Loading...
HomeMy WebLinkAbout0267.98.52penetrations, curbs, and similar items, in accordance with FM and /or manufacturer's requirements. 07600.31 INSTALLATION REQUIREMENTS: A. Comply with manufacturers installation instruction and a base for specified finish points. doors and notify architect of conditions detrimental to proper and timely installation of wood doors. C. At curbs and walls, install flashing sheet extending from at least six inches out over the field membrane, up to the top of the curb or wall and, where possible, extend over the top of curbs or walls and " down over the opposite face. Install reinforcing boots at inside and outside corners as required. D. Whenever possible, flash pipe penetrations with manufacturer approved "boot" flashing terminated at the top with stainless steel clamp, E. Provide a continuous weld where the flashing membrane overlaps the field membrane. Where clad metal is used for scuppers, weld membrane directly to coating on clod metal. F. Bond the flashing membrane to vertical surfaces, metal (except clad metal) or any other non - membrane surfaces using the appropriate contact adhesive. Apply adhesive and bond membrane according to 07600.32 recommendations, and with Sheet Metal and Air Condition Contractors National Association "Architectural Sheet Metal Manual ". Anchor units of work securely in place, providing for thermal expansion of metal units; conceal fasteners where possible, and set units true to line and level. Install work with laps, joints and seams which will be permanently watertight and weatherproof. B. Set cap floshings in a thick bead of mastic sealant at all splice plates. C. Install roof hatch in accordance with manufacturers instructions. CLEANING AND PROTECTION: A. Clean exposed metal surfaces, removing substances which might cause corrosion of metal or deterioration of finishes. 08100.22 FABRICATION: A. GENERAL 1.Fabricate steel door and frame units rigid, neat in appearance and free from defects, warp or buckle. 2.Fabricate exposed faces of doors and panels from only cold - rolled steel. 3.Fabricate frames, concealed stiffeners, reinforcement, and edge channels, from either cold - rolled or hot - rolled steel (at fabricator's option). 4.Fabricate exterior doors, panels, and frames from galvanized sheet steel. Close top and bottom edges of doors with flush channel as integral part of door construction. 5.Fabricote all doors, panels, frames, components, fasteners, and related items from hot -dip galvanized steel in high humidity areas 08210.32 INSTALLATION: A. Condition doors to average prevailing humidity in installation area prior to hanging, by delivery to site four (4) days prior to installation. B. Install wood doors in accordance with manufacturer's instructions and as indicated. C. Align doors to frames for proper fit and uniform clearance at each edge and machine for hardware. Seal cut surfaces after fitting and machining. 1. Bevel doors 1/8" in 2" at lock and hinged edges. D. Provide clearances of 1/16" at jambs and heads; and 1/4" from bottom of door to top of decorative floor finish or covering. Undercut by 1" for HVAC where indicated. w W Z W F U F L x r ` v z V Q t� manufacturer's instructions. Completely bond all fleshings to the underlying surface without any looseness, bubbles, or voids. G. Fasten the top edge of the curb and wall flashings approximately every 12 inches on center with appropriate fasteners through one inch diameter metal discs. Clamp the top edge of pipe flashing sleeves over an additional cushion strip and apply appropriate sealant along the top edge. END DIVISION 7 - THERMAL AND MOISTURE PROTECTION SECTION 07900 JOINT SEALERS 07900.1 GENERAL similar to Florida and Hawaii. 6.Unless otherwise indicated, provide countersunk flat Phillips heads for exposed screws and bolts. B. Finish Hardware Preparation: 1.Prepare doors and frames to receive mortised and concealed finish hardware in accordance with finish hardware manufacturer's recommendations. 08210.33 ADJUST AND CLEAN: A. Rehang or replace doors which do not swing or operate freely, as directed by Owner's Representative. END DIVISION 8 - DOORS AND WINDOWS ['1 ^^ i w H. At roof drains, apply appropriate sealant between the drain rim and the field membrane and between the flashing membrane and clamping 07900.11 RELATED DOCUMENTS: A. Drawings, Specifications, Division 1, and Contract. 