Loading...
HomeMy WebLinkAbout0267.98.10CD rn N 0 P a i NOTE: SCUPPER OPENING TO BE SIZED PER U.P.C. APPENDIX D AND LOCAL CODE REQUIREMENTS ELASTOMERIC SEALANT ON ALL SIDES SCUPPER FLASHING BUILDING PARAPET - 2x2x1/8" 'C' CHANNEL OR UNISTRUT -LAG BOLT 7 TO PARAPET 0 BLK'G & CUT & BEND 0 90' ANGLE PIPE CLAMP -BOLT TO CHANNEL (2 THUS) / I � HOT WATER HEATER FLUE ------- -L - -�� I I I I I I I I I I I c0 0 c c r FLUE SUPPORT DETAIL - CAP SHEET FLASHING SHEET i - VERTICAL WALL CAULK AROUND- PERIMETER - - I PLY SHEET SET IN ASPHALT BEHIND FLANGE CONTINUOUS i PREFINISHED -- - 2 REINFORCEMENT PLIES SET IN ASPHALT METAL FLASHING - 24 GA. G.I. SCUPPER FLASHING- AS REQUIRED SET PRIMED FLANGES INTO ROOF CEMENT OVER FIELD PLIES AND NAIL FLANGES TO ALL SURFACES -SEE DETAIL 13/A6 FOR USING APPROPRIATE FASTENERS TYPICAL. DIMENSIONS - ONS SEAL CUT EDGES AT SCUPPER OPENING USING WOVEN GLASS FABRIC EMBEDDED INTO AND COVERED WITH FLASHING CEMENT - FIBERGLASS BASE SHEET NAILED TO DECK OVER ROSIN SLIP SHEET GRANULE SURFACED FIBERGLASS CAT' SHEET 4" L 3 PLIES TYPE N FIBERGLASS -PLY SHEET _ ROSEN SHEET PREFINISHED -- METAL SCUPPER & DOWNSPOUT CAP SHEET FLASHING SHEET ( ° C) (� PLYWOOD DECK i I 0 0 1/2 " =1' -0" 9 ROOF CRICKET STUCCO CORNER ANCHORS W/ NEOPRENE /STL. BEAD, TYP. WASHERS 0 1' -4" O.C. 3/4" EXT. , PAINTED 22 GA. GALVANIZED CAP GR. PLYWD OVER WATERPROOFING MEMBRANE 3" STUCCO, TYP. (2) 2x6 TREATED WD. TOP 3" X 1 1/2" GALV PLATES SPLICE PER 2 /AD1 'B' NEAR SIDE OF PARAPET TYPE WINATION BAR- 'END UP UNDER COPING FIBER CANT SHING- ANCHORS W/ 2x6 WD STUDS )PRENE /STL WASHERS J -MTL. STUCCO TRIM B" O.C. 2" STL PIPE TO BE WD STUDS +17' -6" 7/8" STUCCO, TYP. IV T. 0. P. N 2x6 WD STUDS N !' EXT. PLYWOOD M FLASHING TURNED UP HOLD -DN IIND PLASTER CLEATS yy/ 1/2'x 2.5" CCO STOP WD SCREW 0 24 "o.c. CAP BELOW cv ARE TO BE SUPPLIED & INSTALLED N c:' BY OTHERS 0 PLAN SECTION DETAIL 3 " =1' -0" 110 N 2x4 WD. BLK'G. �,. ; MTL FLASH'G W/ 20 GA. PAINTED GALV STUCCO CORNER 10 CAP W/ CONT. CLEAT- BEAD, TYP. A6 TURN UP END BEHIND 3/4" EXT. , PLASTER GR. PLYWD OVER 2x6 P.T.D.F. 2x4 WD. BLK'G. — — WATER PROOFING EYELET LOCATION AT MEMBRANE- TURN UP NEAR SIDE OF PARAPET BEHIND PLASTER SEE SHT. A7 2x6 TREATED WD TRIM _ OVER ROOFING- CHAMFER 2x6 WD STUDS TOP EDGE, SET IN MASTIC 7/8" STUCCO, TYP. & LAr SCREW TO WD. STUDS 2" STL PIPE TO BE 0 32 O.C. ANCHORS W/ 7/8" STUCCO, TYP. NEOPRENE /STL 2x6 WD STUDS WASHERS 0 8" O.C. W THE ROOF SURFACE INSTALL BASE