Loading...
HomeMy WebLinkAbout06080101.202 1 3 1 4 1 5 1 6 8 1 9 1 10 11 1 12 1 13 1 14 1 16 N N A& ----------- r ---------- 6 'AR I ri 1 5 I J GENERAL NOTES EXISTING CONDITIONS NOTE w 1VTMENT m Ar Li 5 AREA Li r m r- 1 1 IF1061 2214 METROCENTER BLVD. m IL 90 1. DUCTWORK DIMENSIONS ARE INSIDE CLEAR. FIELD VERIFY EXISTING CONDITIONS. NEW A/C-1 TO SUITE 128 jr; r-1 BE AT LOCATED TO MAINTAIN 25'-0" FROM ANY NASHVILLE, TN 37228 z 2. INDICATES THERMOSTAT. EXISTING EXHAUST OR VENT. NEW EXHAUST FANS TO OFFICE 615.256.7038 ZJ BE LOCATED TO MAINTAIN 25'-0" FROM ANY NEW OR EXISTING AIR INTAKE. FIELD VERIFY EXISTING FAX 615.2S6.7132 w 2 0 3. INDICATES THERMOSTAT WITH LOCKING COVER. CL 130 7 4 DUCTWORK LOCATIONS AT NEW RATED WALL ry w 565R -- - - - - - - - - 4. REFER TO SCHEDULE SHEET MO.00 FOR DIFFUSER AND GRILLE SCHEDULE. PENETRATIONS. PROVIDE FIRE DAMPERS IN EXISTING F- ---------- X E, r ----------- DUCTWORK AS NECESSARY. < N 'in r 3- L 290 1 j 5. SPACES WITH DRYWALL CEILINGS SHALL HAVE FLANGE TYPE CEILING OUTLETS. I L r- 1 I 6. ALL DIFFUSERS IN SAME SPACE SHALL HAVE THE SAME FACE SIZE USING L LARGEST SIZE REQUIRED FROM DIFFUSER AND GRILLE SCHEDULE. u I j �J�l 6x 16- 7. IF NO SIZE IS SHOWN FOR DUCT SERVING DIFFUSER OR GRILLE, USE SIZE KEYED NOTES c- 29uj SHOWN ON DIFFUSER AND GRILLE SCHEDULE. 0 00 04 00 L 7- - 0 !41�- ----- I x 65RI �5 8. AIR INTAKES THRU ROOF SHALL BE A MINIMUM 25 FEET FROM EXHAUST FAN NEW A/C-1 ON MFG'S ROOF CURB ON ROOF C:) 04 t, cy) 9 2 OUTLETS AND PLUMBING VENTS. ABOVE. TRANSITION CONNECTION SIZE SUPPLY M CF) cy) L --------- L--- 9. PROVIDE ACCESS PANELS IN AREAS WITH DRYWALL CEILING FOR ACCESS TO AND RETURN DUCT TO SIZES SHOWN. PROVIDE SMOKE DETECTORS IN SUPPLY AND RETURN (D Z > F- co 00 K ---------- I I 'N r Nx VALVES, BALANCING DAMPERS, FIRE, SMOKE AND/OR COMBINATION DAMPERS, REHEAT COILS, ETC.. VERTICAL RISERS. PROVIDE 1" SOUNDLINER IN < oc) M K (B-)— - - ----- ---29 Y- --- RETURN DUCT FOR A RUN OF 15'-0" IN ALL C-0 Lo U..) 2 0 (W 10. REFER TO OTHER DISCIPLINES DRAWINGS FOR COORDINATION WITH THIS DIRECTIONS. > cf) Li I 4 L ---------- J DRAWING. PROVIDE 1 " SOUND LINER FROM FAN TO THIS cu to C.0 Z LL- - - - - - - - - J, I 11. SEAL ALL WALL, ROOF AND FLOOR PENETRATIONS AIR TIGHT AT PIPE, POINT IN EXHAUST DUCT. DUCT DIMENSIONS GIVEN I x FECI Ir7 00 FA fIENT 565R DUCTWORK AND CONDUIT PENETRATIONS. ARE INSIDE CLEAR DIMENSIONS. 7- iEP ------ 12. REFER TO HVAC DETAILS FOR ADDITIONAL REQUIREMENTS ON EQUIPMENT. 4"0 COMBUSTION AIR & 4"0 VENT UP THRU ROOF Sim PROVIDE MFG'S CONCENTRIC ROOF TERMINATION 13. EQUIPMENT SIZES AND SERVICE SPACE REQUIREMENTS MAY VARY BETWEEN KIT. r --- DIFFERENT MANUFACTURERS. CONSULT THE MANUFACTURER SUBMITTED AND 290 APPROVED, AND COORDINATE WITH THESE DOCUMENTS. It-Y 50 ELECTRICAL! 