Loading...
HomeMy WebLinkAbout06010160.1MARCUS & MILLICHAP INDIANAPOLIS, INDIANA INTERIOR DESIGN STAFFELBACH DESIGN ASSOCIATES INC GENERAL NOTES THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONSTRUCTION DOCUMENTS INCLUDING CONSULTANT'S DRAWINGS AND SHALL IMMEDIATELY REPORT ANY NOTED DISCREPANCIES, INCONSISTANCIES, OR OMMISSIONS TO STAFFELBACH DESIGN ASSOCIATES (SDA). CONTRACTOR SHALL PERFORM NO PORTION OF THE WORK AT ANYTIME WITHOUT CONSTRUCTION DOCUMENTS, OR WHERE REQUIRED, APPROVED SHOP DRAWINGS, PRODUCT DATA, OR SAMPLES FOR SUCH PORTIONS OF THE WORK. I AIA DOCUMENT A201- 1997 GENERAL CONDITIONS SHALL BE INCORPORATED j INTO THESE DOCUMENTS. t Gl SUPPLEMENTAL INSTRUCTIONS i GI A ADD THE FOLLOWING DEFINITION TO AIA A201, PARAGRAPH 1.1 - BASIC DEFINITIONS, 1.1.8- THE USE OF THE WORD "PROVIDE" W CONNECTION i WITH ANY ITEM SPECIFIED IS INTENDED TO MEAN THAT SUCH SHALL BE FURNISHED, INSTALLED AND CONNECTED, WHERE SO REQUIRED, EXCEPT AS OTHERWISE NOTED. G1.2 ADD THE FOLLOWING DEFINITION TO AIA A201, PARAGRAPH 1.1- BASIC I DEFINITIONS, 1.1.9- THE TERM "BUILDING STANDARD" AS NOTED ON DRAWINGS AND AS SPECIFIED HEREIN, REFERS TO ALL MATERIALS, I LABOR, INSTALLATION, ETC. PER BUILDING OWNER'S CRITERIA i i � G1.3 ADD THE FOLLOWING DEFINITION TO AIA A201, PARAGRAPH 1.1- BASIC I I DEFINITIONS, 1.1.10- " WORK" SHALL INCLUDE ALL LABOR, ASSEMBLIES AND FINISH WORK WITH ALL PARTS AND MATERIALS NECESSARY TO MAKE A COMPLETE, IN- PLACE, PROPERLY WORKING AND FINISHED INSTALLATION, REGARDLESS OF WHETHER SHOWN ON THE DRAWINGS I ` OR NOT. G2 CONSTRUCTION DOCUMENTS ! G2.1 ALL DIMENSIONS AND DESCRIPTIONS ON CONSTRUCTION DRAWINGS ARE i COMPLEMENTARY. ANY WORK SHOWN OR REFERRED TO ON ANY I CONSTRUCTION DOCUMENT SHALL BE PROVIDED AS THOUGH ON ALL RELATED DOCUMENTS_ ( G2.2 ANY CONFLICTS BETWEEN THE MEP DRAWINGS AND THE ARCHITECTURAL DRAWINGS ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF STAFFELBACH PRIOR TO CONSTRUCTION. G2.3 UNLESS NOTED OTHERWISE, ALL DRAWINGS HAVE BEEN PRODUCED TO I SCALE, CONTRACTOR SHALL NOT DIRECTLY MEASURE OR "SCALE" SAID ! DRAWINGS TO ASCERTAIN ANY DIMENSION_ G3 CONTRACTUAL RELATIONSHIP5 I G3.1 NOTHING CONTAINED IN THESE DRAWINGS, OR IN ANY ACCOMPANYING I B CONTRACT TWEENTHECCONTRAC ANY TOR AND STAFFELBACH- G4 CONTRACTUAL RELATIONSHIP BACH i G4 BIDDING ! G4.1 PRIOR TO THE BID, THE CONTRACTOR SHALL EXAMINE THE SITE AND PORTIONS THEREOF WHICH WILL AFFECT THIS WORK AND SHALL ( COMPARE IT WITH THE DRAWINGS AND BE SATISFIED AS TO THE CONDITIONS UNDER WHICH WORK IS TO BE PERFORMED. THE CONTRACTOR SHALL AT SUCH TIME ASCERTAIN AND CHECK LOCATIONS OF THE EXISTING STRUCTURE AND EQUIPMENT. G4.2 CONTRACTOR SHALL NOTIFY STAFFELBACH IN WRITTING OF ANY VARIATIONS OR DISCREPANCIES FROM THE EXISTING CONDITIONS PRIOR TO SUBMITTING BID. THE SUBMISSION OF A BID WILL BE CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR, EQUIPMENT