Loading...
HomeMy WebLinkAbout0267.98.55DIVISION 10 - SPECIALTIES d. Install pizza minters on shelf and connect water lines (quick 15100.7 RECORD DRAWINGS: 15400.11 RELATED DOCUMENTS: disconnect), plug in electrical and install flexible drain lines A. Provide to the Area Construction Manager a complete record set of A. Drawings, Specifications Division 1, General Mechanical SECTION 10155 TOILET COMPARTMENTS from minter to inside unit. blue line prints which show every change from the original contract Requirements this Division, and Contract. e. Final leveling and connection of unit will be by unit drawings per the contract. 15400.12 SCOPE OF WORK: 0155.1 GENERAL manufacturer. 15100.8 WORKMANSHIP: A. Furnishing of all labor, materials tools transportation, 9 A. Perform labor in conformance with standards of the trade by services, and related items necessary to complete the inst000tion of 10115.11 RELATED DOCUMENTS: 2.lnstall Ice Machine per instructions found in p packing list. Set mechanics skilled in their particular trade. Install pipe and the plumbing system as illustrated on the drowings and as follows: A. Drawings, Specifications, Division 1 and Contract. unit in place, level and make final connections. Insulate waste equipment square and plumb and accessible for proper operation and Hot and cold water system with compete connections from the water 1.meter ��^^ lines from exit location to drain. Set remote condensing unit on service_ to all plumbing fixtures and equipment requiring water 10115.12 DESCRIPTION OF WORK: roof, if applicable, providing necessary support rails and connections. A. The extent of work is indicated on the drawings and refrigerant line pitch pan. Install refrigerant lines and provide 15100.9 VIBRATION AND NOISE: 2. Soil, waste, vent systems and condensate lines outside and inside includes the following: 1. Laminated plastic edge toilet compartments necessary insulation. Provide copper waste lines as shown . on the drawin drawings. A. Install each of the various pieces of equipment to operate the buildin g' 3.Plumbing fixtures, including all the required trim and supports. W Z Q H a B. Consult drawings to verify items provided by owner and 9 s. Drink Dis ensing System: without objectionable vibration or noise. 4.Trenching and backfilling. x W Z installed b contractor. Y a. Set one 1 dis ensin unit with ice bins at indicated location �) P 9 15100.10 ADJUSTING AND BALANCING: 5.Rough -in and final connection to equipment in the kitchen and Z W U Z 0 10155.13 COORDINATION: and position tight against wall. P 9 9 b. Set remote condensing unit, if applicable, on roof A. Clean out all lines, adjust all valves, and clean all plumbing fixtures service area. 6.Finat plumbing connections to heating and air conditioning a A. Coordinate the placement of inserts and anchorages with providing necessary support rails. and equipment. equipment. "1 other work. c. Install PVC chase in wall as shown on drawings 15100.11 CUTTING AND PATCHING: 7.Meters and utility connections. 8.Met to heating, d. Install beverage lines from syrup /CO2 location to master unit A. Cutting or patching necessary to permit the installation of any ventilating piping ventilating and air conditioning units, 10155.2 PRODUCTS and from master unit to slave unit. work under this Contract is the responsibility of this trade. water heaters, ranges, r, and fryers. %Shh, e. Install refrigerant lines from master unit to roof mounted 9.Emter PVC piping in ceiling space for beverage lines. 10155.21 TOILET COMPARTMENTS: condenser, if applicable. Provide required insulation. 15100.12 EXCAVATION AND BACKFILLING: 15400.2 PRODUCTS A. Provide overhead braced, laminated plastic edge toilet f. Provide copper waste lines as indicated on the drawings. A. Provide necessary excavating and backfilling for the installation compartments with 3 -ply 451b. density, resin impregnated, impact 4.Exhaust Hood Installations: of work specified in this Di Division. After the pipe has been and warp resistant particleboard core. Stiles, doors, and panels " a. Roll exhaust hood on casters and hydraulically jack in place installed, tested and approved, backfill the trenches to grade with . 