Loading...
HomeMy WebLinkAbout06080101.41 2 3 4 5 6 8 9 10 it 12 1 13 1 14 1 15 16 N GENERAL NOTE5 - NEW CONSTRUCTION Q w N EC � DIMENSION BEGINS INSIDE FACE OF DIMENSION BEGINS INSIDE FACE OF DIMENSION BEGINS INSIDE FACE OF 1. CONTRACTOR SHALL PROVIDE AND INSTALL WOOD BLOCKING AS REQUIRED FOR ALL WALL MOUNTED EQUIPMENT AND ACCESSORIES. SEE SHEET A1.03 FOR EQUIPMENT LOCATIONS. J • EXISTING DEMISING EXISTING EXISTING WINDOW EXISTING DEMISING W WALL PARTITION ` -' FRAME WALL PARTITION 2. AT EXTERIOR STORAGE DOOR (NUMBER 1158) INSTALL DOOR BUZZER CONNECTING TO 34' -9" (FIELD VERIFY) ' RECEPTION STORAGE AND NURSE STATION AT TREATMENT. REFERENCE ELECTRICAL 0 411 DRAWINGS. w CL LLJ - - - -- - -- - - -- - - I -- _ - -_ _ -_ - -- - - -- _ 3. AT DOOR NUMBER 112B: INSTALL PUNCH KEY PAD FOR STAFF ACCESS. REFERENCE DOOR M !1 c HARDWARE. Q: - i= I 4. CONTRACTOR SHALL FIELD VERIFY THAT ALL DOORS MAINTAIN A CLEAR OPENING Z _ TREATMENT 8 AREA _ DISTANCE OF 12" ON PUSH SIDE AND 18" ON PULL SIDE. W i I 1�6 - 5. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATE ALL TRADES. 0- I'` �- - - 0 0 8 0 I' CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES OR CONFLICTS BEFORE W {' 0 } PROCEEDING WITH WORK DURING CONSTRUCTION OF THIS PROJECT. !n N ® lt1 _� i 6. UNLESS OTHERWISE NOTED, ALL INTERIOR PARTITION WALLS SHALL BE CONSTRUCTED WITH 3 0 5/8" METAL STUDS. CONTRACTOR SHALL VERIFY WALL DEPTH REQUIRED FOR ALL L RECESSED PANELS, CABINETS OR EQUIPMENT BEFORE ERECTION OF PARTITION. '; 1. METAL STUDS FOR INTERIOR PARTITIONS SHALL BE 25ga. WITH THE EXCEPTION OF 209a. Q ti - METAL STUDS DOUBLED AT ALL JAMBS AND WALL TERMINATIONS. �oc�oo j j e t N ) `- � 8. SEE SHEET A8.01 FOR DOOR INFORMATION. Ili, r S. TECH ROOM SHALL HAVE A MAINTENANCE STATION FOR DIALYSIS MACHINES. (D 77" c`) ` N REFERENCE SHEET A6 01 AND PLUMBING DRAWINGS. Q 1- 00 co 111 L K co 00 itJ = 0 10. ALL INTERIOR PARTITIONS TO RECEIVE 3 1/2" SOUND ATTENUATION, 4" ABOVE FINISH Lo CEILING, TYP. _ 1 B WRAP TIGHT 11. CONTRACTOR SHALL PROVIDE AND INSTALL MINI - BLINDS AT ALL NEW AND EXISTING CD Cfl - - -c - - -- -- - - - _ - -- - - q� -- - - - -- - - -- WINDOW LOCATIONS (EXTERIOR t INTERIOR). �-- { 0 12. ALL FIRE EXTINGUISHER/CABINETS: REFERENCE LIFE SAFETY PLAN FOR LOCATIONS AND l: �' DETAIL I /AIBI. INSTALL 42" AFF_ TO CENTER OF HANDLE. REF. SPECIFICATIONS. {EG PATIENT - 13. CONTRACTOR SHALL PROVIDE AND INSTALL PRE - MANUFACTURED PIPE WRAPS AT ALL PREP = -{ WALL HUNG LAVATORIES WITH EXPOSED PIPING. IL ir, I. , 14. RECESSED SCALE INFORMATION: REFERENCE SHEET A1.51 AND SPECIFICATIONS FOR GUT SHEETS. CNI ±; ,I o LAB 15. CONTRACTOR SHALL INSTALL BLOCKING FOR SUPPORT BEHIND GYPSUM BOARD FOR ALL 104 WALL MOUNTED DOOR BUMPERS AND COAT RACKS. INSTALL BLOCKING FOR TV MOUNTS AT H CLEAR' ELECTRICAL ' rq EXISTING =, r DIALYSIS