Loading...
HomeMy WebLinkAbout0267.98.26co rn to hO 0 Lo I Y i 0 r Y Y Y GENERAL NOTES AIR BALANCE SCHEDULE ( CFM ) AIR DEVICE SCHEDULE 1. THE GENERAL CONTRACTOR SHALL LOCATE, CUT AND FRAME ROOF OPENINGS AS SHOWN FOR ALL HVAC EQUIPMENT AND EXHAUST FANS 2. IT IS VERY IMPORTANT THAT ACCURATE MEASUREMENTS ARE USED WHEN LOCATING EXHAUST FAN ROOF OPENINGS TO ENSURE THAT NO OFF -SETS ARE REQUIRED IN THE EXHAUST DUCTWORK. COORDINATE ROOF OPENINGS WITH THE KITCHEN EQUIPMENT. 3. ANY FRAMING REQUIRED FOR DIFFUSER INSTALLATION IN HARD CEILING SHALL BE BY THE GENERAL CONTRACTOR. ITEM OA RA SA EA PRESSURE -- z a a NECK SIZE DIFFUSER FACE OR CEILING GRID SIZE (INCHES) TYPE (NO.) & AIR PATTERN CFM RANGE MOUNTING DUTY MANUFACTURER MODEL NO. REMARKS rr^^ v1 H w U Z E-' Z � z W a Q) d a � q cy a � V) u- o o- ►w- N 0 �w w z �! g w v < cr N > j w o Z 0 w I- N = w RTU -1 900 2900 4000 0 +900 RTU -2 800 2400 3200 0 +800 S -1 2 8x8 24x24 X - - (1)1W(1)2W/ 100 X - X - _ METAL -AIRE 7000 -6 FURNISH W /SQUARE TO ROUND ADAPTOR. S_2 2 16x16 24x24 X - - (1) 3W/ 650 X - X - - METAL -AIRE 7000 -6 FURNISH W /SQUARE TO ROUND ADAPTOR. EF -1 0 0 0 900 -900 S -3 2 8x8 12x12 X - - (2) 4W/ 75 - X X - - METAL -AIRE 7000 -1 FURNISH W /SQ. TO RND. ADAPTOR. CEILING OPENING IS 11 3/8x11 3/8. EF -2 0 0 0 400 -400 S -4 3 18x18 24x24 X - _ (2)4W(1)3W/ 800 -1000 X - X - - METAL -AIRE 7000 -6 FURNISH W /SQUARE TO ROUND ADAPTOR, EF -3 0 0 0 220 -220 S /R -1 1 R -20 "o S-20 "O 48x30 X - - 4W - X X X - LENNOX RTD1 1 -95 CONCENTRIC DIFFUSER (SEE NOTE #1) TOTAL 1900 5300 7200 1700 +180 R -1 1 46x22 48x24 - - X 0 -3200 X - - X - METAL -AIRE CC- 5 -FB -TB HVAC GENERAL NOTES AIR CONDITIONING NOTES 1. INSTALLATION SHALL CONFORM TO THE ENERGY CONSERVATION DESIGN MANUAL STANDARDS FOR NEW NON- RESIDENTIAL BUILDINGS. 2. ALL WORK AND MATERIALS SHALL COMPLY WITH GOVERNING CODES, SAFETY ORDERS AND REGULATIONS. 3. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS, FEES, AND INSPECTIONS REQUIRED BY GOVERNING AUTHORITIES. 4. ALL MATERIALS AND EQUIPMENT PROVIDED AND /OR INSTALLED SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR UNLESS OTHERWISE INDICATED, FROM THE DATE OF FINAL ACCEPTANCE OF THE WORK BY THE OWNER. ANY DEFECTIVE MATERIALS OR INFERIOR WORKMANSHIP SHALL BE CORRECTED TO THE ENTIRE SATISFACTION OF THE OWNER. 