1540021 DESCRIPTION: to be 1 thick. Compartments to have 11 gunge (3mm) steel level with ceiling and on imaginary line on support wall where hood approved material, well tamped or puddled compactly in place. Install A. Soil, Waste and Vent Piping Below Floor to 5' -0" Outside core reinforcing plate welded to a 3/8" (10mm) thick steel leveling is attached. Remove filters and reach in and up high enough as to all piping outside the building below the frost line. Building: Standard weight coated cast iron soil pipe and cast bar to form single structural units. Pilaster shoe to be stainless be out of sight and install 5" lag screws 16" o.c. at each stud iron /neoprene gasket fittings. Yard piping, extra strength vitrified steel with satin finish. Color: white. location across the back of hood. 15100.13 FLASHING: clay pipe and fittings. A B.S. or P.V.C. Schedule 40 pipe and B. For locations that require a High Abuse Alternate: b. Drill 3/8' holes from the top of hood and provide "all- thread" A. Flash around all pipes passing through the roof in connection fittings may be installed, as approved by local authority in concealed Provide overhead braced, fiberglass reinforced plastic toilet compartments rod from this area up into truss space and bolt to top of hood with this contract, with sheet lead built a minimum of 10" into the locations only. with 3 -ply 451b. density, resin impregnated, impact and warp support area using washers (1 flat, lock type). roofing, in all directions from the outside of the pipe. B. Soil, Waste and Vent Piping Above Floor: Standard weight coated resistant particleboard core. Stiles, doors and panels to be 1 "2 c. Lag -screw 1/8 steel angle iron with 1 1/2" log- screws into and stainless steel /neoprene gasket fitting, or A.B.S. st iron pipe and stai tai cost thick. Compartments to have 11 5au e (3mm) steel core across 2 joist spaces to support "all- thread" rod. Drill 3/8" hole 15100.14 EXAMINATION OF THE SITE AND DRAWINGS: P.V.C. Schedule as approved by local authority in concealed reinforcing plate welded to a 318 (1Omm) thick steel in angle iron and bolt with lock wosher. A. Examine the site and review the Drawings and Specifications prior locations. " " C. Hot and Cold Water Piping Above the Floor: Type L copper, hard leveling bar to form single structural units. Pilaster shoe to be stainless steel with satin finish. Color: White. d. Level exhaust hood to ceiling by adjusting front all- thread rod. NOTE: It is absolutely necessary that the hood first be leveled at to submitting a proposal. drawn. Below ground outside of building; type 'K" soft drawn copper arm C. Hardware: Provide manufacturer's standard Type 304 the locations to installing iron tubing without joints. wall mount prior angle and front 15100.15 GUARANTEE: 'M' stainless steel commercial hardware for each compartment including, but not limited to, heavy duty hinges, surface support system. e. Exhaust ducts into hood fit inside the collared flange openings A. Guarantee for Water Heater: Five (5) years. D. Condensate Drain Piping: Type copper with 50/50 sweat solder and wrought copper fittings. " M W mounted latch and keeper, and stainless steel mounting in the top of the hood. Weld the duct from inside the hood and not END E. Indirect Waste Piping: Type M copper with 50/50 sweat solder brackets. from the roof. DIVISION 15 - MECHANICAL and wrought copper fittings. F. Beverage Line Pipe: Electrical P.V.C. with 30' full 90 D. Hardware: For locations that require vandal resistant hardware: 5.Single /Three Compartment Sink Installation: pipe Provide manufacturer's standard type 304 stainless steel finish for a. A bracket- screed is supplied with sinks for proper sink hanging SECTION 15300 - FIRE PROTECTION degrees sweeps. extra heavy duty hardware for each compartment including, not Y Y P 9. at the wall. Install this bracket in the prescribed location for G. Underground Gas Piping: Schedule 40 block steel pipe with long limited to, continuous full height 16g. door hinges, latches with shock both respective sinks. 15300.1 GENERAL radius steel welding fittings. Installation of Gas Service Piping; in resistant slides, one piece 11g. keepers, vinyl coated doorstops, continuous b. Install faucets (Chicago #540- LD-- L12- E1 -WXF: 1 at single comp vented conduit and meeting with the local gas company's approval. _ full height 18 U channels to secure panels to stiles and walls, and g g, p and 2 at three com Chico 0 923: 1 at 3 com supplied b Owner P/ g # p)) pp y 15300.11 RELATED DOCUMENTS: H. Gas Piping Above Ground: Schedule 40 black steel with 125 pound fittings. Gas Piping Compound � theft resistant one way crews. Y to splash before installing sink to bracket assembly on wall. A. Drawings, Specifications Division 1, General Mechanical black malleable iron screwed at Joints; J 8 c. Slide sinks into respective locations and provide continuous Requirements this Division, and Contract. in comp applicable codes and with NFPA Bulletin #54 and local app W � 10155.3 EXECUTION caulking along wall on three sides. suitable for natural gas service. Install moisture traps on HVAC unts, water heater, and kitchen equipment. m 6.Work Table: Install on casters and place next to fryer. 