Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0815.93.98
C1 I i C2 (D4 I I � I i ' I � I i' Std`, - - 071 BR'rACR�J. _ C G3 05Z SD2 i F ID512 C 350F T 024 SD6 -150 F a 200 3/4 HHS '1 F 3/4' HHR 14 �` 14 1 A i 5 ' 1 1 /2 "HHR ' I SDI_ sTu� SDI 150 G3 055 -1!50 3 G2 0 5 ,G2 _ it -' - -- V SD2 T -225 �- E t G3 SD2 2 G3: it Z SEC. 2 -200 -200 !, 1070 0 G2 SD2 I' -225 16 F 8 -oyi" C56 1 G3 1 0 05 T II 1 069 F ,-- ii SDI 1" HHS, 8 ♦ SD2 G3 1 "HHRi1 -200 C �� z G2 14 13 SD2 066 067I �0 200 - - - 14 V) z13 !' G2 SD2 SD2 -200 -350 _ T -t- JOHN , !, 1065 3/4 ", HHS J -V 314" HOR 1060 SD2 8 14 1 - 200 I' �I 3 ;! STAIR CUH -2 _. F 1064 - -- VLST. SD5 CLOS.�' l , - -50 I� STORAGE 1062 G2 'j r I, , �H - - I i I i I I i I � C2 `--' nCi C4 ) - -- - A \L-,l i NOTE: DIVISION 15 CONTRACTOR IS REQUIRED TO COORDINATE DIFFUSER & REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS. PLAN NOTES: 1� PROVIDE VOLUME DAMPER AT EACH BRANCH DUCT, TYPICAL. O PROVIDE CLEANOUT ACCESS DOOR IN GREASE DUCT ABOVE CEILING; COORDINATE WITH LOCATION OF SHAFT ACCESS DOOR, 3O 14%14" 14" TRANSFER AIR OPENING ABOVE CEILING BETWEEN PLENUMS; REMOVE DRYWALL, O 60 "x30" RETURN AIR DUCT OPENING INTO PLENUM ABOVE CORRIDOR CEILING. PROVIDE FIRE DAMPER AT CHASE WALL PENETRATION, O 30"x30" RETURN AIR DUCT OPENING INTO PLENUM ABOVE CORRIDOR CEILING, PROVIDE FIRE DAMPER AT CHASE WALL PENETRATION. © SPIN -IN FITTING WITH VOLUME DAMPER, TYPICAL. O FLEX DUCT, 6 FEET MAXIMUM (TOTAL). ® 12"x12" TRANSFER AIR DUCT ABOVE CEILING. PROVIDE INTERNAL INSULATION, 24" LEGS -FOR SOUND ATTENUATION. 9O GREASE RATED WELDED STEEL EXHAUST DUCT; REFER TO SPECIFICATIONS. 10 6"x6" DOWN TO " R 1" BELOW. 11 2 1/2" HHS AND 2 1/2" HHR DOWN SHAFT. 2" HHR UP SHAFT TO UPPER LEVEL. 2" HHS AND 2" HHR BRANCH PIPING TO MAIN LEVEL. Q 3 -WAY CONTROL VALVE FOR HOT WATER COIL ON VAV BOX. 2 -WAY CONTROL VALVE FOR HOT WATER COIL ON VAV BOX. 14 3/4" HHS AND 3/4" HHR BRANCH PIPING TO VAV BOX. PIPE ANCHORS, 16 PIPE GUIDES. 3/4" HHS AND HHR DOWN TO CUH -1. SEE SHEET M203. 1® 3/4" HHS AND HHR TO CUH -2. 19 66 "X36" RETURN AIR DUCT UP THROUGH SHAFT TO TOP FLOOR LEVEL PLENUM, �0 REFER TO DWGS, M202 AND M205 FOR CONTINUATION OF DUCTWORK, PIPING IN SHAFT. DUCT CENTERLINE AT APPROX. 9' -9" AFF; COORDINATE WITH STRUCTURE, LIGHTS, PIPING, ETC. © DUCT CENTERLINE AT APPROX. 