Loading...
HomeMy WebLinkAbout0614.95.16[DETAIL 3 [DETAIL 2 DETAIL 3/411 43 SIM, C.8 SIM. 1'41 LINE OF 4" CONCRETE MASONRY UNITS MASONRY ABOVE . �'_ METAL FRAME5 4 GLAZING TT e (TEMPERED 1/4 ") TYP. 1- 2 .. 0 COR ANCHORS TYP. _ 6' O.C. VERTICAL CAULKING (TYP) I SEE STRUCTURAL DRAWNGS FOR COLUMN SIZE. FLASHING -'- ROOF SLOPES 8' BAR JOIST SEE STRUCTURAL BEAM 4 PLATE SEE STRUCTURAL DRAWINGS 3/411 = 1' -011 5M. COPING NSULATION 4 MEMBRANE SINGLE -PLY ROOF. II : JOIST BEARING IL 124' -8' CONTINUOUS BOND BEAM • TYP. HORIZ. MSONRY • ° RE IPFORCEMENT a 16' O.C. VERTICAL. SOLDIER COURSES SEE ELEVATIONS. 3/411 = 1' -011 SM. COPING PRE- TREATED 2X TOP OF MASONRY 126' -0' \ � WALL ANGLE SEE T STRUCTURAL DRAWINGS. WALL REINFORCING s 16" OC. VERTICAL. FLASHNG BEAMS 4 PLATES SEE STRUCTURAL. DRAWINGS. BOTTOM OF PLATE Agk 123' -0' [DETAIL (o [DETAIL E�) EDETAIL 4 3/411 = 1' -0" I al �I i �I v N 13'-0" SEE STRUCTURAL DRAWINGS FOR FOUNDATION 4 FOOTING 1;�EQUIR EMENTS. 3/4" = 1' -0" 1 I I I I I I I I I I I I I I I I I I I - --j----- - —r -1 I.- I I L --------- L -J 39' -0" N.T.S SUSPENDED DRYAT CEILING. SEE REFLECTED CEILING PLAN. GAR ENTRY CANOPY r 110- CON--. PAVERS 3/411 = 1' -011 Cirt_T MCTAI r /1DI►V_ I I I I I I I I I I I I I - J---------- I - - - -`� I I I L----------- L ------ W -4' LAP FIRST FLOOR SECTION �1 1/2" = 1' -0'I 2 4' 14" 1 I I I I � I RECESS TOP OF FLOOR SLAB TO PROVIDE FOR FINISH FLOOR ELEVATION TO BE AT 100' -0' GYM FINISHED FLOOR 100' -0" 2' CONCRETE TOPPING PRECAST DBL. CONCRETE TEES 511 COPING (TYP-) (SEE STRUCTURAL DRAWINGS) 4' CONCRETE BLOCK WALL, CARRY TO UNDERSIDE OF 8" CONCRETE TEES. BEAM SIZES VARIES I SEE STRUCTURAL DRAWWA. vi I- — _ ^# VARIES WITH BEAM 51ZE i 1 I BOTTOM PLATE FIXED * ELEY. 101' -4' I I FIXED WINDOW W1/2 ALUM. FRAMES 2' P.T. NAILER W/ 1/1' ANCHOR i (p SECTION THRU COLUMNS A114 i . BULLN05E BOCK BOLTS STAGERED (TYPICAL) I DASHED LINES INDICATE I COLUMN LOCATION •• I 8' CONIC. BLOCK WALL W/ HORIZ. RENfORGNG EVERY OTHER COURSE. rik TOP OF MASONRY TOP OF MASONRY SM. COPING SINGLE -PLY MEMBRANE ROOF FLASHING 4 MIN. INSUL. BD. a NIGH ROOF AREA '• 5ANQUET ROOF 5M GRAVEL STOP SM. GUTTER I • METAL 5101% 4 GIRT ALL BLOCKING FOR ROOF _ JOIST BEARNG I TO BE P.T. All & SEE STRUGT. FOR ALL 121' -8' BASE ANGLE ANCHORED INTO 2 X 8 P.T. PLATE WV _ SSL JOIST BEARNG BAR JOIST SIZES. COUNTER FLASHING (---- 121'-0" CONTINUOUS BOND BEAM LAP MEMBRANE OVER PLATE. (p "kJ "XI • TOP OF ANGLE • 31/2" X 6 /4" ANGLE '. VARIES W/ ROOF SLOPE ' • 8 CONCRETE MASONRY UNITS " w ( BALLASTED SINGLE -PLY 4 DOWN SPOUTS REAR GONTINJOUS ANGLE SEE STRUCT. 