Loading...
HomeMy WebLinkAbout03060224 Bulletin Number 3STORE NO. 7144 BULLETIN NU/~ ~,oyal Bird Soutl~ Alpharefta, Georgia 30022 (770) 569-1706 TO: T.D. Farrell Construction, Inc. 1360 Union Hill Road Building 12 A pharetta, Georgia 30004 770.754.3110 Ned $?arkrnan, IDI Dan B~ckett, CAP, Max Plan £ J List- for Change Bullefi~ SUBJECT: ~dianapolis, IN CARMax Store No. 7144 In accordance with Section 01035 - Modification Procedures please submit an itemized quotation for the changes in the Contract Sum and / or ad ustments in C~ntract Time incidental to the proposed modifications to the Contract Documents described here n. This is NOT A CHANGE ORDER or a direction to proceed with the work described herein. This Bulletin consists o~eigh~8)-pages. II. PROJECT MANUAL Item 7~01 Section 16630 - Transient Voltage Surge Suppression ('rvss) System Delete the above referenced sh'~et in its entirety and substitute the revised attached sheet. 1. Change the contact information for the TVSS system to Grey Gate, Inc. [prototype change] DRAWINGS Item 7-02 stitute the revised attached sheet. I. Updated Drawing Index [clarification] ---C-3 Site Pla~ Delete the above referenced sheet in its entirety and substitute the rewsed attached sheet. 1. Revised curb and transformer location at Presentation Lanes and transformer WIP/Customer Lot entrance [prototype change] BULLETIN NUMBER THREE 00907 20-01024.02 STORE NO. 7144 01 OCT 03 Item 7-04 C4 Site Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised transformer location at sales lot entrance [prototype change] Item 7-05 C5 Gradin Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised curb and transformer location at Presentation Lanes and transformer WIP/Customer Lot entrance [prototype change] Item 7-06 C6 Gradin Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised transformer location at sales lot entrance [prototype change] Item 7-07 C~ Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised curb and transformer location at Presentation Lanes and transformer WlP/Customer Lot entrance [prototype change] Item 7-08 ~ Delete the above referenced sheet in its entirety and substitute the revised attached sheet. I. Revised transformer location at sales lot entrance [prototype change] Item 7-09 C13 Construction Details ~ced sheet in its entirety and substitute the revised attached sheet. 1. Revised knox box detail [prototype change] Item 7-10 C13b Construction Details d sheet in its entirety and substitute the revised attached sheet. 1. Revised inventory control at Sales lot [prototype change] 2. Revised inventory control at Presentation Lanes [prototype change] 3. Revised inventory control at WIP/Customer Lot [prototype change] Item 7-11 Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised inventory control at Sales tot [prototype change] 2 Revised inventory control at Presentation Lanes [prototype change] 3. Revised inventory control at WlP/Customer Lot [prototype change] BULLETIN NUMBER THREE 00907 - 2 20-01024.02 STORE NO. 7144 01 OCT 03 Item 7-12 A2.0 Showroom Floor Plan unters [prototype change] 2. Revised internet office View window~ (vw-3) [pretotype change] 3, Revised curb and transformer location at Presentatior~ Lanes [prototype change] Item 7-13 A2.1 Service Floor Pla 1. Added 6" radius to production and cesmetic manager counters [prototype door location [RFI 38] sheet in its entirety and substitute the revised Item 7-15 Item 7-16 Item 7-17 Item 7.18 Revise Buyers Office counters [prototype change] 2. Revised Ir~ternet Office View ~ ndo~'s (VW-3) [prototype change 3, Added Intemet Office elevation [prototype cl~ange] 4. Revised counter at Cash Office [prototYpe change] Delete the above referenced sheet in its entirety and substitute the revised attached sheet. Revised lighting and added lighting to Showreom [prototype change] 2, Revised lighting and added lighting to Parts [prototype change] Added "Future Lighting" layout [prototype ct~ange] A2,8 Fixture Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet. Revis~ Buyers Office counters [prototype change] Moved lockers from Corridor 125 to Break room [prototype change] 3. Added round table to LGM [prototype change] A2.8a Fixture Plan eferenced sheet in its entirety and substitute the revised attached sheet. 