Loading...
HomeMy WebLinkAboutCS1.108200 WOOD DOORS .01 REMOVE & SALVAGE FOR REUSE EXISTING SOLID CORE WOOD DOORS. .02 DESIGNATE NEW OPENING LOCATIONS FOR EXISTING DOORS UPON REMOVAL AND ADVISE LANDLORD IF AVAILABLE STOCK IS ADEQUATE FOR QUANTITY & HAND REQUIRED. .03 EXISTING LIGHT OAK DOOR FINISH WILL BE USED AS IS. EXISTING WALNUT STAINED DOORS AND WOOD FRAMES WILL BE PAINTED. REFER TO OPENING SCHEDULE FOR FINISHES. .04 PROVIDE NEW WOOD DOORS MATCHING EXISTING WHERE NEW WOOD DOORS ARE SCHEDULED. 08710 DOOR HARDWARE .01 REMOVE & SALVAGE FOR REUSE EXISTING HINGES, CLOSERS, OPERATING HARDWARE, TRIM AND ACCESSORIES. .02 HINGES: REUSE EXISTING. .03 LOCKSETS : MATCH EXISTING TRIM AND FINISH. FOR NEW UNITS COORDINATE MASTERKEY ING WITH OWNER. .04 PULL HANDLES: IVES 8302 -8, 4" X 16 ", US10. .05 PUSH PLATES: IVES 8200, 4" X 16 ", US10. .06 CLOSERS: MATCH EXISTING TYPE & FINISH. .07 MANUAL FLUSHBOLTS: IVES 458 US10. .08 ELECTRIC STRIKES: ADAMS RITE * 7140 -340 -626, W /TRANSFORMER .09 WALLBUMPERS: IVES 407, US10. PROVIDE FLOOR STOP WHERE WALLBUMPERS DO NOT FUNCTION. .10 HARDWARE SETS SET NO. 1 1.5 PR HINGES - BB MATCHING EXISTING 1 EACH CLOSER W1110 STOP 1 EACH LOCKSET - STOREROOM FUNCTION 1 EACH ELECTRIC STRIKE SET NO. 2 1.5 PR REUSED EXISTING HINGES 1 EACH REUSED EXISTING LATCHSET 1 EACH WALL BUMPER SET NO. 3 1.5 PR REUSED EXISTING HINGES 1 EACH CLOSER 1 EACH LOCKSET - STOREROOM FUNCTION 1 EACH WALL BUMPER SET NO. 4 3 PR REUSED EXISTING HINGES 2 EACH DUMMY LEVER 2 EACH ROLLER CATCH SET NO. 5 1.5 PR REUSED EXISTING HINGES 1 EACH DUMMY LEVER 1 EACH ROLLER CATCH SET NO. 6 3 PR REUSED EXISTING HINGES 2 EACH CLOSERS 1 SET FLUSH BOLTS - TOP AND BOTTOM (INACTIVE LEAF) 1 EACH LOCKSET - EXIT FUNCTION ( ACTIVE LEAF) 2 EACH FLOOR STOPS 2 EACH DUSTPROOF STRIKES 1 EACH ELECTRIC STRIKE SET NO. 7 1.5 PR REUSED EXISTING HINGES 1 EACH CLOSER 1 EACH PULL HANDLE 1 EACH PUSH PLATE 1 EACH WALLBUMPER 08800 GLASS AND GLAZING .01 INDUSTRY STANDARDS: ASTM C -1036 "STANDARD SPECIFICATION FOR FLAT GLASS" AND ASTM C -1048 "STANDARD SPECIFICATION FOR HEAT - TREATED FLAT GLASS - KIND HS, KIND FT COATED AND UNCOATED GLASS ". .02 FLOAT GLASS: ASTM C -1036, CONDITION A (UNCOATED SURFACES), TYPE I (TRANSPARENT GLASS, FLAT), CLASS 1 (CLEAR), QUALITY 03 (GLAZING SELECT). PROVIDE 1/4" ANNEALED, HEAT STRENGTHENED OR TEMPERED AS REQUIRED BY CODES AND AS IND ICATED . .03 MIRROR GLASS: ANNEALED FLOAT GLASS, TYPE I, CLASS 1 (TRANSPARENT), QUALITY q2. .04 COMPLY WITH COMBINED PRINTED RECOMMENDATIONS OF GLASS MANUFACTURERS, OF MANUFACTURERS OF SEALANTS, GASKETS AND OTHER GLAZING MATERIALS, EXCEPT WHERE MORE STRINGENT REQUIREMENTS ARE IND ICATED . .05 PROTECT GLASS FROM DAMAGE DURING HANDLING AND INSTALLATION. REMOVE AND REPLACE DAMAGED GLASS. DIVISION 9 09250 GYPSUM BOARD .01 WALLBOARD: ASTM C 36, 5/8" REGULAR AND TYPE X AS INDICATED AND AS REQUIRED FOR FIRE RATED CONSTRUCTION. .02 WATER RESISTANT GYPSUM BOARD: ASTM C 630, GYPSUM BOARD WITH WATER RESISTANT TREATED CORE AND FACES. .03 METAL STUDS: 2 -112 ' X 25 GAGE UNLESS OTHERWISE INDICATED. RUNNERS OF SAME GAGE AND SIZE AS STUDS. .04 METAL FURRING: ASTM C -645: 25 GAGE MINIMUM ELECTROGALVANIZED, HAT SHAPED, 7/8 ". .05 SOUND ATTENUATION BLANKETS: USG SAFB, ASTM C -665, TYPE I: SEMI-RIGID MINERAL FIBER BLANKET WITHOUT MEMBRANE, MAXIMUM FLAME SPREAD RATING OF 25, 1 112" THICK UNLESS OTHERWISE IND ICATED . .06 CONCEALED ACOUSTICAL SEALANT: NON- DRYING, NON - HARDENING, NON- SKINNING, NON- STAINING, NON- BLEEDING, GUN GRADE SEALANT FOR CONCEALED APPLICATIONS PER ASTM C -919. .07 INSTALL WATERPROOF MEMBRANE IN ALL FLOOR TILE LOCATIONS ON ELEVATED SLABS. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. .08 ACCESSORIES: SCREWS, TAPE, JOINT FINISHING COMPOUND, CORNER BEADS, CASINGS AND OTHER ITEMS AS REQUIRED TO COMPLETE THE INSTALLATION. .09 USE DOUBLE STUDS AT END WALL AND WHERE SUPPORTING WALL HUNG ITEMS. SPACE STUDS AT 24" O.C. UNLESS OTHERWISE IND ICATED. .10 SECURE CEILING SUPPORT MEMBERS IN ACCORDANCE WITH ASTM C- 754. .11 APPLY GYPSUM BOARD IN ACCORDANCE WITH ASTM C -840 AND GYPSUM ASSOCIATION DOCUMENT 216. SECURE WITH SCREWS. APPLY JOINT TAPE AND COMPOUND AT SURFACES EXPOSED TO VIEW, IN ACCORDANCE WITH MANUFACTURER ' S INSTRUCTIONS. SAND JOINTS SMOOTH WITH SURROUNDING WALLBOARD SURFACE. SEAL TIGHT AROUND ALL OPENINGS. DIVISION 8 06100 ROUGH CARPENTRY .01 ROUGH LUMBER: NO. 2 SOUTHERN PINE. FIRE RETARDANT TF =ATED TO UL CLASSIFICATION OF 25 FLAME SPREAD RATING, ASTM E-_84. TREATMENT CHEMICALS SHALL BE NON - HYGROSCOPIC. PERCENT. OF MOISTURE AT DELIVERY - 19 PERCENT MAXIMUM. .02 ROUGH HARDWARE: NAILS, EXPANSION BOLTS, TOGGLE BOLT';, NUTS, SCREWS, WASHERS AND OTHER ITEMS AS REQUIRED. GALVANG'ED FOR EXTERIOR APPLICATIONS. .03 PROVIDE BLOCKING AS REQUIRED. .04 PLYWOOD: APA RATED. C -D , EXTERIOR GRADE. .05 SECURELY ATTACH CARPENTRY TO SUBSTRATES BY ANCHORING AND FASTENING AS INDICATED AND AS REQUIRED BY RECOGN IZEC STANDARDS. INSTALL FASTENERS WITHOUT SPLITTING WOOL : PRE- DRILL AS REQUIRED. .06 COORDINATION: FIT CARPENTRY TO OTHER WORK, SCRIBE ,.M COPE AS REQUIRED FOR ACCURATE FIT. COORDINATE LOCATION )F FURRING, NA ILERS , BLOCKING, GROUNDS AND SIMILAR SUPPORTS TO ALLOW ATTACHMENT TO OTHER WORK. .07 SET CARPENTRY ACCURATELY TO REQUIRED LEVELS AND -INED WITH MEMBERS PLUMB, TRUE AND ACCURATELY CUT AND FITTED. 06400 ARCHITECTURAL WOODWORK .01 MATERIALS A. COMPLY WITH FORMALDEHYDE EMISSION REQUIREMIEI`TS FOR THE FOLLOWING: 1. NPA 9 FOR MEDIUM DENSITY FIBERBOARD 2. HPMA FE FOR HARDWOOD PLYWOOD B. NEMA LD 3 HKH- PRESSURE DECORATIVE PLASTIC L AM INATE 1. GP -50 HORIZONTAL SURFACES 2. GP -42 POSTFORMED SURFACES 3. GP -28 VERTICAL SURFACES 4. GP -50 EDGES C. MILLWORK HARDWARE - 1. DRAWER SLIDES. ACCU -RIDE *3832 2. DRAWER PULLS: EPI MC 303 (BLACK) 3. HINGES: GRASS *1210 4. CLOSET RODS= 1" DIAMETER S.S. K &V 66OSS WITH K &V 734 FLANGES. 5. STANDARDS: K &V 255 WITH NO. 256 SI- PPORTS . .02 FABRICATION A. FABRICATE MILLWORK ITEMS IN ACCORDANCE WITH AWI "CUSTOM" QUALITY STANDARDS AND "FLUSH (',VERLAY" CONSTRUCTION. APPLY LAMINATE PLASTIC CLADDING IN ACCORDANCE WITH AWI AND LAMINATE MANUFA(• ;TUBER'S RECOMMENDATIONS USING AN APPROVED ADHE: IVES & METHODS. B. USE CABINET LINER FOR INTERIOR OF CAB INE.1 S AND DRAWERS. MAKE DRAWER BOTTOMS 1/4" HARDWOOD PLYWOOD (WITH CABINET LINER FINISH) . C. USE 3/4" MDF COVERED BY CABINET LINER -=OR CABINET SHELVING. SUPPORT CABINET SHELVING W IT i ADJUSTABLE BRACKETS. D. WOOD FINISHING: 1. BACK PRIME CONCEALED SURFACES. 2. TRANSPARENT FINISH: AWI FINISH S);STEM *1 STANDARD LACQUER. 3. PAINTED FINISH: AWI FINISH SYSTEM *8 SYNTHETIC ENAMELS. E. PROVIDE CUTOUTS TO ACCOMMODATE SWITC ES, TELEPHONE LINES, SINKS AND OTHER ITEMS, FROM TEMPLATES FURNISHED. .03 INSTALLATION A. INSTALL MILLWORK IN ACCORDANCE WITH FINAL SHOP DRAWINGS AND SPECIFICATION AND DETAIL REQU IREMENTS OF AWI, 1700. B. SET STANDARDS FOR ADJUSTABLE SHELVING BRACKETS AT 32" O.C. HORIZONTALLY MAXIMUM UNLESS OT- iERW ISE IND ICATED . C. INSTALL MILLWORK PLUMB, LEVEL, TRUE, IN ALIGNMENT AND WITH NO DISTORTIONS. SHIM AS REQUIRED USING CONCEALED SHIMS. D. INSTALL