HomeMy WebLinkAboutCS1.108200 WOOD DOORS
.01 REMOVE & SALVAGE FOR REUSE EXISTING SOLID CORE WOOD
DOORS.
.02 DESIGNATE NEW OPENING LOCATIONS FOR EXISTING DOORS UPON
REMOVAL AND ADVISE LANDLORD IF AVAILABLE STOCK IS ADEQUATE
FOR QUANTITY & HAND REQUIRED.
.03 EXISTING LIGHT OAK DOOR FINISH WILL BE USED AS IS. EXISTING
WALNUT STAINED DOORS AND WOOD FRAMES WILL BE PAINTED.
REFER TO OPENING SCHEDULE FOR FINISHES.
.04 PROVIDE NEW WOOD DOORS MATCHING EXISTING WHERE NEW WOOD
DOORS ARE SCHEDULED.
08710 DOOR HARDWARE
.01 REMOVE & SALVAGE FOR REUSE EXISTING HINGES, CLOSERS,
OPERATING HARDWARE, TRIM AND ACCESSORIES.
.02 HINGES: REUSE EXISTING.
.03 LOCKSETS : MATCH EXISTING TRIM AND FINISH. FOR NEW UNITS
COORDINATE MASTERKEY ING WITH OWNER.
.04 PULL HANDLES: IVES 8302 -8, 4" X 16 ", US10.
.05 PUSH PLATES: IVES 8200, 4" X 16 ", US10.
.06 CLOSERS: MATCH EXISTING TYPE & FINISH.
.07 MANUAL FLUSHBOLTS: IVES 458 US10.
.08 ELECTRIC STRIKES: ADAMS RITE * 7140 -340 -626, W /TRANSFORMER
.09 WALLBUMPERS: IVES 407, US10. PROVIDE FLOOR STOP WHERE
WALLBUMPERS DO NOT FUNCTION.
.10 HARDWARE SETS
SET NO. 1
1.5 PR HINGES - BB MATCHING EXISTING
1 EACH CLOSER W1110 STOP
1 EACH LOCKSET - STOREROOM FUNCTION
1 EACH ELECTRIC STRIKE
SET NO. 2
1.5 PR REUSED EXISTING HINGES
1 EACH REUSED EXISTING LATCHSET
1 EACH WALL BUMPER
SET NO. 3
1.5 PR REUSED EXISTING HINGES
1 EACH CLOSER
1 EACH LOCKSET - STOREROOM FUNCTION
1 EACH WALL BUMPER
SET NO. 4
3 PR REUSED EXISTING HINGES
2 EACH DUMMY LEVER
2 EACH ROLLER CATCH
SET NO. 5
1.5 PR REUSED EXISTING HINGES
1 EACH DUMMY LEVER
1 EACH ROLLER CATCH
SET NO. 6
3 PR REUSED EXISTING HINGES
2 EACH CLOSERS
1 SET FLUSH BOLTS - TOP AND BOTTOM (INACTIVE LEAF)
1 EACH LOCKSET - EXIT FUNCTION ( ACTIVE LEAF)
2 EACH FLOOR STOPS
2 EACH DUSTPROOF STRIKES
1 EACH ELECTRIC STRIKE
SET NO. 7
1.5 PR REUSED EXISTING HINGES
1 EACH CLOSER
1 EACH PULL HANDLE
1 EACH PUSH PLATE
1 EACH WALLBUMPER
08800 GLASS AND GLAZING
.01 INDUSTRY STANDARDS: ASTM C -1036 "STANDARD SPECIFICATION FOR
FLAT GLASS" AND ASTM C -1048 "STANDARD SPECIFICATION FOR HEAT -
TREATED FLAT GLASS - KIND HS, KIND FT COATED AND UNCOATED
GLASS ".
.02 FLOAT GLASS: ASTM C -1036, CONDITION A (UNCOATED SURFACES),
TYPE I (TRANSPARENT GLASS, FLAT), CLASS 1 (CLEAR), QUALITY 03
(GLAZING SELECT). PROVIDE 1/4" ANNEALED, HEAT STRENGTHENED
OR TEMPERED AS REQUIRED BY CODES AND AS IND ICATED .
.03 MIRROR GLASS: ANNEALED FLOAT GLASS, TYPE I, CLASS 1
(TRANSPARENT), QUALITY q2.
.04 COMPLY WITH COMBINED PRINTED RECOMMENDATIONS OF GLASS
MANUFACTURERS, OF MANUFACTURERS OF SEALANTS, GASKETS AND
OTHER GLAZING MATERIALS, EXCEPT WHERE MORE STRINGENT
REQUIREMENTS ARE IND ICATED .
.05 PROTECT GLASS FROM DAMAGE DURING HANDLING AND
INSTALLATION. REMOVE AND REPLACE DAMAGED GLASS.
DIVISION 9
09250 GYPSUM BOARD
.01 WALLBOARD: ASTM C 36, 5/8" REGULAR AND TYPE X AS INDICATED
AND AS REQUIRED FOR FIRE RATED CONSTRUCTION.
.02 WATER RESISTANT GYPSUM BOARD: ASTM C 630, GYPSUM BOARD
WITH WATER RESISTANT TREATED CORE AND FACES.
.03 METAL STUDS: 2 -112 ' X 25 GAGE UNLESS OTHERWISE INDICATED.
RUNNERS OF SAME GAGE AND SIZE AS STUDS.
.04 METAL FURRING: ASTM C -645: 25 GAGE MINIMUM
ELECTROGALVANIZED, HAT SHAPED, 7/8 ".
.05 SOUND ATTENUATION BLANKETS: USG SAFB, ASTM C -665, TYPE I:
SEMI-RIGID MINERAL FIBER BLANKET WITHOUT MEMBRANE, MAXIMUM
FLAME SPREAD RATING OF 25, 1 112" THICK UNLESS OTHERWISE
IND ICATED .
.06 CONCEALED ACOUSTICAL SEALANT: NON- DRYING, NON - HARDENING,
NON- SKINNING, NON- STAINING, NON- BLEEDING, GUN GRADE SEALANT
FOR CONCEALED APPLICATIONS PER ASTM C -919.