SHT. & CAP SHEET TO TOP OF 2X4 DIAG. TO TOP CHORD PARAPET WALL o FLAGPOLE & FLAGPOLE BRACKETS - cv ARE TO BE SUPPLIED & INSTALLED o°ar c:' BY OTHERS 0 (y) STL PIPE TO BE SECURED TO D ETAI L 3 " =1' -0" 1 1 PARAPET 8 OVERFLOW SCUPPER CONTINUOUS CANT STRIP 2x WD BLOCKING ROOFING OVER 5/8" PLYWOOD CRICKET OVER 2x FRAMING 0 24' O.C. ROOF DIAPHRAGM PLYWOOD 3" =1' -0" II II �I �JI I N � � T_ 4 3" =1' -0" 24 GA. GALV. METAL REGLE' AND REMOVAE FLASHING COUNTERFLASHING CAP SHEET F 24 GA. SCUPPER FLASHING, SET PRIMED FLANGES INTO ROOF CEMENT OVER FIELD PLIES AND NAIL FLANGES 7 TO ALL SURFACES USING APPROPRIATE FASTENERS 3 PLY BUILT -UP ROOF OVER 5/8" CDX PLYWOOD ROOF DECK, TYP. 'UPPER OVERFLOW SCUPPER SEE DET. 5/A6 THRU -WALL SCUPPER ­ & DOWNSPOUT, " " " SEE DET. 8/A6 3 -6 1 -6 3 11 2 -8 ZZ E: ALL MS 0 3HING TO dt SOLDERED ALL 'AS 0 ;RING TO bt SOLDERED 5 1 SCUPPER FLASHING 7/8" STUCCO EXTERIOR PLYWD 0 PARAPET J -MOLD 6 PLASTER FLASHING DETAIL NTS 2 MIN. 24 GA. G.I. PIPE ENCLOSURE COVER MULTI PIPE GROUPING - = 1- HEAD -NAIL 0 6" - 8" O.C. SCREW THRU NEOPRENE WASHER , 3 PER SIDE CAP SHEET FLASHING r 1.7- L T �- 2 REINFORCEMENT PUES SET IN ASPHALT F16ER CANT STRIP W/ 4" LEGS -NAIL TO DECK AND /OR CURB 0 12" O.C. CO 2x8 WD CURB SECURED TO ROOF DECK f- MULTIPLE PIPE FLASHING / / I / /^I �( -- SATELLITE DISH TO BE NZ / PROVIDED & INSTALLED BY T.B. 1 / � 7 SATELLITE DISH SUPPORT N.T.S. 4 ROOF PLAN J. VO 11 \\ A6 \ \ 2' X 3' WALK -MATS r - - DO NOT MAKE ROOF \ \ H AS STRETCHED TYP. I I PENETRATIONS EITHER \ \ A10 1 I SIDE OF VALLEY FOR DISTANCE OF 18" TYP. \\ \ A6 5' -10" no \ \ HVAC \ \ UNIT #1 \\ °off \ SD1 ROOF SADDLE x O\ \ I 1 1 i I --1 \ 3 L , , \ PE A6 w EF- \\ \ I I 0 100# \ \\ I I cn \ \ - \ \\ 100# 400# 400# `1 \ \ N YY \ \ \ - ICE MACHINE A8 \ CONDENSER / F_ -I 8' -8" 2 / // L J 12' -6" / EF -2 100# nrL., EF -3 VENT THRU ROOF 100# SEE SHT. P1 FOR DIMENSIONAL LOCATION w SEE DET. 2/A6.1 0 a / Q / �° // SATELLITE DISH, SEE DET. 4/A6 AND ROOF FRAMING PLAN FOR LOCATION SEE DET. 2/A6.1 PARAPET WALLS ARE 47" TO 61' HIGH / 9' -4" / 3 o / I I / DO NOT MAKE ROOF I i / PENETRATIONS EITHER SIDE OF VALLEY FOR / DISTANCE OF 18" TYP. / - HVAC v UNIT #2 \ / I ROOF LE v \ 2' X 3' WALK -MATS I X I r - -' 11 AS STRETCHED TYP. �� i e f - SD 1 I* \\ \ 6 OF COVERIN \ SHALL BEAR UL LABELS WITH FIRE t \\ EXPOSURE CLASS 'A' i it \\ SLOPE 1/2- PER FOOT `�' i \ p� \ 5 114 \ \ 4 \ 3 \ \ 2 a \ \G \ \ , on WW A8 ROOF CRICKET SEE 6 /A6 THRU-WALL SCUPPER- & DOWNSPOUT, / i 8/A6 MTL FLASH'G W/ SCUPPER- 10 5/A6 xx 1" X 1/4" DRAW BAND A8 `„ INDICATES 2x6 P.T.D.F. SET IN NON- HARDENING SEALANT (TYP.)