FASTENERS, BRAC ING , BLOCK M. G AND OTHER MISCELLANEOUS MATERIAL REQUIRED TO COMPLETE WORK. SECURELY FASTEN TO WALLS AND /OR F -OORS. SECURELY FASTEN TOPS TO BASE UNITS OR SUPPORTING ING D EV ICES . E. COUNTERSINK EXPOSED FASTENERS. L)CATE FASTENERS FOR MAXIMUM STRUCTURAL CONDITIONS BUT 'IN AS INCONSPICUOUS A LOCATION AS POSS IBI,E . SET EXPOSED FASTENERS AND POINT UP WITH COLOR-1 SPACKLING COMPOUND. F. TOUCH UP FINISHED SURFACES AND SF ACKLED AREAS AT COMPLETION OF INSTALLED MILLWORK. .04 ADJUST AND CLEAN , A. AT COMPLETION OF INSTALLATION, REMOVE PROTECTIVE COVERINGS AND CLEAN SURFACES. B. CHECK AND ADJUST OPERATING HARC.WARE ON ALL DOORS, DRAWERS, ETC. REPLACE DEFECTIVE' HARDWARE. C. REPAIR DAMAGED AND DEFECTIVE M I _LWORK WHEREVER POSSIBLE TO ELIMINATE FUNCT INAL ' OR VISUAL DEFECTS; WHERE NOT POSSIBLE TO REPAIR PROPERLY, REPLACE DEFECTIVE WORK. DIVISION 7 07900 JOINT SEALERS .01 ONE -PART POLYURETHANE FS TT -S- 002;30, CLASS A. TYPE II, VULKEM 921, MAMECO INTERNATIONAL, INTERIOR JOINTS AT MASONRY WALLS, CONTROL JOINTS, EXPANSION JOINTS, JUP'ICTURES AT WALL -TO -WALL, DOOR AND WINDOW FRAME TO WALL, ETC., LOUVERS, AROUND DOOR SILLS, ACCESS PANELS. GRILLES, AND OTHER GENERAL CONSTRUCTION ITEMS. .02 ONE -PART MILDEW RESISTANT SILICONE � FF TT- S- 001543 CLASS A. DOW CORNING 786. INTERIOR JOINTS ARO JND PLUMBING FIXTURES, COUNTERTOPS, TILE WALLS, ETC. .03 LATEX JOINT SEALANT: ASTM C -834 BOST IK CHEM CALK 600, INTERIOR JOINTS AT DRYWALL. DOOR FRAMES. AND OTHER NON-MOVING JOINTS TO BE PAINTED. .04 PRIMER: TYPE RECOMMENDED BY JOINT SEALER MANUFACTURER AS REQUIRED FOR ADHESION OF SEALANT TO JOINT SUBSTRATES IND ICATED . .05 BACKER ROD: COMPRESSIBLE ROD STCCK OF POLYETHYLENE FOAM, POLYURETHANE FOAM, BUTYL RUBBER FOAM OR OTHER FLEXIBLE, NON- ABSORPTIVE MATERIAL AS RECOMMENDED BY SEALANT MANUFACTURER, SIZE AND SHAPE AS FEQUIRED TO CONTROL JOINT DEPTH FOR SEALANT PLACEMENT DIVISION 8 08110 DOOR AND WINDOW FRAMES .01 REMOVE AND SALVAGE FOR REUSE EX STING ALUMINUM OR WOOD DOOR & WINDOW FRAME COMPONENTS 14CLUD ING FRAME CONNECTIONS, INSERTS, STOPS & FA' 3TENERS . .02 DESIGNATE NEW OPENING LOCATIONS FOR EXISTING FRAMES UPON REMOVAL & ADVISE LANDLORD IF AD')ITIONAL COMPONENTS MAY BE REQUIRED FROM EXISTING STOCK. .03 MOCK UP ONE COMPLETE FRAM /DOOR & ONE COMPLETE FRAME /WINDOW AT FINAL LOCATIONS TO ESTABLISH NECESSARY CLEARANCES, INSTALLATION MTHiOD 3 & COMPLETED APPEARANCE. .04 SET REMAINING DOOR AND WINDOW FRAMES TO MATCH APPROVED MOCK -UP INSTALLATION. 01700 PROJECT CLOSEOUT 01400 QUALITY CONTROL .01 BEFORE REQUESTING INSPECTION FOR CERTIFICATION OF w cl- °ooc w .01 SUBSTANTIAL COMPLETION, COMPLETE THE FOLLOWING: .01 THIS SECTION SPECIFIES REQUIREMENTS FOR QUALITY CONTROL DEMOLITION AND INTERIOR CONSTRUCTION AS SHOWN ON CONTRACT IN THE APPLICATION FOR PAYMENT THAT COINCIDES WITH THE SERVICES. QUAY TESTS PERFORMEDITBY TTHEROCONTRACTOR. INCLUDE INSPECTIONS AND DATE SUBSTANTIAL COMPLETION IS CLAIMED, SHOW 100 CONSTRUCT THE WORK UNDER A STIPULATED SUM CONTRACT FOR w PERCENT COMPLETION FOR THE PORTION OF THE WORK CLAIMED SUBSTANTIALLY COMPLETE. VERIFICATION OF EXISTING STRUCTURE THE WORK INCLUDES GENERAL CONSTRUCTION AND ASSOCIATED SUBMIT SPECIFIC WARRANTIES, WORKMANSHIP BONDS, .02 CONTRACTOR RESPONSIBILITIES, PROVIDE INSPECTIONS AND TESTS SPECIFIED OR REQUIRED BY PROJECT SPECIFICATIONS, GOVERNING MAINTENANCE AGREEMENTS, FINAL CERTIFICATIONS AND SIMILAR DOCUMENTS. THE TENANT MAY NEGOTIATE PURCHASE ORDERS WITH SUPPLIERS AUTHORITIES OR INDEPENDENT AGENCIES. INSPECTION AND TESTING N OF NEW