MECHANICAL DEMOLITION NOTES:
L
ELECTIRICAL. COORDINATE
I
I
WITH DIVISION 16 I
I
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE CONDITION OF
L
EXISTING EQUIPMENT, EXACT SIZES OF EXISTING DUCT, ETC. BEFORE
DEMOLITION WORK BEGINS.
CD
2.
DEMOLITION WORK SHALL BE PHASED TO ACCOMPLISH REPLACEMENT WITH
0 00 00
REMOVE EXISTING VAV REHEAT BOXES AND
FAN
MINIMUM AMOUNT OF DOWNTIME.
C�l
Z C,4 C-4
(D r-- ce) -Rd-
1
POWERED BOXES IN THIS AREk REMOVE
ALL
3.
SCHEDULE NEW AND DEMOLITION WORK IN ADVANCE WITH OWNER.
ce)
SUPPLY AND RETURN DUCT IN THIS AREA.
cn
DUCTWORK SHOWN ON THIS DRAWING HAS
NOT
4.
CONTRACTOR SHALL REMOVE EXISTING HVAC EQUIPMENT AND ASSOCIATED
(D z
00 00
K
BEEN FIELD VERIFIED. IT HAS BEEN SHOWN FOR
MATERIALS AS SHOWN AND TURN OVER TO OWNER OR REMOVE FROM SITE AS
-00 00
GENER& SCOPE OF: DEMOLMON WORK.
DIRECTED BY OWNER.
K j— (D
ATI
5.
CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE ROUTING
co -5; LO u)
OF NEW DUCTWORK BEFORE FABRICATION BEGINS AS RISES AND DROPS MAY
cp
cr) cu to to
BE NECESSARY BECAUSE OF EXISTING FIELD CONDITIONS.
Z F— L.L.
6.
COORDINATE WITH MECHANICAL AND ELECTRICAL CONTRACTOR ALL CEILING
REMOVAL WHICH IS REQUIRED TO ACCESS THEIR WORK AND IS NOT
DESIGNATED FOR REMOVAL. NOTIFY ARCHITECT AND OWNER PRIOR TO
COMMENCING REMOVAL. IF EXISTING CEILING IS DETERMINED TO REQUIRE
REMOVAL, REMOVE ONLY THAT PORTION NECESSARY TO ACCESS AND COMPLETE
THE NEW WORK. UPON COMPLETION OF THE ABOVE CEILING WORK, CEILING
EXISTING TRANSFER OMLLE TO REMAIN
IS TO BE REPLACED TO MATCH EXISTING CEILING.
7.
A MEASUREMENT OF EXISTING SYSTEMS AFFECTED BY THIS RENOVATION SHALL
BE PERFORMED AND RECORDED BY THE BALANCING CONTRACTOR PRIOR TO
THE COMMENCEMENT OF ANY DEMOLITION WORK. THESE MEASUREMENTS
H
SHALL INCLUDE THE FOLLOWING:
t
* SUPPLY AND RETURN AIR FLOWS AT EXISTING AIR HANDLING UNIT.
* MEDIUM PRESSURE SUPPLY AIR FLOW AT ENTERING SIDE OF TERMINAL REHEAT
H
BOXES. VERIFY MFR. LOCATIONS AND CAPACITIES.
THE AIR DISTRIBUTION SYSTEM(S) SHALL BE REBALANCED TO MEET EXISTING
AIR FLOWS AS WELL AS NEW AIR FLOW REQUIREMENTS AS INDICATED ON THE
NEW CONSTRUCTION HVAC DOCUMENTS. AREAS SERVED BY AFFECTED EXISTING
SYSTEMS NOT RENOVATED IN THIS PROJECT SHALL BE REBALANCED TO AIR
FLOWS EXISTING PRIOR TO COMMENCEMENT OF WORK.
8.
THE BALANCING CONTRACTOR SHALL NOTIFY THE OWNER AND THE ENGINEER
OF DEFICIENCIES FOUND IN ANY OF THE SYSTEMS LISTED IN NOTE # 7.
0
G
G
it
<
ct�
0
u�
-------------- ---------
__j -0
< I
0
U
F
F LLJ
u
if
__j
--�JJIL
L.Lj <
u
ry
0"
F-
ry
<
0
=77-7
u
E
E
D
D
fill
rI
If! aw
DRAWN: LKK
PROJECT ARCHITECT' SPP
X
PROJECT MANAGER: LKK
C REVISIONS:
c
6�
'j,/
Ley—
d)
... ... . . ..
JOB# 05098
FILE:
DATE: JULY 21, 2006
B
B
LEGEND
HVAC DEMOLITION PLAN
'.NO.
SCALE: 1/8" FI
EXISTING TO REMAIN
PETO
STAT
DEMOLITION
WI ... ........
1)
It 111111
0 2' 4' 8'
16'
- - ---
A
TRUE
A tiVAC
NORTH
Demolition Plan