2.Reinforce doors and frames to receive surface - applied hardware. Drilling and tapping for surface- applied finish hardware may be SECTION 08410 ALUMINUM ENTRANCES AND WINDOWS 07530.36 ring. Secure clamping ring tightly over both membranes and re- install strainer dome. I. After complete installation of the roofing system, inspect all roof drains and test to assure that no clogging of the drainage system is present. Provide roof drain leader in such condition that the full diameter of the drain leader is clear. J. Provide all other flashing in accordance with Roof Details and /or manufacturers instructions. Where flashing requirements vary from those described herein or on details, submit shop drawings to describe proposed detail modifications prior to job start. K. Install metal coping over top of walls to overlap and seal the top of the wall covering. ROOF PROTECTION MATERIAL: 07900.12 07900.13 07900.2 07900.21 DESCRIPTION OF WORK: A. The applications for joint sealers includes the following: 1. Expansion joints. 2. Caulking compounds. JOB CONDITIONS: A. Do not proceed with installation of liquid sealants under unfavorable weather conditions, as recommended by manufacturer for installation. PRODUCTS MATERIALS: 08100.24 performed at project site. 31ocate finish hardware in accordance with "Recommended Locations for Builder's Hardware ", published by Door and Hardware Institute and local codes. C. Shop Painting: 1.Clean, treat and paint exposed surfaces of steel door and frame units, including galvanized surfaces. STANDARD STEEL FRAMES: A. Provide 16 gauge metal frames for doors and other openings, of sizes shown on drawings with concealed fastenings, unless otherwise indicated. 1.Fabricate frames with mitered corners, welded . construction for exterior applications and knocked -down for field assembly at 08410.1 08410.11 GENERAL Vista Wall National Accounts: Scope: GC will provide glass and installation Taco Bell will provide storefront material including doors /panic hardware /closers PROCEDURES: 1. Glazier calls Vista Wall at 1 (800) 869 -4567 and confirms package and options. 2. Vista Wall confirms delivery date. 3. Vista Wall ships and glazier confirms receipt of materials. RELATED DOCUMENTS: A.+ Drawings, Specifications Division 1, and Contract. 07530.38 A. Install new walkway protection pads around and between all air conditioning units and in front of all roof access points. Space protection pods approximately one to two inches apart to allow for water flow. Adhere walk pad to membrane in accordance with manufacturer's instructions. B. Support all pipelines running along the roof surface, as well as any non - penetrating supports, using redwood sleepers set loosely over a spot- adhered section of protection material. Extend the protection material at least 4" beyond the sleeper on all sides. Secure pipes to sleepers using galvanized metal clips secured on both sides of pipe. If required, stack sleepers and secure together to accommodate elevated pipes. Space sleeper supports no more than 8 feet apart and installed so as not to impede water flow. CLEAN UP: 07900.3 07900.31 A. Provide colors indicated or, if not otherwise indicated, as selected by Owner's Representative from manufacturer's standard colors. Select materials for compatibility with joint surfaces as I recommended by manufacturer for each application indicated. B. Silicone Rubber Sealant: Silicone rubber- based, one -part elastomeric sealant, recommended by manufacturer for exterior joints. C. Expansion Joints: Provide one of the following: 1. Resilient and non - extruding type premolded cork units. 2. Resilient and non - extruding type premolded bituminous impregnated fiber board units. D. Sealant Backer Rods: Compressible rod stock of flexible, permanent, durable non abssorptive material as recommended by sealant manufacturer for compatibility with sealant. EXECUTION MANUFACTURER'S INSTRUCTION: A. Comply with manufacturers printed instructions except where more I 08100.3 08100.31 08100.32 interior applications. Ship welded frames to site with removable steel spreader at bottom. Do not remove spreader until completion of wall construction. B. Provide two (2) silencers on strike jambs of single -swing frames. EXECUTION INSPECTION: A. Examine substrate and conditions where steel doors and frames are installed and notify architect of any conditions detrimental to proper and timely completion of work. INSTALLATION: A. Install standard steel doors, frames, and accessories in accordance with manufacturer's data, and as herein specified. B. Placing Frames: 1.Comply with provision of "Recommended Erection instructions for Steel Frames", unless otherwise indicated. 