.07 INSTALL WATERPROOF MEMBRANE IN ALL FLOOR TILE LOCATIONS ON
ELEVATED SLABS. INSTALL PER MANUFACTURER'S
RECOMMENDATIONS.
.08 ACCESSORIES: SCREWS, TAPE, JOINT FINISHING COMPOUND,
CORNER BEADS, CASINGS AND OTHER ITEMS AS REQUIRED TO
COMPLETE THE INSTALLATION.
.09 USE DOUBLE STUDS AT END WALL AND WHERE SUPPORTING WALL
HUNG ITEMS. SPACE STUDS AT 24" O.C. UNLESS OTHERWISE
IND ICATED.
.10 SECURE CEILING SUPPORT MEMBERS IN ACCORDANCE WITH ASTM C-
754.
.11 APPLY GYPSUM BOARD IN ACCORDANCE WITH ASTM C -840 AND
GYPSUM ASSOCIATION DOCUMENT 216. SECURE WITH SCREWS.
APPLY JOINT TAPE AND COMPOUND AT SURFACES EXPOSED TO VIEW,
IN ACCORDANCE WITH MANUFACTURER ' S INSTRUCTIONS. SAND
JOINTS SMOOTH WITH SURROUNDING WALLBOARD SURFACE. SEAL
TIGHT AROUND ALL OPENINGS.
DIVISION 8
06100 ROUGH CARPENTRY
.01 ROUGH LUMBER: NO. 2 SOUTHERN PINE. FIRE RETARDANT TF =ATED
TO UL CLASSIFICATION OF 25 FLAME SPREAD RATING, ASTM E-_84.
TREATMENT CHEMICALS SHALL BE NON - HYGROSCOPIC. PERCENT. OF
MOISTURE AT DELIVERY - 19 PERCENT MAXIMUM.
.02 ROUGH HARDWARE: NAILS, EXPANSION BOLTS, TOGGLE BOLT';, NUTS,
SCREWS, WASHERS AND OTHER ITEMS AS REQUIRED. GALVANG'ED
FOR EXTERIOR APPLICATIONS.
.03 PROVIDE BLOCKING AS REQUIRED.
.04 PLYWOOD: APA RATED. C -D , EXTERIOR GRADE.
.05 SECURELY ATTACH CARPENTRY TO SUBSTRATES BY ANCHORING AND
FASTENING AS INDICATED AND AS REQUIRED BY RECOGN IZEC
STANDARDS. INSTALL FASTENERS WITHOUT SPLITTING WOOL : PRE-
DRILL AS REQUIRED.
.06 COORDINATION: FIT CARPENTRY TO OTHER WORK, SCRIBE ,.M COPE
AS REQUIRED FOR ACCURATE FIT. COORDINATE LOCATION )F
FURRING, NA ILERS , BLOCKING, GROUNDS AND SIMILAR SUPPORTS TO
ALLOW ATTACHMENT TO OTHER WORK.
.07 SET CARPENTRY ACCURATELY TO REQUIRED LEVELS AND -INED
WITH MEMBERS PLUMB, TRUE AND ACCURATELY CUT AND FITTED.
06400 ARCHITECTURAL WOODWORK
.01 MATERIALS
A. COMPLY WITH FORMALDEHYDE EMISSION REQUIREMIEI`TS FOR
THE FOLLOWING:
1. NPA 9 FOR MEDIUM DENSITY FIBERBOARD
2. HPMA FE FOR HARDWOOD PLYWOOD
B. NEMA LD 3 HKH- PRESSURE DECORATIVE PLASTIC L AM INATE
1. GP -50 HORIZONTAL SURFACES
2. GP -42 POSTFORMED SURFACES
3. GP -28 VERTICAL SURFACES
4. GP -50 EDGES
C. MILLWORK HARDWARE -
1. DRAWER SLIDES. ACCU -RIDE *3832
2. DRAWER PULLS: EPI MC 303 (BLACK)
3. HINGES: GRASS *1210
4. CLOSET RODS= 1" DIAMETER S.S. K &V 66OSS WITH K &V
734 FLANGES.
5. STANDARDS: K &V 255 WITH NO. 256 SI- PPORTS .
.02 FABRICATION
A. FABRICATE MILLWORK ITEMS IN ACCORDANCE WITH AWI
"CUSTOM" QUALITY STANDARDS AND "FLUSH (',VERLAY"
CONSTRUCTION. APPLY LAMINATE PLASTIC CLADDING IN
ACCORDANCE WITH AWI AND LAMINATE MANUFA(• ;TUBER'S
RECOMMENDATIONS USING AN APPROVED ADHE: IVES &
METHODS.
B. USE CABINET LINER FOR INTERIOR OF CAB INE.1 S AND
DRAWERS. MAKE DRAWER BOTTOMS 1/4" HARDWOOD
PLYWOOD (WITH CABINET LINER FINISH) .
C. USE 3/4" MDF COVERED BY CABINET LINER -=OR CABINET
SHELVING. SUPPORT CABINET SHELVING W IT i ADJUSTABLE
BRACKETS.
D. WOOD FINISHING:
1. BACK PRIME CONCEALED SURFACES.
2. TRANSPARENT FINISH: AWI FINISH S);STEM *1 STANDARD
LACQUER.
3. PAINTED FINISH: AWI FINISH SYSTEM *8 SYNTHETIC
ENAMELS.
E. PROVIDE CUTOUTS TO ACCOMMODATE SWITC ES, TELEPHONE
LINES, SINKS AND OTHER ITEMS, FROM TEMPLATES FURNISHED.
.03 INSTALLATION
A. INSTALL MILLWORK IN ACCORDANCE WITH FINAL SHOP
DRAWINGS AND SPECIFICATION AND DETAIL REQU IREMENTS OF
AWI, 1700.
B. SET STANDARDS FOR ADJUSTABLE SHELVING BRACKETS AT 32"
O.C. HORIZONTALLY MAXIMUM UNLESS OT- iERW ISE IND ICATED .