5. CONTRACTOR PROVIDES CONDUIT FOR LINE AND LOW VOLTAGE WIRING, LINE VOLTAGE WIRING SWITCHES, DISCONNECTS, CIRCUIT BREAKERS, FINAL CONNECTIONS, AND ITEMS INDICATED THUS O. 6. FLEXIBLE DUCT SHALL BE JOHN'S MANVILLE J.M. FLEX METAL INSULATED WITH ACCOUSTICAL VINYL VAPOR BARRIER U.L. APPROVED. MAXIMUM LENGTH 5' -0 ", CONDUCTANCE =0.22 ® 75'F. DUCT SHALL BE CONNECTED TO TRUNK OR BRANCH DUCT WITH SHEET METAL SCREWS, HANGER STRAPS SHALL BE MINIMUM 1" x 30 ga.. 7. CONCEALED CONDITIONED SUPPLY AND RETURN AIR DUCTS SHALL BE INSULATED WITH ONE AND ONE HALF (1 1/2 ") THICK 0.75 POUND (LB. /CU.FT.) DENSITY GLASS FIBER DUCT WRAP WITH REFLECTIVE VAPOR SEAL FASTENED TO DUCTWORK WITH 16 GAUGE SOFT ANNEALED WIRE SPACED AT 12" ON CENTER. SPACING TO BE 6" ON CENTER FOR FITTINGS. 8. ALL SHEET METAL DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH SMACNA AND /OR LOCAL AND ASHRAE CODES. TAPE ALL TRANSVERSE AND LONGITUDINAL JOINTS, AND TAKE -OFFS ON SUPPLY, RETURN AND EXHAUST DUCTS. DUCT SHALL BE MILD GALVANIZED STEEL IN ACCORDANCE WITH SMACNA STANDARDS (EXCEPT EXHAUST HOOD). 9. WHERE INTERIOR OF DUCTWORK IS VISIBLE THRU AN AIR OUTLET, INSIDE OF DUCT SHALL BE PAINTED WITH A FLAT BLACK PRIMER, OR INSIDE SHALL HAVE BLACK FACING. 10. CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL DUCTWORK WITH CEILING AND ROOF FRAMING, COOPERATE WITH OTHER TRADES, MAINTAIN MANUFACTURERS RECOMMENDED CLEARANCES OF ALL ITEMS OF EQUIPMENT, INSTALL TURNING VANES IN ALL 90' DUCT ELBOWS, INSTALL SPIN -IN EXTRACTOR /DAMPER ® BRANCH DUCT CONNECTION TO MAIN DUCT AND SEAL AIR TIGHT. 11. THE SUBMISSION OF PROPOSAL BY THE CONTRACTOR WILL BE CONSTRUED AS EVIDENCE THAT THE CONTRACTOR HAS FAMILIARIZED HIMSELF WITH THE PLANS AND BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF THEY COULD HAVE BEEN FORESEEN HAD PROPER EXAMINATION BEEN MADE. 12. ANY EQUIPMENT THAT IS SUBSTITUTED SHALL FIT IN THE SPACE PROVIDED, WITH ADEQUATE ROOM FOR SERVICING, INCLUDING SUBSTITUTE EQUIPMENT NAMED IN THE SPECIFICATIONS. CONTRACTOR SHALL SUBMIT A 1/4" SCALE DRAWING OF ALL EQUIPMENT SUBSTITUTED FOR APPROVAL PRIOR TO INSTALLATION. 13. CONTRACTOR TO INSTALL RECHARGEABLE REFRIGERANT LINES FROM ICE MACHINE TO CONDENSER ON ROOF. 14. GENERAL CONTRACTOR SHALL START UP SYSTEM AND BALANCE AIR SIDE TO PLUS /MINUS 10 % OF INDICATED AIR QUANTITIES. 15. ALL SUPPLY AND RETURN AIR DUCT SIZES ARE INSIDE CLEAR DIMENSIONS. 16. SMOKE DETECTORS SHALL BE INSTALLED AND CONNECTED BY THE CONTRACTOR. 