Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0267.98.36
ca rn Lo N O ul Lo M CV N n Of co N O W 8 ul s N I a n EMS NOTES EMS PHONE LINE. MOUNT A STANDARD RJ -11 PHONE JACK ABOVE CEILING, ABOVE THE 24 "x 36 "x 6" EMS CPU. �2 FRAME OUT AN 8 "(H)x12 1/2 "(W) SECTION IN THE MANAGERS OFFICE FOR THE EMS TOUCH SCREEN PANEL (PROVIDED AND INSTALLED BY SCES). MAKE SURE THAT RIGHT SIDE OF FRAMED OUT SECTION IS AT LEAST 12" FROM SIDE WALL AND BOTTOM SIDE OF FRAMED OUT SECTION IS 54" A.F.F. AS SHOWN IN DETAIL 1, SHEET E7 & Al2 ELEV 109. �3 RUN A 1 1/2" CONDUIT STUB FROM ABOVE HEADER TO BOTTOM SIDE OF UPPER BLOCK. BOTTOM OF CONDUIT SHALL BE FLUSH WITH BOTTOM OF UPPER BLOCK. THERE MUST NOT BE ANY OBSTRUCTIONS WITHIN THE 8 "x12 1/2 "x4" FRAMED OUT SECTION. SEE DETAIL 1, SHEET E7. ® MOUNT A 4" SQUARE BOX WITH A TWO GANG MUD RING 6" BELOW THE TOUCH SCREEN CUTOUT IN THE MANAGERS OFFICE FOR THE EMS ALARM BUZZER. �5 CONTRACTOR TO PROVIDE AND INSTALL THE 12 "x12 "x6" PULLBOX IN THE ATTIC. COORDINATE PLACEMENT WITH HVAC SYSTEM LOCATION. MUST BE ACCESSIBLE FOR FUTURE MAINTENANCE. ® INSTALL SINGLE GANG J -BOX, FLUSH MOUNTED AT 7' -0" A.F.F. IN DINING ROOM AND 7' -0" A.F.F. IN KITCHEN. SCES SHALL PROVIDE AND INSTALL THE AIR TEMPERATURE SENSORS. MOUNT A SINGLE GANG J -BOX AT THE SUPPLY AIR DUCT OF THE KITCHEN AND DINING ROOM HVAC UNITS. THE BOX SHOULD BE MOUNTED JUST BELOW THE HVAC UNITS. ® MOUNT A TWO GANG WEATHERPROOF BOX FOR OSA TEMPERATURE SENSOR AND PHOTOCELL ON SOUTH SIDE PARAPET WALL FACING NORTH. KEEP BOX 1' -0" BELOW ROOF FLASHING AND 10' -0" AWAY FROM EXHAUST FANS. SCES SHALL PROVIDE AND INSTALL THE SENSORS. MOUNT SINGLE GANG WEATHERPROOF BOX WITH 1/2" KNOCKOUTS ON THE CEILING OF THE WIC AND WIF AS INDICATED ON DETAIL 1, SHEET E7. FOAM AND SEAL CONDUIT PENETRATIONS AS SHOWN ON DETAIL 7, SHEET E7. 10 MOUNT 24 "x 36 "x 6" FLUSH MOUNTED ENCLOSURE AT 68" A.F.F., PROVIDED BY SCES, FOR EMS CPU. ROUTE TWO 1 1/4- CONDUITS TO THE PULLBOX FOR CONTROL CABLE. 11 NOTE 11 12 PROVIDE A ROOF PENETRATION AND 1/2" CONDUIT FOR CONTROL CABLE INTO LOW VOLTAGE COMPARTMENT OF THE KITCHEN AND DINING ROOM HVAC UNITS. 13 NOTE 13 14 RUN 1/2" CONDUIT FROM PULL BOX INTO THE MINILINE TERMINATION PANEL (TP). 15 NOTE 15 16 NOTE 16 17 NOTE 17 18 RUN 1/2" CONDUIT FROM PULL BOX INTO THE MINILINE TERMINATION PANEL (TP). 19 NOTE 19 20 RUN A DEDICATED CIRCUIT B -24 WITH AN ISOLATED GROUND TO THE EMS CPU. 21 CONTRACTOR SHALL PROVIDE AND INSTALL THE EMS CONDUIT AND ELECTRICAL BOXES, FITTINGS AND CONNECTORS. 