08410.12 08410.13 DESCRIPTION OF WORK: A. Extent of aluminum entrances and windows is shown on drawings and schedules and includes the following: 1. Exterior entrance doors and frames. 2. Brake metal for exterior entrance, storefront framing, and aluminum windows. 3. Fixed aluminum windows. 4. Storefront type framing system. 5. Drive -up window QUALITY ASSURANCE: A Comply with applicable provision of "Metal Curtain Wall, Window, Storefront, and Entrance Guide specifications Manual ", by Architectural Aluminum Manufacturers Association. B. Provide aluminum entrances and window framing system produced by the following manufacturers through National Accounts Departments: Primary vendor: Vista Wall Corp. (214) 563 -2624 r J LLJ m O U Q 1- _ r _ A. DIVISION 7 SECTION 07600 07600.1 07600.11 07600.12 Remove bituminous or other markings from finished surfaces. Keep the roof and premises clean and free from accumulations of waste materials and rubbish at all times. Remove all debris, scrap, and rubbish from the work area daily. Promptly remove surplus materials and all equipment from the site upon completion of the work. Prior to final acceptance, restore all areas affected by this work to their original state of cleanliness and repair all damage done to the premises, by workmen and equipment. END - THERMAL AND MOISTURE PROTECTION SHEET METAL AND ROOF ACCESSORIES GENERAL RELATED DOCUMENTS: A. Drawings, Specifications Division 1 and Contract. B. See Section 06100 for termite shield. DESCRIPTION OF WORK: A. The extent of roof accessories and sheet metal work is indicated on the drawings and by provisions of this section with the following work specified herein: 1. Flashing and counter flashing. 2. Wall cap. 3. Hood 4. Fascia cap. 5. Scupper. 6. Roof hatch. 07900.32 07900.33 07900.34 stringent requirements are shown or specified. JOINT PREPARATION: A. Clean joint surfaces immediately before installation of sealant or caulking compound. Where required on masonry construction, etch concrete and masonry joint surfaces as recommended by sealant manufacturer. B. Prime or seal joint surfaces where indicated, and where recommended by sealant manufacturer. INSTALLATION: A. Set joint filler units at proper depth or position in joint to coordinate with other work, including installation of backer rods and sealants. B. Install sealant backer road for liquid elastomeric sealants as recommended by sealant manufacturer for application indicated. C. Employ only proven installation techniques which will ensure that sealants are deposited without gaps or air pockets, with complete "wetting" of joint fill sealant rabbet to a slightly concave surface. Where horizontal joints ore between a horizontal surface and vertical surface, fill joint to form a slight cove to eliminate trapped moisture. D. Install sealant to depths recommended by sealant manufacturer. E. Do not allow sealant or compounds to overflow or spill onto adjoining surfaces. Clean adjoining surfaces by whatever means may be necessary to eliminate evidence of spillage. CURE AND PROTECTION: A. Cure sealants and caulking compounds in compliance with manufacturer's instructions and recommendations. 08100.23 DIVISION 8 SECTION 08210.1 2.Place frames prior to construction of enclosing walls and ceilings. Set frames accurately in position, plumbed, aligned, and braced securely until permanent anchors are set. a. Locate three (3) concealed wall anchors of proper design for wall condition per jamb, one each at hinge and strike levels. Provide angle floor clip for each jamb with floor fastener to suit floor construction. C. Door Installation: 1.Fit hollow metal doors accurately in frames, within clearances specified in "Recommended Specifications Standard Steel Doors and Frames ". D. Adjust and Clean: 1.After erection, sand smooth all rusted or damaged areas of prime coat and apply touch -up of compatible air -drying primer. 2.Check and readjust operating finish hardware items, leaving steel doors and frames in proper operating condition. STANDARD STEEL DOORS: A. Provide metal doors equal to Ceco Regent for full flush type design with 16 gauge skins and stiffened with one -piece resin impregnated full honeycomb core. Provide flush top and bottom channels. In snow locations, fill door with thermal insulation equivalent to R19. END - DOORS AND WINDOWS 08210 WOOD DOORS GENERAL 08410.2 08410.21 Drive -up Window: Quikserve 209) 651 -4000 C. Performance and Testing: 1.Fabricate exterior components from stock systems which have been designed to provide for expansion and contraction resulting from ambient temperature range of 120 degrees F (49 degrees C). 