-20 Item 6-21 Item 6-22 Item 6-23 Item 6-24 Item 6-25 Item 6-26 Item 6-27 1. Revised structures as noted above STP - 6 Gr da in - Plan~ ~ 19.Aug,03 - Per City Comments Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised structures as noted above [city comments] STP - 7 Gradin Plan - 19.Aug.03 - Per City Comments Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised structures as noted above [city comments] A1 0. Architectural Site Jan 1 2. Revised Transformer location [RFI 32] A2.1 Service Floor Pla 1 Section marker at Break Room should read: 33/A4.4 [desigr coordination] 2, Revised electrical transformer location [RFI 32] D~ferenced sheet in its entirety and substitute the revised attached sheet. 1. Rev sed dimensions for doors at FQC [design coordination 2. Revised site wall he ght to 6'-0' [prototype change] A2.3 Enlar ed Floor Plans Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised toilet accessories at Men's and Women's Service Restrooms [clarification] A2 4 F n sh Foor Pan Delete the above referenced sheet m its entirety and substitute the rewsed attached sheet. 1. Revised floor material legend and notes for clarity [clarification] A2.5 Relfected Ceilin Plan Delete the above referenced Sheet in its entirety and substitute the revised attached sheet. 1. Revised Fighting and hose reel dimension locations in FQC [design coordination] BULLETIN NUMBER TWO 00906 - 5 20-01024.02 STORE NO. 7144 09 Sept 03 Item 6-28 Item 6-29 Item 6-30 Item 6-31 Item 6-32 Item 6-33 Item 6-34 A2.6 Roof Plan_ Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added 28'-0' w~de' 'doghouse behind' Presentation Lanes parapet for Service Signage [design coordination] 2. Added cricket at Presentation Lanes [design coordination1 A3.0 Exterior Elevations Delete the above referenced sheet in its entirety and substitute the rev sed attached sheet. 1 Revised exterior elevations at CMU to show painted 'soffit' to match EIFS [design coordination] 2. Centered Service sign at Presentation Lanes above northern door [CAP, Max request] A4.3 Wall Sections and Details Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added dog house detail for Service signage at Presentation Lanes [design coordination] A4, 5 FQC Wall Sedions and Details ~n its entirety and substitute the revised attached sheet. 1. Revised height at site wall [prototype change] S2.0 Overall Foundation Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. FQC Foundation Plan - doors along the east and West have moved 4" south [design coordination] 2. FQC Foundation Plan, Pilasters between doors 200A/E and 200B/D have been centered between the two doors [design coordination] S2.5 Foundation Sections ~ced sheet in its entirety and substitute the revised attached sheet. 1. Details' C & E - top of wall changed to 6'-0' max [prototype change] S3.0Overall Roof Framin Plan Delete the above referenc~ed sheet in its entirety and substitute the revised attached sheet. FQC Foundation Plan - doors along the east and West have moved 4" south [design coordinationl FQC Foundation Plan - Pilasters between doors 200A/E and 2008/D have been centered between the two doors [design coordination] BULLETIN NUMBER TWO 00906 - 6 · 20-01024.02 Item 6-35 Item 6-36 Item 6-37 Item 6-38 Item 6-39 Item 6-40 Item 6-41 STORE NO. 7144 09 Sept 03 EO~cal Le ends and Schedule Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised catalog number for fixture ~/pe EF to agree with shop drawings [clarification[ 2. Revised finish to be dark bronze for fixture types OLA, OLB. OLC and OLG to agree with shop drawings [clarification( E1.1 Site Powe~ STS Plan~ Delete the above referenced sheet in its entire~y and substitute the revised attached sheet. 