Loading...
HomeMy WebLinkAbout06110089.27618 East Market Street DOOR AND FRAME SCHEDULE Indianapolis, Indiana 46202 ph 317/264.8162 fx 317/264.8165 DOOR FRAME LABEL HARDWARE MATERIALS SIZE STL STEEL HM HOLLOW METAL AL ALUMINUM WOOD STUD AND HOLLOW METAL FRAME WD SOLID CORE WOOD VENEER DOOR a x I S a r c c o m GYPSUM BOARD WALL, AND ANCHORING Cie scope Drawngs HARDWARE ACR ACRYLIC , "A- : - I REF: PLAN V) LU S.T i ..E. WAP'oz 0 V) –J z –J z co PCARB POLYCARBONATE GLAZING These drawings indicate the general scope of Z UJ LU 0 0 1:E the project in terms of architectural design DOOR, REF: DOOR TEMP TEMPERED (OR LAMINATED) GLASS 2 co z concept, #w dimensions of the building, HOLLOW METAL FRAME SCHEDULE Cie Cie I'- �6/- LU LU IG INSULATED TEMPERED GLASS #w major architectural elements and the LL 11-- t� 0 z z M'� 3k "ofstructural, mechanical and electrical AND ANCHORING HOLLOW METAL ROOM NAME(RM. #) 0 U < HARDWARE WOOD STUD AND LU LU LU —J Cie EX EXISTING systems. The drowings, do not necessafi� GYPSUM BOARD WALL, FRAME (BEYOND) L—U LU 0 z indicate or describe all work required for —L—uj LU (n LL. Cie full performance and completion of the REF: PLAN FINISHED FLOOR T D�- A, Va requirements of the contract On the basis A DOOR, REF: DOOR of the general scope indicated or described, REMARKS SCHEDULE DOOR, REF: DOOR K the trade contractors shall furnish all items required for the proper execution and SCHEDULE 1 OOA VESTIBULE completion ofthe work (2)3'0 8�011 1.75" AL A TEMP AL 1 H3 J3 S3 100B VESTIBULE DRAWN by bil (2) 3'0 81-011 1.75" A L A TEMP A L 3 H 3 J 3 S3 2 H 1 HEAD DETAIL J 1 JAMB DETAIL S 1 SILL DETAIL 3'0 71-011 1.75" WD B HM 14 H1 JI S1 5 CHECKED by KO i� 103 MECHANICAL ROOM - I DATE issued 13 OCT. 2006 11 1 i 10A WOMENS 3'0 7�011 1.75" WD HM 14 H1 JI SI 6 -011 1 SCALE: 1 1/2 1 SCALE: 1 1/2" P-0-1 SCALE: 1 1/2" P-0" I REVISIONS 105 MENS 3'0 71-011 1.75" WD B HM 14 HI ii S1 6 N" A 106 ELECTRICAL ROOM 3'0 71-011 1.75" WD B HM 14 H1 J1 S1 5 108A OPEN OFFICE 310 7-011 1.75" AL A TEMP HM 15 H3 J3 S3 FUTURE, NOT IN CONTRACT 1088 OPEN OFFICE 3'0 71-011 1.75" WD B - HM 14 H1 JI SI FUTURE, NOT IN CONTRACT 109A OPEN OFFICE 3'0 71-011 1.75" AL A TEMP AL 15 H3 J3 S3 - FUTURE, NOT IN CONTRACT --x THE SCHNEIDER CORP. 1098 OPEN OFFICE 3'0 71-01f 1.75" AL A TEMP AL 13 H3 J2 S2 3 T 9 — ASHTON FRITZ 8901 OTIS AVENUE BRICK VENEER ST-1A STAIR 1 3'0 71-011 1.75" WD B HM 14 H1 J1 SI 4 INDIANAPOLIS, IN 46216 SEALANT �x :X. (317) 826-7100 ST-1 B STAIR 1 DOOR, REF: DOOR 3'0 1 81-011 1.75" AL A TEMP AL 6 H3 J2, J3 S2 3 DOOR, REF: DOOR --- (317) 826-7200 SCHEDULE ..