C. INSTALL MILLWORK PLUMB, LEVEL, TRUE, IN ALIGNMENT AND
WITH NO DISTORTIONS. SHIM AS REQUIRED USING CONCEALED
SHIMS.
D. INSTALL FASTENERS, BRAC ING , BLOCK M. G AND OTHER
MISCELLANEOUS MATERIAL REQUIRED TO COMPLETE WORK.
SECURELY FASTEN TO WALLS AND /OR F -OORS. SECURELY
FASTEN TOPS TO BASE UNITS OR SUPPORTING ING D EV ICES .
E. COUNTERSINK EXPOSED FASTENERS. L)CATE FASTENERS FOR
MAXIMUM STRUCTURAL CONDITIONS BUT 'IN AS
INCONSPICUOUS A LOCATION AS POSS IBI,E . SET EXPOSED
FASTENERS AND POINT UP WITH COLOR-1 SPACKLING
COMPOUND.
F. TOUCH UP FINISHED SURFACES AND SF ACKLED AREAS AT
COMPLETION OF INSTALLED MILLWORK.
.04 ADJUST AND CLEAN ,
A. AT COMPLETION OF INSTALLATION, REMOVE PROTECTIVE
COVERINGS AND CLEAN SURFACES.
B. CHECK AND ADJUST OPERATING HARC.WARE ON ALL DOORS,
DRAWERS, ETC. REPLACE DEFECTIVE' HARDWARE.
C. REPAIR DAMAGED AND DEFECTIVE M I _LWORK WHEREVER
POSSIBLE TO ELIMINATE FUNCT INAL ' OR VISUAL DEFECTS;
WHERE NOT POSSIBLE TO REPAIR PROPERLY, REPLACE
DEFECTIVE WORK.
DIVISION 7
07900 JOINT SEALERS
.01 ONE -PART POLYURETHANE FS TT -S- 002;30, CLASS A. TYPE II, VULKEM
921, MAMECO INTERNATIONAL, INTERIOR JOINTS AT MASONRY WALLS,
CONTROL JOINTS, EXPANSION JOINTS, JUP'ICTURES AT WALL -TO -WALL,
DOOR AND WINDOW FRAME TO WALL, ETC., LOUVERS, AROUND DOOR
SILLS, ACCESS PANELS. GRILLES, AND OTHER GENERAL
CONSTRUCTION ITEMS.
.02 ONE -PART MILDEW RESISTANT SILICONE � FF TT- S- 001543 CLASS A.
DOW CORNING 786. INTERIOR JOINTS ARO JND PLUMBING FIXTURES,
COUNTERTOPS, TILE WALLS, ETC.
.03 LATEX JOINT SEALANT: ASTM C -834 BOST IK CHEM CALK 600, INTERIOR
JOINTS AT DRYWALL. DOOR FRAMES. AND OTHER NON-MOVING
JOINTS TO BE PAINTED.
.04 PRIMER: TYPE RECOMMENDED BY JOINT SEALER MANUFACTURER AS
REQUIRED FOR ADHESION OF SEALANT TO JOINT SUBSTRATES
IND ICATED .
.05 BACKER ROD: COMPRESSIBLE ROD STCCK OF POLYETHYLENE FOAM,
POLYURETHANE FOAM, BUTYL RUBBER FOAM OR OTHER FLEXIBLE,
NON- ABSORPTIVE MATERIAL AS RECOMMENDED BY SEALANT
MANUFACTURER, SIZE AND SHAPE AS FEQUIRED TO CONTROL JOINT
DEPTH FOR SEALANT PLACEMENT
DIVISION 8
08110 DOOR AND WINDOW FRAMES
.01 REMOVE AND SALVAGE FOR REUSE EX STING ALUMINUM OR WOOD
DOOR & WINDOW FRAME COMPONENTS 14CLUD ING FRAME
CONNECTIONS, INSERTS, STOPS & FA' 3TENERS .
.02 DESIGNATE NEW OPENING LOCATIONS FOR EXISTING FRAMES UPON
REMOVAL & ADVISE LANDLORD IF AD')ITIONAL COMPONENTS MAY BE
REQUIRED FROM EXISTING STOCK.
.03 MOCK UP ONE COMPLETE FRAM /DOOR & ONE COMPLETE
FRAME /WINDOW AT FINAL LOCATIONS TO ESTABLISH NECESSARY
CLEARANCES, INSTALLATION MTHiOD 3 & COMPLETED APPEARANCE.
.04 SET REMAINING DOOR AND WINDOW FRAMES TO MATCH APPROVED
MOCK -UP INSTALLATION.
01700
PROJECT CLOSEOUT
01400
QUALITY CONTROL
.01
BEFORE REQUESTING INSPECTION FOR CERTIFICATION OF
w
cl- °ooc
w
.01
SUBSTANTIAL COMPLETION, COMPLETE THE FOLLOWING:
.01
THIS SECTION SPECIFIES REQUIREMENTS FOR QUALITY CONTROL
DEMOLITION AND INTERIOR CONSTRUCTION AS SHOWN ON CONTRACT
IN THE APPLICATION FOR PAYMENT THAT COINCIDES WITH THE
SERVICES. QUAY
TESTS PERFORMEDITBY TTHEROCONTRACTOR. INCLUDE INSPECTIONS AND
DATE SUBSTANTIAL COMPLETION IS CLAIMED, SHOW 100
CONSTRUCT THE WORK UNDER A STIPULATED SUM CONTRACT FOR
w
PERCENT COMPLETION FOR THE PORTION OF THE WORK
CLAIMED SUBSTANTIALLY COMPLETE.
VERIFICATION OF EXISTING STRUCTURE
THE WORK INCLUDES GENERAL CONSTRUCTION AND ASSOCIATED
SUBMIT SPECIFIC WARRANTIES, WORKMANSHIP BONDS,
.02
CONTRACTOR RESPONSIBILITIES, PROVIDE INSPECTIONS AND TESTS
SPECIFIED OR REQUIRED BY PROJECT SPECIFICATIONS, GOVERNING
MAINTENANCE AGREEMENTS, FINAL CERTIFICATIONS AND
SIMILAR DOCUMENTS.