1. Relocated communications pull box IRF127( E2.0Sa~esAreaLi htin Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added legend note 14 ]RFI 30] Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added iunction box for signage ]RFI 30] 2. Revised lighting in FQC [design coordination( E4._3 STS Details Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised detail 2/E4.3 [RF125] E6.1 Panelboard Schedules ~d sheet in its entirety and substitute the revised attached sheet. 1. Revised panel schedule SLB, circu t 35. [RFI 301 2. Changed circuit breaker size on panel schedule LC, circuit 16. [Prototype change] 3. Revised panel schedules to agree with shop drawings: SLA, SLB, HA, HB (sect 2) HC (sect 1 & 2), LA (~ect 1 & 2), LB (sect 1 & 2) and LC [sect. 1) ]design coordinat on] E6.2 Panelboard Schedules ~d sheet in its entirety and substitute the revised attached sheet. 1. Changed circuit breaker s ze on panel schedule LCP, c rcuit 55; LCPA circui~ 13; LCPB, circuit 25. [items left off from may PE Log] 2. Revised panel schedules to c~gree with shop drawings; LD (sect. 1 & 2) LF (sect. 1 & 2), LG (sect 1 & 2), and LCPA. [d~sign coordination1 BULLETIN NUMBER TWO 00906 - 7 ' 20-01024.02 STORE NO. 7144 09 Sep! 03 III. ATTACHMENTS PRO_ JECT MANUAL None DRAW_INGS Gl.0 Cover Sheet, Drawing ndex and M sc nformat on C1 Cover Sheet- 19.Aug.C~3 - Per City Comments C2 Specifications- 19.Aug.03 - Per City Comments C3 Site Plan - 19.Aug.03 - Per City Comments C4 Site Plan - 19.Aug.03 - Per City Comments C5 Grading Plan - 19.Aug.03 - Per City Comments C6 Grading Plan - 19.Aug.03 - Per City Comments C7 Utility Plan - 19.Aug.(~ - Per City Comments C8 Utili~ Plan - 19.Aug.03 - Per City Comments C9 Off Site Storm Water Extension - 19.Aug.03 - Per City Comments C10 96th Street and Gray Road Entrance Plan - 19.Aug.03 - Per C ty Comments CIOA Maintenance of T~affic - 19.Aug.03 - Per City Comments C11 Erosion Control Plan - 19.Aug.03 - Per City Comments C12 Erosion Control Plan - 19.Aug.03 - Per Ci~ Comments C 13 Construction Details - 19.Aug.03 - Per City Comments C-13a Construction Details - 19.,~ug.03 - Per ~ ty Comments C 13b Construction Details - 19.Aug.03 ~ Per City Comments C14 Construction Details - 19.Aug.03 - Per City Comments C 15 Construction Details - 19.Aug.03 - Per Ci~ Comments STP- 1 Grading P an - 19 Aug.0~ - Per City C~mments STP- 2 Grading Plan- 19,Aug.03 - Per City Comments STP- 3 Grading Plan- 19.Aug.03 - Per City Comments STP - 4 Grad!ng Plan - 19,Aug.03 - Per City Comments STP - 5 Grading Plan - 19.Aug.03 - Per Ci~ Comments STP - 6 Grading Plan - 19.Aug.03 - Per Ci~ Comments STP- 7 Grading Plan - 19.Aug.03 - Per Ci~ Comments Al.0 Architectural Site Plan r Plan · Details g Plan Details A4,5 Sections and Details S2.0 Foundation Plan S2.5 F S3.0 Overall Roof Framing Plan EO.1 Electrca Legendsand Schedule E1.1 Site Power/STS Plan E2.0 Sales Area Lighting P an E2.2 FQC & Presentation Lanes Lighting Plans, Details BULLETIN NUMBER TWO 00906 - 8 · '' 20-01024.02 STORE NO. 7144 09 Sept 03 E4.3 STS Details E6 1 Pane board Schedules E6.2 Panelboard Schedules (9 pages) END OF BULLETIN NUMBERTWO BULLETIN NUMBER TWO 00906 - 9 RE: CARMax Indianapolis TO: Geoff Marcenik FROM: Kim Ferraro #7144 ARI~H IT~ Along with this transmittal are two add tional sets of Addendum Three Documents {per the City record- Change Bulletin 2 per our changes). These documents need to be submitted to the City for their review. Also along with these documents is a letter from Earl to Jim Blanchard. This letter also needs to be included in your submittal. Please let me know when you have submitted these documents and if you are