AND/ OR MATERIALS REQUIRED, OR FOR i ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN HAD � DIFFICULTIES ( SUCH AN EXAMINATION BEEN MADE, WILL NOT BE RECOGNIZED_ ' G4.3 WITHIN FIVE (5) DAYS FROM AWARD OF THE CONTRACT, CONTRACTOR SHALL NOTIFY STAFFELBACH IN WRITING AS TO THE NAMES OF ALL SUB - CONTRACTORS. l 1 G4.4 THE CONTRACTOR SHALL EXPRESSLY ACKNOWLEDGE, IN WRITING, IN HIS BID, THAT HE HAS READ AND REVIEWED THESE CONSTRUCTION DOCUMENTS IN THEIR ENTIRETY, INCLUDING ALL INFORMATION CONTAINED IN THIS } COVER SHEET_ I G5 SUBSTITUTIONS I G5.1 WHERE A PARTICULAR MANUFACTURER OR ITEM HAS BEEN SPECIFIED, AN EQUAL TO, OR SUPERIOR PRODUCT OF ANOTHER MANUFACTURER MAY I BE ACCEPTED ONLY UPON REVIEW AND WRITTEN ACCEPTANCE BY I STAFFELBACH IT IS MANDATORY THAT SUCH REVIEW BE OBTAINED PRIOR i TO BIDDING, OR THE SUBSTITUTION WILL NOT BE CONSIDERED. ANY SUCH PROPOSED SUBMITION SHALL BE SUBMITTED TO STAFFELBACH WITH ALL APPROPRIATE MANUFACTURER'S DATA AND LITERATURE. STAFFELBACH'S I DECISION AS TO WHETHER A PRODUCT IS EQUAL OR SUPERIOR TO THE SPECIFIED PRODUCT SHALL BE FINAL. THIS SECTION APPLIES TO ANY "OR EQUAL" NOTED IN THE SPECIFICATIONS_ jG6 CONSTRUCTION PROGRESS SCHEDULE G6.1 THE CONTRACTOR, PRIOR TO BEING GIVEN NOTICE TO PROCEED, SHALL PREPARE AND SUBMIT TO STAFFELBACH A PRELIMINARY PROGRESS SCHEDULE 1. OF THE WORK IN BAR CHART FORM. i G6.2 THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING PERMITS FOR I ALL PHASES OF THE WORK AS REQUIRED BY FEDERAL, STATE, COUNTY AND MUNICIPAL LAW. G7 USE OF PREMISES G7.1 CONTRACTOR SHALL CONFINE HIS APPARATUS, DELIVERY AND STORAGE OF MATERIALS, AND THE OPERATION OF HIS WORKMEN TO LIMITS DEFINED BY THE OWNER. CONTRACTOR SHALL NOT UNREASONABLY ENCUMBER THE PREMISES TO THE INCONVENIENCE OF THE TENANTS AND OWNER'S PERSONNEL AND OPERATION. G7.2 CONTRACTOR SHALL MINIMIZE NOISE DISTURBANCE TO ADJACENT i OCCUPANTS. ( G7.3 CORING AND OTHER WORK WHICH MIGHT AFFECT OTHER TENANTS SHALL 1 BE SCHEDULED WITH OWNER'S AND BUILDING LANDLORD'S APPROVAL. I G7.4 CONTRACTOR IS RESPONSIBLE FOR STACKING OF ALL MATERIALS DURING I CONSTRUCTION IN A MANNER THAT PREVENTS LIVE LOADS FROM I EXCEEDING THOSE ALLOWED FOR IN THE BUILDING'S STRUCTURAL I DESIGN. CONTRACTOR TO COORDINATE THIS WITH BUILDING I LANDLORD. I G8 CONSTRUCTION OFFICE G8.1 CONTRACTOR SHALL PROVIDE AND MAINTAIN A FIELD CONSTRUCTION OFFICE, LOCATED AS DIRECTED BY THE OWNER AND /OR LANDLORD. G8.2 CONTRACTOR SHALL ALLOW FOR ACCESS BY OTHER VENDORS AND TENANT'S OWN FORCES. CONTRACTOR SHALL COOPERATE WITH THE TENANT ON SCHEDULING AND PERFORMING THE CONTRACTOR'S WORK TO AVOID CONFLICT, DELAY, OR INTERFERENCES WITH THE WORK OF OTHER i VENDORS OR THE CONSTRUCTION OR OPERATIONS OF THE TENANT'S I OWN FORCES. 