HomeMy WebLinkAbout06010160.1MARCUS &
MILLICHAP
INDIANAPOLIS, INDIANA
INTERIOR DESIGN STAFFELBACH DESIGN ASSOCIATES INC
GENERAL NOTES
THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONSTRUCTION
DOCUMENTS INCLUDING CONSULTANT'S DRAWINGS AND SHALL IMMEDIATELY
REPORT ANY NOTED DISCREPANCIES, INCONSISTANCIES, OR OMMISSIONS TO
STAFFELBACH DESIGN ASSOCIATES (SDA). CONTRACTOR SHALL PERFORM NO PORTION
OF THE WORK AT ANYTIME WITHOUT CONSTRUCTION DOCUMENTS, OR WHERE
REQUIRED, APPROVED SHOP DRAWINGS, PRODUCT DATA, OR SAMPLES FOR SUCH
PORTIONS OF THE WORK.
I AIA DOCUMENT A201- 1997 GENERAL CONDITIONS SHALL BE INCORPORATED j
INTO THESE DOCUMENTS. t
Gl SUPPLEMENTAL INSTRUCTIONS
i GI A ADD THE FOLLOWING DEFINITION TO AIA A201, PARAGRAPH 1.1 - BASIC
DEFINITIONS, 1.1.8- THE USE OF THE WORD "PROVIDE" W CONNECTION i
WITH ANY ITEM SPECIFIED IS INTENDED TO MEAN THAT SUCH SHALL
BE FURNISHED, INSTALLED AND CONNECTED, WHERE SO REQUIRED,
EXCEPT AS OTHERWISE NOTED.
G1.2 ADD THE FOLLOWING DEFINITION TO AIA A201, PARAGRAPH 1.1- BASIC I
DEFINITIONS, 1.1.9- THE TERM "BUILDING STANDARD" AS NOTED ON
DRAWINGS AND AS SPECIFIED HEREIN, REFERS TO ALL MATERIALS,
I LABOR, INSTALLATION, ETC. PER BUILDING OWNER'S CRITERIA i
i
� G1.3 ADD THE FOLLOWING DEFINITION TO AIA A201, PARAGRAPH 1.1- BASIC I
I DEFINITIONS, 1.1.10- " WORK" SHALL INCLUDE ALL LABOR, ASSEMBLIES
AND FINISH WORK WITH ALL PARTS AND MATERIALS NECESSARY TO
MAKE A COMPLETE, IN- PLACE, PROPERLY WORKING AND FINISHED
INSTALLATION, REGARDLESS OF WHETHER SHOWN ON THE DRAWINGS I
` OR NOT.
G2 CONSTRUCTION DOCUMENTS
! G2.1 ALL DIMENSIONS AND DESCRIPTIONS ON CONSTRUCTION DRAWINGS ARE
i COMPLEMENTARY. ANY WORK SHOWN OR REFERRED TO ON ANY
I CONSTRUCTION DOCUMENT SHALL BE PROVIDED AS THOUGH ON ALL
RELATED DOCUMENTS_
( G2.2 ANY CONFLICTS BETWEEN THE MEP DRAWINGS AND THE ARCHITECTURAL
DRAWINGS ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF
STAFFELBACH PRIOR TO CONSTRUCTION.
G2.3 UNLESS NOTED OTHERWISE, ALL DRAWINGS HAVE BEEN PRODUCED TO
I SCALE, CONTRACTOR SHALL NOT DIRECTLY MEASURE OR "SCALE" SAID
! DRAWINGS TO ASCERTAIN ANY DIMENSION_
G3 CONTRACTUAL RELATIONSHIP5
I G3.1 NOTHING CONTAINED IN THESE DRAWINGS, OR IN ANY ACCOMPANYING
I B CONTRACT
TWEENTHECCONTRAC ANY
TOR AND STAFFELBACH-
G4 CONTRACTUAL RELATIONSHIP
BACH
i
G4 BIDDING
! G4.1 PRIOR TO THE BID, THE CONTRACTOR SHALL EXAMINE THE SITE AND
PORTIONS THEREOF WHICH WILL AFFECT THIS WORK AND SHALL
( COMPARE IT WITH THE DRAWINGS AND BE SATISFIED AS TO THE
CONDITIONS UNDER WHICH WORK IS TO BE PERFORMED. THE
CONTRACTOR SHALL AT SUCH TIME ASCERTAIN AND CHECK LOCATIONS
OF THE EXISTING STRUCTURE AND EQUIPMENT.