* ;k SCHEDULE STOREFRONT ALUMINUM FRAME (BEYOND) 200A MECHANICAL ROOM 3'0 71-011 1.75" WD B HM 14 H1 ii S1 5 - Mwi z. STOREFRONT FRAME ADA SILL 200B MECHANICAL ROOM STRUCTURAL DESIGN, DRYWALL "J" TRIM 30" x 36" ROOF HATCH INC. WOOD FRAMING a ° ° ° ° EXPANSION 201 MENS 3'0 7'-0" 1 1.75" WD B HM 14 H1 A S1 6 - NOT USED 5/8" TYPE "X" GYP. BOARD 4 4 MATERIAL 202 WOMENS 3'0 7l-011 1.75" WD B HM 14 H1 ii S1 6 CHUCK SCHAEFER CONCRETE SLAB 203 ELECTRICAL ROOM 337 MAIN STREET 3'0 71-011 1.75" WD B HM 14 H1 ii SI 5 BEECH GROVE, IN 46107 (317) 822.0204 (317) 822.0206 ST -1C STAIR 1 3'0 7�011 1.75" WD B HM I A H I J 1 S1 4 ;f-A. N. H2 HEAD DETAIL J2 JAMB DETAIL S2 SILL DETAIL �t-A. t-A. N5M.. Cy'L*.w-rr\ 11*1:1x ;: Mme' VECTOR CONSULTING �A Ck.0:r' r; '4�1 SCALE: 1 1/2" P-O" SCALE: 1 1/2" P-011 SCALE: 1 1/2" P-O" KA.. ki= �`�111* ROOF ACCESS 3'0 41-6 11 1.75" HM T B HM 17 H4 J4 S4 WEATHERSTRIP, CLOSER, LOCK FROM OUTSIDE, PAINT 1A. P=R ��'p �r- ZT, wc BEN DEREMIAH zx 212 W. 10TH ST., SUITE D-395 INDIANAPOLIS, IN 46202 (317) 632.4444 71-2 1/4" 9!-6" 7�2 114" (317) 632.4960 e 01 11 01 11 10 41/2" EQUAL DOOR SCH. EQUAL 41/2" 41/2" EQUAL EQUAL EQ. REF. DOOR SCH. EQ. EQUAL EQUAL �4 1/2" be e- L& 11 01 IL. 0 pk: 0 A qv I Ll v t-vla L CE) IF I % % DOOR, REF: DOOR I INSULATED GLAZING SCHEDULE QD (jD TP ALUMINUM TP STOREFRONT FRAME STOREFRONT LU b b UJ b FRAME (BEYOND) k*( 1 "A' Cie UJI o ALUMINUM STOREFRONT ADA SILL FRAMING I" INSULATED GLAZING U C') U DOOR, REF. DOOR C? 0, in -1 C� 14 zo - I w 'I, L.A. '" SCHEDULE EXPANSION 0 0 01 6, 0 1/4" TEMPERED GLAZING SCHEDULE DOOR, REF. DOOR 4 < 4 MATERIAL 0 o C.4 N."r 00 <— CONCRETE SLAB i s tA Z.- 1/4 TEMPERED GLAZING LU LU Cie H3 HEAD DETAIL J3 JAMB DETAIL S3 SILL DETAIL L-IJ 11� xi; 1-1 L--1-J NV-141 z SCALE: 1 1/2" = P-O" SCALE: 1 1/2" P-O" SCALE: 1 1/2" = P-0" I.. Luz W LU m 5'-8" R.O. or 10. 3,4" R.O. 10 'Of 9'-5 1/2" R.O. 0 4%Q REF. SCH. REF. SCH. EQUAL REF. SCH. W EQUAL 211" REF. SCH. 2" SP SP 101 7 (:iD (aD CE) C14 ROOFING MEMBRANE HOLLOW METAL DOOR, REF. 2%,1 REF. SCH. ROOFING MEMBRANE w ROOF TRUSS BEYOND DOOR SCHEDULE Z) 0 U.J LU FLASHING CD -0 LU = M LU 2x4 BLOCKING SEALANT SILL M: c; in 0 U LU LU V) z: a: 5/8' PLYWOOD SHEATHING U M 01 FN DOOR, REF. SCHEDULE 3/A" PLYWOOD SUBFLOOR U U HOLLOW METAL DOOR FRAME 0 O� 00 TP UJ ROOF TRUSS BEYOND FLASHING 0 CD FLASHING 0 0 0 0 UJ UJ 00 E 2x4 BLOCKING 2x4 BLOCKING U- 0 0 0 HOLLOW METAL DOOR, REF. LU 0 PLYWOOD SHEATHING LU DOOR SCHEDULE HOLLOW METAL DOOR FRAME 5/8 LL: LL: I'm � LU LLJ LU 5/8" PLYWOOD SHEATHING ROOFING MEMBRANE oe CN Ln 12 13 15 14 17 O O O O O ix H 4 HEAD DETAIL. J 4 JAMB DETAIL. S4 SILL DETAIL ALUMINUM STOREFRONT NOTE: HOLLOW METAL FRAME 1511 NOT PART OF THIS CONTRACTAND SCALE: 1 1/2" = P-O" SCALE: 1 1/2" = V-011 SCALE: 1 1/2" = 1'-0" FRAME ELEVATION S IS SHOWN FOR REFERENCE ONLY. FRAME ELEV.- REF. SCH.. REF. SCH. '0 or DR 10 ................ 511 5" G S T No. 4!-8 1/2" R.O. 4--8 1/2" R.O. 4'-8 1/2" R.O. 4'-8 1/2" R.O. 2i-5 1/2" R.O. 4'-8 i " 8 1/2" R.O. 4l-8 1/2" R.O. AR- 19400087 0" 3m-5 R.O. 01 01 10 01 01 10 10 Ile It rn 10 STATE OF 9 in % % % CfD LU (G IG IG U " IG CD I'- IG OD 00 OD �IG IG M CV) CV) VERTICAL 00 00 ------- 0 U is C? Cl) 0 Ci C? 0 MUNTINS Jf/ ^"`'� 00 00 0i c3i L 0 0 0 O O p LO M c) Cl) ce 0 10 - c) Cie LL: 10 C� V� OD 00 CD OD LIJ L11 L-1 LJ JG co 10 co co cn CV) —co CO O "I > IG co G IG - IG 1 - – - DOOR SCHEDULE A B O O O7 8O O9 10 11 16 SCALE AS NOTED -0 1-: DOOR ELEVATIONS WINDOW ELEVATIONS ILO N - - i A5.1 N