1 G8.3 CONTRACTOR SHALL MAINTAIN, ON THE SITE, ONE RECORD COPY OF THE RECORD DRAWINGS, RECORD SHOP DRAWINGS, PRODUCT DATA, SAMPLES AND SIMILAR REQUIRED SUBMITTALS FOR REFERENCE. G8.4 CONTRACTOR SHALL PROVIDE UNLIMITED LOCAL TELEPHONE SERVICE FOR THE USE OF ALL SUBCONTRACTORS, SUPPLIERS, DESIGNERS, AND INSPECTORS. LONG DISTANCE CHARGES SHALL BE PAID BY THE CONTRACTOR AND MAY BE CHARGED TO THOSE INCURRING SUCH COSTS_ G9 TOILET FACILITIES AND DRINKING WATER G9.1 UPON THE APPROVAL OF THE BUILDING'S LANDLORD, THE USE OF DESIGNATED TOILET FACILITIES AND DRINKING FOUNTAINS WITHIN THE BUILDING SHALL BE AVAILABLE FOR THE USE OF ALL WORKMEN FOR THE DURATION OF THE PROJECT. IF, AT ANY TIME, THE OWNER FEELS THAT ANY OF THE WORKMEN ARE RESPONSIBLE FOR LEAVING A TOILET ROOM OR DRINKING FOUNTAIN UNNECESSARILY DIRTY, OR ARE RESPONSIBLE FOR CAUSING ANY DAMAGE TO EXISTING TOILET FACILITIES OR DRINKING FOUNTAINS, THE OWNER MAY HOLD THE CONTRACTOR RESPONSIBLE FOR THE COST OF CLEAN -UP OR REPAIR. G10 PROTECTION OF PERSONS AND PROPERTY G10.1 CONTRACTOR SHALL PROTECT AREAS AND NEW OR EXISTING MATERIALS AND FINISHES FROM DAMAGE WHICH MAY OCCUR FROM CONSTRUCTION, DEMOLITION, DUST, WATER, ETC., AND SHALL PROVIDE AND MAINTAIN TEMPORARY BARRICADES, CLOSURE WALLS, ETC., AS REQUIRED TO PROTECT THE PUBLIC DURING THE PERIOD OF CONSTRUCTION_ DAMAGE TO NEW AND EXISTING MATERIAL, FINISHES, STRUCTURES, AND EQUIPMENT SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER AT THE EXPENSE OF THE CONTRACTOR_ G10.2 CONTRACTOR SHALL ERECT DUST-PROOF BARRIERS, AT THE DIRECTION OF THE OWNER AND /OR BUILDING'S LANDLORD, TO PROTECT ADJACENT CORRIDORS AND TENANCIES. G11 INTERRUPTION OF SERVICES G11.1 CONTRACTOR SHALL COOPERATE WITH OWNER AND /OR BUILDING'S LANDLORD IN REGARD TO ANY INTERRUPTIONS OR SHUT -DOWN OF ELECTRICAL, MECHANICAL, PLUMBING, OR TELEPHONE SERVICE_ OWNER AND/ OR BUILDING'S LANDLORD SHALL BE NOTIFIED AS REQUIRED BUT NOT LESS THAN 48 HOURS IN ADVANCE BEFORE SHUT -DOWN OCCURS. G12 SECURITY G12.1 CONTRACTOR SHALL OBTAIN THROUGH OWNER AND /OR BUILDING'S LANDLORD, THE REQUIRED SECURITY CLEARANCES, ACCESS ARRANGEMENTS, PASSES, OR BADGES NECESSARY FOR ALL HIS WORKMEN, SUBCONTRACTORS, AND SUPPLIERS WHO MAY REQUIRE ACCESS TO THE FACILITY DURING CONSTRUCTION, AND SHALL COOPERATE WITH THE OWNER AND /OR BUILDING'S LANDLORD IN REGARD TO ANY AREAS OF LIMITED ACCESS - G13 DEBRIS CONTROL AND CLEANING G13.1 THE CONTRACTOR SHALL REMOVE ALL RUBBISH AND WASTE 1 MATERIAL ON A REGULAR BASIS, AND SHALL EXERCISE STRICT CONTROL i OVER JOB CLEANING TO PREVENT ANY DIRT, DEBRIS, OR DUST FROM AFFECTING, IN ANY WAY, FINISHED AREAS INSIDE OR OUTSIDE JOB SITE_ j THE BUILDING REFUSE FACILITIES SHALL NOT BE USED FOR THIS PURPOSE - G13.2 AT COMPLETION, THE CONTRACTOR SHALL LEAVE PREMISES AND ALL SURFACES AND FIXTURES FINISHED, CLEANED, ORDERLY, AND READY t FOR MOVE -IN_ E G14 PROJECT MEETINGS i G14.1 AT THE OWNERS REQUEST, THE CONTRACTOR SHALL SCHEDULE REGULAR AND PERIODIC MEETINGS TO REVIEW THE PROJECT. I G14.2 