15300.12 REFERENCES: 10155.31 EXAMINATION: 7.Fryer: Install, set and start up with water in unit to ensure proper operation. Install gas regulator prior to fryer quick- A. NFPA 17A Standard on Wet Chemical Extinguishing Systems, B. NFPA 96 Standard for the Installation of Equipment for the 15400.22 INSULATION: " 0 U : disconnect A. Insulate all hot and cold water copper piping with at least 1/2 Q A. Examine substrates and other conditions under which connection. Removal of Smoke and Grease Laden Vapors from Commercial Cooking foam rubber or foam plastic type pipe insulation. installation is to occur, and notify Architect of conditions B.Rethermalizer: Install, set and start u with water in unit to P Equipment. quipment. � detrimental to proper and timely completion of work. ensure proper operation. Install gas regulator prior to fryer C. Underwriters Laboratories, Inc. (UL): Fire Protection Equipment 15400.23 FIXTURES: quick- disconnect connection. Directory. A. All Fixtures: As indicated on drawings s with with equal products 10155.32 INSTALLATION: 9. Walk -in- Cooler: The General Contractor shall be furnished by American Standard, Kohler, A. Install toilet compartments in accordance with responsible for the installation of the entire walk -in- 15300.13 SCOPE OF WORK: manufacturer's instructions, using fasteners which are cooler system and coordinate with electrical subcontractor A. Furnishing of all labor, materials, tools, transportation appropriate to substrate and recommended by manufacturer of for all related electrical connections. The General services and related items necessary to complete the installation of 15400.24 CL. FLOOR DRAINS & FLOOR SINKS: unit. Install units plumb and level, firmly anchored in Contractor shall use a certified refrigeration specialist the range hood wet chemical fire extinguishing system as illustrated All I A. Al Accessories: As indicated on drawings with equal products Q locations indicated. for installation of all related refrigeration equipment. on the drawings and as follows: furnished by Wade, Josam, or Zurn being acceptable. B. Install all items in accordance with manufacturer's The scope of work is listed below: 1. Wet chemical tank, pressure cartridge, extinguishing O instructions, ANSI All 7.1, ADA, and local codes. a. Hong evaporator coils agentcharge, automatic detection and remote actuation, dry contact 15400.25 EQUIPMENT: rr b. Set and secure condensing units on roof in control panel for gas and electrical systems shut down, piping, A. Water Heater: As indicated on drawings with equal products U� Q 10155.33 ADJUST AND CLEAN: A. Adjust compartments for proper operations and verify rails C. Provide and install freon line and freon nozzles. furnished by Ruud, State, or A.O. Smith. Provide gas water heater "B" Z W Z that hardware mechanisms function smoothly. from condenser to coils (20ft.). Lines shall be soldered 15300.14 OPERATION AND MAINTENANCE DATA with class U.L. labeled flue vent similar to Metalbestos Type RV flashing, toll Z Q B. Clean and polish all exposed surf aces of factory (Mid. temp: R -22; Low temp: R -404), No quick A. Provide data on design, inspection and procedures related to comp ceiling s collar, roof, and complete with fitting, g , , g, O - - finished units after removing protective coatings. disconnect" or other modular fittings are preventative maintenance. weathertight top. Provide water heater with all temperature and safety controls including ASME rated T. and P. relief valve, - E-- J END approved. d. Evacuate and charge fines. 