contacted with their approved release. Thanks. Klm of item This message and its attachments are intended to be received only by the addressee shown above, fyouarenottheaddresseeandyouarenotresponsble for delivering messages to the addressee, you have received it by mistake. No privilege or confidence is intended to be waived by the transmission of this messc~e. We request you not to review or copy this material. Please notify us by collect call at the number below. Thank you for your help. TD Farrell y Road Priority Fed Ex 317.818.1095 STORE NO. 7144 09 Sept 03 III. ATTACHMENTS PROJECT MANUAL JNone DRAWINGS G1 0 Cover Sheet Drawing Index and Misc, Information C1 Cover Sheet - 19.Aug.l~3 - Per City comments C2 Specifications - 19.Aug.03 - Per City Comments C3 S te Plan - 19 Aug 03 - Per City Comments C4 Site P an - 19.Aug 03 - Per C ty Comments C5 Grading Plan - 19.Aug.03 - Per City Comments C6 Grading Plan - 19.Aug.03 - Per City Comments C7 Utility Plan - 19,Aug.03 - Per City Comments C8 Ut I ty Plan - 19.Aug.03 - Per City Comments C9 Off ~ite Storm Water Extension - 19.Aug.03 - Per City Comments C 10 96 Street and Gray Road Entrance Plan - 19,Aug.03 - Per City Comments C 10A Maintenance of Traffic - 19.Aug.03 - Per City Comments C11 Eros on Contro P an - 19 Aug.03 - Per City C~mments C12 Erosion Control Plan- 19.Aug.03 - Per City Comments C13 Construction Details- 19,Aug.03 - Per City Comments C-13a Construction Details - 19.Aug.03~'~c~::ity Comments C13b Construction Deta s - 19,Aug 03 - Per City Comments C]4 Construction Deta Is - 19,Aug,03 - Per City Comments C15 Construction Details - 19.Aug.03 - Per City Comments STP - 1 Grading Plan - 19.Aug.03 - Per City C(~mments - STP - 2 Grading Plan - 19.Aug.03 - Per City Comments STP - 3 Grading Plan - 19 Aug.03 - Per City Comments STP - 4 Grading Plan - 19.Aug.03 - Per City Comments STP - 5 Grading Plan - 19.Aug.03 - Per Ci~/Comments STP - 6 Grading Plan - 19,Aug.03 - Per City Comments STP - 7 Grading Plan - 19.Aug.03 - Per City Comments A1.0 Arch tectural Site Plan A2.1 Service Floor Plan A2..2 FQC,Carwash,& Dumpster Details A2.3 En arged Floor Plans A2.4 Finish Floor Plan A2.5 Reflected Ceiling Plan A2.6 Roof Plan A3.0 Exterior Elevations A4.3 Wall Sections and Details -A4~5 FQC Wa Sections and Details ..... S2.0 ~Dvera Foundation Plan S2,5 Foundation Sections S3.0 Overall Roof Framing Plan E0.1 E ectrical Legends an~l Schedule E1,1 Site Power / STS P an E2.0 Sales Area Lighting Plan E2.2 FQC & Presentation Lanes Lightin~ Plans, Details BULLETIN NUMBER TWO 00906 - 8 20-01024.02 STORE NO. 7144 01 OCT 03 00907 BULLETIN NUMBER THREE FROM: TERRY L. HERR ARCHITECT 3000 Royal Blvd South Alpharefla. Georgia 30022 (770) 569-1706 TO: T.D. Farrell Construction, Inc. 1360 Union Hill Road Building 12 Alpharefla, Georgia 30004 770.754.3110 Ned Sparkman, IDI Dan Bickett, CARMax Plan Distribution List- for Change Bulletin SUBJECT: CARMax - Indianapolis, IN CARMax Store No. 7144 In accordance with Section 01035 - Modification Procedures, please submit an itemized quotation for the changes in the Contract Sum and / or adjustments in Contract Time incidental to the proposed modifications to the Contract Documents described herein. This is NOT A CHANGE ORDER or a direction to proceed with the work described herein. This Bulletin consists of eight (8) pages. I. PROJECT MANUAL Item 7-01 Section 16630 - Transient Voltage Surge Suppression (TVSS) System Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Change the contact information for the TVSS system to Grey Gate, Inc. [prototype change] II. DRAWINGS Item 7-02 G1 ~ Index and Misc. Informa_tion Delete the above referenced sheet in its entirety and su--~stitute the revised attached sheet. 