THE TENANT MAY NEGOTIATE PURCHASE ORDERS WITH SUPPLIERS
AUTHORITIES OR INDEPENDENT AGENCIES. INSPECTION AND TESTING
N
OF NEW EQUIPMENT AND MAY ALSO FURNISH RELOCATED EXISTING
COSTS ARE INCLUDED IN THE CONTRACT UNLESS NOTED OTHERWISE.
EQUIPMENT ITEMS TO BE INCORPORATED INTO THE WORK.
SUBMIT RECORD DRAWINGS, MAINTENANCE MANUALS AND
SIMILAR RECORD INFORMATION.
.03
THE CONTRACTOR SHALL COORDINATE THE SEQUENCE OF ACTIVITIES
to
o
TESTING OF PRE - ORDERED NEW EQUIPMENT AND RELOCATED
TO ACCOMMODATE SERVICES WITH A MINIMUM OF DELAY. THE
CHANGE -OVER PERMANENT LOCKS AND TRANSMIT KEYS TO
Ir
CONTRACTOR SHALL COORDINATE ACTIVITIES TO AVOID REMOVING
AND REPLACING CONSTRUCTION TO ACCOMMODATE INSPECTIONS
THE CONTRACTOR IS RESPONSIBLE FOR HANDLING, SETTING,
THE OWNER.
UTILITIES TO AND FINAL CONNECTION OF PRE-ORDERED NEW
AND TESTS.
Q to U 111
COMPLETE START -UP TESTING OF SYSTEMS, AND INSTRUCTION
OF THE OWNER'S PERSONNEL. REMOVE TEMPORARY
.04
PRIOR TO CORE DRILLING EXISTING POST - TENSIONSED CONCRETE,
CONFINE OPERATIONS TO AREAS WITHIN THE TENANT LEASE SPACE.
FACILITIES FROM THE SITE, ALONG WITH CONSTRUCTION
FLOOR PLANKS CONTRACTOR SHALL VERIFY EXISTING
REINFORCEMENT LOCATIONS. UNDER NO CIRCUMSTANCES MAY
TOOLS, MOCK-UPS, AND SIMILAR ELEMENTS.
D ISTURBED .
EXISTING FLOOR PLANK REINFORCEMENT BE CUT.
.05
COMPLETE FINAL CLEAN UP. TOUCH -UP AND REPAIR AND
RESTORE MARRIED EXPOSED FINISHES.
.05
CONTACT JOE RETZNER PE AT AMERICAN PRECAST 317 - 353 -2118 FOR
CORRIDORS CLEAR AT ALL TIMES. DO NOT USE THESE AREAS FOR
PERMISSIBLE LOCATIONS AND SIZES OF CONCRETE FLOOR PLANK
MINIMIZE REQUIREMENTS FOR STORAGE OF MATERIALS.
PENETRATIONS.
.02
ON RECEIPT OF A REQUEST FOR INSPECTION, THE ARCHITECT WILL
PROCEED OR ADVISE THE CONTRACTOR OF UNFILLED
.06
UPON COMPLETION OF INSPECTION AND TESTING REPAIR DAMAGED
OCCUPY AND PLACE AND INSTALL EQUIPMENT AND SUPPLIES IN
REQUIREMENTS. THE ARCHITECT WILL PREPARE THE CERTIFICATE OF
CONSTRUCTION AND RESTORE SUBSTRATES AND FINISHES TO
ELIMINATE DEFICIENCIES.
SUBSTANTIAL COMPLETION FOLLOWING INSPECTIONS. OR ADVISE THE
SUCH OCCUPANCY DOES NOT INTERFERE WITH COMPLETION OF THE
CONTRACTOR OF CONSTRUCTION THAT MUST BE COMPLETED OR
CORRECTED BEFORE THE CERTIFICATE WILL BE ISSUED.
.07
THE CONTRACTOR SHALL PROTECT CONSTRUCTION EXPOSED BY OR
SUPPLIES SHALL NOT CONSTITUTE ACCEPTANCE OF THE TOTAL
>
FOR QUALITY CONTROL SERVICE ACTIVITIES, AND PROTECT REPAIRED
.03
FINAL ACCEPTANCE BEFORE REQUESTING INSPECTION FOR
CONSTRUCTION REGARDLESS OF THE ASSIGNMENT OF
RESPONSIBILITY FOR INSPECTION AND TESTING. UPON COMPLETION
CERTIFICATION OF FINAL ACCEPTANCE AND FINAL PAYMENT, SUBMIT
THE FOLLOWING:
OF INSPECTION AND TESTING, , REPAIR DAMAGED CONSTRUCTION AND
RESTORE SUBSTRATES AND FINISHES TO ELIMINATE DEFICIENCIES.
FINAL PAYMENT REQUEST WITH RELEASES.
01500
TEMPORARY FACILITIES
FINAL ACCOUNTING FOR CHANGES TO THE CONTRACT SUM.
.01
THIS SECTION SPECIFIES TEMPORARY SERVICES AND FACILITIES
FINAL INSPECTION STATING INDIVIDUAL ITEM COMPLETION OR
INCLUDING UTILITIES, CONSTRUCTION AND SUPPORT FACILITIES,
SECURITY AND PROTECTION. PROVIDE FACILITIES READY FOR USE.
RESOLUTION.
REMOVE WHEN NO LONGER NEEDED, OR REPLACED BY PERMANENT
CONSENT OF SURETY TO FINAL PAYMENT.
FACILITIES.
CONTINUING INSURANCE COVERAGE EVIDENCE.
.02
COMPLY WITH NFPA CODE 241, "BUILDING CONSTRUCTION AND
DEMOLITION OPERATIONS ", ANSI -A10 SERIES STANDARDS FOR
.04
RECORD DRAWINGS: MAINTAIN A CLEAN, UNDAMAGED SET OF BLUE
"SAFETY REQUIREMENTS FOR CONSTRUCTION AND DEMOLITION". AND
ELECTRICAL DESIGN LIBRARY "TEMPORARY ELECTRICAL
LINE WHITE-PRINTS OF CONTRACT DRAWINGS AND SHOP DRAWINGS.
FACILITIES".