10' -3" AFF; COORDINATE WITH STRUCTURE, LIGHTS, PIPING, ETC, © BOTTOM OF AIR TERMINAL AT APPROX 9' -8" AFF; COORDINATE WITH STRUCTURE, LIGHTS, PIPING, ETC. ® ROUTE DUCT AS HIGH AS POSSIBLE. COORDINATE WITH STRUCTURE, LIGHTS, PIPING, ETC, r - CK MAIN LEVEL PLAN AREA "C" - HVAC SCALE: 1/8" i X15 NORTH MAIN LEVEL KEY PLAN mom 0 Ur 5 ILL I � FILE NO 92217 ! i' Std`, - - 071 BR'rACR�J. _ C G3 05Z SD2 i F ID512 C 350F T 024 SD6 -150 F a 200 3/4 HHS '1 F 3/4' HHR 14 �` 14 1 A i 5 ' 1 1 /2 "HHR ' I SDI_ sTu� SDI 150 G3 055 -1!50 3 G2 0 5 ,G2 _ it -' - -- V SD2 T -225 �- E t G3 SD2 2 G3: it Z SEC. 2 -200 -200 !, 1070 0 G2 SD2 I' -225 16 F 8 -oyi" C56 1 G3 1 0 05 T II 1 069 F ,-- ii SDI 1" HHS, 8 ♦ SD2 G3 1 "HHRi1 -200 C �� z G2 14 13 SD2 066 067I �0 200 - - - 14 V) z13 !' G2 SD2 SD2 -200 -350 _ T -t- JOHN , !, 1065 3/4 ", HHS J -V 314" HOR 1060 SD2 8 14 1 - 200 I' �I 3 ;! STAIR CUH -2 _. F 1064 - -- VLST. SD5 CLOS.�' l , - -50 I� STORAGE 1062 G2 'j r I, , �H - - I i I i I I i I � C2 `--' nCi C4 ) - -- - A \L-,l i NOTE: DIVISION 15 CONTRACTOR IS REQUIRED TO COORDINATE DIFFUSER & REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS. PLAN NOTES: 1� PROVIDE VOLUME DAMPER AT EACH BRANCH DUCT, TYPICAL. O PROVIDE CLEANOUT ACCESS DOOR IN GREASE DUCT ABOVE CEILING; COORDINATE WITH LOCATION OF SHAFT ACCESS DOOR, 3O 14%14" 14" TRANSFER AIR OPENING ABOVE CEILING BETWEEN PLENUMS; REMOVE DRYWALL, O 60 "x30" RETURN AIR DUCT OPENING INTO PLENUM ABOVE CORRIDOR CEILING. PROVIDE FIRE DAMPER AT CHASE WALL PENETRATION, O 30"x30" RETURN AIR DUCT OPENING INTO PLENUM ABOVE CORRIDOR CEILING, PROVIDE FIRE DAMPER AT CHASE WALL PENETRATION. © SPIN -IN FITTING WITH VOLUME DAMPER, TYPICAL. O FLEX DUCT, 6 FEET MAXIMUM (TOTAL). ® 12"x12" TRANSFER AIR DUCT ABOVE CEILING. PROVIDE INTERNAL INSULATION, 24" LEGS -FOR SOUND ATTENUATION. 9O GREASE RATED WELDED STEEL EXHAUST DUCT; REFER TO SPECIFICATIONS. 10 6"x6" DOWN TO " R 1" BELOW. 11 2 1/2" HHS AND 2 1/2" HHR DOWN SHAFT. 2" HHR UP SHAFT TO UPPER LEVEL. 2" HHS AND 2" HHR BRANCH PIPING TO MAIN LEVEL. Q 3 -WAY CONTROL VALVE FOR HOT WATER COIL ON VAV BOX. 2 -WAY CONTROL VALVE FOR HOT WATER COIL ON VAV BOX. 14 3/4" HHS AND 3/4" HHR BRANCH PIPING TO VAV BOX. PIPE ANCHORS, 16 PIPE GUIDES. 3/4" HHS AND HHR DOWN TO CUH -1. SEE SHEET M203. 1® 3/4" HHS AND HHR TO CUH -2. 19 66 "X36" RETURN AIR DUCT UP THROUGH SHAFT TO TOP FLOOR LEVEL PLENUM, �0 REFER TO DWGS, M202 AND M205 FOR CONTINUATION OF DUCTWORK, PIPING IN SHAFT. DUCT CENTERLINE AT APPROX. 9' -9" AFF; COORDINATE WITH STRUCTURE, LIGHTS, PIPING, ETC. © DUCT CENTERLINE AT APPROX. 10' -3" AFF; COORDINATE WITH STRUCTURE, LIGHTS, PIPING, ETC, © BOTTOM OF AIR TERMINAL AT APPROX 9' -8" AFF; COORDINATE WITH STRUCTURE, LIGHTS, PIPING, ETC. ® ROUTE DUCT AS HIGH AS POSSIBLE. COORDINATE WITH STRUCTURE, LIGHTS, PIPING, ETC, r - CK MAIN LEVEL PLAN AREA "C" - HVAC SCALE: 1/8" i X15 NORTH MAIN LEVEL KEY PLAN mom 0 Ur 5 ILL I � FILE NO 92217 j SD2 14' -300 17 i �I 28 "o DN. 22"o UP� 26 "o DN. "o ---�► ::.,: :.. 