G4.2 CONTRACTOR SHALL NOTIFY STAFFELBACH IN WRITTING OF ANY
VARIATIONS OR DISCREPANCIES FROM THE EXISTING CONDITIONS
PRIOR TO SUBMITTING BID. THE SUBMISSION OF A BID WILL BE CONSTRUED
AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE AND LATER
CLAIMS FOR LABOR, EQUIPMENT AND/ OR MATERIALS REQUIRED, OR FOR
i
ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN HAD
�
DIFFICULTIES
( SUCH AN EXAMINATION BEEN MADE, WILL NOT BE RECOGNIZED_
' G4.3 WITHIN FIVE (5) DAYS FROM AWARD OF THE CONTRACT, CONTRACTOR
SHALL NOTIFY STAFFELBACH IN WRITING AS TO THE NAMES OF ALL
SUB - CONTRACTORS.
l
1 G4.4 THE CONTRACTOR SHALL EXPRESSLY ACKNOWLEDGE, IN WRITING, IN HIS
BID, THAT HE HAS READ AND REVIEWED THESE CONSTRUCTION DOCUMENTS
IN THEIR ENTIRETY, INCLUDING ALL INFORMATION CONTAINED IN THIS
} COVER SHEET_
I G5 SUBSTITUTIONS
I G5.1 WHERE A PARTICULAR MANUFACTURER OR ITEM HAS BEEN SPECIFIED,
AN EQUAL TO, OR SUPERIOR PRODUCT OF ANOTHER MANUFACTURER MAY
I BE ACCEPTED ONLY UPON REVIEW AND WRITTEN ACCEPTANCE BY
I STAFFELBACH IT IS MANDATORY THAT SUCH REVIEW BE OBTAINED PRIOR
i TO BIDDING, OR THE SUBSTITUTION WILL NOT BE CONSIDERED. ANY SUCH
PROPOSED SUBMITION SHALL BE SUBMITTED TO STAFFELBACH WITH ALL
APPROPRIATE MANUFACTURER'S DATA AND LITERATURE. STAFFELBACH'S
I DECISION AS TO WHETHER A PRODUCT IS EQUAL OR SUPERIOR TO THE
SPECIFIED PRODUCT SHALL BE FINAL. THIS SECTION APPLIES TO ANY
"OR EQUAL" NOTED IN THE SPECIFICATIONS_
jG6 CONSTRUCTION PROGRESS SCHEDULE
G6.1 THE CONTRACTOR, PRIOR TO BEING GIVEN NOTICE TO PROCEED, SHALL
PREPARE AND SUBMIT TO STAFFELBACH A PRELIMINARY PROGRESS SCHEDULE
1. OF THE WORK IN BAR CHART FORM.
i G6.2 THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING PERMITS FOR
I ALL PHASES OF THE WORK AS REQUIRED BY FEDERAL, STATE, COUNTY
AND MUNICIPAL LAW.
G7 USE OF PREMISES
G7.1 CONTRACTOR SHALL CONFINE HIS APPARATUS, DELIVERY AND STORAGE
OF MATERIALS, AND THE OPERATION OF HIS WORKMEN TO LIMITS
DEFINED BY THE OWNER. CONTRACTOR SHALL NOT UNREASONABLY
ENCUMBER THE PREMISES TO THE INCONVENIENCE OF THE TENANTS AND
OWNER'S PERSONNEL AND OPERATION.
G7.2 CONTRACTOR SHALL MINIMIZE NOISE DISTURBANCE TO ADJACENT
i OCCUPANTS.
( G7.3 CORING AND OTHER WORK WHICH MIGHT AFFECT OTHER TENANTS SHALL
1 BE SCHEDULED WITH OWNER'S AND BUILDING LANDLORD'S APPROVAL.
I
G7.4 CONTRACTOR IS RESPONSIBLE FOR STACKING OF ALL MATERIALS DURING
I CONSTRUCTION IN A MANNER THAT PREVENTS LIVE LOADS FROM
I EXCEEDING THOSE ALLOWED FOR IN THE BUILDING'S STRUCTURAL
I DESIGN. CONTRACTOR TO COORDINATE THIS WITH BUILDING
I LANDLORD.
I G8 CONSTRUCTION OFFICE
G8.1 CONTRACTOR SHALL PROVIDE AND MAINTAIN A FIELD CONSTRUCTION
OFFICE, LOCATED AS DIRECTED BY THE OWNER AND /OR LANDLORD.
G8.2 CONTRACTOR SHALL ALLOW FOR ACCESS BY OTHER VENDORS AND
TENANT'S OWN FORCES. CONTRACTOR SHALL COOPERATE WITH THE
TENANT ON SCHEDULING AND PERFORMING THE CONTRACTOR'S WORK TO
AVOID CONFLICT, DELAY, OR INTERFERENCES WITH THE WORK OF OTHER
i VENDORS OR THE CONSTRUCTION OR OPERATIONS OF THE TENANT'S
I OWN FORCES.
1 G8.3 CONTRACTOR SHALL MAINTAIN, ON THE SITE, ONE RECORD COPY OF THE
RECORD DRAWINGS, RECORD SHOP DRAWINGS, PRODUCT DATA, SAMPLES
AND SIMILAR REQUIRED SUBMITTALS FOR REFERENCE.