22 NOTE 22 23 INSTALL A TWO GANG WEATHERPROOF EXTENSION RING WITH 1/2" KNOCKOUTS ONTO THE J -BOX IN THE WALL AT 18" A.F.F. UNDER THE EXHAUST HOOD, NEXT TO THE WATER AND GAS LINES FOR THE RETHERMALIZER. CONNECT TO THE REAR OF THE RETHERMALIZER WITH A 3/4" FLEXIBLE CONDUIT. 24 NOTE 24 25 NOTE 25 26 CONTRACTOR RUNS AND TERMINATES ALL EXTERIOR LIGHTING CIRCUITS THROUGH CONTACTORS PROVIDED WITH PANEL B. CIRCUITS SHOULD BE SEPARATED AS SIGNS AND BUILDING LIGHTS, SITE LIGHTS, AND SECURITY LIGHTS. RUN SIGNS AND BUILDING LIGHTS THROUGH THE 12 POLE CONTACTOR. RUN SITE LIGHTS THROUGH THE 10 POLE CONTACTOR. RUN SECURITY LIGHTS (ONE CIRCUIT) THROUGH THE SECURITY RELAY PROVIDED. CAUTION: THIS BUILDING IS ON AN ENERGY MANAGEMENT SYSTEM. BEFORE DOING ANY ELECTRICAL WORK CONTACT: SOUTHERN CALIFORNIA ENERGY SYSTEMS (818) 338 -6963 024 0 Coo U W RISER DIAGRAM CABLE NUMBERING CABLE NO.1 TYPE CABLE ROUTING 21 PARAPET WALL -1 /2 "C CEILING O = CABLE NUMBER O = NOTES FLOOR U 22/3 SHD FROM EMS CPU TO OUTSIDE AIR TEMP SENSOR O2 22/3 SHD FROM EMS CPU TO PHOTOCELL O3 22/3 SHD FROM EMS CPU TO WALK -IN COOLER 4 22/3 SHD FROM EMS CPU TO WALK -IN FREEZER Q5 22/3 SHD FROM EMS CPU TO KITCHEN ZONE © 22/3 SHD FROM EMS CPU TO KITCHEN SUPPLY O7 22/3 SHD FROM EMS CPU TO DINING ROOM ZONE ® 22/3 SHD FROM EMS CPU TO DINING ROOM SUPPLY 90 22/3 SHD FROM EMS CPU TO RIGHT RETHERMALIZER 10 22/3 SHD FROM EMS CPU TO LEFT RETHERMALIZER 11 22/3 SHD FROM EMS CPU TO STEAM TABLE 1© 22/3 SHD FROM EMS CPU TO MINI LINE ® 22/3 SHD FROM EMS CPU TO TOUCH SCREEN POWER ® 22/3 SHD FROM EMS CPU TO ALARM BUZZER ® 20/8 FROM EMS CPU TO KITCHEN A/C UNIT ® 20/8 FROM EMS CPU TO DINING ROOM A/C UNIT 3Q 22/3 SHD FROM EMS CPU TO STEAM TABLE POWER INPUT ® 22/3 SHD FROM EMS CPU TO MINI LINE POWER INPUT ® 22/3 SHD FROM EMS CPU TO RIGHT RETHERMALIZER POWER INPUT ® 22/3 SHD FROM EMS CPU TO LEFT RETHERMALIZER POWER INPUT ® 18/4 FROM EMS CPU TO LIGHTING CONTROL RELAYS ® DATA FROM EMS CPU TO TOUCH SCREEN PANEL CABLE TYPES 22/3 BELDEN 8771 OR EQUIVALENT 20/8 CAROL 05488 OR EQUIVALENT 18/4 EMS FLOOR PLAN VESTIBULE OPTION TO BE INSTALLED ON THIS PROJECT SEE DRAWINGS 01A AND 01B FOR LAYOUT AND DETAILS. �" 11 M P W U z� W U Z o a rcr,.� �1 nqn V J � � LLJ >rs m s o Q ��g DAM BY: TrP CHECKED BY: ni BUIDW TYPE K -50 FRAME JOB MAR 97125 PROTOTYPE ISSUE DATE 2/l/97.1 E6 n �-- Q Q Z � 0 WW Cr Q 7; Q uJ z LLJ z Q J Q Qz0z W zQ z Q rr J L1J n rr L1J L1J (� (y) z� W (n DAM BY: TrP CHECKED BY: ni BUIDW TYPE K -50 FRAME JOB MAR 97125 PROTOTYPE ISSUE DATE 2/l/97.1 E6