EQUIPMENT AND MAY ALSO FURNISH RELOCATED EXISTING COSTS ARE INCLUDED IN THE CONTRACT UNLESS NOTED OTHERWISE. EQUIPMENT ITEMS TO BE INCORPORATED INTO THE WORK. SUBMIT RECORD DRAWINGS, MAINTENANCE MANUALS AND SIMILAR RECORD INFORMATION. .03 THE CONTRACTOR SHALL COORDINATE THE SEQUENCE OF ACTIVITIES to o TESTING OF PRE - ORDERED NEW EQUIPMENT AND RELOCATED TO ACCOMMODATE SERVICES WITH A MINIMUM OF DELAY. THE CHANGE -OVER PERMANENT LOCKS AND TRANSMIT KEYS TO Ir CONTRACTOR SHALL COORDINATE ACTIVITIES TO AVOID REMOVING AND REPLACING CONSTRUCTION TO ACCOMMODATE INSPECTIONS THE CONTRACTOR IS RESPONSIBLE FOR HANDLING, SETTING, THE OWNER. UTILITIES TO AND FINAL CONNECTION OF PRE-ORDERED NEW AND TESTS. Q to U 111 COMPLETE START -UP TESTING OF SYSTEMS, AND INSTRUCTION OF THE OWNER'S PERSONNEL. REMOVE TEMPORARY .04 PRIOR TO CORE DRILLING EXISTING POST - TENSIONSED CONCRETE, CONFINE OPERATIONS TO AREAS WITHIN THE TENANT LEASE SPACE. FACILITIES FROM THE SITE, ALONG WITH CONSTRUCTION FLOOR PLANKS CONTRACTOR SHALL VERIFY EXISTING REINFORCEMENT LOCATIONS. UNDER NO CIRCUMSTANCES MAY TOOLS, MOCK-UPS, AND SIMILAR ELEMENTS. D ISTURBED . EXISTING FLOOR PLANK REINFORCEMENT BE CUT. .05 COMPLETE FINAL CLEAN UP. TOUCH -UP AND REPAIR AND RESTORE MARRIED EXPOSED FINISHES. .05 CONTACT JOE RETZNER PE AT AMERICAN PRECAST 317 - 353 -2118 FOR CORRIDORS CLEAR AT ALL TIMES. DO NOT USE THESE AREAS FOR PERMISSIBLE LOCATIONS AND SIZES OF CONCRETE FLOOR PLANK MINIMIZE REQUIREMENTS FOR STORAGE OF MATERIALS. PENETRATIONS. .02 ON RECEIPT OF A REQUEST FOR INSPECTION, THE ARCHITECT WILL PROCEED OR ADVISE THE CONTRACTOR OF UNFILLED .06 UPON COMPLETION OF INSPECTION AND TESTING REPAIR DAMAGED OCCUPY AND PLACE AND INSTALL EQUIPMENT AND SUPPLIES IN REQUIREMENTS. THE ARCHITECT WILL PREPARE THE CERTIFICATE OF CONSTRUCTION AND RESTORE SUBSTRATES AND FINISHES TO ELIMINATE DEFICIENCIES. SUBSTANTIAL COMPLETION FOLLOWING INSPECTIONS. OR ADVISE THE SUCH OCCUPANCY DOES NOT INTERFERE WITH COMPLETION OF THE CONTRACTOR OF CONSTRUCTION THAT MUST BE COMPLETED OR CORRECTED BEFORE THE CERTIFICATE WILL BE ISSUED. .07 THE CONTRACTOR SHALL PROTECT CONSTRUCTION EXPOSED BY OR SUPPLIES SHALL NOT CONSTITUTE ACCEPTANCE OF THE TOTAL > FOR QUALITY CONTROL SERVICE ACTIVITIES, AND PROTECT REPAIRED .03 FINAL ACCEPTANCE BEFORE REQUESTING INSPECTION FOR CONSTRUCTION REGARDLESS OF THE ASSIGNMENT OF RESPONSIBILITY FOR INSPECTION AND TESTING. UPON COMPLETION CERTIFICATION OF FINAL ACCEPTANCE AND FINAL PAYMENT, SUBMIT THE FOLLOWING: OF INSPECTION AND TESTING, , REPAIR DAMAGED CONSTRUCTION AND RESTORE SUBSTRATES AND FINISHES TO ELIMINATE DEFICIENCIES. FINAL PAYMENT REQUEST WITH RELEASES. 01500 TEMPORARY FACILITIES FINAL ACCOUNTING FOR CHANGES TO THE CONTRACT SUM. .01 THIS SECTION SPECIFIES TEMPORARY SERVICES AND FACILITIES FINAL INSPECTION STATING INDIVIDUAL ITEM COMPLETION OR INCLUDING UTILITIES, CONSTRUCTION AND SUPPORT FACILITIES, SECURITY AND PROTECTION. PROVIDE FACILITIES READY FOR USE. RESOLUTION. REMOVE WHEN NO LONGER NEEDED, OR REPLACED BY PERMANENT CONSENT OF SURETY TO FINAL PAYMENT. FACILITIES. CONTINUING INSURANCE COVERAGE EVIDENCE. .02 COMPLY WITH NFPA CODE 241, "BUILDING CONSTRUCTION AND DEMOLITION OPERATIONS ", ANSI -A10 SERIES STANDARDS FOR .04 RECORD DRAWINGS: MAINTAIN A CLEAN, UNDAMAGED SET OF BLUE "SAFETY REQUIREMENTS FOR CONSTRUCTION AND DEMOLITION". AND ELECTRICAL DESIGN LIBRARY "TEMPORARY ELECTRICAL LINE WHITE-PRINTS OF CONTRACT DRAWINGS AND SHOP DRAWINGS. FACILITIES". MARK -UP THESE DRAWINGS TO SHOW THE ACTUAL INSTALLATION. MARK WHICHEVER