MARK -UP THESE DRAWINGS TO SHOW THE ACTUAL INSTALLATION.
MARK WHICHEVER DRAWINGS IS NOT CAPABLE OF SHOWING
CONDITIONS ACCURATELY. GIVE PARTICULAR ATTENTION TO
.03
INSTALL AND MAINTAIN TEMPORARY FIRE PROTECTION OF TYPES
CONCEALED ELEMENTS THAT WOULD BE DIFFICULT TO MEASURE AND
NEEDED TO PROTECT AGAINST PREDICTABLE AND CONTROLLABLE
FIRE LOSSES. COMPLY WITH NFPA 10 "STANDARD FOR PORTABLE
RECORD AT A LATER DATE.
FIRE EXTINGUISHERS," AND NFPA 241 "STANDARD FOR
MAINTENANCE MANUALS ORGANIZE MAINTENANCE DATA INTO SETS
SAFEGUARDING CONSTRUCTION, ALTERATIONS AND DEMOLITION
OPERATIONS. "
OF MANAGEABLE SIZE. BIND IN INDIVIDUAL HEAVY -DUTY 2 -INCH, 3 -
RING VINYL - COVERED BINDERS, WITH POCKET FOLDERS FOR FOLDED
SHEET INFORMATION. MARK IDENTIFICATION ON FRONT AND SPINE
.04
USE TEMPORARY BRANCHES FROM EXISTING WATER AND ELECTRICAL
OF EACH BINDER.
SERVICE DURING CONSTRUCT ION . ARRANGE FOR AUTHORITIES
HAVING JURISDICTION TO INSPECT AND TEST EACH TEMPORARY
OPERATING AND MAINTENANCE INSTRUCTIONS: ARRANGE FOR THE
UTILITY BEFORE USE. OBTAIN REQUIRED CERTIFICATIONS AND
PERMITS.
INSTALLER OF EQUIPMENT THAT REQUIRES REGULAR MAINTENANCE
TO MEET WITH THE OWNER'S PERSONNEL TO PROVIDE INSTRUCTION
IN PROPER OPERATION AND MAINTENANCE.
.05
PROVIDE FIELD OFFICE SPACE WITHIN THE CONSTRUCTION AREA TO
ACCOMMODATE PROJECT PERSONNEL. PROVIDE POWER, TELEPHONE
.05
EMPLOY EXPERIENCED WORKERS FOR FINAL CLEANING. CLEAN EACH
AND FAX SERVICE. KEEP FIELD OFFICE SPACE CLEAN AND ORDERLY
FOR SMALL PROGRESS MEETINGS. EXISTING WASHROOMS MAY BE
SURFACE TO THE CONDITION EXPECTED IN A COMMERCIAL BUILDING
CLEANING AND MAINTENANCE PROGRAM.
USED BY CONTRACTOR PERSONNEL DURING CONSTRUCT ION
PROV!O ING THESE AREAS ARE MAINTAINED IN A CONDITION SIMILAR
.06
REMOVE TEMPORARY PROTECTION AND FACILITIES. COMPLY WITH
TO THAT REQUIRED WITH USE BY THE GENERAL PUBLIC.
REGULATIONS OF AUTHORITIES HAVING JURISDICTION AND SAFETY
STANDARDS FOR CLEANING. REMOVE WASTE MATERIALS FROM THE
.06
PROVIDE OFF -SITE STORAGE OR SPACE WITHIN THE CONSTRUCTION
SITE AND DISPOSE OF IN A LAWFUL MANNER.
AREA TO ACCOMMODATE CONSTRUCTION MATERIALS AND
EQUIPMENT.
DIVISION 2
.07
PROVIDE CONSTRUCTION AREA AND STORAGE FACILITY SECURITY IN
02070
SELECTIVE DEMOLITION
THE FORM OF LOCKS. ALARM DEVICES OR SECURITY GUARD
SERVICES AS NECESSARY TO PROTECT AGAINST PREDICTABLE AND
.01
COORDINATE WORK WITH LANDLORD TO AVOID DISRUPTION OF
CONTROLLABLE THEFT OR VANDALISM LOSSES.
ADJACENT TENANT'S OPERATIONS. EXISTING THIRD FLOOR TENANTS
BELOW & SIXTH FLOOR TENANTS EAST WILL CONTINUOUSLY OCCUPY
.08
PROVIDE TEMPORARY ENCLOSURES FOR PROTECTION OF ADJACENT
AREAS IMMEDIATELY ADJACENT TO AREAS OF WORK.
AREAS FORM CONSTRUCTION OPERATIONS AND SIMILAR ACTIVITIES.
COORDINATE ENCLOSURE WITH VENTILATING AND MATERIAL DRYING
.02
SUBMIT SCHEDULE TO LANDLORD INDICATING PROPOSED METHODS,
OR CURING REQUIREMENTS TO AVOID DANGEROUS CONDITIONS.
SCHEDULE OF WORK AND COORDINATION WITH ADJACENT TENANT'S
OPERATIONS.
.09
COLLECT WASTE DAILY, COMPLY WITH NFPA 241 FOR REMOVAL OF
COMBUSTIBLE WASTE. ENFORCE REQUIREMENTS STRICTLY. HANDLE
.03
OBTAIN LANDLORD'S APPROVAL FOR LOCATION OF DEBRIS
HAZARDOUS, DANGEROUS, OR UNSANITARY WASTE MATERIALS
SEPARATELY FROM OTHER WASTE BY CONTAINERIZING PROPERLY.
CONTAINMENT AND TRUCK TRAFFIC.
DISPOSE IN A LAWFUL MANNER.
.04
CONDUCT OPERATIONS IN CONFORMANCE WITH ALL RULES,
ORDINANCES AND REGULATIONS OF AUTHORITIES HAVING
.10
ENFORCE STRICT DISCIPLINE IN USE OF TEMPORARY FACILITIES.
JURISDICTION.
LIMIT AVAILABILITY TO INTENDED USE TO MINIMIZE ABUSE. MAINTAIN
FACILITIES IN GOOD OPERATING CONDITION UNTIL REMOVAL.