17. VERIFY WITH THE OWNER FOR THE USE OF HEAT PIPES. INSTALLATION IS DETERMINED BY GEOGRAPHICAL LOCATION. 18. HVAC UNITS SHALL BE MOUNTED LEVEL. VERIFY MTL. CURB AND ROOF SLOPE PRIOR TO LIFTING HVAC UNITS INTO PLACE. 19. DUCT SMOKE DETECTORS TO BE MOUNTED IN THE RETURN AIR PLENUM OF EACH HVAC UNIT. (SUPPLIED BY G.C.) 20. GENERAL CONTRACTOR SHALL INSTALL WALK -IN COOLER. SEE SPECIFICATION 11400.31 INSTALLATION FOR SCOPE OF WORK. 1. THE ENTIRE HVAC PACKAGE INCLUDING ALL HVAC UNITS, CURBS, SMOKE DETECTORS AND DUCTWORK TO BE SUPPLIED BY AN APPROVED HVAC VENDOR LISTED BELOW AND INSTALLED BY THE CONTRACTOR. THE VARIOUS PIECES OF DUCTWORK AND ACCESSORIES TO BE INSTALLED PER THE ISOMETRIC DRAWING PROVIDED BY THE NATIONAL HVAC VENDOR WITH THE HVAC PACKAGE. 2. ALL DUCTWORK TO BE INDEPENDENTLY HUNG FROM STRUCTURAL MEMBERS. 3. THE CONTRACTOR SHALL COORDINATE DIFFUSER LOCATIONS WITH THE REFLECTED CEILING PLAN. 4. FINAL HVAC SYSTEM TESTING AND BALANCING SHALE BE PERFORMED BY THE OWNERS INDEPENDENT AGENT. A RETEST IS MANDATORY FOR A FALSE START (I.E. NO POWER UPON AGENTS ARRIVAL, EQUIPMENT NOT WIRED, ETC.) AND SHALL BE A COST INCURRED BY THE G.C. IN THE EVENT A SYSTEM /STORE RECEIVES A GRADE OF 5 OR BELOW AS A RESULT OF THE HVAC SYSTEM PERFORMANCE OR OPERATIONAL DEFICIENCIES, TACO BELL WILL REQUEST A RETEST AND THE COST FOR SAME SHALL BE ALSO INCURRED BY THE GENERAL CONTRACTOR. 5. THE MAIN HOOD GREASE DUCT TO BE FABRICATED AND INSTALLED BY THE CONTRACTOR. E -1 3 8x8 10 1/2x10 1/2 - - X 100 X - - - X METAL AIRE CC -5 FURNISH W /SQ TO RND ADAPTER CEILING OPNG IS 8 1/2x8 1/2. NOTE: 1. DINING AREA HAS ONE CONCENTRIC DIFFUSER. FOR DETAILS - SEE SHEET M3. ro EXHAUST FAN SCHEDULE - - CFM SP RPM HP VOLT ACCESS MANUFACTURER AND MODEL N0. REMARKS u o o m° w w Or - (n t w m > o o -- MARK -J J m LL1 m i y O U Q EF -1 900 1 " 1445 113 120/1 PH X - - X - GREENHECK CUBE -120 -3 NOTE If 1 EF -2 400 5/8" 1550 1 /8 120/1 PH X X X X - GREENHECK G -95 -D NOTE #2 EF -3 220 3/8" 1300 1130 120/1 PH X X X - X GREENHECK G -85 -G NOTE �2 NOTES. 1. MEETS UL CODE 762 (GREASE). 2. SPEED CONTROLLER FURNISHED BY HVAC SUPPLIER. ELECTRICAL CONTRACTOR TO WIRE AT HIGH SPEED. CIS Ll__i L� Z U 0 u� L1J 0 Q z Q 0 Q W Z Z Q -- W 0 U Z Z Q HVAC UNIT SCHEDULE MANUFACTURER AND MODEL NO. CFM ESP RPM Q '`' :r z 0 m m TOTAL COOLING CAPACITY BTUH * HEATING CAPACITY BTUH BLOWER ELECTRICAL DATA m w _j n o REMARKS a` = E o > ``' = o_ w Q MARK INPUT OUTPUT RTU -1 L LENNOX OS 