CHASE. VERIFY WITH OWNER ON TV MOUNTING LOCATION. "SCREENED" SOME TO 16. ROOM NAMES AND NUMBERS MAY BE ON PLANS PROVIDE CLARITY �_ ! OF INFORMATION. H Hil _ _- � PATIENT PATIENT TOILET TOILET - 0 � ;ls CLINIC MANAGER ! Im3 Iml 11. ALL UPPER CABINETS SHALL HAVE SLOPED TOPS. UPPER CABINETS SHALL HAVE A a► ro, MINIMUM INSIDE CLEAR DIMENSION OF 14 ". REFERENCE CASEWORK DETAIL SHEETS. I; OPEN TO - ALL EXPOSED CORNERS SHALL HAVE A 2" RADIUS FILLET. n 18. COUNTERTOPS WITH � WINDOW �u l ` 311 5' -5" ' -10" 8' -2" 3'� 19. ALL COUNTERTOPS TO BE CHEMICAL RESISTANT TOPS THROUGHOUT. _ 1 Zro. Ca w !" 5'_01 'JANITO STUD r-EC 20. ALL NEW SINK LOCATIONS SHALL HAVE A PAPER TOWEL DISPENSER AND SOAP Z 0 - -- ---- CLEAR WAITING _ DISPENSERS. REFERENCE SPECIFICATIONS. lu LL v l; lm8 AREA Imm -A q BLOCK -OUT v 21. CONTRACTOR SHALL PROVIDE LABELING FOR ALL DIALYSIS LOOP PIPING. CONTACT WINDOW OWNER PROJECT MANAGER FOR INFORMATION_ Z U � m II ` DfET/ SOCIAL _ 22. CORNER GUARDS: REFERENCE DETAIL 9/A7 51 AND SPEC. d 0 Ir = I, NEW 2 1/2 STUD ; �` 23. F15ERGLASS UNISTRUT FOR R.O. PIPING TO BE USED THROUGHOUT AS NEEDED. FIBERGLASS -' L 1 � FURROUT AT EXIS To ,- UNISTRUt TO BE USE THROUGHOUT IN WATER TREATMENT Z It r,'• BLOCK BOTTOM OF 5 0 WINDOW, TYP. CLEAR RECEPTION 02 ' 0 24. CONTRACTOR SHALL PROVIDE ARCH TECT ALL FINISH SAMPLES FOR APPROVAL PRIOR TO - U ORDERING FINISH MATERIALS. FINISH SCHEMES ARE SUBJECT TO CHANGE DURING F 'l `114 -� I : s CONSTRUCTION BY OWNER PROJECT MANAGER k I a 25. SEE SHEET A1-01 FOR LOCATIONS OF 6" METAL STUD WALL PARITIONS. �-- cp EXAM/ DOG OPEN TO c _ 9 d CORRIDOR 26. SEE SHEET A401 FOR FRP WALL LOCATIONS. l� nm WINDOW w F-1127 U V `I( 6" STUD 2i. SEE SHEET A1.02 FOR ADDITIONAL NEW CONSTRUCTION KEY NOTES AND ADD ALTERNATES. _ BLOCK -OUT 1161 OL 5' -0'I U CLEAR I E _ a� - I I STA TOILET STAFF LOUNGE/ CONFERENCE _ 0 $ r;. � ; 113 - , I START 3 5/8" STUD I � "11(i TECH 1 ROOM STORAGE: WALL LEGEND 0 BLOCK $TUD I' WINDOW > EXISTING ` BLOCK -OUT WINDOW 6" STUD 3 -5/8" MTL. STUD UJ/ 5/8" GYP. EITHER g'_311 5' -4" 20' -8" ' 4� SIDE, UNRATED PARTITION - NEW DRa, LKK 3" TYP. I " PROJECT ARCHITECT: SPP PROJECT MANAGER LKK 61 ro MTL. STUD W1 5/8" GYP. EITHER SIDE, UNRATED PARTITION - NEW c REVISIONS: WATER TREATMENT d1 BIO 116- -' - _ ! iW " WASTE 111 WRAP TIGHT ' A - BLOCK -OU JOB" 05098 iN ! WINDOW 6" STUD ro STUD ' FILE: - DATE: JULY 21, 2006 DIMENSION BEGINS INSIDE FACE OF i 41' -011 \ttlltiplllii /►����, EXISTING DEM15ING WALL PARTITION ,` >>� �O�t�.P�P,o 4 '►�►••�t. Rat' DIMENSION BEGINS DIMENSION BEGINS 54 :r INSIDE FACE OF INSIDE FACE OF NEW EXISTING WINDOW FRAME DEM151NG WALL PARTITION �0 •• �H i * P•� ' iEft��• PUW NORTH ,m Nom 01 DIMEN510N FLOOR FLAN A ,4101 SCALE: 1/8" V -0" DIMENSION FLOOR PLAN 1 2 1 3 1 4 1 5 1 6 1 8 9 IfD 11 12 1 13 1 14 15 16