.05
PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF
PROTECT FROM DAMAGE BY FREEZING TEMPERATURES AND THE
ELEMENTS.
PROTECTION REQUIRED TO PROTECT BUILDING OCCUPANTS AND
GENERAL PUBLIC DURING SELECTIVE DEMOLITION WORK. EMPLOY
POSITIVE METHODS TO PREVENT DUST AND DIRT FROM RISING INTO
.11
REMOVE EACH FACILITY WHEN THE NEED HAS ENDED, OR REPLACED
A IR
BY A PERMANENT FACILITY, OR NO LATER THAN SUBSTANTIAL
.
COMPLETION. COMPLETE OR RESTORE CONSTRUCTION DELAYED
.06
PROVIDE SHORING, BRACING OR SUPPORT TO PREVENT DAMAGE TO
BECAUSE OF INTERFERENCE WITH THE FACILITY. REPAIR DAMAGED
WORK, CLEAN EXPOSED SURFACES AND REPLACE CONSTRUCTION
PERSONS AND PROPERTY FROM MOVEMENT AND SETTLEMENT OR
COLLAPSE.
THAT CANNOT BE SATISFACTORILY REPAIRED.
.07
MAINTAIN ALL UTILITIES AND RELATED ITEMS INDICATED TO REMAIN
01600
MATERIALS AND EQUIPMENT
AND PROTECT AGAINST DAMAGE ;DURING D EMOL IT ION OPERATIONS.
REMOVE, CAP, ABANDON AND /OR DISCONNECT ALL UTILITIES AS
.02
"PRODUCTS" ARE ITEMS PURCHASED FOR INCORPORATION IN THE
INDICATED. SEQUENCE WORK AS REQUIRED TO MAINTAIN EXISTING
WORK. WHETHER PURCHASED FOR THE PROJECT OR TAKEN FROM
PREVIOUSLY PURCHASED STOCK.
TENANT'S OPERATIONS. DO NOT DISRUPT ANY UTILITY SERVICE
WITHOUT 48 HOUR NOTICE TO. AND PRIOR APPROVAL FROM
LANDLORD.
"NAMED PRODUCTS" ARE ITEMS IDENTIFIED BY
MANUFACTURER'S PRODUCT NAME, INCLUDING MAKE OR
.08
EXERCISE CARE TO PREVENT DAMAGING EXIST ING UTILITIES,
MODEL DESIGNATION IND ICATED IN THE MANUFACTURER ' S
PRODUCT LITERATURE.
STRUCTURES, AND FINISHES TO REMAIN. REPAIR ANY DAMAGED
ITEMS OUTSIDE PROJECT AREA TO THE SATISFACTION OF LANDLORD.
"MATERIALS" ARE PRODUCTS THAT ARE SHAPED, CUT,
.09
REMOVE DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM
WORKED, MIXED, FINISHED, REFINED OR OTHERWISE
FABRICATED, PROCESSED, OR INSTALLED TO FORM A PART
DEMOLITION OPERATIONS FROM THE PROJECT SITE.
OF
THE WORK.
DIVISION 5
"EQUIPMENT" IS A PRODUCT WITH OPERATIONAL PARTS,
05500
METAL FABRICATIONS
WHETHER MOTORIZED OR MANUALLY OPERATED, THAT
.01
STRUCTURAL PERFORMANCE: DESIGN, ENGINEER, FABRICATE, AND
REQUIRES SERVICE CONNECTIONS SUCH AS WIRING OR PIPING.
INSTALL THE FOLLOWING METAL FABRICATIONS.
.02
PROVIDE PRODUCTS COMPLYING WITH CONTRACT DOCUMENTS AS
A. TEMPERED GLASS STOREFRONT SYSTEM FRAME:
FOLLOWS:
1. STEEL ANGLE JAMB & HEAD SUPPORTS.
STANDARD PRODUCTS: WHERE AVAILABLE, PROVIDE
2. JAMB ANGLE FLOOR & CEILING STRUCTURE
STANDARD PRODUCTS OF TYPES THAT HAVE BEEN PRODUCED
CONNECTIONS.
AND USED SUCCESSFULLY IN SIMILAR SITUATIONS ON OTHER
3. HEAD ANGLE JAMB CONNECTIONS.
PROJECTS.
B. OPERABLE PARTITION SUPPORT:
PROPRIETARY SPECIFICATION REQUIREMENTS: WHERE ONLY
A SINGLE PRODUCT OR MANUFACTURER IS NAMED. PROVIDE
1. CARRIER BEAM
THE PRODUCT IND ICATED . NO SUBSTITUTIONS WILL BE
2. HANGER RODS & FASTENERS
PERMITTED.
.02
SUBM IT SHOP DRAWINGS FOR STRUCTURAL ITEMS.
SEM IPROPR IETARY SPECIFICATION REQUIREMENTS: WHERE
TWO OR MORE PRODUCTS OR MANUFACTURERS ARE NAMED,
.03
STEEL SHAPES, PLATES AND OTHER ITEMS: ASTM A -36.
PROVIDE ONE OF THE PRODUCTS INDICATED. NO
SUBSTITUTIONS WILL BE PERMITTED.
.04
BOLTS AND NUTS: ASTM A -307, GRADE A FOR LESS THAN 3/4" AND
ASTM A-325 FOR 3/4" DIAMETER AND LARGER, UNLESS OTHERWISE
NON- PROPRIETARY SPECIFICATIONS: WHEN SPECIFICATIONS
INDICATED.
LIST PRODUCTS OR MANUFACTURERS THAT ARE AVAILABLE
MAY BE USED, BUT DO NOT RESTRICT THE CONTRACTOR TO
.05
EXPANSION BOLTS:
USE OF THESE PRODUCTS ONLY, THE CONTRACTOR MAY
PROPOSE ANY PRODUCT THAT COMPLIES WITH CONTRACT
A. FOR CONCRETE: FED. SPEC. FF -S -325, GROUP I1, TYPE 4, CLASS
REQUIREMENTS. COMPLY WITH PROVISIONS FOR
"SUBSTITUTIONS"
1,
TO OBTAIN APPROVAL FOR USE OF AN
UNNAMED PRODUCT.