THE CONTRACTOR SHALL PREPARE AGENDAS OF THE MEETING AND DISTRIBUTE COPIES TO PARTIES IN ATTENDANCE_ IN GENERAL, THESE I MEETINGS SHOULD BE ATTENDED BY: THE CONTRACTOR, THE OWNER OR j OWNER'S REPRESENTATIVE, STAFFELBACH, THE SUBCONTRACTORS OR i SUPPLIERS AS MY BE APPROPRIATE TO THE AGENDA, AND OTHERS_ { G14.3 THE CONTRACTOR SHALL RECORD MINUTES OF THE PROJECT MEETINGS INCLUDING SIGNIFICANT PROCEDURES AND DECISIONS. COPIES OF THESE MINUTES SHALL BE DISTRIBUTED WITHIN FOUR DAYS AFTER EACH MEETING TO ALL PARTICIPANTS. G15 WORKMANSHIP AND MATERIALS G15.1 ALL WORK SHALL BE DONE IN THE FINEST QUALITY/ WORKMANSHIP- LIKE ? MANNER, IN ACCORDANCE WITH THE INDUSTRY STANDARD FOR CONSTRUCTION, FABRICATION AND INSTALLATION FOR EACH TRADE. UNLESS OTHERWISE NOTED, USE ONLY NEW, HIGHEST QUALITY MATERIALS CONSISTENT WITH SPECIFICATION! AS INDICATED. I G16 SUBMITTALS i j G16.1 WITHIN FIVE (5) DAYS FROM AWARD OF THE CONTRACT, CONTRACTOR SHALL i SUBMIT TO SDA, A DETAILED SHOP DRAWING SUBMITTAL AND SAMPLE SCHEDULE G16.2 THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL FABRICATED ITEMS i INCLUDING MECHANICAL AND ELECTRICAL EQUIPMENT, CUT SHEETS FOR ALL FIXTURES AND EQUIPMENT AND SAMPLES OF ALL FINISHES TO SDA TO SUBMITTAL NOT LIMITED M UT 0 ARY OF (B A SU M I PRIOR TO TIMELY ORDERING- REQUIRED UNDER THE ARCHITECTURAL SCOPE OF WORK ARE AS FOLLOWS. DRAWINGS SAMPLE DATA 04480 STONE 05525 HANDRAILS • • 05580 SHEET METAL • • • 06400 WOODWORK • • • 07270 FIRE STOPPING • • 07900 SEALERS • • 08100 METAL DOORS 08125 ALUMINUM DOORS • • • 08211 WOOD DOORS 08305 ACCESS DOORS • • 08712 HARDWARE 08805 GLAZING • • • 09260 GYPSUM BOARD • • • 09300 TILE 09511 ACOUST_CEILING • • 09650 RESILIENT FLOOR • • 09678 RESILIENT BASE • • 09684 CARPET 09720 WALLCOVERING • • 09800 SPECIAL COATINGS • • 09900 PAINTING • • 10100 DISPLAY BOARDS • • 10270 ACCESS FLOORING • • • 10522 FIRE EXTINGUISHERS • • 10990 MISC_SPECIALTIES • • 11132 PROJECTION SCREENS • • • 11450 APPLIANCES • 12492 WINDOW TREATMENT • • G16.3 THE CONTRACTOR SHALL PERFORM NO PORTION OF THE WORK REQUIRING SUBMITTAL AND REVIEW OF SHOP DRAWINGS, PRODUCT DATA, SAMPLES OR SIMILIAR SUBMITTALS UNTIL THE RESPECTIVE SUBMITTAL HAS BEEN REVIEWED BY SDA SUCH WORK SHALL BE IN ACCORDANCE WITH ACCEPTED SUBMITTALS. G16.4 THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBLITIES FOR DEVIATIONS FROM REQUIREMENTS OF THE CONTRACT DOCUMENTS BY SDA'S REVIEW OF SHOP DRAWINGS, PRODUCT DATA, SAMPLES OR SIMILAR SUBMITTALS UNLESS THE CONTRACTOR HAS SPECIFICALLY INFORMED SDA, IN WRITING, OF SUCH DEVIATION AT THE TIME OF SUBMITTAL AND SDA HAS GIVEN WRITTEN ACCEPTANCE TO THE SPECIFIC DEVIATION-THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR ERRORS OR OMISSIONS OF SHOP DRAWINGS, PRODUCT DATA, SAMPLES OR SIMILIAR SUBMITTALS BY SDA'S ACCEPTANCE THEREOF. G16.5 SDA WILL REVIEW OR TAKE OTHER APPROPRIATE ACTION UPON THE