1. Revise rack layout in Parts Room [prototype change] 2. Moved Iocker~ from Corridor 125 to Break Room 159 [prototype 3. Deleted fixture number forAudioVox [prototype change] et,/and substitute the revised attached sheet. 1. Revised canopy design at Presentation Lanes to include soffit [design coordination] change] BULLETIN NUMBER THREE 00907 - 3 STORE NO. 7144 01 OCT 03 Item 7-19 A4,6 Sections Details Delete the above referenced sheet i'n its entirety and substitute the revised attached sheet 1 Added new Wall Cap detail [prototype change] 2 Added expansion Joint detail [prototype change] Item 7-20 A5.0 Door Windows and Schedule Delete the above referenced sheet m ~ts entirety and substitute the rewsed attached sheet. Loop sensors by Door Installer [prototype change] 2, All ~/iew Windows are Hollow Metal Frame [pr~t0type change] 3. Revised height of VW-3 at Internet Office [prototype change] Item 7-21 A7.0 Interior Elevations Delete the above referenced sheet m its entirety and substitute the revised attached sheet. Item 7-22 Item 7-23 Item 7-24 Item 7-25 Item 7-26 1. Added Internet Office elevation [prototype change] A7.1 Interior Elevations nced sheet in its entirety and substitute the revised attached sheet, Revised storefront decal at Kid's Room [prototype change] 2. Revised storefrorrkdecat at Presentation Lanes [prototype change] ...... 3. Revised Showroom North elevation [prototype change] 4. Revised Cash Office elevation to reflect counter chang~ [prototype change] A7.2 Interior Elevations De ere the above referenced sheet in its ent rety and substitute the revised attached sheet. I Revised Shelf at Break room to be 20" deep [prototype change] A7.3 Interior Sections and Details t in its entirety and substitute the revised attached sheet. 1. Revised wall cap at Iow wall [prototype change] 2. Revised TV mounting height [prototype change] 41.0 E. ui~ ment Plan fenced sheet in its entirety and substitute the revised attached sheet. 1. Updated Equ pment Schedule [prototype change 2. R~vised Equipment numbers at Alignment Lift ~nd Front End Computer [design coordination] M3.0 FQC and Presentation Part Plan - HVAC ty and substitute the revised attached sheet. BULLETIN NUMBER THREE 00907 - 4 STORE NO. 7144 01 OCT 03 1. Revised duct for EF 21 [prototyl~e change] Item 7-27 M5.0_ Schedule - HVAC Delete the above referenced sheet n its entirety and substitute the revised attached sheet. Item 7-28 Item 7-29 1. Added HVAC General Note #30 [prototype change] El.0 Site Li htin ~ Plan Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised perimeter parking lot lights to be on night light circuit. [prototype change] E1 2 Ste Eectrca Deta s Delete the above referenced sheet in its entirety and substitute the revised attached sheet. 1. Relocated power units to secure side of inventory gates, details 1, 2 and 3. [prototype change] Item 7-30 E2.0SalesAreg Li hr_in Plgn heet in its entirety and substitute the revised attached sheet. rototype change] ds roam, [prototype change] lighting [prototype change] its entirety and substitute the revised sheet. Added provisions for future lighting [prototype change] Item 7-31 Item 7-32 Item 7-33 E3.0 Sales Area Power Plan ~d sheet in its entirety and substitute the revised attached sheet. 