4000 .90" 866 11.0 120,000 235,000 188,000 3 208 3 51.2 54.0 1460 RTU -2 L GCS24 -953 3200 .70" 1010 10.1 88,000 200,000 160,000 2 208 3 39.4 43.0 1100 MANDATORY HVAC AND PLUMBING SYSTEM MEASURES ELECTRICAL NOTES U 1 u W [ (n m T- 1. ENERGY EFFICIENCY REQUIREMENTS IF ANY EQUIPMENT OF THE TYPES REQUIRING MINIMUM EFFICIENCY IS INSTALLED, IT SHALL MEET OR EXCEED THE MINIMUM EFFFICIENCY REQUIREMENTS OF THE STATE ENERGY AGENCY /COMMISSION. SUCH MINIMUM EFFICIENCY SHALL BE CERTIFIED BY THE MANUFACTURER OF THE EQUIPMENT AND SHALL HAVE BEEN DETERMINED BY TESTING USING THE PROCEDURE SPECIFIED BY THE STATE FOR THAT TYPE OF EQUIPMENT. 2. EACH HVAC SYSTEM SHALL BE EQUIPPED WITH AT LEAST ONE AUTOMATIC DEVICE TO SETBACK OR SHUT -OFF THE SYSTEM DURING PERIODS OF NON -USE OR ALTERNATE USE. 3. EACH UNIT SHALL BE PROVIDED WITH AT LEAST ONE AUTOMATIC TEMPERATURE CONTROL DEVICE FOR THE REGULATION OF SPACE TEMPERATURE. EACH UNIT SHALL: A. BE ABLE TO MAINTAIN SPACE TEMPERATURE SET POINTS FROM 55'F TO 857. TWO OR MORE REPLACEABLE FIXED SET POINT DEVICES, ONE FOR COOLING AND ONE FOR HEATING, MAY BE USED IN LIEU OF CONTINUOUSLY ADJUSTABLE SET POINT DEVICES. B. BE ABLE TO OPERATE HEATING AND COOLING IN SEQUENCE. C. PROVIDE A TEMPERATURE RANGE ADJUSTABLE UP TO 10'F BETWEEN FULL HEATING AND FULL COOLING CAPACITY. 4. THE BUILDER SHALL PROVIDE THE BUILDING OWNER, MANAGER, AND ORIGINAL OCCUPANTS A DESCRIPTION OF THE QUANTITIES OF OUTDOOR AND RECIRCULATED AIR THAT THE VENTILATION SYSTEMS ARE DESIGNED TO PROVIDE EACH AREA. 1. THE CONTRACTOR SHALL FURNISH AND INSTALL PIPE HOOD FOR POWER AND CONTROL WIRING AND SHALL MAINTAIN 12" MINIMUM CLEARANCE FROM BACK 'PANEL OF HVAC UNITS. 2. THE CONTRACTOR SHALL INSTALL ALL LOW VOLTAGE CONTROL WIRING FOR HVAC UNITS AND ALL FANS. COORDINATE HVAC AND ELECTRICAL PLANS. 3. THE CONTRACTOR SHALL FURNISH AND INSTALL DISCONNECTS FOR HVAC UNITS. 4. THE CONTRACTOR SHALL USE A MINIMUM OF 4' -6" SEALTITE FLEXIBLE CONDUIT WHEN WIRING KITCHEN HOOD EXHAUST FANS ON ROOF SO THAT FANS MAY BE REMOVED FROM CURBS AND PLACED ON ROOF FOR CLEANING 'EXHAUST DUCTWORK. * ARI STANDARD 210 /240 RATING. LEGEND REVISM SYMBOL & ABBREVIATION DESCRIPTION SYMBOL & ABBREVIATION DESCRIPTION SA /SUP SUPPLY AIR (RISE /DROP) A/C , AC AIR CONDITIONING RA /RET RETURN AIR DUCT (RISE /DROP) BDD BACK DRAFT DAMPER EA /EXH EXHAUST AIR DUCT (RISE /DROP) CB CIRCUIT BREAKER ` ®r CD /SR CEILING DIFFUSER /SUPPLY