CONTRACTOR'S SUBMITTALS SUCH AS SHOP DRAWINGS, PRODUCT DATA AND SAMPLES, BUT ONLY FOR THE LIMITED PURPOSE OF CHECKING FOR CONFORMANCE WITH INFORMATION GIVEN AND THE DESIGN CONCEPT EXPRESSED IN THE CONTRACT DOCUMENTS- SDA'S ACTION WILL BE TAKEN WITH SUCH REASONABLE PROMPTNESS AS TO CAUSE NO DELAY IN THE WORK OR IN THE ACTIVITIES OF THE OWNER, CONTRACTOR OR SEPARATE CONTRACTORS, WHILE ALLOWING SUFFICIENT TIME IN SDNS PROFESSIONAL JUDGMENT TO PERMITADEQUATE REVIEW. REVIEW OF SUCH SUBMITTALS IS NOT CONDUCTED FOR THE PURPOSE OF DETERMINING THE ACCURACY AND COMPLETENESS OF OTHER DETAILS SUCH AS DIMENSIONS AND QUANTITIES, OR FOR SUBSTANTIATING INSTRUCTIONS FOR INSTALLATION OR PERFORMANCE OF EQUIPMENT OR SYSTEMS, ALL OF WHICH REMAIN THE RESPONSIBILITY OF THE CONTRACTOR AS REQUIRED BY THE CONTRACT DOCUMENTS. SDA'S REVIEW SHALL NOT CONSTITUTE APPROVAL OF SAFETY PRECAUTIONS, OR UNLESS OTHERWISE SPECIFICALLY STATED BY SDA, OF ANY CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES. SDA'S APPROVAL OF A SPECIFIC ITEM SHALL NOT INDICATE APPROVAL OF AN ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. G16.6 BY APPROVING AND SUBMITTING SHOP DRAWINGS AND SAMPLES TO SDA, THE CONTRACTOR REPRESENTS THAT HE HAS DETERMINED AND VERIFIED FIELD MEASUREMENTS, FIELD CONSTRUCTION CRITERIA, MATERIALS, CATALOG NUMBERS AND SIMILAR DATA, THAT EACH SUBMITTAL HAS BEEN CHECKED AND COORDINATED WITH THE REQUIREMENTS OF THE CONTRACT. 2525 CARLISLE G16.7 THE CONTRACTOR SHALL REVIEW AND STAMP, WITH HIS APPROVAL , ALL j SUBMITTALS. ANY SUBMITTALS WHICH DO NOT BEAR CONTRACTOR'S ; APPROVAL STAMP SHALL BE RETURNED WITHOUT REVIEW. WHERE PRINTED MATERIALS DESCRIBE MORE THAN ONE PRODUCT OR MODEL, CLEARLY IDENTIFY j i WHICH IS TO BE FURNISHED. SHOP DRAWINGS SHALL NOT BE REPRODUCTIONS j ' OF CONSTRUCTION DOCUMENTS. EACH SHOP DRAWING, SAMPLE AND PRODUCT DATA SUBMITTAL SHALL BE PROPERLY IDENTIFIED BEARING THE NAME AND I QUALITY OF THE MATERIAL, THE MANUFACTURER'S NAME, THE CONTRACTOR'S j NAME, THE SUBCONTRACTOR'S NAME, THE NAME OF THE PROJECT AND THE ! DATE OF SUBMISSION. 1 G16.8 REJECTED SHOP DRAWINGS AND SAMPLES SHALL BE RESUBMITTED AS SOON AS j POSSIBLE AND SHALL BE IDENTIFIED AS "RESUBMITTALS ". G16.9 THE CONTRACTOR SHALL IDENTIFY SPECIFIC ATTENTION, IN WRITING, ON I RESUBMITTED SHOP DRAWINGS, PRODUCT DATA OR SAMPLES TO REVISIONS, i OTHER THAN THOSE REQUESTED BY SDA G16.10THE CONTRACTOR SHALL MAKE SUBMITTALS IN THE FOLLOWING QUANTITIES. 1 COPY SECTIONS 08712 09260 10522 10990 11132 11450 t 1 COPY SECTIONS 04880 07270 08100 j 3 SAMPLES 08125 08211 08305 I 1 08805 09300 09511 09650 09678 09684 i J 09720 09800 09900 10100 10270 12492 I 2 COPIES SECTION 05525 05580 06400 } 3 SAMPLES 07900 i t 4 COPIES SECTION 15000 2 COPIES SECTION 16000 i G17 CLARIFICATIONS i G17.1 ALL REQUESTS FOR CLARIFICATION OF THE CONSTRUCTION DRAWINGS SHALL BE DIRECTED TO STAFFELBACH_ ALL RESPONSES SHALL BE ISSUED THROUGH STAFFELBACH IN THE FORM OF CLARIFICATION j DRAWINGS AND /OR WRITTEN CORRESPONDENCE. 