G8.4 CONTRACTOR SHALL PROVIDE UNLIMITED LOCAL TELEPHONE SERVICE
FOR THE USE OF ALL SUBCONTRACTORS, SUPPLIERS, DESIGNERS, AND
INSPECTORS. LONG DISTANCE CHARGES SHALL BE PAID BY THE
CONTRACTOR AND MAY BE CHARGED TO THOSE INCURRING SUCH COSTS_
G9 TOILET FACILITIES AND DRINKING WATER
G9.1 UPON THE APPROVAL OF THE BUILDING'S LANDLORD, THE USE OF
DESIGNATED TOILET FACILITIES AND DRINKING FOUNTAINS WITHIN THE
BUILDING SHALL BE AVAILABLE FOR THE USE OF ALL WORKMEN FOR THE
DURATION OF THE PROJECT. IF, AT ANY TIME, THE OWNER FEELS THAT
ANY OF THE WORKMEN ARE RESPONSIBLE FOR LEAVING A TOILET ROOM
OR DRINKING FOUNTAIN UNNECESSARILY DIRTY, OR ARE RESPONSIBLE
FOR CAUSING ANY DAMAGE TO EXISTING TOILET FACILITIES OR DRINKING
FOUNTAINS, THE OWNER MAY HOLD THE CONTRACTOR RESPONSIBLE FOR
THE COST OF CLEAN -UP OR REPAIR.
G10 PROTECTION OF PERSONS AND PROPERTY
G10.1 CONTRACTOR SHALL PROTECT AREAS AND NEW OR EXISTING MATERIALS
AND FINISHES FROM DAMAGE WHICH MAY OCCUR FROM CONSTRUCTION,
DEMOLITION, DUST, WATER, ETC., AND SHALL PROVIDE AND MAINTAIN
TEMPORARY BARRICADES, CLOSURE WALLS, ETC., AS REQUIRED TO
PROTECT THE PUBLIC DURING THE PERIOD OF CONSTRUCTION_ DAMAGE
TO NEW AND EXISTING MATERIAL, FINISHES, STRUCTURES, AND
EQUIPMENT SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF
THE OWNER AT THE EXPENSE OF THE CONTRACTOR_
G10.2 CONTRACTOR SHALL ERECT DUST-PROOF BARRIERS, AT THE DIRECTION
OF THE OWNER AND /OR BUILDING'S LANDLORD, TO PROTECT ADJACENT
CORRIDORS AND TENANCIES.
G11 INTERRUPTION OF SERVICES
G11.1 CONTRACTOR SHALL COOPERATE WITH OWNER AND /OR BUILDING'S
LANDLORD IN REGARD TO ANY INTERRUPTIONS OR SHUT -DOWN OF
ELECTRICAL, MECHANICAL, PLUMBING, OR TELEPHONE SERVICE_ OWNER
AND/ OR BUILDING'S LANDLORD SHALL BE NOTIFIED AS REQUIRED BUT NOT
LESS THAN 48 HOURS IN ADVANCE BEFORE SHUT -DOWN OCCURS.
G12 SECURITY
G12.1 CONTRACTOR SHALL OBTAIN THROUGH OWNER AND /OR BUILDING'S
LANDLORD, THE REQUIRED SECURITY CLEARANCES, ACCESS
ARRANGEMENTS, PASSES, OR BADGES NECESSARY FOR ALL HIS WORKMEN,
SUBCONTRACTORS, AND SUPPLIERS WHO MAY REQUIRE ACCESS TO THE
FACILITY DURING CONSTRUCTION, AND SHALL COOPERATE WITH THE
OWNER AND /OR BUILDING'S LANDLORD IN REGARD TO ANY AREAS OF
LIMITED ACCESS -
G13 DEBRIS CONTROL AND CLEANING
G13.1 THE CONTRACTOR SHALL REMOVE ALL RUBBISH AND WASTE
1 MATERIAL ON A REGULAR BASIS, AND SHALL EXERCISE STRICT CONTROL
i OVER JOB CLEANING TO PREVENT ANY DIRT, DEBRIS, OR DUST FROM
AFFECTING, IN ANY WAY, FINISHED AREAS INSIDE OR OUTSIDE JOB SITE_
j THE BUILDING REFUSE FACILITIES SHALL NOT BE USED FOR THIS PURPOSE -
G13.2 AT COMPLETION, THE CONTRACTOR SHALL LEAVE PREMISES AND ALL
SURFACES AND FIXTURES FINISHED, CLEANED, ORDERLY, AND READY
t FOR MOVE -IN_
E G14 PROJECT MEETINGS
i G14.1 AT THE OWNERS REQUEST, THE CONTRACTOR SHALL SCHEDULE REGULAR AND
PERIODIC MEETINGS TO REVIEW THE PROJECT.