1. Updated Drawing Index [clarification] Item 7-03 C3 Site Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet 1. Revised curb and transformer location at Presentation Lanes and transformer WIP/Customer Lot entrance [prototype change] BULLETIN NUMBER THREE 00907 20-01024.02 STORE NO. 7144 01 OCT 03 Item 7-04 Item 7-05 Item 7-0~ Item 7-07 Item 7-08 Item 7-09 Item 7- 10 Item 7~11 C4 Site Plan ~bove referenced sheet in ifs entirety and substitute the revised attachert sheet. 1. Revised transformer location at sales lot entrance [prototype change] C5 Gradin Plan Delete the above referenced sheet in :ts entirety and substitute the revised attached sheet. 1. Revised curb and transformer location at Presentation Lanes and transformer WIP/Customer Lot entrance [prototype change] C6 Gradin. Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet. Revised transformer location at sales lot entrance [prototype change] Delete the above referencea sheet in its entirety and substitute the revised attached sheet Revised curb and transformer location at Presentation Lanes and transformer WIP/Customer Lot entrance [prototype change] Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised transformer location at sales tot entrance [prototype change] C] 3 Construction Details Delete the above referenced sheet in its entirety and substitute the revised attached Sheet. 1. Revised knox box detail [prototype change] C13b Construdion Details Delete the above referenc~ed sheet in its entirety and substitute the revised attached sheet, 1. Revised inventory control at Sales lot prototype change] 2. Revised inventory control at Presentation Lanes [prototype change] 3. Revised inventory control at WIP/Customer Lot [prototype change] A1 ~0 Architectural Site Plan De~d sheet in its entirety and substitute the revised attached sheet. 1. Revised inventory control at Sales lot [prototype change] 2. Revised inventory control ar Presentation Lanes [prototype change] 3 Revised inventory control at WIP/Customer Lot [prototype change] BULLETIN NUMBER THREE 00907 - 2 20-01024.02 STORE NO. 7144 01 OCT 03 Item 7-12 A2.0 Showroom Floor Plan 1. Revise Buyers Office counters [prototype change] 2. Revised internet office View Windows [VW-3) [prototype change] 3 Revised curb and transformer location at Presentation Lanes [prototype change] Item 7-13 A2.1 Sery_ice Floor Plan 1, Added 6" radius to production and cosmetic manager counters [prototype change] 2. Revised Electrical Room door location [RF138] Item 7-14 A2.3 Enlar- ed Floor Plans_ Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revise Buyers Office counters [prototype change] 2. Revised Internet Office View V~indow~ (VW-3) [prototype change] 3. Added Internet Office elevation [prototype change] 4. Revised counter at Cash Office [prototype change] Item 7-15 A2~ Reflected Ceilin Plan Delete the above referenced sheet in its entirety aha substitute the revised attached sheet. 1, Revised lighting and added lighting to Showroom [prototype change] 2. Revised, lighting and ad,,ded lighting to Parts [prototype change] 3. Added Future Lighting layout [p~ototype chbnge] Item 7-16 A2.8 Fixture Plan ~ referenced sheet in its entirety and substitute the revised attached sheet. 