1 G18 CLAIMS FOR ADDITIONAL COSTS s G18.1 IF THE CONTRACTOR WISHES TO MAKE A CLAIM FOR AN INCREASE IN THE ` CONTRACT SUM, HE SHALL GIVE STAFFELBACH WRITTEN NOTICE THEREOF I WITHIN SEVEN (7) DAYS AFTER THE OCCURRENCE OF THE EVENT GIVING RISE i, TO SUCH CLAIM. THIS NOTICE SHALL BE GIVEN BY THE CONTRACTOR BEFORE I PROCEEDING TO EXECUTE THE WORK, EXCEPT IN AN EMERGENCY ENDANGERING LIFE OR PROPERTY. ANY CHANGE IN THE CONTRACT SUM RESULTING FROM SUCH CLAIM SHALL BE AUTHORIZED BY A WRITTEN i CHANGE ORDER APPROVED BY OWNER. { G19 DOCUMENTATION AT SITE l G19.1 CONTRACTOR SHALL MAINTAIN, ON THE SITE, ONE RECORD COPY OF THE DRAWINGS/ SPECIFICATIONS, ADDENDA, CHANGE ORDERS AND OTHER MODIFICATIONS, AND MARKED CURRENTLY TO FIELD CHANGES AND SELECTIONS, MADE DURING CONSTRUCTION. THREE COPIES OF THESE RECORD j DRAWINGS ARE TO BE DELIVERED TO STAFFELBACH FOR SUBMITTAL TO THE OWNER UPON COMPLETION OF THE WORK. G20 WARRANTIES AND OPERATING INSTRUCTIONS G20.1 PRIOR TO FINAL APPLICATION FOR PAYMENT OF THE PROJECT, THE THE CONTRACTOR SHALL SUBMIT TO STAFFELBACH, IN TRIPLICATE, ON BEHALF OF HIMSELF AND HIS RESPECTIVE SUBCONTRACTORS: I A ONE (1) YEAR WRITTEN GUARANTEE AGAINST DEFECTIVE WORKMANSHIP AND /OR MATERIALS. THIS GAURANTEE SHALL BE IN ADDITION TO ( NOT IN i LIEU OF) ANY WARRANTIES AND /OR GUARANTEES PROVIDED BY PRODUCT MANUFACTURERS, SUPPLIERS, ETC. G20.2 PRIOR TO FINAL APPLICATION FOR PAYMENT, CONTRACTOR i SHALL SUBMIT TO STAFFELBACH, IN TRIPLICATE, CLOSE -OUT CONSISTING DOCUMENTATION 0 SISTING OF THE FOLLOWING: EVIDENCE OF COMPLIANCE WITH REQUIREMENTS OF GOVERNING AUTHORITIES. PROJECT RECORD DOCUMENTS OPERATIONS AND MAINTENANCE DATA WARRANTIES AND BONDS SPARE PARTS AND MAINTENANCE MATERIALS KEY AND KEYING SCHEDULE EVIDENCE OF PAYMENT AND RELEASE OF LIENS CONSENT OF SURETY AND FINAL PAYMENT CERTIFICATES OF INSURANCE FOR PRODUCTS AND COMPLETED OPERATIONS. G21 COMPLETION G21.1 WHEN CONTRACTOR IS NEARING COMPLETION, HE SHALL NOTIFY STAFFELBACH ACCORDINGLY IN WRITING, UPON INSPECTION, STAFFELBACH SHALL PREPARE A FINAL PUNCH LIST OUTLINING INCOMPLETE OR UNACCEPTABLE WORK. CONTRACTOR SHALL COMPLETE ALL PUNCH LIST ITEMS WITHIN TWO (2) WEEKS OF RECEIPT OF PUNCH LIST. THE PROJECT WILL NOT BE CONSIDERED COMPLETE UNTIL ALL ITEMS ON THE PUNCH LIST HAVE BEEN RESOLVED AND ALL RECORD DRAWINGS, WARRANTIES AND OPERATING INSTRUCTIONS HAVE BEEN RECEIVED BY STAFFELBACH. BUILDING STANDARDS I CODE CHECKLIST FLOOR 1 I JURISDICTION: INDIANAPOLIS, INDIANA I BUILDING CODE: FLOOR AREA: 2000 IBC WITH INDIANAPOLIS AMENDMENTS USF OCCUPANCY GROUP: B (BUSINESS) OCCUPANCY FACTOR: 100 SQ. FT /PERSON OCCUPANCY LOAD: 49 FIRE SUPPRESSION: SPRINKLERED NUMBER OF REQUIRED EXITS: 2 MAX. TRAVEL DISTANCE ALLOWED: 200 DALLAS, TEXAS 75201 -1230 SHEET INDEX