15300.15 QUALIFICATIONS gas pressure regulator, drain valve, and similar items. B. Fire Suppression System: Provide R-101-30 fire L1J Z DIVISION 11 - EQUIPMENT e. Start -up system and adjust temperatures, in A Manufacturer shall specialize in the design and manufacture of complete in for installation in - both compartments to manufacturers specified wet chemical fire extinguishing systems. protection system as indicated on drawings tally the the � z SECTION 11400 OWNER FURNISHED EQUIPMENT temperatures. B. Installer shall be authorized and trained by the manufacturer to range exhaust hood. Comply with all local codes and NPPA Bulletin Q __J f. Check electrical routing on line -set between install and maintain a wet chemical fire extinguishing systems. #96. C. Shutoff Valves Undemeath Lavatories and Tank Type Water W 11400.1 GENERAL condensing unit and evaporator coil on freezer side to PRODUCTS Closets: Chrome plated angle stop valves with chrome plated U ensure proper wiring through thermostat controls. 15300.2 escutchion plates. 11400.11 RELATED DOCUMENTS: g. Check installation of drain lines and �v D. Hose Cocks: Non - freeze type with integral vacuum breaker. W 2 Q A. Drawings, Specifications Division 1, and Contract freezer tape. 15300.21 STEM: h. Provide 120 day labor warranty on the entire A System shall be an Ansul R 102 Wet Chemical Restaurant Fire 11400.12 DESCRIPTION OF WORK: system. Suppression System. 15400.3 INSTALLATION T A. Extent of equipment is indicated on drawings and includes the B. Complete installation of the tile base and wood fillers at Owner 15400.31 PIPING: G) following: furnished and installed safe after it has been set in place. Provide 15300.22 FSCRIPTION: A. Run all piping concealed except where otherwise indicated on 1. Kitchen Preparation Equipment. 1" diameter x 12' Ig. expansion bolt into concrete floor for anchorage Wet Chemical A gent: The agent shall be a specially formulated, drawings. T- 2. Kitchen Serving Equipment of safe after being set in place by the shipper. ocueous solution of organic salts with a pH range between 7.8 and 8.2, B. I valves, traps, clean -outs and other apparatus in an 3. Walk -in Cooler 11400.32 CLEANING AND RESTORING FINISHES: designea for 'lame knockdown and securement of grease related fires. easily accessible location. REVIIONS S 4. Exhaust Hood A. After completion of installation, and completion of other major B A Agent Tank: The agent tank shall be installed in a stainless 9 9 C. Install soil waste vent offsets and house drains with o 5. Storage Shelving work, remove protective coverings (if any) and clean all items, steel enclosure. Tank shall be constructed of deep drawn carbon " minimum, uniform rode of 1 4 to the foot. 9 6. Employee Lockers internally and externally. Restore exposed and semi- exposed finishes steel, finished in red enamel. Tank shall have 100 psi working p g D Maintain hot and cold water lines at least 6 apart where piping is 7. Miscellaneous Kitchen Equipment to remove abrasions and other damages; polish exposed -metal surfaces pressure, 30C psi test pressure and a 600 psi minimum burst ressure. parallel. B. A separate contract will be issued by the Owner for installation and touch -up paint surfaces. Regulated Release Mechanism: Spring loaded, mechanical pneumatic Provide escutcheon plates where all pipe passes through a of the drive -thru order system. Contractor is only to install buried END type capable of providing expellant gas supply to agent tank. It f fi nished wall. sensor loop in pavement. DIVISION 15 - MECHANICAL shall contain a factory installed regulator deadset at 100 psi and C. Installation of electrical rough -ins for items installed under compatible with electrical shut off device. 15400.32 HANGERS AND SUPPORTS: separate contracts is indicated on the drawings. SECTION 15100 - GENERAL MECHANICAL REQUIREMENT D. Discharge Nozzles: Nozzles shall be tested and listed for a • A. Support copper piping at intervals not to exceed 7 -0 and at D. A separate contract will be issued by the Owner for installation specific application, each shall be stamped with flow designation. each change in horizontal or vertical direction. of exterior signoge including: 15100.1 RELATED DOCUMENTS: Each nozzle shall be equipped with a protective cap to keep the nozzle 1. Taco Bell pole sign with necessary foundation. A. Drawings, Specifications Division 1, and Contract orifice free of cooking grease build-up. 15400.33 PLUMBING FIXTURES: 2. Drive -thru menu board and directional signs with necessary B. See Drawings for materials furnished by owner and installed by E. E Distribution Piping and Actuation and Expellant Gas Piping: A. Furnish and install all plumbing fixtures complete with all foundation. Contractor Piping shall be Schedule 40 black iron where concealed and shall be equipment fittings, trimmings, and accessories. 