Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
06080101.28
IN IL I IJ I r«. PIPE FROM SYSTEM GATE VALVE UNION TYPE CONNECTION, PIPE SO PUMP CAN BE REMOVED FOR SERVICE. SUPPORT PUMP AS REQ'D. FROM WALL OR FLOOR. PIPE TO SYSTEM IIN REDUCED PRESSURE BACK —FLOW PREVENTER WITH AIR GAP. —� GATE VALVE STRAINER W/BLOW —OFF ALLOW SPACE FOR STRAINER -7 REMOVAL NOTE: 1. SEE FLOOR PLAN FOR SIZE OF R.P.B.P. AND PIPE. 2. PROVIDE WALL SUPPORTS FOR R.P.B.P. IF UNIT IS TO BE LOCATED BELOW CEILING LINE. 0 TO 100 PSI PRESSURE GAUGE WITH GAUGE COCK TYPICAL —� OUT- -1 TO SYSTEM PIPE AIR GAP FUNNEL DRAIN DISCHARGE TO NEAREST FLOOR DRAIN REDUCED PRESSURE BACKFLOW PREVENTER IN -LINE CIRCULATING PUMP DETAIL 3/4" TO 2" LINE SIZE SCALE: NONE SCALE: NONE HWRP -1 BALANCING - - - VALVES 3,4" I a I / �- / —Cw Cw FROM WATER SOFTENER S HW 105' HW 105' I MIXING VALVE PROVIDED BY WATER 1y4 HW 140:]Ti S TREATMENT VENDOR. TMV -1 1 Y" 3/4 3/4" 1„ its 1 o I — ._ TMV -2 = 1" RPBP---, THERMOMETER IN WELL (0 -160 RANGE) 1 y4 T n TO RO 1 SYSTEM 3/4" BYPASS F- � fir- -- --- - - - - -- LINE I - - - - -� WATER HEATER ALL PIPING AFTER REDUCED PRESSURE BACKFLOW PREVENTER BY OWNER. ( TEMPERATURE CONTROL COORDINATE LOCATION & REQUIRED ��� SENSOR TEMPERATURE WITH WATER VENDOR. I BOOSTER PUMP BY WATER VENDOR FINISHED FLOOR C .+�.c. WATER FLOW DIAGRAM SCALE: NONE 1 TYP. CUT VALVE FLOOR DRAIN TRAP PRIMER " DISTRIBUTION UNITS, ANCHOR 1 /2, TO WALL SEE FLOOR PLANS FOR NUMBER OF LINES REQ'D RUN TO P —TRAP ON FLOOR DRAIN, SOFT COPPER. --,,_ 1 AVOID DIRECT INSTALLATION TO PREVENT FOREIGN MATERIAL FROM ENTERING DIRECTLY INTO PRIMER ON WALL TRAP PRIMER VALVE, ANCHOR TO WALL, SEE SPECS 1/2'0 1/2" FLOOR ON WALL TRAP PRIMER DISTRIBUTION SCALE: NONE SEE NOTE 1 1" QUARTER TURN BALL VALVE d 4' �d FINISHED WALL N i vv XI IAA A AI l i 1 I N II I o N i 1 J I lop II I, 1 10 kJ 1 1 11 I`�M I ! 1" SCH. 80 PVC LOOP FOR RO 3/4" SCH 80 PVC LOOP FOR BICARB. & CONCENTRATE MOUNT HIGH IN CHASE, STAGGER CONNECTIONS d d NOTES 1. TUBING FROM DIALYSIS BOX TO BALL VALVE WILL BE SUPPLIED BY WATER TREATMENT VENDOR & INSTALLED BY CONTRACTOR. 2. CONTRACTOR TO SUPPLY & INSTALL MAIN LOOPS, TEES, & BALL VALVES ON R0, PRIMARY & SECONDARY CONCENTRATE, & BICARB. DIALYSIS BOX & TUBING FROM BOX WILL BE SUPPLIED BY OWNER & INSTALLED BY CONTRACTOR. DIALYSIS PIPING IN CHASE (FOR REFERENCE ONLY) SCALE: NONE ( " 140' HW 00 N o N r- r` 0o N z M M ® " HOT WATER SUPPLY SUPPLY Z 00 co 00 Q co LINE TO PLUMBING r i Lo r Lo � M �- cn CU Z to F- FIXTURES © " HOT WATER z O Q _j O W RETURN TO HW ry �— Li Q CIL*' ©" COLD WATER TANK cr� cf� ry } z SUPPLY LINE CHECK VALVE O 1 RECIRCULATING BALL VALVE TO PUMP BALANCE SYSTEM —�'�I VACUUM BREAKER TEMPERATURE GAUGE ® MIXING VALVE SET AT ® F AND ® GPM UNION (TYP) LL — ..— Q O RECIRCULATED MIXING VALVE PIPING SCHEMATIC - TMV -2 SCALE: NONE n 2214 METROCENTER BLVD. SUITE 128 NASHVILLE, TN 37228 OFFICE 615.256.7038 FAX 615.256.7132 LtJ O a- M � LU W 1= z 00 N o N r- r` 0o N z M M .qt. N > Z 00 co 00 Q co co r i Lo r Lo � M �- cn CU Z to F- co LL- W U LU E-- U [1✓ RAWN: LKK ROJECT ARCHITECT. SPP ROJECT MANAGER: LKK EVISIONS: 05098 it-ILL: DATE: JULY 21, 2006 * : NO. PE100001� * r �; STA EOF " Plumbing Details P6.01 U� z U z O I z w 1- J Q U U z D Q U `- 0 z z > z O Q _j O W ry �— Li Q CIL*' 75; U F-- cr� cf� ry Q z LiJ U O RAWN: LKK ROJECT ARCHITECT. SPP ROJECT MANAGER: LKK EVISIONS: 05098 it-ILL: DATE: JULY 21, 2006 * : NO. PE100001� * r �; STA EOF " Plumbing Details P6.01