CONTACT: STACI LOCKHART SHT. NO. DESCRIPTION ISSUED REVISED i WALL TRIM REVEAL SL, AP MANUFACTURER: FRY REGIET I AO.00 ! COVER SHEET 01/04/0 01/16/06 A1.02 CONSTRUCTION PLAN 01/04/0 01/16/06 A1.03 POWER/COMMUNICATIONS PLAN 01/04/06 01/16/06 Al .04 REFLECTED CEILING PLAN 01/04/0 01/16/06 A1.05 i FINISH PLAN Ol /04/06 ; O1 /16/06 A2.10 ENLARGED PLANS ; 01 /04/06 01/7 6/06 j A4.10 ELEVATIONS 01/04/ 01 /16 /06 A4.11 ELEVATIONS i 01/04/ 6 01 /16/06 I A5.10 MILLWORK SECTIONS 01/04/ i 01/16/06 A5.11 MILLWORK SECTIONS O1 /04 6 O1 /16 /O6 A5.20 MILLWORK DETAILS I 01/04 06 01/16/06 1 A6.10 i WALL TYPES AND DETAILS O1 /04/ 6 01/16/06 I A6.11 DOOR, FRAME, AND HARDWARE ; 01/04/ I I 0 /16/0 e i 4 � 1 I } ' I I i , S j ! i I i 1 ' WHITE MATTE PROJECTION SCREEN WITH A. 38" 74689 (PULL ROD) IN LIEU OF THE ADVANTAGE ? DELUXE ELECTROL MOTORIZED PROJECTION SCREEN IN THE LARGE CONFERENCE ROOM 102 OMIT ALL POWER AND CONTROLS AS REQUIRED. j FLOOR 1 � 4W TRUE NORTH PHONE: 214.747.2511 f APPLIANCE /PRODUCT SPECIFICATIONS f .GARBAGE DISPOSAL: (GD -1) MANUFACTURER: MODEL: SIZE: CONTACT /REP-= REFRIGERATOR: (REF -1) MANUFACTURER: MODEL: SIZE: FINISH: REFRIGERATOR: (REF -2) MANUFACTURER: MODEL- SIZE: FINISH: MICROWAVE: (MW -1) MANUFACTURER- MODEL: SIZE: FINISH: DISHWASHER: (DW -1) MANUFACTURER: MODEL: SIZE: FINISH: SINK: (SK -1) MANUFACTURER: MODEL: FAUCET HOLES: FINISH- FAUCET: (F -1) MANUFACTURER- MODEL/DESCRIPTION: GROMMET MANUFACTURER- MODEL/DESCRIPTION- FILE DRAWER LOCKS MANUFACTURER: MODEL /DESCRIPTION- LOCK PLUG: i CABINET LOCKS fMANUFACTURER- MODEL/DESCRIPTION- LOCK PLUG: I ELBOW CATCH: NOTE: MANUAL WINDOW SHADE MANUFACTURER: MODEL/ DESCRIPTION: FILM ON GLASS MANUFACTURER: MODEL /DESCRIPTION: IN- SINK- ERATOR BADGER ONE ( 1/3 HORSEPOWER) 11%" HIGH, 65/6' DIAMETER GE PROFILE ENERGY STAR SIDE -BY -SIDE WITH ICE MAKER GSH25SGPSS 691/4" H X 339/6" D X 35Y4" W STAINLESS STEEL MARVEL ACCESSIBLE UNDER COUNTER REFIGERATOR 32.5 " H X 24 "DX 24 "W (REFER TO CUT SHEETS FOR ROUGH CUT OUT OPENING) STAINLESS STEEL GE PROFILE COUNTERTOP MICROWAVE OVEN JE1860SH 131/2" H X 191/4" D X 23%8" W STAINLESS STEEL GE PROFILE BUILT IN DISHWASHER WITH STAINLESS INTERIOR PDW7880GSS 34" H X 251/4" D X 24 " W STAINLESS STEEL EEKAY "CELEBRITY" SERIES SINK SINGLE BOWL •GECR2521L4 25 "L x 211/4 "W x 53/8 "D INSIDE BOWL, 4 FAUCET HOLES STAINLESS STEEL DELTA " SIGNATURE" 440SSWF 4 HOLE APPLICATION DOUG MOCKETT 21/2" ADUSTABLE DEPTH LINER (BLACK) EDPADI TIMBERLINE LOCKING SYSTEMS SYSTEM - 150 LP -100 NICKEL TIMBERLINE LOCKING SYSTEMS CB -230, CYLINDER BODY LP -100 NICKEL IVES ELBOW CATCH, ALUMINUM, AT ADJACENT CABINET DOOR_ CONTRACTOR TO ENSURE FILE DRAWER LOCKS AND CABINET LOCKS ALLOW A MINIMUM OF 100 KEYING OPTIONS CASTEC - MANULA ROLLSTAR SHADES ROLLSTAR 200 SERIES, FABRIC TO BE SELECTED C16 CLUTCH W/ STANDARD BRACKET AND 4" FASCIA AND TOP AND BACK COVERS NO HORIZONTAL