- SEE DTL. �z co 4. IN FASTEN FLANGE zQ_ W TO PLYWD DECK �z z 2" STL PIPE TO BE _ Q Q EXTENDED 2' -6" ABOVE W THE ROOF SURFACE 2X4 DIAG. TO TOP CHORD Q L_L OF ADJACENT TRUSSES �U 0 (y) STL PIPE TO BE SECURED TO T TRUSSES W /SIMPSON PGT2 W/ (4)1/4- LAG BOLTS (TOP & BOT.) -DRILL & BOLT PIPE TO TRUSS _ 0 W/ 3/8" DIA BOLTS SIMPSON PGT2 7 SATELLITE DISH SUPPORT N.T.S. 4 ROOF PLAN J. VO 11 \\ A6 \ \ 2' X 3' WALK -MATS r - - DO NOT MAKE ROOF \ \ H AS STRETCHED TYP. I I PENETRATIONS EITHER \ \ A10 1 I SIDE OF VALLEY FOR DISTANCE OF 18" TYP. \\ \ A6 5' -10" no \ \ HVAC \ \ UNIT #1 \\ °off \ SD1 ROOF SADDLE x O\ \ I 1 1 i I --1 \ 3 L , , \ PE A6 w EF- \\ \ I I 0 100# \ \\ I I cn \ \ - \ \\ 100# 400# 400# `1 \ \ N YY \ \ \ - ICE MACHINE A8 \ CONDENSER / F_ -I 8' -8" 2 / // L J 12' -6" / EF -2 100# nrL., EF -3 VENT THRU ROOF 100# SEE SHT. P1 FOR DIMENSIONAL LOCATION w SEE DET. 2/A6.1 0 a / Q / �° // SATELLITE DISH, SEE DET. 4/A6 AND ROOF FRAMING PLAN FOR LOCATION SEE DET. 2/A6.1 PARAPET WALLS ARE 47" TO 61' HIGH / 9' -4" / 3 o / I I / DO NOT MAKE ROOF I i / PENETRATIONS EITHER SIDE OF VALLEY FOR / DISTANCE OF 18" TYP. / - HVAC v UNIT #2 \ / I ROOF LE v \ 2' X 3' WALK -MATS I X I r - -' 11 AS STRETCHED TYP. �� i e f - SD 1 I* \\ \ 6 OF COVERIN \ SHALL BEAR UL LABELS WITH FIRE t \\ EXPOSURE CLASS 'A' i it \\ SLOPE 1/2- PER FOOT `�' i \ p� \ 5 114 \ \ 4 \ 3 \ \ 2 a \ \G \ \ , on WW A8 ROOF CRICKET SEE 6 /A6 THRU-WALL SCUPPER- & DOWNSPOUT, SEE DET. 8/A6 OVERFLOW SCUPPER- S E DET. 5/A6 xx A8 INDICATES 2x6 P.T.D.F. WD. NAILERS (TYP.)- SEE DTL. 7/A6. ROOF CRICKET SEE 6/A6 1 A6.1 12 x24" TOWER VENT Li a 0 1 A6.1 'C' CHANNEL FLUE SUPPORT - SEE DET. 9/A6 SLOPE 4" DIA. WATER HEATER FLUE MIN. 2' -0" ABOVE PARAPET WALL AND MIN. 3' -0" ABOVE AIR INTAKE SEE DETS. 8/P3 & 4/A6.1 EQUIPMENT RAILS BY G.C. SEE DIET. 7 /SD 1 WALK -IN FREEZER/ COOLER CONDENSORS (TYP. OF 2) 1 A6.1 1 A6.1 MIN. 4" LAP 0 PARAPET CAP FLASHING SEAM (TYP.) SEE DET. 6/A6.1 A6.1 12 "x24" TOWER VENT 5 PLY BUILT -UP ROOFING W/ MINERAL CAP 4" FIBER CANT, TYP. GEN. NOTES: 1. FOR MMIIMUM CLEARANCES ON VARIOUS PIPES & PENETRATIONS SEE DET. 3/A6.1 v v XX A8 Cy 1 W U 4 W U a � q Ld ri m s o Q u 0 Q Q 0 W wz zQ_ W �z z z _ Q Q J W U Q L_L 0 �U 0 (y) T OWN BY TTP CHWn BY- TH aLam TYPE —50 K FRAME JOB NUMMR 97125 PROTOTYPE ISSUE DATE 2/l/97.1 -_J