HomeMy WebLinkAbout0815.93.88(1 V
(j j
/<
j / \
\
\ 3/4" CW DN. N WAL
WH -1
co 24 "A.F.G
3 "RD D -14
\ X\
P %\ 13
v j j j
P20
\
/ (14 SQ.FT.)
j j \
` \ A
/ P401 3'
`,j \
Xv
j�
9J
j � v
5" RDL DN.
(3230 SQ.FT.
(145 SQ. ) i
A
\
Pte'
\ j
/2 HW DN. / j `� /� v y / \ \3" rr FD -6 2"V UP \i
\ O 4 / \
1 \ 5 S T� � j
WH -1 /
\ /2
5" RD /OFD -13 3 FT v, j A.J .G. / /
(320 SQ..) 10 24 "
i �iV N \ \\ \
3/ i v / ` �� / j� V j &P RELIEF 1 -1 /2 "V
3 4" C
DWH -2 j. j/ .ti�1 -1/2 "V UP
jV j// jj v j v j/ w\ ',A
3/4" W \ i / v \ ; \%/ \vv 1 j 2 -1/2" CW 1
FPS ET S ) AROUND CIRCULAR STAIRS i j �� `
,.V A / A`• i \� % SEE PLUMBIN(
v SECTION A /P4
w \ �
UP jj j� .vim v � i �� WCO� l y 1/2 "H & j DN,
r ��X v_ j v �`�v � / � j
\ / \
2 "V /' —1 /2 2-1/2" CW RUN
\ ii j v i (3230 IN JOIST SPACE.
_O
—T- \3/4„ CW
4 \i�
5
j
` ` 10 5" RD /OFD -12 MEZANIE LUING
1 /2 "CW EE 5 ST (3230 SQ.FT.)
j
MEZZANINE PLAN
FOR CONTINUATIO .
SCALE: 1/8"
r
i AA � i
/ / K� \ j
ly vcHAS i. IN JOIST , j �S' ST �
CO 3' j
v
\ j / FINISHED FLOOR
ELEVATION 18.5/
j v ,
i
\ / jamv
2-1/2" C W RUN,,`
' i
3/4" CW IN JOIST SPACE•
V< v �; j jj ` \ \V\ v \
w j 0 (3230 SQ.FT.) j ♦ / / ;n `/ A v jj\ vvV \`
� r v_ j'
5'/ST
•
--
v X`
jv 2 1/ 2" CW
RUN IN JOIST j / j v V r
SPACE �> UP TO SANCT AkY ` j / j` V ` \\ \ jj \\ �i
JOIST SPACE; \ \ jA v ��\
�� H
3/4" CW DN
3/4" CW
/ WH -1
24 A.F.G. � �
\ o �� j� v v/ �j ?
>
jj 2 -1 /2" CW DN. IN WALL !TC�' V �� /jam j A �� jX�
/ MECH RM BELW
5" RDL DN, R
j (3230 SQ.FT.
f' `2
j j;
i
i
y�
4„ RD /OFD -8
"ST / / FIRE RISER PIPE TO / (1 289 SQ.FT.) 6 �
X,
SIZE PER / SANCTUARY —ZONE, #2 x y v
+iYDRAULIC
CALCULATI
j; " R F —17 / i
", ST RUN, PIPE vv
10 4
(3230 SQ.FT.) x
IN JO�ST ,SPACE
\:
T v j j� v .v v (3589 SQ.FT,.
3/4" CW DN j .� / 5.r ST
V a. WH -1
24 "A.F.G. v A V jam. v i jv
;A CO
vx `y \ v rt - 6 4" R' -7
4" RD FD ��\ / ii \ vj\ L LKHEAD) �30Q', SO.FT.)
(1619 SQ.FT.)\
4 ST
\i
,v Ij St4 (EXTLp PAST
\ ,
DRYdWk\ BULKHEAD) r —
5" STv i
v 6� RDL DN
(3 4 ' 0. FT.) vST
4" RD /OFD -9 \ /
6 (815 SQ.FT.)