I G14.2 THE CONTRACTOR SHALL PREPARE AGENDAS OF THE MEETING AND
DISTRIBUTE COPIES TO PARTIES IN ATTENDANCE_ IN GENERAL, THESE
I MEETINGS SHOULD BE ATTENDED BY: THE CONTRACTOR, THE OWNER OR
j OWNER'S REPRESENTATIVE, STAFFELBACH, THE SUBCONTRACTORS OR
i SUPPLIERS AS MY BE APPROPRIATE TO THE AGENDA, AND OTHERS_
{ G14.3 THE CONTRACTOR SHALL RECORD MINUTES OF THE PROJECT MEETINGS
INCLUDING SIGNIFICANT PROCEDURES AND DECISIONS. COPIES OF THESE
MINUTES SHALL BE DISTRIBUTED WITHIN FOUR DAYS AFTER EACH
MEETING TO ALL PARTICIPANTS.
G15 WORKMANSHIP AND MATERIALS
G15.1 ALL WORK SHALL BE DONE IN THE FINEST QUALITY/ WORKMANSHIP- LIKE
? MANNER, IN ACCORDANCE WITH THE INDUSTRY STANDARD FOR CONSTRUCTION,
FABRICATION AND INSTALLATION FOR EACH TRADE. UNLESS OTHERWISE NOTED,
USE ONLY NEW, HIGHEST QUALITY MATERIALS CONSISTENT WITH SPECIFICATION!
AS INDICATED.
I G16 SUBMITTALS
i
j G16.1 WITHIN FIVE (5) DAYS FROM AWARD OF THE CONTRACT, CONTRACTOR SHALL
i SUBMIT TO SDA, A DETAILED SHOP DRAWING SUBMITTAL AND SAMPLE SCHEDULE
G16.2 THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL FABRICATED ITEMS
i INCLUDING MECHANICAL AND ELECTRICAL EQUIPMENT, CUT SHEETS FOR ALL
FIXTURES AND EQUIPMENT AND SAMPLES OF ALL FINISHES TO SDA
TO SUBMITTAL
NOT LIMITED
M UT 0
ARY OF (B
A SU M
I PRIOR TO TIMELY ORDERING-
REQUIRED UNDER THE ARCHITECTURAL SCOPE OF WORK ARE AS FOLLOWS.
DRAWINGS SAMPLE DATA
04480 STONE
05525 HANDRAILS • •
05580 SHEET METAL • • •
06400 WOODWORK • • •
07270 FIRE STOPPING • •
07900 SEALERS • •
08100 METAL DOORS
08125 ALUMINUM DOORS • • •
08211 WOOD DOORS
08305 ACCESS DOORS • •
08712 HARDWARE
08805 GLAZING • • •
09260 GYPSUM BOARD • • •
09300 TILE
09511 ACOUST_CEILING • •
09650 RESILIENT FLOOR • •
09678 RESILIENT BASE • •
09684 CARPET
09720 WALLCOVERING • •
09800 SPECIAL COATINGS • •
09900 PAINTING • •
10100 DISPLAY BOARDS • •
10270 ACCESS FLOORING • • •
10522 FIRE EXTINGUISHERS • •
10990 MISC_SPECIALTIES • •
11132 PROJECTION SCREENS • • •
11450 APPLIANCES •
12492 WINDOW TREATMENT • •
G16.3 THE CONTRACTOR SHALL PERFORM NO PORTION OF THE WORK REQUIRING
SUBMITTAL AND REVIEW OF SHOP DRAWINGS, PRODUCT DATA, SAMPLES OR
SIMILIAR SUBMITTALS UNTIL THE RESPECTIVE SUBMITTAL HAS BEEN REVIEWED
BY SDA SUCH WORK SHALL BE IN ACCORDANCE WITH ACCEPTED SUBMITTALS.
G16.4 THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBLITIES FOR
DEVIATIONS FROM REQUIREMENTS OF THE CONTRACT DOCUMENTS BY
SDA'S REVIEW OF SHOP DRAWINGS, PRODUCT DATA, SAMPLES OR
SIMILAR SUBMITTALS UNLESS THE CONTRACTOR HAS SPECIFICALLY
INFORMED SDA, IN WRITING, OF SUCH DEVIATION AT THE TIME OF
SUBMITTAL AND SDA HAS GIVEN WRITTEN ACCEPTANCE TO THE
SPECIFIC DEVIATION-THE CONTRACTOR SHALL NOT BE RELIEVED
OF RESPONSIBILITY FOR ERRORS OR OMISSIONS OF SHOP DRAWINGS,
PRODUCT DATA, SAMPLES OR SIMILIAR SUBMITTALS BY SDA'S
ACCEPTANCE THEREOF.