1. Revise Buyers Office counters [prototype change] 2. Moved lockers from Corridor 125 to Break room [prototype change] 3. Added round table to LGM [prototype change] Item 7-17 A2.Sa Fixture Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet. t. Revise rack layout in Parts Room [prototype change] 2. Moved lockers from Corridor 125 to Break Room 159 [prototype change] 3. Deleted fixture number for AudioVox [prototype change] Item 7-18 A4.3 Wall Se_ctions and Details Delete the above referenced sheet in its entirety and substitute the revised attached sheet. Revised canopy design at Presentation Lanes to include soffit [design coordination] BULLETIN NUMBER THREE 00907 - 3 20~01024.02 STORE NO. 7144 01 OCT 03 Item 7-19 Item 7-20 Item 7-21 Item 7-22 Item 7-23 Item 7-24 Item 7-25 Item 7-26 A4.6 Sections Details Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added new Wall Cap detail [prototype change] -1~1~1~, ~ 2. Added expansion Jeint detail [prototype change] A5.0 Door Windows and Schedule Delet~ in its entirety and substitute the revised attached sheet. 1. Leop sensors by Door Installer [prototype change] 2. All View Windows are Hollow Metal Frame [prototype change] 3. Revised height oJ VW-3 at Internet Office [prototype change] A7.0 Interior Elevations Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added Internet Office elevation [prototype change] A7.1 Interior Elevations Delet~nced sheet in its entirety and substitute the revised attached sheet. 1. Revised storefront decal at Kid's Room [prototype change] 2, Revised storefront decal at Presentation Lanes [prototype change] 3. Revised Showroom North elevation [prototype change] 4. Revised Cash Office elevation to reflect counter change [prototype change] A7.2 Interior Elevations_ Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised Shelf at Break room to be 20" deep [prototype change] A7.3 Interior Sections and Details ~t in its entirety and substitute the revised attached sheet. 1. Revised wall cap al Iowwall [prototype change] 2. Revised TV mounting height [prototype change] Q1.0 Equ'~-ment Plan~ Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Updated Equipment Schedule [prototype change] 2. Revised Equipment numbers at Alignment Lift and Front End Computer [design coordination] M3.0 FQC and Presentation Part Plan - HVAC Delete the above referenced sheet in its entirety and substitute the re~,ised attached sneer. 3ULLETIN NUMBER THREE 00907 - 4 20-0]024,02 STORE NO. 7144 01 OCT 03 Item 7-27 Item 7-28 Item 7-29 Item 7-30 Item 7-31 1 Revised duct for EF 21 [prototype change] MS,0 Schedule_- HVAC Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added HVAC General Note ~30 [prototype change] El.0 Site Li, htin, Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet, Revised perimeter parking lot lights to be on night light circuit. [prototype change] E1.2 Site Electrical Details Delete the above referenced sheet in its entirety and substitute the revised attached sheet. Relocated power units to secure side of inventory gates, details 1, 2 and 3~ [prototype change] E2.0Sales Area Li htin Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Reduced number of track lighting fixtures to six. [prototype change] 2. Added 3 track fixtures outside of kids room. [prototype change] 3. Added legend note #15 for future lighting [prototype change] E2.1 Service Area Li ~htin ~ Plain Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added provisions for future lighting [prototype change] Item 7-32 Item 7-33 E3.0 Sales Area Power Pla Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Deleted receptacle for printer in LGM. [prototype change] 2. Revised TV mounting height [prototype change] 1:3.1 ServicM Area Power Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Added recemacle at parts receiving counter. [prototype change] 2. Added note to mount all rece~=tacles in parts area at 24" a.f.f, [prototype change] BULLETIN NUMBER THREE 00907 - 5 20-01024.02 Item 7-34 Item 7-35 Item 7-36 Item 7-37 Item 7-38 Item 7~39 STORE NO. 7144 01 OCT03 E3.2 FQC & Presentation Lanes Power Plan Details substitute the revised attached sheet. 