DRAWINGS IS NOT CAPABLE OF SHOWING CONDITIONS ACCURATELY. GIVE PARTICULAR ATTENTION TO .03 INSTALL AND MAINTAIN TEMPORARY FIRE PROTECTION OF TYPES CONCEALED ELEMENTS THAT WOULD BE DIFFICULT TO MEASURE AND NEEDED TO PROTECT AGAINST PREDICTABLE AND CONTROLLABLE FIRE LOSSES. COMPLY WITH NFPA 10 "STANDARD FOR PORTABLE RECORD AT A LATER DATE. FIRE EXTINGUISHERS," AND NFPA 241 "STANDARD FOR MAINTENANCE MANUALS ORGANIZE MAINTENANCE DATA INTO SETS SAFEGUARDING CONSTRUCTION, ALTERATIONS AND DEMOLITION OPERATIONS. " OF MANAGEABLE SIZE. BIND IN INDIVIDUAL HEAVY -DUTY 2 -INCH, 3 - RING VINYL - COVERED BINDERS, WITH POCKET FOLDERS FOR FOLDED SHEET INFORMATION. MARK IDENTIFICATION ON FRONT AND SPINE .04 USE TEMPORARY BRANCHES FROM EXISTING WATER AND ELECTRICAL OF EACH BINDER. SERVICE DURING CONSTRUCT ION . ARRANGE FOR AUTHORITIES HAVING JURISDICTION TO INSPECT AND TEST EACH TEMPORARY OPERATING AND MAINTENANCE INSTRUCTIONS: ARRANGE FOR THE UTILITY BEFORE USE. OBTAIN REQUIRED CERTIFICATIONS AND PERMITS. INSTALLER OF EQUIPMENT THAT REQUIRES REGULAR MAINTENANCE TO MEET WITH THE OWNER'S PERSONNEL TO PROVIDE INSTRUCTION IN PROPER OPERATION AND MAINTENANCE. .05 PROVIDE FIELD OFFICE SPACE WITHIN THE CONSTRUCTION AREA TO ACCOMMODATE PROJECT PERSONNEL. PROVIDE POWER, TELEPHONE .05 EMPLOY EXPERIENCED WORKERS FOR FINAL CLEANING. CLEAN EACH AND FAX SERVICE. KEEP FIELD OFFICE SPACE CLEAN AND ORDERLY FOR SMALL PROGRESS MEETINGS. EXISTING WASHROOMS MAY BE SURFACE TO THE CONDITION EXPECTED IN A COMMERCIAL BUILDING CLEANING AND MAINTENANCE PROGRAM. USED BY CONTRACTOR PERSONNEL DURING CONSTRUCT ION PROV!O ING THESE AREAS ARE MAINTAINED IN A CONDITION SIMILAR .06 REMOVE TEMPORARY PROTECTION AND FACILITIES. COMPLY WITH TO THAT REQUIRED WITH USE BY THE GENERAL PUBLIC. REGULATIONS OF AUTHORITIES HAVING JURISDICTION AND SAFETY STANDARDS FOR CLEANING. REMOVE WASTE MATERIALS FROM THE .06 PROVIDE OFF -SITE STORAGE OR SPACE WITHIN THE CONSTRUCTION SITE AND DISPOSE OF IN A LAWFUL MANNER. AREA TO ACCOMMODATE CONSTRUCTION MATERIALS AND EQUIPMENT. DIVISION 2 .07 PROVIDE CONSTRUCTION AREA AND STORAGE FACILITY SECURITY IN 02070 SELECTIVE DEMOLITION THE FORM OF LOCKS. ALARM DEVICES OR SECURITY GUARD SERVICES AS NECESSARY TO PROTECT AGAINST PREDICTABLE AND .01 COORDINATE WORK WITH LANDLORD TO AVOID DISRUPTION OF CONTROLLABLE THEFT OR VANDALISM LOSSES. ADJACENT TENANT'S OPERATIONS. EXISTING THIRD FLOOR TENANTS BELOW & SIXTH FLOOR TENANTS EAST WILL CONTINUOUSLY OCCUPY .08 PROVIDE TEMPORARY ENCLOSURES FOR PROTECTION OF ADJACENT AREAS IMMEDIATELY ADJACENT TO AREAS OF WORK. AREAS FORM CONSTRUCTION OPERATIONS AND SIMILAR ACTIVITIES. COORDINATE ENCLOSURE WITH VENTILATING AND MATERIAL DRYING .02 SUBMIT SCHEDULE TO LANDLORD INDICATING PROPOSED METHODS, OR CURING REQUIREMENTS TO AVOID DANGEROUS CONDITIONS. SCHEDULE OF WORK AND COORDINATION WITH ADJACENT TENANT'S OPERATIONS. .09 COLLECT WASTE DAILY, COMPLY WITH NFPA 241 FOR REMOVAL OF COMBUSTIBLE WASTE. ENFORCE REQUIREMENTS STRICTLY. HANDLE .03 OBTAIN LANDLORD'S APPROVAL FOR LOCATION OF DEBRIS HAZARDOUS, DANGEROUS, OR UNSANITARY WASTE MATERIALS SEPARATELY FROM OTHER WASTE BY CONTAINERIZING PROPERLY. CONTAINMENT AND TRUCK TRAFFIC. DISPOSE IN A LAWFUL MANNER. .04 CONDUCT OPERATIONS IN CONFORMANCE WITH ALL RULES, ORDINANCES AND REGULATIONS OF AUTHORITIES HAVING .10 ENFORCE STRICT DISCIPLINE IN USE OF TEMPORARY FACILITIES. JURISDICTION. LIMIT AVAILABILITY TO INTENDED USE TO MINIMIZE ABUSE. MAINTAIN FACILITIES IN GOOD OPERATING CONDITION UNTIL REMOVAL. .05 PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECT FROM DAMAGE BY FREEZING TEMPERATURES AND THE ELEMENTS. PROTECTION REQUIRED TO PROTECT BUILDING OCCUPANTS AND GENERAL PUBLIC DURING SELECTIVE DEMOLITION WORK. EMPLOY POSITIVE METHODS TO PREVENT DUST AND DIRT FROM RISING INTO .11 REMOVE EACH FACILITY WHEN THE NEED HAS ENDED, OR REPLACED A IR BY A PERMANENT FACILITY, OR NO LATER THAN SUBSTANTIAL . COMPLETION. COMPLETE OR RESTORE CONSTRUCTION DELAYED .06 PROVIDE SHORING, BRACING OR SUPPORT TO PREVENT DAMAGE TO BECAUSE OF INTERFERENCE WITH THE FACILITY. REPAIR DAMAGED WORK, CLEAN EXPOSED SURFACES AND REPLACE CONSTRUCTION PERSONS AND PROPERTY FROM MOVEMENT AND SETTLEMENT OR COLLAPSE. THAT CANNOT BE SATISFACTORILY REPAIRED. .07 MAINTAIN ALL UTILITIES AND RELATED ITEMS INDICATED TO REMAIN 01600 MATERIALS AND EQUIPMENT AND PROTECT AGAINST DAMAGE ;DURING D EMOL IT ION OPERATIONS. REMOVE, CAP, ABANDON AND /OR DISCONNECT ALL UTILITIES AS .02 "PRODUCTS" ARE ITEMS PURCHASED FOR INCORPORATION IN THE INDICATED. SEQUENCE WORK AS REQUIRED TO MAINTAIN EXISTING WORK. WHETHER PURCHASED FOR THE PROJECT OR TAKEN FROM PREVIOUSLY PURCHASED STOCK. TENANT'S OPERATIONS. DO NOT DISRUPT ANY UTILITY SERVICE WITHOUT 48 HOUR NOTICE TO. AND PRIOR APPROVAL FROM LANDLORD. "NAMED PRODUCTS" ARE ITEMS IDENTIFIED BY MANUFACTURER'S PRODUCT NAME, INCLUDING MAKE OR .08 EXERCISE CARE TO PREVENT DAMAGING EXIST ING UTILITIES, MODEL DESIGNATION IND ICATED IN THE MANUFACTURER ' S PRODUCT LITERATURE. STRUCTURES, AND FINISHES TO REMAIN. REPAIR ANY DAMAGED ITEMS OUTSIDE PROJECT AREA TO THE SATISFACTION OF LANDLORD. "MATERIALS" ARE PRODUCTS THAT ARE SHAPED, CUT, .09 REMOVE DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM WORKED, MIXED, FINISHED, REFINED OR OTHERWISE FABRICATED, PROCESSED, OR INSTALLED TO FORM A PART DEMOLITION OPERATIONS FROM THE PROJECT SITE. OF THE WORK. DIVISION 5 "EQUIPMENT" IS A PRODUCT WITH OPERATIONAL PARTS, 05500 METAL FABRICATIONS WHETHER MOTORIZED OR MANUALLY OPERATED, THAT .01 STRUCTURAL PERFORMANCE: DESIGN, ENGINEER, FABRICATE, AND REQUIRES SERVICE CONNECTIONS SUCH AS WIRING OR PIPING. INSTALL THE FOLLOWING METAL FABRICATIONS. .02 PROVIDE PRODUCTS COMPLYING WITH CONTRACT DOCUMENTS AS A. TEMPERED GLASS STOREFRONT SYSTEM FRAME: FOLLOWS: 1. STEEL ANGLE JAMB & HEAD SUPPORTS. STANDARD PRODUCTS: WHERE AVAILABLE, PROVIDE 2. JAMB ANGLE FLOOR & CEILING STRUCTURE STANDARD PRODUCTS OF TYPES THAT HAVE BEEN PRODUCED CONNECTIONS. AND USED SUCCESSFULLY IN SIMILAR SITUATIONS ON OTHER 3. HEAD ANGLE JAMB CONNECTIONS. PROJECTS. B. OPERABLE PARTITION SUPPORT: PROPRIETARY SPECIFICATION REQUIREMENTS: WHERE ONLY A SINGLE PRODUCT OR MANUFACTURER IS NAMED. PROVIDE 1. CARRIER BEAM THE PRODUCT IND ICATED . NO SUBSTITUTIONS WILL BE 2. HANGER RODS & FASTENERS PERMITTED. .02 SUBM IT SHOP DRAWINGS FOR STRUCTURAL ITEMS. SEM IPROPR IETARY SPECIFICATION REQUIREMENTS: WHERE TWO OR MORE PRODUCTS OR MANUFACTURERS ARE NAMED, .03 STEEL SHAPES, PLATES AND OTHER ITEMS: ASTM A -36. PROVIDE ONE OF THE PRODUCTS INDICATED. NO SUBSTITUTIONS WILL BE PERMITTED. .04 BOLTS AND NUTS: ASTM A -307, GRADE A FOR LESS THAN 3/4" AND ASTM A-325 FOR 3/4" DIAMETER AND LARGER, UNLESS OTHERWISE NON- PROPRIETARY SPECIFICATIONS: WHEN SPECIFICATIONS INDICATED. LIST PRODUCTS OR MANUFACTURERS THAT ARE AVAILABLE MAY BE USED, BUT DO NOT RESTRICT THE CONTRACTOR TO .05 EXPANSION BOLTS: USE OF THESE PRODUCTS ONLY, THE CONTRACTOR MAY PROPOSE ANY PRODUCT THAT COMPLIES WITH CONTRACT A. FOR CONCRETE: FED. SPEC. FF -S -325, GROUP I1, TYPE 4, CLASS REQUIREMENTS. COMPLY WITH PROVISIONS FOR "SUBSTITUTIONS" 1, TO OBTAIN APPROVAL FOR USE OF AN UNNAMED PRODUCT. B. FOR MASONRY: FED. SPEC. FF -S -325, GROUP II, TYPE 3, CLASS 3. .03 DELIVER, STORE, AND HANDLE PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, USING METHODS THAT WILL .06 FABRICATE AND SHOP PAINT IN ACCORDANCE WITH A ISC PREVENT DAMAGE, DETERIORATION AND LOSS. SPECIFICATIONS. .04 COMPLY WITH MANUFACTURER'S INSTRUCTIONS AND .07 INSTALL METAL FABRICATIONS USING FASTENER TYPES AND RECOMMENDATIONS FOR INSTALLATION OF PRODUCTS. ANCHOR ANCHORING METHODS APPROPRIATE TO SUBSTRATE AND DESIGNED EACH PRODUCT SECURELY IN F'LACE, ACCURATELY LOCATED AND TO WITHSTAND EXPECTED LOADS. ALIGNED WITH OTHER WORK. CLEAN EXPOSED SURFACES AND PROTECT TO ENSURE FREEDOM FROM DAMAGE AND DETERIORATION AT TIME OF SUBSTANTIAL COMPLETION. DIVISION 1 ci 01010 SUMMARY OF WORK I C. REVIEW "K+ w cl- °ooc w .01 THE WORK CONSISTS OF EXISTING OFFICE BUILDING TENANT SPACE 0 F_ DEMOLITION AND INTERIOR CONSTRUCTION AS SHOWN ON CONTRACT z DOCUMENTS PREPARED BY HIXSON. .02 CONSTRUCT THE WORK UNDER A STIPULATED SUM CONTRACT FOR w ALL WORK INDICATED OR REQUIRED BY THE CONTRACT DOCUMENTS. z (D THE WORK INCLUDES GENERAL CONSTRUCTION AND ASSOCIATED J PLUMBING. FIRE PROTECTION, MECHANICAL AND ELECTRICAL WORK. .03 THE TENANT MAY NEGOTIATE PURCHASE ORDERS WITH SUPPLIERS N v N OF NEW EQUIPMENT AND MAY ALSO FURNISH RELOCATED EXISTING o EQUIPMENT ITEMS TO BE INCORPORATED INTO THE WORK. Q THE TENANT IS RESPONSIBLE FOR RECEIVING, STORAGE AND to o TESTING OF PRE - ORDERED NEW EQUIPMENT AND RELOCATED Lu EXISTING EQUIPMENT. Ir THE CONTRACTOR IS RESPONSIBLE FOR HANDLING, SETTING, UTILITIES TO AND FINAL CONNECTION OF PRE-ORDERED NEW Q to U 111 AND RELOCATED EXISTING EQUIPMENT. .04 CONFINE OPERATIONS TO AREAS WITHIN THE TENANT LEASE SPACE. w 0 AREAS BEYOND THE TENANT LEASE SPACE ARE NOT TO BE D ISTURBED . .05 KEEP DRIVEWAYS, ENTRANCES, CONCOURSE AND SERVICE CORRIDORS CLEAR AT ALL TIMES. DO NOT USE THESE AREAS FOR PARKING OR STORAGE OF MATERIALS. SCHEDULE DELIVERIES TO MINIMIZE REQUIREMENTS FOR STORAGE OF MATERIALS. .06 PARTIAL TENANT OCCUPANCY: THE TENANT RESERVES THE RIGHT TO OCCUPY AND PLACE AND INSTALL EQUIPMENT AND SUPPLIES IN COMPLETED AREAS PRIOR TO SUBSTANTIAL COMPLETION PROVIDED SUCH OCCUPANCY DOES NOT INTERFERE WITH COMPLETION OF THE WORK. PARTIAL OCCUPANCY FOR PLACING OF EQUIPMENT AND z SUPPLIES SHALL NOT CONSTITUTE ACCEPTANCE OF THE TOTAL > WORK. C OBTAIN A TEMPORARY CERTIFICATE OF OCCUPANCY FROM LOCAL BUILDING OFFICIALS PRIOR TO TENANT OCCUPANCY. PRIOR TO PARTIAL TENANT OCCUPANCY. MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE FULLY OPERATIONAL AND REQUIRED INSPECTIONS AND TEST SHALL HAVE BEEN SUCCESSFULLY COMPLETED. 01040 PROJECT COORDINATION .01 COORDINATE ACTIVITIES OF VARIOUS TRADES TO ASSURE EFFICIENT AND ORDERLY CONSTRUCTION. COORDINATE OPERATIONS OF VARIOUS TRADES THAT ARE DEPENDENT ON EACH OTHER FOR PROPER INSTALLATION AND OPERATION. .02 COORDINATE SCHEDULING AND TIMING OF ADMINISTRATIVE PROCEDURES WITH OTHER ACTIVITIES TO AVOID CONFLICTS AND ENSURE ORDERLY PROGRESS. WHERE INSTALLATION OF ONE COMPONENT DEPENDS ON INSTALLATION OF OTHER COMPONENTS BEFORE OR AFTER ITS OWN INSTALLATION. SCHEDULE ACTIVITIES IN THE SEQUENCE REQUIRED TO OBTAIN THE BEST RESULTS. WHERE SPACE IS LIMITED. COORDINATE INSTALLATION OF DIFFERENT COMPONENTS TO ASSURE MAXIMUM ACCESSIBILITY FOR MAINTENANCE, SERVICE AND REPAIR. MAKE PROVISIONS TO ACCOMMODATE ITEMS SCHEDULED FOR LATER INSTALLATION. .03 THE INSTALLER OF EACH COMPONENT SHALL INSPECT THE SUBSTRATE AND