G16.5 SDA WILL REVIEW OR TAKE OTHER APPROPRIATE ACTION UPON THE
CONTRACTOR'S SUBMITTALS SUCH AS SHOP DRAWINGS, PRODUCT DATA
AND SAMPLES, BUT ONLY FOR THE LIMITED PURPOSE OF CHECKING FOR
CONFORMANCE WITH INFORMATION GIVEN AND THE DESIGN CONCEPT
EXPRESSED IN THE CONTRACT DOCUMENTS- SDA'S ACTION WILL BE TAKEN
WITH SUCH REASONABLE PROMPTNESS AS TO CAUSE NO DELAY IN THE
WORK OR IN THE ACTIVITIES OF THE OWNER, CONTRACTOR OR SEPARATE
CONTRACTORS, WHILE ALLOWING SUFFICIENT TIME IN SDNS PROFESSIONAL
JUDGMENT TO PERMITADEQUATE REVIEW. REVIEW OF SUCH SUBMITTALS IS
NOT CONDUCTED FOR THE PURPOSE OF DETERMINING THE ACCURACY AND
COMPLETENESS OF OTHER DETAILS SUCH AS DIMENSIONS AND QUANTITIES,
OR FOR SUBSTANTIATING INSTRUCTIONS FOR INSTALLATION OR
PERFORMANCE OF EQUIPMENT OR SYSTEMS, ALL OF WHICH REMAIN THE
RESPONSIBILITY OF THE CONTRACTOR AS REQUIRED BY THE CONTRACT
DOCUMENTS. SDA'S REVIEW SHALL NOT CONSTITUTE APPROVAL OF
SAFETY PRECAUTIONS, OR UNLESS OTHERWISE SPECIFICALLY STATED
BY SDA, OF ANY CONSTRUCTION MEANS, METHODS, TECHNIQUES,
SEQUENCES OR PROCEDURES. SDA'S APPROVAL OF A SPECIFIC ITEM
SHALL NOT INDICATE APPROVAL OF AN ASSEMBLY OF WHICH THE
ITEM IS A COMPONENT.
G16.6 BY APPROVING AND SUBMITTING SHOP DRAWINGS AND SAMPLES TO
SDA, THE CONTRACTOR REPRESENTS THAT HE HAS DETERMINED
AND VERIFIED FIELD MEASUREMENTS, FIELD CONSTRUCTION CRITERIA,
MATERIALS, CATALOG NUMBERS AND SIMILAR DATA, THAT EACH SUBMITTAL
HAS BEEN CHECKED AND COORDINATED WITH THE REQUIREMENTS OF THE
CONTRACT.
2525 CARLISLE
G16.7 THE CONTRACTOR SHALL REVIEW AND STAMP, WITH HIS APPROVAL , ALL j
SUBMITTALS. ANY SUBMITTALS WHICH DO NOT BEAR CONTRACTOR'S ;
APPROVAL STAMP SHALL BE RETURNED WITHOUT REVIEW. WHERE PRINTED
MATERIALS DESCRIBE MORE THAN ONE PRODUCT OR MODEL, CLEARLY IDENTIFY j
i WHICH IS TO BE FURNISHED. SHOP DRAWINGS SHALL NOT BE REPRODUCTIONS j
' OF CONSTRUCTION DOCUMENTS. EACH SHOP DRAWING, SAMPLE AND PRODUCT
DATA SUBMITTAL SHALL BE PROPERLY IDENTIFIED BEARING THE NAME AND I
QUALITY OF THE MATERIAL, THE MANUFACTURER'S NAME, THE CONTRACTOR'S j
NAME, THE SUBCONTRACTOR'S NAME, THE NAME OF THE PROJECT AND THE !
DATE OF SUBMISSION.
1 G16.8 REJECTED SHOP DRAWINGS AND SAMPLES SHALL BE RESUBMITTED AS SOON AS
j POSSIBLE AND SHALL BE IDENTIFIED AS "RESUBMITTALS ".
G16.9 THE CONTRACTOR SHALL IDENTIFY SPECIFIC ATTENTION, IN WRITING, ON I
RESUBMITTED SHOP DRAWINGS, PRODUCT DATA OR SAMPLES TO REVISIONS,
i OTHER THAN THOSE REQUESTED BY SDA
G16.10THE CONTRACTOR SHALL MAKE SUBMITTALS IN THE FOLLOWING QUANTITIES.
1 COPY SECTIONS 08712 09260 10522
10990 11132 11450
t 1 COPY SECTIONS 04880 07270 08100 j
3 SAMPLES 08125 08211 08305 I
1 08805 09300 09511
09650 09678 09684 i
J 09720 09800 09900
10100 10270 12492 I
2 COPIES SECTION 05525 05580 06400
} 3 SAMPLES 07900 i
t
4 COPIES SECTION 15000
2 COPIES SECTION 16000 i
G17 CLARIFICATIONS i
G17.1 ALL REQUESTS FOR CLARIFICATION OF THE CONSTRUCTION
DRAWINGS SHALL BE DIRECTED TO STAFFELBACH_ ALL RESPONSES
SHALL BE ISSUED THROUGH STAFFELBACH IN THE FORM OF CLARIFICATION j
DRAWINGS AND /OR WRITTEN CORRESPONDENCE.