2.Fobricate exterior components from stock systems which have been tested to withstand uniform pressure of 20 psf inward and 20 psf outward. 3.Fabricate exterior storefront components from stock systems which have been tested to demonstrate permanent resistance to leakage's as follows: a. Air Infiltration: Not more than 0.06 cfm per square foot. b. Water Infiltration: No uncontrolled water penetration. D. Wherever possible, take field measurements to insure proper fitting of work. However, proceed with fabrication and coordinate installation tolerances as necessary when field measurements might delay work. E. Provide shop drawings for standard units from the manufacturer upon request. PRODUCTS MATERIALS AND ACCESSORIES: A. Aluminum Members: Alloy and temper recommended by manufacturer for strength, corrosion resistance, and application of required finish. Main extrusion; 6063 -T5 extruded aluminum alloy of 0.125" minimum wall thickness. B. Fasteners: Aluminum, non - magnetic stainless steel, or other material warranted by manufacturer to be non - contusive and compatible with aluminum components. z 0 Q U U W Q Q O Q Lli z z Q J 0 W Z z Q W W Q U Co T 07600.13 JOB CONDITIONS: A. Coordinate work with interfacing and adjoining work for proper sequencing of each installation. END DIVISION 8 - DOORS AND WINDOWS SECTION 08100 STEEL DOORS AND FRAMES 08210.11 08210.12 RELATED DOCUMENTS: A. Drawings, Specifications Division 1, and contract. DESCRIPTION OF WORK: 1.Do not use exposed fasteners except where unavoidable for application of hardware. Match finish of adjoining metal and use Phillips flat -head machine screws. 2.Reinforce aluminum less than 0.125" thick with aluminum or non- RivrM 07600.2 07600.21 PRODUCTS SHEET METAL MATERIALS: A. Zinc - Coated Steel: Commercial quality with 0.20% copper, hot -dip galvanized; 0.0359" thick (20 gauge) except as otherwise indicated. Provide equivalent gauge copper or stainless steel 304 Grade or higher in high humidity areas similar to Florida and Hawaii. B. Mastic Sealant: Polyisobutylene; Non hardening, nonskinning, nondrying, non migrating sealant. C. Roof Hatch: Bilco Type S " ; size as indicated on drawings. D. Provide sheet metal clips, straps, anchoring devices and similar accessory units as required for installation of work, matching or compatible with material being installed. 08100.1 08100.11 08100.12 08100.13 GENERAL RELATED DOCUMENTS: A. Drawings, Specifications Division 1 and Contract. B. See drawings for extent of doors and frames furnished by owner and installed by contractor DESCRIPTION OF WORK: A. Extent of standard steel doors and frames is shown and scheduled on drawings. QUALITY ASSURANCE: A. Provide doors and frames complying with Steel Door Institute 08210.13 08210.14 A. Extent and location of each type of wood door is shown on drawings and in schedules. Provide following: 1. Solid core flush wood doors with medium density overlay faces. QUALITY ASSURANCE: A. Submit written agreement on door manufacturer's standard form signed by Manufacturer, Installer, and Contractor agreeing to repair or replace defective doors which have warped (bow, cup or twist) or which show photographing of construction below in face veneers. 1.Provide warranty in effect for a five (5) year period following date of substantial completion. PRODUCT DELIVERY, STORAGE, AND HANDLING: A. Protect wood doors during transit, storage and handling to magnetic stainless steel at screw anchors. C. Concealed Flashing: Dead -soft stainless steel, 26 gouge minimum, type selected by manufacturer for compatibility. D. Brackets and Reinforcements: Manufacturer's high- strength aluminum units where feasible; otherwise, non - magnetic stainless steel or hot -dip galvanized steel. E. Masonry Inserts Where Required: Cast iron, malleable iron, or 12 gauge steel hot -dip galvanized. F. Bituminois Coatings: Cold - applied asphalt mastic for 30 -mil thickness per coat. G. Clear Protective Coatings: Apply for protection of aluminum finish during construction. H. Compression Weatherstrippng: Manufacturer's standard replaceable stripping of either molded neoprene gaskets, molded PVC gaskets, or 07600.22 FABRICATED UNITS: A. Shop- fabricate work to greatest extent possible. Comply with "Recommended Specifications: Standard Steel Doors and Frames ". prevent damage, soiling and deterioration. molded expanded neoprene gaskets. J. Systems: 4 1/2" x 1 3/4" for 1/4" glazing and 1" glazing. 