/ \
NORTH
-14-4'R Q /0 FID —1 1
0 SQ.FT.)
\ (1 55
� � � � � ST
j
MAIN LEVEL PLAN AREA A AND B PLUMBING j
SCALE: 1/8" = 1' -0" j j / 4" S
WALL,
VANDAL
AP AND
1.
i
V
n
PLAN NOTES
U
6 GAL. WATER HEATER LOCATED ON MECHANICAL
INCORPORATED
MEZZININE.
(DWH -2). PROVIDE SHUT —OFF VALVE
INTERIOR DESIGNERS
ON COLD
WATER SUPPLY.
O
CONNECT
1 "CW TO BAPTISERY POOL,
These drawings Indicate the general scope of
the project In terns of architectural design
concept, the dimensions of the building, the
DO NOT BLOCK
BAPTISERY POOL ACCESS DOOR.
0
1/2 "COLD
WATER DOWN, EXTEND 1 /2 "CW TO LAVATORY.
O
4" WASTE
DOWN, 2" VENT UP, 1-1/2" WASTE
M
ARM OVER
TO LAVATORY,
5
0
3 WASTE
DOWN.
O
4" DOWN
FROM ROOF DRAIN /OVERFLOW DRAIN
w
ABOVE.
M
M
O
2" P —TRAP LOCATED BELOW BAPTISERY PLATFORM FOR
BAPTISERY
POOL DRAIN AND OVERFLOW CONNECTION.
O
1 /2" HOT
& COLD WATER UP TO DWH— ON
MEZZANINE LEVEL.
J
3" WASTE
DOWN, 1-1/2" VENT UP.
10
5" DOWN
FROM ROOF DRAIN /OVERFLOW DRAIN ABOVE. e
11
3" DOWN
FROM ROOF DRAIN /OVERFLOW DRAIN ABOVE.
12
PP DV I OE
PI PE EVE, --,EE DETAI t,
GENERAL NOTES
1. CONTRACTOR TO COORDINATE ALL PIPE ROUTING
WITH OTHER TRADES (MECHANICAL, ELECTRICAL,
STRUCTURAL ETC.) PRIOR TO BEGINNING WORK.
2. REFER TO DRAWING P502 FOR PLUMBING SCHEDULES.
3. INVERT ELEVATIONS:
A
ELEV. 803.5'= ELEV. +O' -0"
ELEV. 818.5'= ELEV. +15' -0"
ELEV. 831.5'= ELEV. +28' -0"
4. SLEEVE AND FIRE STOP ALL PENETRATIONS THRU ALL FIRE
RATED WALLS, REFER TO 'A' SERIES DRAWINGS FOR FIRE
RATED WALL LOCATIONS.
U
MAIN LEVEL KEY PLAN
L�.
(53
CSO
ARCHITECTS
INCORPORATED
ARCHITECTS
PLANNERS
INTERIOR DESIGNERS
O COPYRIGHT 1991
9100 KEYSTONE CROSSING
INDIANAPOLIS, INDIANA 46240
(317) 848 -7800
SCOPE DRAWINGS
These drawings Indicate the general scope of
the project In terns of architectural design
concept, the dimensions of the building, the
major architectural dement& and the type of
stmctuml,mechanlcal and electrical systems.
The drawings do not necessorlly iMicata w
describe di work required for full performance
and completion of the equlrements of the
Contract On the basis of the general scope
Indicated or described. the trade contractors
shall famish oil Items the for the props
ezecuton and completion of the work.
vi
z
O
w
Of
M
M m Q
w
Y
w � �
Q w 3
m
00 U
Z
w
Q
M
M
W
Cr
Z
Q
V)
p
Z
v
J
Of
Q
U
W
��r
W
M
In
tf')
Q
U
D
W
U
w
Q
LL
J
z
z
Q
�
Q
00-00,
Q�
0
=
,-L_,
z
U
W
z_
Q
L
� -,II \X.A. Aj 1,
i
T � �
No.
Z PE60910310
' k�+
� STATE OF. ,r �
4�•
Fss ; N A `
0 ` 11%
CERTIFIED BY
r
SHEET NO
P206
OF SHEETS
FILE NO
92217