1. Deleted receptac e for printer n LGM [prototype change] 2. Revised TV mounting h~'ight [prototype change] E3.1 Service Area PoWer Plan indts~ntirety and substitute the'revised-- affached sheet. t. Added receptacle at pads receiving counter. [prototype ?ange] 2. Added note to mount a I receptacles in pads area at 24 a f.f. [prototype change] BULLETIN NUMBER THREE 00907 - 5 20-01024.02 STORE NO. 7144 01 OCT 03 Item 7-34 E3.2 FQC & Presentation Lanes Power Plan Details substitute the revised attached sheet. 1. Deleted receptacle for r~ gerator in FQC building. Added two receptacles for vending ~ chines. Relocated car wash door activation cont~'o pane [prototYPE ~hange] 2. Car Wash changes per 1' d Sparkman email dated 9/17/03 - Revised locations of car ~vash uti ~, devices. Item 7~35 I Electrical Details heel in its entire~ and substitute the revised attached sheet. 1. Added detail reference notation to detail 1/E3.3. [,prototype change] 2. Revised paint booth electrical requirements on schedule [prototyp~ change] Item 7-36 E4.0 Sales Area STS Plan ced sheet in its entirety and substitute the revised attached sheet. 1, Deleted data outlet for printer in LGM [prototype change] 2. Revised TV mount ng ~eight. [prototype change] 3, Deleted data Outlet from short wall opposite debk in LGM. [prototype change] 4. Revised general note #12. [prototype change] its entirety and substitute the revised Added camera unction box above parts window. [prototype change] Added data outlet at parts receiving counter, [prototype change] Added note to mount all data outlets in parts area at 24" a.f.f. [prototype change] Added ~rovisions for future parts systems. [prototype change] Item 7-38 E4.3 STS Details Delete the abov; referenced sheet in its entirety and substitute the revised attached sheet. 1. Revised note #3 on detail 9/E4.3 to coordinate quantity of receptacles for data catch cabinet with Checkpoint. [prototype cl~ange] 2. Revised door alarm junction box detc~il 1/E4.3. [protc~t~pe change] Item 7-39 d substitute the reviSed attached sheet. 1. Revised main data/pbx room p an and elevations to coordinate with PE Log sketches. Revised legend notes M O, P AG and AN; added legend note AY. [prototype change] 2. Revised legend note Z, [prototype change] BULLETIN NUMBER THREE 00907 - 6 20-01024.02 STORE NO. 7144 01 OCT 03 ' Item 7-4a Item 7-41 E6.1 Panelboard Schedules b--eZelete the above referenced sheet in its entirety and substitute the revised attached sheet. Revised panelboard schedule LC, circuits 25, 27. [prototype change] Revised panetboard schedule HD circuit 14 circu t breaker size. [~rototype change] Revised panelboard schedule SLA circuits 9,11, and 21,23; revised panelb0brd schedule SLB, circuits 37,39 and 34 36. [prototype change] E6.2 Panelboard Schedules d sheet in its entirety and substitute the revised attached sheet. ]. Revised panelboard schedule LCPC circuits 31 and 28 thru 34. [prototype change] 2. Revised panelboard schedule LF circuit 35 circuit breaker size. [prototype change] 3. Revised panelboard schedule LCP circuit 20. [prototype change] 4. Revised panelboard schedule LCPC, circu ts 37 thru 41. [clarification] III. PROJECT MANUAl. ~n] 6630 -Transient Voltage Surge Suppression (T~SS)~,stem DRAWINGS C13b Constructien Details A1.0 Architectural Site Plan A2.0 Showroom Floor Plan A2.1 Service Floor Plan A2.3 Enlarged Floor Plans A2.5 Reflected Ceiling Flan A2.8 Fixture P an ~its JJe ts and Details lan BULLETIN NUMBER THREE 00907 - 7 20-01024.02 STORE NO. 7144 O1 OCT 03 M3.0 FCiC and Presentation Part Plan - HVAC M5 0 Schedu e - HVAC E1.0 Site Lighting Plan E1.2 Site Electrical Details E2,0 Sales Area Lighting Plan E2.1 Service Area Lighting Plan E3.0 Sales Area Pow~r Plan E3.1 Service Area Power Plan E3.2 FQC & Presentation Lanes Power Plan Details E3.3 Equipment Schedu e and Electrical Detai s E4.0 Sales Area STS Plan E4,1 Service Area STS Plan E4,3 STS Details E4,4 Enlarged Main Te/PBX Room Plan, Elevations E6.1 PaneJboard Schedules E6 2 Panelboard Schedules (8 pages) END OF BULLETIN NUMBER THREE BULLETIN NUMBER THREE 00907 - 8