1
G18 CLAIMS FOR ADDITIONAL COSTS
s
G18.1 IF THE CONTRACTOR WISHES TO MAKE A CLAIM FOR AN INCREASE IN THE `
CONTRACT SUM, HE SHALL GIVE STAFFELBACH WRITTEN NOTICE THEREOF I
WITHIN SEVEN (7) DAYS AFTER THE OCCURRENCE OF THE EVENT GIVING RISE i,
TO SUCH CLAIM. THIS NOTICE SHALL BE GIVEN BY THE CONTRACTOR BEFORE I
PROCEEDING TO EXECUTE THE WORK, EXCEPT IN AN EMERGENCY
ENDANGERING LIFE OR PROPERTY. ANY CHANGE IN THE CONTRACT SUM
RESULTING FROM SUCH CLAIM SHALL BE AUTHORIZED BY A WRITTEN i
CHANGE ORDER APPROVED BY OWNER.
{
G19 DOCUMENTATION AT SITE l
G19.1 CONTRACTOR SHALL MAINTAIN, ON THE SITE, ONE RECORD COPY OF THE
DRAWINGS/ SPECIFICATIONS, ADDENDA, CHANGE ORDERS AND OTHER
MODIFICATIONS, AND MARKED CURRENTLY TO FIELD CHANGES AND SELECTIONS,
MADE DURING CONSTRUCTION. THREE COPIES OF THESE RECORD j
DRAWINGS ARE TO BE DELIVERED TO STAFFELBACH FOR SUBMITTAL TO THE
OWNER UPON COMPLETION OF THE WORK.
G20 WARRANTIES AND OPERATING INSTRUCTIONS
G20.1 PRIOR TO FINAL APPLICATION FOR PAYMENT OF THE PROJECT, THE
THE CONTRACTOR SHALL SUBMIT TO STAFFELBACH, IN TRIPLICATE,
ON BEHALF OF HIMSELF AND HIS RESPECTIVE SUBCONTRACTORS: I
A ONE (1) YEAR WRITTEN GUARANTEE AGAINST DEFECTIVE WORKMANSHIP
AND /OR MATERIALS. THIS GAURANTEE SHALL BE IN ADDITION TO ( NOT IN i
LIEU OF) ANY WARRANTIES AND /OR GUARANTEES PROVIDED BY PRODUCT
MANUFACTURERS, SUPPLIERS, ETC.
G20.2 PRIOR TO FINAL APPLICATION FOR PAYMENT, CONTRACTOR i
SHALL SUBMIT TO STAFFELBACH, IN TRIPLICATE, CLOSE -OUT
CONSISTING DOCUMENTATION 0 SISTING OF THE FOLLOWING:
EVIDENCE OF COMPLIANCE WITH REQUIREMENTS OF GOVERNING AUTHORITIES.
PROJECT RECORD DOCUMENTS
OPERATIONS AND MAINTENANCE DATA
WARRANTIES AND BONDS
SPARE PARTS AND MAINTENANCE MATERIALS
KEY AND KEYING SCHEDULE
EVIDENCE OF PAYMENT AND RELEASE OF LIENS
CONSENT OF SURETY AND FINAL PAYMENT
CERTIFICATES OF INSURANCE FOR PRODUCTS AND COMPLETED OPERATIONS.
G21 COMPLETION
G21.1 WHEN CONTRACTOR IS NEARING COMPLETION, HE SHALL NOTIFY STAFFELBACH
ACCORDINGLY IN WRITING, UPON INSPECTION, STAFFELBACH SHALL PREPARE A
FINAL PUNCH LIST OUTLINING INCOMPLETE OR UNACCEPTABLE WORK.
CONTRACTOR SHALL COMPLETE ALL PUNCH LIST ITEMS WITHIN TWO (2) WEEKS
OF RECEIPT OF PUNCH LIST. THE PROJECT WILL NOT BE CONSIDERED
COMPLETE UNTIL ALL ITEMS ON THE PUNCH LIST HAVE BEEN RESOLVED
AND ALL RECORD DRAWINGS, WARRANTIES AND OPERATING INSTRUCTIONS
HAVE BEEN RECEIVED BY STAFFELBACH.
BUILDING STANDARDS I
CODE CHECKLIST FLOOR 1
I
JURISDICTION: INDIANAPOLIS, INDIANA I
BUILDING CODE:
FLOOR AREA:
2000 IBC WITH INDIANAPOLIS AMENDMENTS
USF
OCCUPANCY GROUP: B (BUSINESS)
OCCUPANCY FACTOR: 100 SQ. FT /PERSON
OCCUPANCY LOAD: 49
FIRE SUPPRESSION: SPRINKLERED
NUMBER OF REQUIRED EXITS: 2
MAX. TRAVEL DISTANCE ALLOWED: 200
DALLAS, TEXAS 75201 -1230
SHEET INDEX
CONTACT: STACI LOCKHART
SHT. NO.
DESCRIPTION
ISSUED
REVISED i
WALL TRIM REVEAL
SL, AP
MANUFACTURER:
FRY REGIET
I AO.00 !