SEAMS 3M DUSTED CRYSTAL BRACKETS & STANDARDS v v v v v 11.. MANUFACTURER= KNAPE & VOGT MODEL/ DESCRIPTION: 16" HEAVY DUTY 85 STANDARDS & 185 BRACKETS, ANACHROME COAT HOOKS (WORKSTATIONS) MANUFACTURER: ALNO, STYLE (KB- 18914) MODEL /DESCRIPTION: CABINET HARDWARE, A823 -1 -SN V KNOB NOTE: INVERT HARDWARE TO BE INSTALLED AS COAT HOOK COAT HOOKS (DOORS) MANUFACTURER: DOUG MOCKETT NOT EL /DESCRIPTI IN t46. POLISHED CHROME _ _ Yom/ \ INDIVIDUAL. OCCUPANT ADAPTABLE 1 ANGL CKET (FILE DRAWERS)- MANUFACTURER: JULIUS BLUM MODEL /DESCRIPTION: ALLOY 606.3-T52,1/2" x %2" WALL TRIM REVEAL SL, AP MANUFACTURER: FRY REGIET MODEL /DESCRIPTION= "SNAP -IN" REVEAL% "W, DRM- SNAP -IN -625 FLUSH POKE -THRU DEVICE 09 MANUFACTURER: WIREMOLD WALKER INFLOOR SYSTEMS MODEL /DESCRIPTION: RC7 ATCBK POWERED PROJECTION SCREEN AND PULL ROD ' MANUFACTURER: DA -LITE, ADVANTAGE DELUXE ELECTROL MOTORIZED MODEL /DESCRIPTION= 87" H x 116" W WATER SUPPLY BOX: (WB -1) MANUFACTURER :. OATEY MODEL /DESCRIPTION= S2K %SUPPLY BOX TENANT APPROVAL THESE DOCUMENTS HAVE BEEN REVIEWED AND CHECKED FOR ACCURACY REGARDING: LOCATIONS OF PARTITIONS, TELEPHONE, AND ELECTRICAL OUTLET LOCATIONS INCLUDING ANY SPECIAL ELECTRICAL AND LIGHTING REQUIREMENTS), WALL AND FLOOR FINISH LOCATIONS AND SPECIFICATIONS. ALL REVISIONS SHALL BE IN WRITING BY THE TENANT. EXPENSE OF ADDITIONAL OR REVISED CONSTRUCTION DOCUMENTS, DESIGN AND ENGINEERING FEES, AND ANY DEMOLITION OR CONSTRUCTION REQUIRED AS A RESULT OF SUCH CHANGES SHALL BE BORNE BY THE TENANT, UNLESS NOTED OTHERWISE IN THE TENANT LEASE AGREEMENT. i i STAFFELBACH DESIGN ASSOCIATES INC 2525 CARLISLE DALLAS TEXAS 75201 -1397 P 214.747.2511 F 214.855.5316 WWW.STAFFELBACH.COM MARCUS & MILLICHA REAL ESTATE INVESTMENT BROKERAGE COMPANY CORPORATE HEADQUATERS 16830 VENTURA BOULEVARD #3: ENCINO, CALIFORNIA 91436 PARKWOOD IX 900 E. 96th STREET INDIANAPOLIS, IN .AA240 4,87 USF ISSUE LOG: NO. DATE REVISION A01/16/06 ADDENDUM *1 A - - - -_ _. - - _- _ �•- Wiz.. C__ - nepk of C, Fsse+ hers'= one _ -' -PUNA As the anthoriwd it lor 4 - 1 DENnCAI tD dhow relem*d for cwt* d1c _ ltuderstand t h a t if i t is Mart -tit i tt nutnar,�a --�,: Wit: °:' >�r-� • - ,� 'Required under 7. Seim t0 of �ierarmel. H'YM- q Chapter City ccae, wed" .: 29. 4. 3ent itted"Adrniaistration ".�tliy`€u�tLvn�hi�._ .R. ..violations and Penalties ". S: Permits /Forms /Auttrentsticicerll -01 1 10 iAMarcus & Millichap \Indianapolis \9 Parkwood\1 st Floor I 1/16/2006 / 10:33:55 AM ...... ❑ APPROVED AS NOTED FOR CONSTRUCTION R ❑ DISAPPROVED op ' `",. n 8 /,�r TENANT /CLIENT DATE tr, "`till PLEASE RETURN SIGNED PRINT SET TO STAFFELBACH DESIGN ASSOCIATES, INC. 20 19 18 17 AR ': SL, AP No. 89006 13 PRAWN s = CHECKED = e IS) TA T OF 09 08 07 06 05 20 19 18 17 16 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 A D COVER SHEET J PROJECT NO.: 460.055 ISSUE DATE: 01/04/06 A0900. O W W t!)