1. Deleted receptacle for refrigerator in FQC building. Added ~vo receptacles for vending machines. Relocated car wash door activation control panel. [prototype change] 2. Car Wash changes per Ned Spbrkman email dated 9/17/03 - Revised locations of car wash utility devices. E3~ Electrical Details Delete the above er ferenced sheet in its entirety and substitute the revised attached sheet, i. Added detail reference notation to detail 1/E3.3. [prototype change] 2. Revised paint booth electrical requirements on schedule [prototype change] E4.0 Sales Area STS Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Deleted data outlet for printer in LGM. [prototype change] 2. Revised TV mounting height. [prototype change] 3. DeJemd date outlet from short wall opposite desk in LGM, [prototype change] 4. Revised general note #12, [prototype change] E4.1 Service Area STS Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1, Added camera junction box above parts window. [prototype change] Added data outlet at parts receiving counter. [prototype change] 3. Added note to mount all data outlets in parts area at 24" a.f.f. [prototype change] 4. Added provismns for future parts systems, [prototype change] E4.3 STS Details its entirety and substitute the revised 1. Revised note #3 on detail 9/E4.3 to coordinate quantity of receptacles for data catch cabinet w th Checkpoint. [prototype change] 2. Revised door alarm junction b~x detail 1/E4.3. [prototype change Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1 Revised main data/pbx room plan and elevations to coordinate with PE Log sketches. Revised legend notes M, O, P AG and AN; added legend note AY. [prototype change] 2. Revised legend note Z. [prototype change] BULLETIN NUMBER TH REE 00907 - 6 20-01024,02 STORE NO. 7144 01 OCT 03 Item 7-40 Item 7-41 E6.1 Panel_board Schedules Delete the above referenced sheet in its entirety and substitute the revised attached sheet. Revised panelboard schedule LC, circuits 25.27. [prototype change] 2. Revised panelboard schedule HD, circuit 14 circuit breaker size. [prototype change] 3. Revised panelboard schedule SLA, circuits 9,11, and 21,23; revised panelboard schedule SLB. circuits 37,39 and 34.36 [prototype change] E6.2 Panelbo_ard Schedules Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised panetboard schedule LCPC. circuits 31 and 28 thru 34. [prototype change] 2. Revised panelboard schedule LF, circuit 35 circuit breaker size. [prototype change] 3. Revised panelboard schedule LCP, circuit 20. [prototype change] 4. Revised panelboard schedule LCPC. circuits 37 thru 41. [clarification] III. ATTACHMENTS PROJEC_T MANUAL Section 16630 - Transient Voltage Surge Suppression ['P/SS) System DRA_WINGS G1.0 Cover Sheet. Drawing Index and Misc. Information C3 Site Plan C4 Site Plan C5 Grading Plan C6 Grading Plan C7 Utility Plan CB Utility Plan C13 Construction Details - 19.Aug.03 - Per City Comments C13b Construction Details A1.0 Architectural Site Plan A2.0 Showroom Floor Plan A2.1 Service Floor Plan A2.3 Enlarged Floor Plans A2.5 Reflected Ceiling Plan A2.8 Fixture Plan A2.Ba Fixture Plan A4.3 Wall Sections and Details A4.6 Sections Details AS.0 Door WindoWs and Schedule A7.0 Interior Elevations A7.1 Interior Elevations A7.2 Interior Elevations A7.3 Interior Sedions and Details Q] .0 Equipment Plan BULLETIN NUMBER THREE 00907 - 7 20-01024.02 STORE NO. 7144 01 OCT 03 M3.0 FQC and Presentation Part Plar~ ~ HVAC MS.0 Schedule ~ HVAC E1.0 Site Lighting Plan E1.2 Site Electrical Details E2.0 Sales Area Lighting Plan E2. I Service Area Lighting Plan E3.0 Sales Area Power