Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0267.98.39
a: c L; i a i3 t N Y Y v 0 0 N O m 0 LO F01 TIL NOTE: 1. ALL FLOOR SINKS MUST BE 1/2" ABOVE TILE FLOOR AS SHOWN ABOVE 2. FLOOR SINK BODY TO BE PVC EXCEPT AT RETHERMALIZER AND PREP LINES. FLOOR SINK N.T.S. PLUMBING LEGEND SYMBOLS Q S TO - - -- PEN. - - - - -- SD CD SLOPE (1/8" / FT.) 1/2" SPACE FOR QUARRY TILE NOTE: SLOPE TO START AT 2' -0" DIA. FROM CENTER OF DRAIN. FLOOR DRAIN FULL SIZE PIPE VENT TO ATM"`'n' irnr COf cot D R� N.T.S I L-1 \Tnn IrnI L_ r%i wivr JII IrN TYP. CONDENSATE DRAIN N.T.S 2 3 PLUMBING © SHEARWALL FTG. 1 "= 1' -o "I 4 u S OR W G CW HW H.W.R. V. S.D. C.D. FCO /COTG WCO FW TW H.B. S.O.V. S.O.C. C.V. P.T.R.V. Y. B. R.D. A.P. V.T.R. V.B.F. U.T.R. V.C.P. C. 1. A.C.P. (N) (E) H. D. OFD F.S. G.L. A.F.F. KEY NOTES DESCRIPTION SOIL OR WASTE GAS COLD WATER HOT WATER HOT WATER RETURN SANITARY VENT STORM DRAIN CONDENSATE DRAIN FLOOR CLEANOUT OR CLEANOUT TO GRADE WALL CLEANOUT FILTERED WATER PREMIXED TEMPERATURE WATER BUNDLED SYRUP LINES ABOVE CEILING HOSE BIBB SHUT -OFF GATE VALVE SHUT -OFF GAS COCK CHECK VALVE PRESS - TEMPERATURE RELIEF VALVE YARD BOX ROOF DRAIN ACCESS PANEL VENT THRU ROOF VENT BELOW FLOOR UP THRU ROOF VITRIFIED CLAY PIPE CAST IRON ASBESTOS CEMENT PIPE NEW EXISTING FLOOR DRAIN HUB DRAIN OVERFLOW DRAIN FLOOR SINK GAS LINE ABOVE FINISHED FLOOR CAST IRON OR TYPE K COPPER FIRE PROTECTION PIPING. O 1-1/2" C.W. WITH WATER METER PER LOCAL UTILITY. PROVIDE SHUTOFF VALVES ON BOTH SIDES OF WATER METER VERIFY LOCATION WITH CIVIL DRAWINGS. �2 3/4" F.W. STUBOUT FOR ICE MACHINE WITH 3/4" VALVE ABOVE CEILING AND CODE APPROVED BACKFLOW PREVENTER AT CONNECTION TO UNIT. O3 WATER METER PIT & SHUT -OFF VALVE, SEE SITE PLAN FOR LOCATION. (ADJUST PER LOCAL REQ'S) ® 1/2" C.W. & H.W. FOR POT SINK 0 12" A.F.F. O5 1/2" C.W. & H.W. FOR PREP SINK ® 12" A.F.F. © 1/2" C.W. & H.W. FOR MOP SINK 0 36" A.F.F. O 1/2" C.W. & 3/4" H.W. DOWN FROM ABOVE CEILING TO PREP LINES THRU S/S MECHANICAL CHASE. ® 1/2" H.W. STUBOUT FOR RETHERMALIZER AT 12" A.F.F. 0 1/2* H.W. STUBOUT FOR HOT WATER SYSTEM AT 52" A.F.F. 10 6" PVC CHASE FROM ABOVE CEILING TO 60" A.F.F., SEE DETAIL 6/P3. 11 6" PVC CHASE FROM ABOVE CEILING TO 44" A.F.F., SEE DETAIL 6/P3. 12 6" PVC CHASE FROM ABOVE CEILING TO 44" A.F.F., SEE DETAIL 6/P3. 13 6" PVC CHASE FROM ABOVE CEILING TO 24" A.F.F., SEE DETAIL 6/P3. 14 3/4" FW TO ICE MACHINE TO DROP DOWN FROM CEILING TO ICE MACHINE IN A STAINLESS STEEL CHASE. 1/2- REDUCER AT ICE MACHINE. QD GAS METER LOCATION. (aD MOUNT RPZ 3' -0" A.F.F. NOTE: DOUBLE DRIVE T14I TO BE INSTALLED ON THIS PROJECT DRAWINGS 03 AND LAYOUT AND DETAI PROVIDE BF LINE SERVI� PLUMBING PLAN - WATER 1 PRESSURE PRINCIPLE W PREVENTER (PIPE ISCHARGE TO NEAREST INK) CD Di L - - -J T -OFF VALVE ARD BOX C MIXING VALVE HBL01 )883 1/4n= l'-O* r� 1 W U W V a � nqn Lv b m is lwl 0�� DRAWN BY: TTP CHECKED W. TM K -50 FRAME " MAIM 97125 PROTOTYPE ISSUE DATE 2/11/97.1 SHEET MAW P2 0 Q 0 z cc Q � wz n u z Q 0 — Q w Z Z m W Q -__J Q CC w o Q n- U T DRAWN BY: TTP CHECKED W. TM K -50 FRAME " MAIM 97125 PROTOTYPE ISSUE DATE 2/11/97.1 SHEET MAW P2