REGISTER (ARROWHEAD REPRESENTS NUMBER OF THROW) CLG. CEILING CONN. CONNECT /CONNECTION -+- RR /RG RETURN REGISTER /GRILLE CONT. CONTINUATION ®--+ -- ER /EG EXHAUST REGISTER /GRILLE CONT'R CONTRACTOR - - -' - _ RECTANGULAR DUCT ELBOW WITH TURNING VANES CFM CUBIC FEET PER MINUTE FC FLEXIBLE CONNECTION DET. DETAIL MVD MANUAL VOLUME DAMPER DISC. DISCONNECT FD FIRE DAMPER DTR DOWN THRU ROOF (L) DUCT LINING (1" THICK UNLESS OTHERWISE NOTED) EF EXHAUST FAN SINGLE LINE DUCT BRANCH TAKE -OFF (E) EXIST. EXISTING DUCT TRANSITION (RECTANGULAR TO ROUND) GA. GAGE /GAUGE APPROVED NATIONAL HVAC VENDORS PLUMBING NOTES FLEX FLEXIBLE DUCT (5' -0 MAXIMUM) GC GENERAL CONTRACTOR DPAW BY: rrP CHECKED BY- TH S SENSOR ROOM SENSOR HVAC HEATING, VENTILATING, AND AIR CONDITIONING FULL PACKAGE INCLUDING DUCTWORK: NATIONAL AIR SYSTEMS, INC. TROPIC -KOOL ENGINEERING CORP. 3380 SAN FERNANDO RD. SUITE 101 1232 DONEGAN ROAD LOS ANGELES, CA. 90065 LARGO FLORIDA 34641 CONTACT: STUART KAUFMAN CONTACT: CARLEEN LOWE 213� 344 -4388 FAX (813) 581 -2824 (813) 581 -7973 FAX THE NATIONAL HVAC VENDOR SHALL FURNISH A WRITTEN GUARANTEE COVERING A ONE YEAR PERIOD FOR ALL EQUIPMENT AND AN ADDITIONAL FOUR YEAR PERIOD FOR THE COMPRESSORS IN THE AIR CONDITIONING UNITS. 1. CONTRACTOR SHALL PROVIDE AND INSTALL FLUE GAS EXHAUST VENT FOR WATER HEATER. 2. CONTRACTOR TO PROVIDE AND INSTALL CONDENSATE DRAINS FOR ALL HVAC UNITS TO APPROVED DRAIN POINTS ACCORDING TO LOCAL CODE REQUIREMENTS. 3. CONTRACTOR TO COORDINATE PLUMBING VENT STACKS WITH OUTSIDE AIR INTAKES OF HVAC UNITS & SUPPLY FANS. MAINTAIN AT LEAST 10' -0" DISTANCE FROM ALL INTAKES. 4. CONTRACTOR SHALL PROVIDE & INSTALL GAS SHUT -OFF VALVES FOR ALL GAS EQUIPMENT. - D - D CONDENSATE DRAIN MFR. MANUFACTURER eun.aNC TYPE � _ C O J FRAME 0 DIA. DIAMETER MECH. MECHANICAL - DL- DL DOOR LOUVER (N) NEW -UC_ UC DOOR UNDERCUT (3/4" MINIMUM) OA /OSA OUTSIDE AIR O FURNISHED AND INSTALLED BY MECHANICAL CONTRACTOR. OBD OPPOSED BLADE DAMPER JOB NUMBER 97125 O FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. S/S STAINLESS STEEL TYP TYPICAL ME FURNISHED BY MECHANICAL CONTRACTOR AND INSTALLED BY ELECTRICAL CONTRACTOR. LION UNLESS OTHERWISE NOTED PROTOTYPE ISSUE DATE 2/11/97.1 S -1 100 AIR OUTLET /INLET DEVICE DESIGNATIONS- SUPPLY, R- RETURN, E- EXHAUST) AIR QUANTITY IN CFM UTR UP THRU ROOF SHEET NUMBER M 1 FN21596.d AC - 1 MECHANICAL EQUIPMENT DESIGNATION DESIGNATED NUMBER