Plan E3.1 Service Area Power Plan E3.2 FQC & Presentation Lanes Power Plan, Details E3.3 Equipment Schedule and Electrical Details E4.C~ Sales Area STS Plan E4.1 Service Area STS Plan E4.3 STS Details E4.4 Enlarged Main Tel/PBX Room Plan, Elevations E6.1 Panelboard Schedules E6.2 Panelboard Schedules (8 pages) END OF BULLETIN NUMBER THREE BULLETIN NUMBER THREE 00907 - 8 RE: TO: FROM: FOR: CARMax Indianapolis #7144 Jim Blanchard Klm Ferraro ARCHITECTS~ Mr. Blanchard, Attached please find a copy of Addendum Number Four to the perm t drawings. Per our previous submittals, these documents have not been sent to the State for their review. Please advise as soon as possible if we should submit these :trawings to the State so not to impact our construction schedule. If you have any questions, please do not hesitate to contad either Earl Smith or myself. Thankyou, --~escription Full size, Full set - Addendum Four (CB3) narrative copies 3 0 be received oflJy by the at,tire,see shown above, If you are not the addressee and you are no~ responsible privilege or confidence is in~enaecl to oe waived by the transmission of this message. We request you not to rewew or copy th s mater a Please notify us by collect call at The number below. Thank you for your help. Klm Ferraro =rci e Enforcement Department of Community Services CA _R~Aax lndian~ 2 __ Rush Courier 317 B18.109~ Ned Saarkman File PI~AR~TT 0022 770.569 ENCOMPASS NOTEPAD - 10/03/03 NOTES FOR: 03060224 - Pt DATE TIME NOTE TEXT 2003-0S-30 12:20:44 CARMAX AUTO SUPERSTORE (Plumber TBA prior to R/I) Pre-submittal meeting Thurs June 26, 2003. Project will be an auto sales facility. Docket numbers 46-02 DP, 47-02 PP, TAC in March & April 2002. Indy Wtr Carmel Sewer, zoned Letters ~f Grant on file RE improvemen5s to the R-O-W of Gray Rd. & 96%h St. and several commitments regarding the ADLS approval, specifically the 'large blue roof .... was reduced d~amatically and lowered'. City Engineer's requiremen5s regarding curb cut approval, sewer availaSility, plat approval, a~d consent to encroach all to 5~ considered at July 2nd BPW, but City Engineer gives go-ahead to proceed on ~eviewing for building permit. Address assigned by W. Akers. 2003-08-27 10:22:44 Per JK: Addendum release will be conditional to conforming to the sign ordinance. 2003-09-26 09:39:26 On 9 p( to det( Sta Number Three to the is was received. We are .on. 2003-I0-03 1 1.06.44 cosmetic~ or no~ 3 to ~he Engineer's of ette r and these noEes given to Jeff and he will direct the nex5 moves. LINES OF NOTES: any PAGE 1 OPERATOR gs5ahl slillard gssahl slillard PARCEL ID #: 1614080000015000 LOT & SUBDIVISION: ADDRESS OF CONSTRUCTION: 9750 GRA~ Township?: 17 Zoning: FIoodZone: N ~PRO~P. ERTY OWNER INFORMATION: Name: Ph. ft: 8047470422 Fax #: 8049354595 Street Address: 9750 GRAY RD CARMEL, IN 46033 Name T.D FARRELL CONSTRUCTION Ph. #: (770) 754-3110 Fax #: Emalh Street Address: 1360 UNION HILL RD, BLDG 12 ALPHARRETTA, GA 30004 Plumber's Name. Codes for Project: PROJECT NAME: PERMIT TYPE: COMNEW ; COMMERCIAL NEW STRUCTURE SPECIAL NOTES/CONDITIONS: ERSTORE SEE NOTEPAD IF ED TO LIST INDPLS; 46280, PER BILL · LOCAL CONTACT IS GEOFF MARCINEK On 9/24/03, Addendum Number Three to the are Jeff and/er Jim B. Permit #:. 03060224 Date: 07/14/2003 $~r~c~rcs,.4(]d~tfor~, or Accc~sor~ Srr~c~rcs Lot Split: N Water Service by: INDPLS County Well Permit #: SewerServlce by: CARMEL CountySepflc Permit #: Foundation Type: _ Estimated Cost of Construction:6815647 Sump Pump: N Manufactured Trusses: N Usage Class: COM Construction Type: State Design Release #: 294595 Square Footage: 58477 SPARKMAN COM. IND INST, C/O 43.50 COM NDINST NEWADDACC 9720~32