3. Taco Bell building sign. chrome plated where exposed and where it is located in the range hood, B. All Fixtures: Grade A; white E. A separate Contract will be issued by the Owner for installation 15100.2 SCOPE OF WORK: even though the piping in the hood may be concealed. All piping shall C. Exposed Piping to Fixtures: A product of the fixture of Computer system including: A. The work accomplished under this trade section of specifications be threaded and sealed with Teflon tape. manufacturer. 1. Cash Registers with cash drawers 2. Printer includes: 15300.3 INSTALLATION D. Provide stops as manufactured by the fixture manufacturer, with 3. Cable Assembly 1.Furnishing all labor, supervision, and equipment for the complete metal -to -metal seat for all fixtures and equipment. 4. Video monitors installation of air conditioning, heating, ventilation, and 15300.31 INSTALLATION: 5. Processor plumbing, together with all necessary auxiliaries and A. Install system in accordance with the manufactures Design 15400.34 TEST appurtenances. Installation Recharge and Maintenance Manual. A. The plumbing s stem and associated system is subject to final P 9 Y Y 1 11400.13 PRODUCT HANDLING: 2.Furnishing of all plumbing materials as noted on drawings. B. Run all piping concealed except where otherwise indicated on the approval of the Owner's Representative, and Code Authorities having A. Upon delivery of the equipment, unload and store until drawings. jurisdiction. Perform all tests required to show code compliance, as installation. Provide protection from exposure to weather and 15100.3 PRODUCTS AND EXECUTION: A. Except for such items as are normally wired at their point of C. Provide chrome plated escutheon plates where es P P pipes pass through directed. �� �,. � continuing construction. manufacture and so delivered and unless specifically noted to the the walls, ceiling and hood. 15400.35 CLEANING AND PROTECTION: CHECKED BY: TH 11400.2 PRODUCTS contrary herein, the electrical trade will do all electric wiring of 15300.32 INSPECTION: A. After the plumbing piping has been installed, inspected, and (Not Used) every character for power supply including control wring. Under this A. Inspect and verify that hood and duct system meets the approved, flush the piping system to remove any foreign matter from BUnnW T>K trade, erect all motors in place ready for connection and furnish requirements of NFPA 96. the pipes. Where required, use chlorine or HTH solution to sanitize 11400.3 EXECUTION starters with each such motor of the type required and deliver it in the new piping. K-50 good condition to the electrical at the job. The electrical trade 15300.33 FIELD TESTING: 11400.31 INSTALLATION: will mount all such starters. A. System shall be field tested b personnel authorized and trained Y Y P 15400.36 MAINTENANCE: FRAME A. Assemble and set all equipment according to manufacturer's shop by the manufacturer. A. Maintain all its of the plumbing fixtures and associated Pa P 9 drawings and instruction. Provide blocking, spacers, fillers and 15100.4 PERMITS, FEES, AND CODE REGULATIONS: equipment throughout the guarantee period of one month after final JOB NUMBER connectors as necessary to insure a final installation that is plumb, A. Obtain all permits required to perform this work and pay all fees required for such permits. 15300.34 DEMONSTRATION AND INSTRUCTION: acceptance of the building. 97125 level, and firmly anchored in locations indicated. B. Conform to all state and local ordinances and rulings applicable A. Demonstrate and instruct the owners personnel in the operation END 1.Install Stainless Steel Food Service Equipment. Set each piece in to this work and in effect at the time the work is performed. of the system. approximate final location. PROTOTYPE ISSUE DATE a. Provide 1" copper waste lines (not PVC) to all separate equipment drain locations shown on drawings. Proper 15100.5 STRUCTURAL AND SPACE CONDITION: END 2/1/97.1 support of A. All work shall avoid obstructions and interferences with other DIVISION 15 - MECHANICAL these waste lines to equipment frames and separate terminations trades, preserve headroom, and keep openings and passageways clear. into drain are necessary. SHEET NUMBER b. Provide electrical service to prewired electrical panel. 15100.6 DRAWINGS: SECTION 15400 - PLUMBING c. Provide cold water and hot water service to solenoid valves at A. The drawings as prepared are diagrammatic. Follow as closely as 15400.1 GENERAL SP 11 service shaft. actual construction of the project and the work of the trades permit.