COVER SHEET
01/04/0
01/16/06
A1.02
CONSTRUCTION PLAN
01/04/0
01/16/06
A1.03
POWER/COMMUNICATIONS PLAN
01/04/06
01/16/06
Al .04
REFLECTED CEILING PLAN
01/04/0
01/16/06
A1.05 i
FINISH PLAN
Ol /04/06
; O1 /16/06
A2.10
ENLARGED PLANS
; 01 /04/06
01/7 6/06
j A4.10
ELEVATIONS
01/04/
01 /16 /06
A4.11
ELEVATIONS
i 01/04/ 6
01 /16/06 I
A5.10
MILLWORK SECTIONS
01/04/
i 01/16/06
A5.11
MILLWORK SECTIONS
O1 /04 6
O1 /16 /O6
A5.20
MILLWORK DETAILS
I 01/04 06
01/16/06 1
A6.10 i
WALL TYPES AND DETAILS
O1 /04/ 6
01/16/06 I
A6.11
DOOR, FRAME, AND HARDWARE
; 01/04/
I
I 0 /16/0
e i
4
�
1
I
}
'
I
I
i
,
S
j
!
i
I
i
1 '
WHITE MATTE PROJECTION SCREEN WITH A. 38" 74689 (PULL ROD) IN LIEU OF THE ADVANTAGE
? DELUXE ELECTROL MOTORIZED PROJECTION SCREEN IN THE LARGE CONFERENCE ROOM 102
OMIT ALL POWER AND CONTROLS AS REQUIRED. j
FLOOR 1
� 4W TRUE NORTH
PHONE: 214.747.2511
f APPLIANCE /PRODUCT SPECIFICATIONS
f .GARBAGE DISPOSAL: (GD -1)
MANUFACTURER:
MODEL:
SIZE:
CONTACT /REP-=
REFRIGERATOR: (REF -1)
MANUFACTURER:
MODEL:
SIZE:
FINISH:
REFRIGERATOR: (REF -2)
MANUFACTURER:
MODEL-
SIZE:
FINISH:
MICROWAVE: (MW -1)
MANUFACTURER-
MODEL:
SIZE:
FINISH:
DISHWASHER: (DW -1)
MANUFACTURER:
MODEL:
SIZE:
FINISH:
SINK: (SK -1)
MANUFACTURER:
MODEL:
FAUCET HOLES:
FINISH-
FAUCET: (F -1)
MANUFACTURER-
MODEL/DESCRIPTION:
GROMMET
MANUFACTURER-
MODEL/DESCRIPTION-
FILE DRAWER LOCKS
MANUFACTURER:
MODEL /DESCRIPTION-
LOCK PLUG:
i CABINET LOCKS
fMANUFACTURER-
MODEL/DESCRIPTION-
LOCK PLUG:
I ELBOW CATCH:
NOTE:
MANUAL WINDOW SHADE
MANUFACTURER:
MODEL/ DESCRIPTION:
FILM ON GLASS
MANUFACTURER:
MODEL /DESCRIPTION:
IN- SINK- ERATOR
BADGER ONE ( 1/3 HORSEPOWER)
11%" HIGH, 65/6' DIAMETER
GE PROFILE ENERGY STAR SIDE -BY -SIDE WITH ICE MAKER
GSH25SGPSS
691/4" H X 339/6" D X 35Y4" W
STAINLESS STEEL
MARVEL ACCESSIBLE UNDER COUNTER REFIGERATOR
32.5 " H X 24 "DX 24 "W
(REFER TO CUT SHEETS FOR ROUGH CUT OUT OPENING)
STAINLESS STEEL
GE PROFILE COUNTERTOP MICROWAVE OVEN
JE1860SH
131/2" H X 191/4" D X 23%8" W
STAINLESS STEEL
GE PROFILE BUILT IN DISHWASHER WITH STAINLESS INTERIOR
PDW7880GSS
34" H X 251/4" D X 24 " W
STAINLESS STEEL
EEKAY "CELEBRITY" SERIES SINK
SINGLE BOWL •GECR2521L4
25 "L x 211/4 "W x 53/8 "D INSIDE BOWL,
4 FAUCET HOLES
STAINLESS STEEL
DELTA " SIGNATURE"
440SSWF
4 HOLE APPLICATION
DOUG MOCKETT
21/2" ADUSTABLE DEPTH LINER (BLACK)
EDPADI
TIMBERLINE LOCKING SYSTEMS
SYSTEM - 150
LP -100 NICKEL
TIMBERLINE LOCKING SYSTEMS
CB -230, CYLINDER BODY
LP -100 NICKEL
IVES ELBOW CATCH, ALUMINUM,
AT ADJACENT CABINET DOOR_
CONTRACTOR TO ENSURE FILE DRAWER LOCKS
AND CABINET LOCKS ALLOW A MINIMUM OF
100 KEYING OPTIONS
CASTEC - MANULA ROLLSTAR SHADES
ROLLSTAR 200 SERIES, FABRIC TO BE SELECTED
C16 CLUTCH W/ STANDARD BRACKET
AND 4" FASCIA AND TOP AND BACK COVERS
NO HORIZONTAL SEAMS
3M
DUSTED CRYSTAL
BRACKETS & STANDARDS v v v v v
11..