B. FOR MASONRY: FED. SPEC. FF -S -325, GROUP II, TYPE 3, CLASS
3.
.03
DELIVER, STORE, AND HANDLE PRODUCTS IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS, USING METHODS THAT WILL
.06
FABRICATE AND SHOP PAINT IN ACCORDANCE WITH A ISC
PREVENT DAMAGE, DETERIORATION AND LOSS.
SPECIFICATIONS.
.04
COMPLY WITH MANUFACTURER'S INSTRUCTIONS AND
.07
INSTALL METAL FABRICATIONS USING FASTENER TYPES AND
RECOMMENDATIONS FOR INSTALLATION OF PRODUCTS. ANCHOR
ANCHORING METHODS APPROPRIATE TO SUBSTRATE AND DESIGNED
EACH PRODUCT SECURELY IN F'LACE, ACCURATELY LOCATED AND
TO WITHSTAND EXPECTED LOADS.
ALIGNED WITH OTHER WORK. CLEAN EXPOSED SURFACES AND
PROTECT TO ENSURE FREEDOM FROM DAMAGE AND DETERIORATION
AT TIME OF SUBSTANTIAL COMPLETION.
DIVISION 1
ci
01010
SUMMARY OF WORK
I C. REVIEW
"K+
w
cl- °ooc
w
.01
THE WORK CONSISTS OF EXISTING OFFICE BUILDING TENANT SPACE
0
F_
DEMOLITION AND INTERIOR CONSTRUCTION AS SHOWN ON CONTRACT
z
DOCUMENTS PREPARED BY HIXSON.
.02
CONSTRUCT THE WORK UNDER A STIPULATED SUM CONTRACT FOR
w
ALL WORK INDICATED OR REQUIRED BY THE CONTRACT DOCUMENTS.
z (D
THE WORK INCLUDES GENERAL CONSTRUCTION AND ASSOCIATED
J
PLUMBING. FIRE PROTECTION, MECHANICAL AND ELECTRICAL WORK.
.03
THE TENANT MAY NEGOTIATE PURCHASE ORDERS WITH SUPPLIERS
N
v
N
OF NEW EQUIPMENT AND MAY ALSO FURNISH RELOCATED EXISTING
o
EQUIPMENT ITEMS TO BE INCORPORATED INTO THE WORK.
Q
THE TENANT IS RESPONSIBLE FOR RECEIVING, STORAGE AND
to
o
TESTING OF PRE - ORDERED NEW EQUIPMENT AND RELOCATED
Lu
EXISTING EQUIPMENT.
Ir
THE CONTRACTOR IS RESPONSIBLE FOR HANDLING, SETTING,
UTILITIES TO AND FINAL CONNECTION OF PRE-ORDERED NEW
Q to U 111
AND RELOCATED EXISTING EQUIPMENT.
.04
CONFINE OPERATIONS TO AREAS WITHIN THE TENANT LEASE SPACE.
w
0
AREAS BEYOND THE TENANT LEASE SPACE ARE NOT TO BE
D ISTURBED .
.05
KEEP DRIVEWAYS, ENTRANCES, CONCOURSE AND SERVICE
CORRIDORS CLEAR AT ALL TIMES. DO NOT USE THESE AREAS FOR
PARKING OR STORAGE OF MATERIALS. SCHEDULE DELIVERIES TO
MINIMIZE REQUIREMENTS FOR STORAGE OF MATERIALS.
.06
PARTIAL TENANT OCCUPANCY: THE TENANT RESERVES THE RIGHT TO
OCCUPY AND PLACE AND INSTALL EQUIPMENT AND SUPPLIES IN
COMPLETED AREAS PRIOR TO SUBSTANTIAL COMPLETION PROVIDED
SUCH OCCUPANCY DOES NOT INTERFERE WITH COMPLETION OF THE
WORK. PARTIAL OCCUPANCY FOR PLACING OF EQUIPMENT AND
z
SUPPLIES SHALL NOT CONSTITUTE ACCEPTANCE OF THE TOTAL
>
WORK.
C
OBTAIN A TEMPORARY CERTIFICATE OF OCCUPANCY FROM
LOCAL BUILDING OFFICIALS PRIOR TO TENANT OCCUPANCY.
PRIOR TO PARTIAL TENANT OCCUPANCY. MECHANICAL AND
ELECTRICAL SYSTEMS SHALL BE FULLY OPERATIONAL AND
REQUIRED INSPECTIONS AND TEST SHALL HAVE BEEN
SUCCESSFULLY COMPLETED.
01040 PROJECT COORDINATION
.01 COORDINATE ACTIVITIES OF VARIOUS TRADES TO ASSURE EFFICIENT
AND ORDERLY CONSTRUCTION. COORDINATE OPERATIONS OF
VARIOUS TRADES THAT ARE DEPENDENT ON EACH OTHER FOR
PROPER INSTALLATION AND OPERATION.
.02 COORDINATE SCHEDULING AND TIMING OF ADMINISTRATIVE
PROCEDURES WITH OTHER ACTIVITIES TO AVOID CONFLICTS AND
ENSURE ORDERLY PROGRESS.
WHERE INSTALLATION OF ONE COMPONENT DEPENDS ON
INSTALLATION OF OTHER COMPONENTS BEFORE OR AFTER ITS
OWN INSTALLATION. SCHEDULE ACTIVITIES IN THE SEQUENCE
REQUIRED TO OBTAIN THE BEST RESULTS.
WHERE SPACE IS LIMITED. COORDINATE INSTALLATION OF
DIFFERENT COMPONENTS TO ASSURE MAXIMUM ACCESSIBILITY
FOR MAINTENANCE, SERVICE AND REPAIR.
MAKE PROVISIONS TO ACCOMMODATE ITEMS SCHEDULED FOR
LATER INSTALLATION.
.03 THE INSTALLER OF EACH COMPONENT SHALL INSPECT THE
SUBSTRATE AND CONDITIONS UNDER WHICH WORK IS PERFORMED.
DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN
CORRECTED.