2 1 E EXISTING 14.REFER TO EQUIPMENT SCHEDULES FOR BRANCH PIPE SIZES TO INDIVIDUAL EQUIPMENT. 121 H 15. PROVIDE MANUAL BALANCING DAMPERS IN EACH BRANCH RUN OUT TO ----------- (L -i EF-1 ON SUPPLY DIFFUSERS, RETURN AND EXHAUST GRILLES. CLINIC 250R MANAGER MFG'S ROOF CONTROLSEQUENCE 6z'), 12,xi CURB ON 16. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE ROUTING OF NEW DUCTWORK BEFORE FABRICATION BEGINS AS RISES AND 5q, ROOF ABOVE H 95 50 1 DROPS MAY BE NECESSARY DUE TO FIELD CONDITIONS. THE A/C UNIT FAN WILL RUN CONTINUOUS AS 250 00 �50 DETERMINED BY A 24/7 PROGRAMMABLE THERMOSTAT x 0 TO MAINTAIN AIR CHANGE AND OUTSIDE AIR REQUIREMENTS DURING FACILITY OPERATING HOURS TO E- 0)-- c*4 2 OR 8X8 FECI I JAMTORV �5. BE DETERMINED BY FACILITY STAFF. .0 WAITING AREA THE COMPRESSOR/COOLING CYCLE OR HEATING CYCLE 2 -o-ol 7P SHALL ACTIVATE IN RESPONSE TO THE PROGRAMMABLE 109E THERMOSTAT TO SATISFY THE SPACE TEMPERATURE G 1000- D rD \RHC SETTING. EXHAUST FANS ASSOCIATED WITH EACH A/C UNIT WILL DE-ENERGIZE DURING CORRESPONDING A/C UNIT G < LLJ 0 295�\ 1ox10 SHUT DOWN. SEE THE EXHAUST FAN INTERLOCK 00 SCHEDULE SHEET MO.00. u < - �ECEPTIO .7 x 215 0 04 THE NEW AIR HANDLER SHALL BE PROVIDED WITH A n 1 295R HUMIDITY SENSOR IN THE SUPPLY DUCT. THE IN 12x12 x ------- !�2 COMPRESSOR(S) SHALL CONTINUE TO OPERATE TO MAINTAIN HUMIDITY SET POINT. THE UNIT WILL Cf) �7 z 1202 t 19 Rl i COMM 1 1� I INITIATE THE HOT GAS REHEAT TO MAINTAIN SPACE 0 , =;r 0 1 2 RR I 4fsi 1 5R TEMPERATURE SET POINT. < LLJ F= F D(a 0 CORRVI t C---1 F Q 4x 12 225 Aw i (D III < ry I AE OCK u x 50 C14 280 ry ry RHC-3— 04 t- 1$x 141 8 CONF J < 7 0 Li-J RHCUT 0 0 E 18x6 SIDEWALL SUPPLY REGISTER, I cl, D� 280R E BALANCE AT 300 CFM TECH PX12 ROOM RHC-4 L- STORAGE F1 1-4-1 246 SIDEWK05 8x6 SIDEWALL SUPPLY REGISTER, 1800 SIDEWALL RETURN GRILLE,------ RETURN GRILLE, BALANCE AT 115 CFM EACH BALANCE AT 300 CFM BALANCE AT (TYP 3) oxio 255 CFM 1OX10 3 D D 8x6 SIDEWALL SUPPLY REGISTER, FE-,A BALANCE AT 140 CFM EACH (TYP 2) 4Q DRAWN: LKK PROJECT ARCHITECT: SPP Bib WA PROJECT MANAGER: LKK WAS 1R NT MUDM120 3 8X12 C REVISIONS: - c 160E 00 0 1 -02-06 Z'�f ADD #2 EF-2 ON 1800 SIDEWALL NO CO�IE: MFG'S EXHAUST GRILLE, RDINATE EXHAUST GRILLE JOB# 05098 FILE: CURB N BALANCE AT LOPATION WITH BIO-TECH ROOF VE WATER TREATMENT VENDOR 280 CFM ANP TO' LOCATE GRILLE ABOVE ACID DATE: JULY 21, 2006 MIX LOCATION. REVISE DUCTWORK AS NECESSARY. LEGEND HVAC PLAN SCALE: 1/8" 1'-0" EXISTING TO REMAIN NEW CONSTRUCTION NO, PE`I STA OF 0 .. p 4 C 81 0 2' 4' 16' TRUE A FjVAC A NORTH Plan M2.01 1 2 1 3 1 4 1 5 1 6 1 7 1-- 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 11