MANUFACTURER= KNAPE & VOGT
MODEL/ DESCRIPTION: 16" HEAVY DUTY
85 STANDARDS & 185 BRACKETS, ANACHROME
COAT HOOKS (WORKSTATIONS)
MANUFACTURER: ALNO, STYLE (KB- 18914)
MODEL /DESCRIPTION: CABINET HARDWARE, A823 -1 -SN V KNOB
NOTE: INVERT HARDWARE TO BE INSTALLED AS COAT HOOK
COAT HOOKS (DOORS)
MANUFACTURER: DOUG MOCKETT
NOT EL /DESCRIPTI IN t46. POLISHED CHROME
_ _ Yom/ \ INDIVIDUAL. OCCUPANT ADAPTABLE 1
ANGL CKET (FILE DRAWERS)-
MANUFACTURER:
JULIUS BLUM
MODEL /DESCRIPTION:
ALLOY 606.3-T52,1/2" x %2"
WALL TRIM REVEAL
SL, AP
MANUFACTURER:
FRY REGIET
MODEL /DESCRIPTION=
"SNAP -IN" REVEAL% "W, DRM- SNAP -IN -625
FLUSH POKE -THRU DEVICE
09
MANUFACTURER:
WIREMOLD WALKER INFLOOR SYSTEMS
MODEL /DESCRIPTION:
RC7 ATCBK
POWERED PROJECTION SCREEN AND PULL ROD '
MANUFACTURER:
DA -LITE, ADVANTAGE DELUXE ELECTROL MOTORIZED
MODEL /DESCRIPTION=
87" H x 116" W
WATER SUPPLY BOX: (WB -1)
MANUFACTURER :.
OATEY
MODEL /DESCRIPTION=
S2K
%SUPPLY BOX
TENANT APPROVAL
THESE DOCUMENTS HAVE BEEN REVIEWED AND CHECKED FOR ACCURACY REGARDING:
LOCATIONS OF PARTITIONS, TELEPHONE, AND ELECTRICAL OUTLET LOCATIONS
INCLUDING ANY SPECIAL ELECTRICAL AND LIGHTING REQUIREMENTS), WALL AND
FLOOR FINISH LOCATIONS AND SPECIFICATIONS. ALL REVISIONS SHALL BE IN
WRITING BY THE TENANT. EXPENSE OF ADDITIONAL OR REVISED CONSTRUCTION
DOCUMENTS, DESIGN AND ENGINEERING FEES, AND ANY DEMOLITION OR CONSTRUCTION
REQUIRED AS A RESULT OF SUCH CHANGES SHALL BE BORNE BY THE TENANT, UNLESS
NOTED OTHERWISE IN THE TENANT LEASE AGREEMENT.
i
i
STAFFELBACH DESIGN
ASSOCIATES INC
2525 CARLISLE
DALLAS TEXAS 75201 -1397
P 214.747.2511
F 214.855.5316
WWW.STAFFELBACH.COM
MARCUS & MILLICHA
REAL ESTATE INVESTMENT
BROKERAGE COMPANY
CORPORATE HEADQUATERS
16830 VENTURA BOULEVARD #3:
ENCINO, CALIFORNIA
91436
PARKWOOD IX
900 E. 96th STREET
INDIANAPOLIS, IN
.AA240
4,87
USF
ISSUE LOG:
NO. DATE REVISION
A01/16/06 ADDENDUM *1
A
- - - -_ _. - - _- _ �•- Wiz..
C__ -
nepk of C, Fsse+ hers'=
one _ -'
-PUNA
As the anthoriwd it lor 4 -
1 DENnCAI tD dhow relem*d for cwt* d1c _
ltuderstand t h a t if i t is Mart -tit i tt
nutnar,�a --�,: Wit: °:' >�r-� • - ,�
'Required under 7. Seim t0 of �ierarmel. H'YM-
q Chapter City ccae, wed" .:
29. 4. 3ent itted"Adrniaistration ".�tliy`€u�tLvn�hi�._
.R.
..violations and Penalties ".
S: Permits /Forms /Auttrentsticicerll -01
1 10
iAMarcus & Millichap \Indianapolis \9 Parkwood\1 st Floor I
1/16/2006 /
10:33:55 AM ......
❑ APPROVED AS NOTED FOR CONSTRUCTION R
❑ DISAPPROVED
op ' `",. n 8 /,�r
TENANT /CLIENT DATE
tr, "`till
PLEASE RETURN SIGNED PRINT SET TO STAFFELBACH DESIGN ASSOCIATES, INC.
20
19
18
17
AR ':
SL, AP
No. 89006
13
PRAWN s
= CHECKED
=
e IS) TA T OF
09
08
07
06
05
20
19
18
17
16
15
14
13
12
11
10
09
08
07
06
05
04
03
02
01
A D COVER SHEET
J
PROJECT NO.: 460.055
ISSUE DATE: 01/04/06
A0900.
O
W
W
t!)