07600.3 details shown, and with applicable requirements of Sheet Metal and Air Conditioning Contractors National Association "Architectural Sheet Metal Manual ". Fabricate for waterproof and weather - resistant performance; with expansion provisions for running work. Form work to fit substrates. Form exposed sheet metal work without excessive oil- canning, buckling and tool marks, true to line and levels as indicated, with exposed edges folded back to form hems. B. Fabricate non - moving seams in sheet metal with flat -lock seams. Tin edges to be seamed, form seams and solder. C. Non - Expansion Type Joints: Provide for proper installation of elastomeric sealant. D. Provide for separation of metal from non compatible metal or corrosive substrates by coating concealed surfaces to location of contact, with bituminous coating or other permanent separation. E. Wall Cap: Snap in place system with concealed clips at a maximum of 24" o.c. 1. Provide a minimum 12" long joint plate at all splices. 2. Corners and Ends: Shop fabricated having a minimum leg. F. Back paint concealed metal surfaces with protective backing point to a minimum dry film thickness of 15 mils. EXECUTION 08100.14 08100.2 08100.21 DELIVERY, STORAGE, AND HANDLING: A. Deliver hollow metal work cortoned or crated to provide protection during transit and job storage. B. Store doors and frames at building site under cover in vertical position. Place units on wood sills and provide spaces between each unit. PRODUCT MATERIALS: A. Provide standard steel doors and frames by one of the following: 1. Amweld Building Products Division 2. Ceco Corporation 3. SteelCroft Manufacturing Company B. Hot - Rolled Steel Sheets and Strip: Commercial quality carbon steel, pickled and oiled. C. Cold - Rolled Steel Sheets: Commerical quality carbon steel. D. Galvanized Steel Sheets: Zinc - coated carbon steel sheets of commercial quality. E. Fabricate supports and anchors of not less than 18 gauge galvanized sheet steel. F. Inserts, Bob, and Fasteners: Manufacturer's standard units except hot -dip galvanize items built into exterior walls. Provide hot- dip galvanized units at all conditions in high humidity areas similar to Florida and Hawaii. G. Shop Applied Primer. Rust inhibitive enamel or paint suitable as 08210.2 08210.21 08210.22 08210.23 08210.3 08210.31 PRODUCTS MATERIALS AND COMPONENTS: A. Face Panels: Manufacturer's standard 2 -ply face panels, unless otherwise indicated. B. Exposed Surfaces: As specified with some exposed surface material on both faces. SOLID CORE WOOD DOORS: A. Provide solid core wood doors by one of the following: 1. Cal -Wood 2. Eggers B. Core Construction: Mat formed particle board. C Face Panels: Manufacturer's standard 2 -ply face panels of medium density over -lay applied over manufacturer's standard thickness hardwood face veneer. Provide any close grain hardwood for exposed edges and other exposed solid wood components. SHOP- PRIMING: A. Before delivery of door to project site, shop -prime exposed portion of wood doors. EXECUTION INSPECTION: A. Examine door frames and verify that frames ore correct type and have been installed as required for proper hanging of corresponding 08410.22 08410.23 HARDWARE: A. Provide door manufacturer's standard heavy -duty hardware units as shown, scheduled, or required for operation of each door 1.Offset Pivots: Cast aluminum alloy with steel pins and otute bearings (ball bearings bottom pivots). 2.Overhead Exposed Closers: Norton #1605 surface closer with delayed action for handicapped use. 3.Deadlocks: Dor- O -Matic 990 with concealed rod panic bar. 4.Construction Cylinders: Supply in deadlocks and replace with Falcon cylinders supplied per hardware section of specifications. 5.Push Pull Set: Style F -2. 6.Thresholds: Extruded aluminum in mill finish, complete with anchors and clips coordinated with pivots. FABRICATION: A. GENERAL: 1.Required sizes for door and window units are shown on drawings. a. Details shown are based on standard details by manufacturer indicated. 2.To greatest extent possible, complete fabrication, assembly, finishing, hardware application, and other work before shipment to project site. a. Preglaze door and window units to greatest extent possible. b. Do not drill and tap for surface - mounted hardware items until time of installation at project site. 3.Complete cutting, fitting, forming, drilfing, and grinding of metal DRAW BY: M cW= BY: TM T K-50 FRAME ,im NuMM 97125 PRMtYE ISSUE oKE 2/1/97.1 sHM Nut S P 8