.04 INSPECT MATERIAL IMMEDIATELY UPON DELIVERY AND AGAIN PRIOR
TO INSTALLATION. REJECT DAMAGED AND DEFECTIVE ITEMS.
RECHECK MEASUREMENTS AND DIMENSIONS BEFORE STARTING
INSTALLATION.
.05 PROVIDE ATTACHMENT AND CONNECTION DEVICES AND METHODS
NECESSARY FOR SECURING EACH CONSTRUCTION ELEMENT.
SECURE EACH CONSTRUCTION ELEMENT TRUE TO LINE AND LEVEL.
ALLOW FOR EXPANSION AND BUILDING MOVEMENT.
.06 COMPLY WITH MANUFACTURER ' S INSTALLATION INSTRUCTION AND
RECOMMENDATIONS TO THE EXTEND THAT THEY ARE MORE
STRINGENT THAN REQUIREMENTS IN CONTRACT DOCUMENTS.
.07 WHERE MOUNTING HEIGHTS ARE NOT IND ICATED , INSTALL
COMPONENTS AT STANDARD HEIGHTS FOR THE APPLICATION
IND ICATED . REFER QUESTIONABLE DECISIONS TO THE ARCHITECT.
.02 CLEANING AND PROTECTION: DIMING HANDLING AND INSTALLATION,
CLEAN AND PROTECT CONSTRUCTION IN PROGRESS AND ADJOINING
MATERIALS IN PLACE. APPLY PROTECTIVE COVERING WHERE
REQUIRED TO ENSURE PROTECTION FROM DAMAGE OR
DETERIORATION AT SUBSTANTIAL COMPLETION. CLEAN AND MAINTAIN
COMPLETED CONSTRUCTION AS OFTEN AS NECESSARY THROUGH
THE CONSTRUCTION PERIOD.
01300 SUBMITTALS
.01 COORDINATE SUBMITTAL PREPARATION WITH PERFORMANCE OF
CONSTRUCTION ACTIVITIES AND WITH PURCHASING OR FABRICATION,
DELIVERY. OTHER SUBMITTALS AND RELATED ACTIVITIES. TRANSMIT
IN ADVANCE OF PERFORMANCE OF RELATED ACTIVITIES TO AVOID
DELAY.
.02 SHOP DRAWINGS: SUBMIT NEW INFORMATION, DRAWN TO ACCURATE
SCALE. INDICATE DEVIATIONS FROM CONTRACT DOCUMENTS. DO
NOT REPRODUCE CONTRACT DOCUMENTS OR COPY STANDARD
INFORMATION AS THE BASIS OF SHOP DRAWINGS. SUBMIT ONE
BLUELINE PRINT FOR REVIEW AND ONE CORRECTABLE TRANSLUCENT
PRINT FOR REPRODUCTION AND DISTRIBUTION.
.03 PRODUCT DATA: COLLECT PRODUCT DATA INTO A SINGLE SUBMITTAL
FOR EACH ELEMENT OR SYSTEM. MARK EACH COPY TO SHOW
APPLICABLE CHOICES AND OPTIONS. WHERE PRODUCT DATA
INCLUDES INFORMATION ON SEVERAL PRODUCTS, SOME OF WHICH
ARE NOT REQUIRED. MARK COPIES TO INDICATE THE APPLICABLE
INFORMATION. SUBMIT FOUR COPIES.
.04 SAMPLES: SUBMIT FULL -SIZE SAMPLES CURED AND FINISHED AS
SPECIFIED AND IDENTICAL TO THE PRODUCT PROPOSED. MOUNT,
DISPLAY, OR PACKAGE SAMPLES TO FACILITATE REVIEW. PREPARE
SAMPLES TO MATCH THE ARCHITECT'S SAMPLE. SUBMIT THREE
SAMPLES.
.05 THE GENERAL CONTRACTOR SHALL PACKAGE SUBMITTALS WITH AIA
DOCUMENT G 810 OR SIMILAR TRANSMITTAL FORM. SUBMITTALS
RECEIVED DIRECTLY FROM SUBCONTRACTORS OR SUPPLIERS
WITHOUT GENERAL CONTRACTOR REVIEW WILL BE RETURNED
WITHOUT ACTION.
.06 ARCHITECT'S ACTION: EXCEPT FOR SUBMITTALS FOR RECORD,
INFORMATION OR SIMILAR PURPOSES, WHERE ACTION AND RETURN
IS REQUIRED, THE ARCHITECT WILL REVIEW EACH SUBMITTAL, MARK
TO INDICATE ACTION TAKEN. AND RETURN. COMPLIANCE WITH
CONTRACT DOCUMENTS IS THE CONTRACTOR'S RESPONSIBILITY.
°j 3 ... o
cr
CHECKED
� ; L
N o J a
L >�
I C. REVIEW
"K+
w
cl- °ooc
cr
NUMBER
d �% L N
PRINT
DATE
F_
N �2 0° ,�
z
L p 3
z
u•�
L u
° U
w
CL
z (D
_c L
J
D
W°
N
0.0 0-0 U
N
v
N
s o •o`_ ul
3 ao b_
o
Q.
0
Q
LL z° o
to
o
cu
V
0
cz
v� 0
Z -
p
a
V
W
lu
v V
9L um
u. -
Z J aC
O 0 -J a i
~ a Q
Q Z
IOC z Z z
Im Q 0 .1
CID w
W W
O cc
DATABASE db.U042Oa8
DRAWN
cr
CHECKED
GPH
I C. REVIEW
"K+
DRAW i NG
DATE
cr
NUMBER
5204.20
PRINT
DATE
F_
csial
z
z
w
z (D
Ln
Co
W°
N
Ln
w
No
�
o
F-
L) M
H Q�
z �-
U U N
Q to U 111
cu
V
0
cz
v� 0
Z -
p
a
V
W
lu
v V
9L um
u. -
Z J aC
O 0 -J a i
~ a Q
Q Z
IOC z Z z
Im Q 0 .1
CID w
W W
O cc
DATABASE db.U042Oa8
DRAWN
GOF
CHECKED
GPH
I C. REVIEW
"K+
DRAW i NG
DATE
081595
NUMBER
5204.20
PRINT
DATE
csial