CONDITIONS UNDER WHICH WORK IS PERFORMED. DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. .04 INSPECT MATERIAL IMMEDIATELY UPON DELIVERY AND AGAIN PRIOR TO INSTALLATION. REJECT DAMAGED AND DEFECTIVE ITEMS. RECHECK MEASUREMENTS AND DIMENSIONS BEFORE STARTING INSTALLATION. .05 PROVIDE ATTACHMENT AND CONNECTION DEVICES AND METHODS NECESSARY FOR SECURING EACH CONSTRUCTION ELEMENT. SECURE EACH CONSTRUCTION ELEMENT TRUE TO LINE AND LEVEL. ALLOW FOR EXPANSION AND BUILDING MOVEMENT. .06 COMPLY WITH MANUFACTURER ' S INSTALLATION INSTRUCTION AND RECOMMENDATIONS TO THE EXTEND THAT THEY ARE MORE STRINGENT THAN REQUIREMENTS IN CONTRACT DOCUMENTS. .07 WHERE MOUNTING HEIGHTS ARE NOT IND ICATED , INSTALL COMPONENTS AT STANDARD HEIGHTS FOR THE APPLICATION IND ICATED . REFER QUESTIONABLE DECISIONS TO THE ARCHITECT. .02 CLEANING AND PROTECTION: DIMING HANDLING AND INSTALLATION, CLEAN AND PROTECT CONSTRUCTION IN PROGRESS AND ADJOINING MATERIALS IN PLACE. APPLY PROTECTIVE COVERING WHERE REQUIRED TO ENSURE PROTECTION FROM DAMAGE OR DETERIORATION AT SUBSTANTIAL COMPLETION. CLEAN AND MAINTAIN COMPLETED CONSTRUCTION AS OFTEN AS NECESSARY THROUGH THE CONSTRUCTION PERIOD. 01300 SUBMITTALS .01 COORDINATE SUBMITTAL PREPARATION WITH PERFORMANCE OF CONSTRUCTION ACTIVITIES AND WITH PURCHASING OR FABRICATION, DELIVERY. OTHER SUBMITTALS AND RELATED ACTIVITIES. TRANSMIT IN ADVANCE OF PERFORMANCE OF RELATED ACTIVITIES TO AVOID DELAY. .02 SHOP DRAWINGS: SUBMIT NEW INFORMATION, DRAWN TO ACCURATE SCALE. INDICATE DEVIATIONS FROM CONTRACT DOCUMENTS. DO NOT REPRODUCE CONTRACT DOCUMENTS OR COPY STANDARD INFORMATION AS THE BASIS OF SHOP DRAWINGS. SUBMIT ONE BLUELINE PRINT FOR REVIEW AND ONE CORRECTABLE TRANSLUCENT PRINT FOR REPRODUCTION AND DISTRIBUTION. .03 PRODUCT DATA: COLLECT PRODUCT DATA INTO A SINGLE SUBMITTAL FOR EACH ELEMENT OR SYSTEM. MARK EACH COPY TO SHOW APPLICABLE CHOICES AND OPTIONS. WHERE PRODUCT DATA INCLUDES INFORMATION ON SEVERAL PRODUCTS, SOME OF WHICH ARE NOT REQUIRED. MARK COPIES TO INDICATE THE APPLICABLE INFORMATION. SUBMIT FOUR COPIES. .04 SAMPLES: SUBMIT FULL -SIZE SAMPLES CURED AND FINISHED AS SPECIFIED AND IDENTICAL TO THE PRODUCT PROPOSED. MOUNT, DISPLAY, OR PACKAGE SAMPLES TO FACILITATE REVIEW. PREPARE SAMPLES TO MATCH THE ARCHITECT'S SAMPLE. SUBMIT THREE SAMPLES. .05 THE GENERAL CONTRACTOR SHALL PACKAGE SUBMITTALS WITH AIA DOCUMENT G 810 OR SIMILAR TRANSMITTAL FORM. SUBMITTALS RECEIVED DIRECTLY FROM SUBCONTRACTORS OR SUPPLIERS WITHOUT GENERAL CONTRACTOR REVIEW WILL BE RETURNED WITHOUT ACTION. .06 ARCHITECT'S ACTION: EXCEPT FOR SUBMITTALS FOR RECORD, INFORMATION OR SIMILAR PURPOSES, WHERE ACTION AND RETURN IS REQUIRED, THE ARCHITECT WILL REVIEW EACH SUBMITTAL, MARK TO INDICATE ACTION TAKEN. AND RETURN. COMPLIANCE WITH CONTRACT DOCUMENTS IS THE CONTRACTOR'S RESPONSIBILITY. °j 3 ... o cr CHECKED � ; L N o J a L >� I C. REVIEW "K+ w cl- °ooc cr NUMBER d �% L N PRINT DATE F_ N �2 0° ,� z L p 3 z u•� L u ° U w CL z (D _c L J D W° N 0.0 0-0 U N v N s o •o`_ ul 3 ao b_ o Q. 0 Q LL z° o to o cu V 0 cz v� 0 Z - p a V W lu v V 9L um u. - Z J aC O 0 -J a i ~ a Q Q Z IOC z Z z Im Q 0 .1 CID w W W O cc DATABASE db.U042Oa8 DRAWN cr CHECKED GPH I C. REVIEW "K+ DRAW i NG DATE cr NUMBER 5204.20 PRINT DATE F_ csial z z w z (D Ln Co W° N Ln w No � o F- L) M H Q� z �- U U N Q to U 111 cu V 0 cz v� 0 Z - p a V W lu v V 9L um u. - Z J aC O 0 -J a i ~ a Q Q Z IOC z Z z Im Q 0 .1 CID w W W O cc DATABASE db.U042Oa8 DRAWN GOF CHECKED GPH I C. REVIEW "K+ DRAW i NG DATE 081595 NUMBER 5204.20 PRINT DATE csial