22 UP V H . FD' i' Std`, - - 071 BR'rACR�J. _ C G3 05Z SD2 i F ID512 C 350F T 024 SD6 -150 F a 200 3/4 HHS '1 F 3/4' HHR 14 �` 14 1 A i 5 ' 1 1 /2 "HHR ' I SDI_ sTu� SDI 150 G3 055 -1!50 3 G2 0 5 ,G2 _ it -' - -- V SD2 T -225 �- E t G3 SD2 2 G3: it Z SEC. 2 -200 -200 !, 1070 0 G2 SD2 I' -225 16 F 8 -oyi" C56 1 G3 1 0 05 T II 1 069 F ,-- ii SDI 1" HHS, 8 ♦ SD2 G3 1 "HHRi1 -200 C �� z G2 14 13 SD2 066 067I �0 200 - - - 14 V) z13 !' G2 SD2 SD2 -200 -350 _ T -t- JOHN , !, 1065 3/4 ", HHS J -V 314" HOR 1060 SD2 8 14 1 - 200 I' �I 3 ;! STAIR CUH -2 _. F 1064 - -- VLST. SD5 CLOS.�' l , - -50 I� STORAGE 1062 G2 'j r I, , �H - - I i I i I I i I � C2 `--' nCi C4 ) - -- - A \L-,l i NOTE: DIVISION 15 CONTRACTOR IS REQUIRED TO COORDINATE DIFFUSER & REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS. PLAN NOTES: 1� PROVIDE VOLUME DAMPER AT EACH BRANCH DUCT, TYPICAL. O PROVIDE CLEANOUT ACCESS DOOR IN GREASE DUCT ABOVE CEILING; COORDINATE WITH LOCATION OF SHAFT ACCESS DOOR, 3O 14%14" 14" TRANSFER AIR OPENING ABOVE CEILING BETWEEN PLENUMS; REMOVE DRYWALL, O 60 "x30" RETURN AIR DUCT OPENING INTO PLENUM ABOVE CORRIDOR CEILING. PROVIDE FIRE DAMPER AT CHASE WALL PENETRATION, O 30"x30" RETURN AIR DUCT OPENING INTO PLENUM ABOVE CORRIDOR CEILING, PROVIDE FIRE DAMPER AT CHASE WALL PENETRATION. © SPIN -IN FITTING WITH VOLUME DAMPER, TYPICAL. O FLEX DUCT, 6 FEET MAXIMUM (TOTAL). ® 12"x12" TRANSFER AIR DUCT ABOVE CEILING. PROVIDE INTERNAL INSULATION, 24" LEGS -FOR SOUND ATTENUATION. 9O GREASE RATED WELDED STEEL EXHAUST DUCT; REFER TO SPECIFICATIONS. 10 6"x6" DOWN TO " R 1" BELOW. 11 2 1/2" HHS AND 2 1/2" HHR DOWN SHAFT. 2" HHR UP SHAFT TO UPPER LEVEL. 2" HHS AND 2" HHR BRANCH PIPING TO MAIN LEVEL. Q 3 -WAY CONTROL VALVE FOR HOT WATER COIL ON VAV BOX. 2 -WAY CONTROL VALVE FOR HOT WATER COIL ON VAV BOX. 14 3/4" HHS AND 3/4" HHR BRANCH PIPING TO VAV BOX. PIPE ANCHORS, 16 PIPE GUIDES. 3/4" HHS AND HHR DOWN TO CUH -1. SEE SHEET M203. 1® 3/4" HHS AND HHR TO CUH -2. 19 66 "X36" RETURN AIR DUCT UP THROUGH SHAFT TO TOP FLOOR LEVEL PLENUM, �0 REFER TO DWGS, M202 AND M205 FOR CONTINUATION OF DUCTWORK, PIPING IN SHAFT. DUCT CENTERLINE AT APPROX. 9' -9" AFF; COORDINATE WITH STRUCTURE, LIGHTS, PIPING, ETC. © DUCT CENTERLINE AT APPROX. 10' -3" AFF; COORDINATE WITH STRUCTURE, LIGHTS, PIPING, ETC, © BOTTOM OF AIR TERMINAL AT APPROX 9' -8" AFF; COORDINATE WITH STRUCTURE, LIGHTS, PIPING, ETC. ® ROUTE DUCT AS HIGH AS POSSIBLE. COORDINATE WITH STRUCTURE, LIGHTS, PIPING, ETC, r - CK MAIN LEVEL PLAN AREA "C" - HVAC SCALE: 1/8" i X15 NORTH MAIN LEVEL KEY PLAN mom 0 Ur 5 ILL I � FILE NO 92217