1 • 9 > 5 CONC. 3/4' PLYWOOD (WATERPROOF) OF MASONRY PIER _ ° UTILITY BRICK r 111' - 4" JOIST BEARINCs CONTINUOUS BOND BEAM 111' -5 1/2" 4 REINFORCING SEE STRUCT. HORIZONTAL REW- ORCING 3 "X3 "X 1/4" CONTINUOUS ANGLE. to 16' O.G. (TYPICAL) time, mmrrtn JOIST EA JOIST BEARING • 1 •- DRAPE SIDEWALL NSULATION. - 6" 8'. •�1� I SEE 5TRUCTURAL DRAWING5 FOR FLASHING , Y r� I ALL BEAM SIZES 4 BRACING. LINTEL �'�`i CENTERLINE, ADJUSTABLE BRICK TIES 106' -S° SEE STRUCTURAL DRAWINGS. SUSPENDED METAL FRAM 4 DRYVIT CEILNG. BOTTOM BEAM 4 PLATE -A TYPICAL DRIVE -THRU CANOPY WEEP HOLES 424" O.G. 4 BOTTOM OF BEAM BOTTOM OF BE EXPANSION JOINTS a DRYVIT CEILING 123' -0" 16" 113' -0' SEE REFLECTED CEILING PLAN. 12' BLOC` TO GARDEN5 VE5TA8ULE [DETAIL 3 [DETAIL 2 DETAIL 3/411 43 SIM, C.8 SIM. 1'41 LINE OF 4" CONCRETE MASONRY UNITS MASONRY ABOVE . �'_ METAL FRAME5 4 GLAZING TT e (TEMPERED 1/4 ") TYP. 1- 2 .. 0 COR ANCHORS TYP. _ 6' O.C. VERTICAL CAULKING (TYP) I SEE STRUCTURAL DRAWNGS FOR COLUMN SIZE. FLASHING -'- ROOF SLOPES 8' BAR JOIST SEE STRUCTURAL BEAM 4 PLATE SEE STRUCTURAL DRAWINGS 3/411 = 1' -011 5M. COPING NSULATION 4 MEMBRANE SINGLE -PLY ROOF. II : JOIST BEARING IL 124' -8' CONTINUOUS BOND BEAM • TYP. HORIZ. MSONRY • ° RE IPFORCEMENT a 16' O.C. VERTICAL. SOLDIER COURSES SEE ELEVATIONS. 3/411 = 1' -011 SM. COPING PRE- TREATED 2X TOP OF MASONRY 126' -0' \ � WALL ANGLE SEE T STRUCTURAL DRAWINGS. WALL REINFORCING s 16" OC. VERTICAL. FLASHNG BEAMS 4 PLATES SEE STRUCTURAL. DRAWINGS. BOTTOM OF PLATE Agk 123' -0' [DETAIL (o [DETAIL E�) EDETAIL 4 3/411 = 1' -0" I al �I i �I v N 13'-0" SEE STRUCTURAL DRAWINGS FOR FOUNDATION 4 FOOTING 1;�EQUIR EMENTS. 3/4" = 1' -0" 1 I I I I I I I I I I I I I I I I I I I - --j----- - —r -1 I.- I I L --------- L -J 39' -0" N.T.S SUSPENDED DRYAT CEILING. SEE REFLECTED CEILING PLAN. GAR ENTRY CANOPY r 110- CON--. PAVERS 3/411 = 1' -011 Cirt_T MCTAI r /1DI►V_ I I I I I I I I I I I I I - J---------- I - - - -`� I I I L----------- L ------ W -4' LAP FIRST FLOOR SECTION �1 1/2" = 1' -0'I 2 4' 14" 1 I I I I � I RECESS TOP OF FLOOR SLAB TO PROVIDE FOR FINISH FLOOR ELEVATION TO BE AT 100' -0' GYM FINISHED FLOOR 100' -0" 2' CONCRETE TOPPING i I ° 1 EPDXY PANT 4" 4" NON -SLIP ON FLOOR VAPOR BARRIER TYPICAL ARCNITEG1URAl. TEXTURED FINISH I 5' CONCRETE SLAB ON OF COLUMN I I BANK RUN GRAVEL I I ° 6 MIL POLYURETHANE • I VAPOR BARRIER I I • I EXPANSION JOINT MATERIAL I I I I I I I I L -- -_J SECTION J 125 -A FIRST FLOOR C - �1G/1L/' - 11 • - • 1 , • • SEE STRUCTURAL DRAWINGS FOR FOOTINGS 4 WALL ' " • REINFORCEMENT. (TYPICAL) SECTION L 1/2" = 1' -011 1 METAL DECK 3 5/8" METAL "Co STUDS 14 GA *16" OL. 1/1' DRYWALL — r- Z cp L d z KICK ao �I N v JOGGING TRAGIC • SINGLE PLY BALLASTED INSULATION U=m45 MIN.) EPS AND PERLITE NOTE : ROOF SYSTEM TO MEET FACTORY MUTUAL CLA56 I (DEFLEX COMIECTION) (2) 3 5/8" 14 GA "C" STUDS BACK TO BACK SLOTTED HOLES AND BOLTS IN 'L' STNS BRACING a 4' -0' MAX TEMPERED GLASS WALL 3 5/8" METAL 'C' STUDS +I6" O.C. 1/2' DRYWALL 3" CONCRETE SLAB ON METAL DECK 3' X 3' X 114' STEEL ANGLE STEEL JOIST W/ 5' SEAT 3 5/8" METAL STUDS 16, O.C. �UETSALL COURTS EFN15WED FLOOR WALLS, EILNG BY RAGQIETBALL JRT SUPPLIER) TEMPERED GLASS WALL and DOOR BY RACQJETBALL COURT SUPPLIER SECTION �4 1/211 = 1' -011 V) z 0 Q w W n o im o w V 1 � Y • ,Zw o0zN .dd z III ►-7 �r m 0 ch 4 m 0 m 0 U I N 02/09/95 14 9304.030 PRECAST DBL. CONCRETE TEES (SEE STRUCTURAL DRAWINGS) 4' CONCRETE BLOCK WALL, CARRY TO UNDERSIDE OF 8" CONCRETE TEES. BEAM SIZES VARIES I SEE STRUCTURAL DRAWWA. vi I- — _ ^# VARIES WITH BEAM 51ZE i 1 I BOTTOM PLATE FIXED * ELEY. 101' -4' I I FIXED WINDOW W1/2 ALUM. FRAMES e i (p SECTION THRU COLUMNS A114 i . BULLN05E BOCK �r I DASHED LINES INDICATE I COLUMN LOCATION •• I 8' CONIC. BLOCK WALL W/ HORIZ. RENfORGNG EVERY OTHER COURSE. i I ° 1 EPDXY PANT 4" 4" NON -SLIP ON FLOOR VAPOR BARRIER TYPICAL ARCNITEG1URAl. TEXTURED FINISH I 5' CONCRETE SLAB ON OF COLUMN I I BANK RUN GRAVEL I I ° 6 MIL POLYURETHANE • I VAPOR BARRIER I I • I EXPANSION JOINT MATERIAL I I I I I I I I L -- -_J SECTION J 125 -A FIRST FLOOR C - �1G/1L/' - 11 • - • 1 , • • SEE STRUCTURAL DRAWINGS FOR FOOTINGS 4 WALL ' " • REINFORCEMENT. (TYPICAL) SECTION L 1/2" = 1' -011 1 METAL DECK 3 5/8" METAL "Co STUDS 14 GA *16" OL. 1/1' DRYWALL — r- Z cp L d z KICK ao �I N v JOGGING TRAGIC • SINGLE PLY BALLASTED INSULATION U=m45 MIN.) EPS AND PERLITE NOTE : ROOF SYSTEM TO MEET FACTORY MUTUAL CLA56 I (DEFLEX COMIECTION) (2) 3 5/8" 14 GA "C" STUDS BACK TO BACK SLOTTED HOLES AND BOLTS IN 'L' STNS BRACING a 4' -0' MAX TEMPERED GLASS WALL 3 5/8" METAL 'C' STUDS +I6" O.C. 1/2' DRYWALL 3" CONCRETE SLAB ON METAL DECK 3' X 3' X 114' STEEL ANGLE STEEL JOIST W/ 5' SEAT 3 5/8" METAL STUDS 16, O.C. �UETSALL COURTS EFN15WED FLOOR WALLS, EILNG BY RAGQIETBALL JRT SUPPLIER) TEMPERED GLASS WALL and DOOR BY RACQJETBALL COURT SUPPLIER SECTION �4 1/211 = 1' -011 V) z 0 Q w W n o im o w V 1 � Y • ,Zw o0zN .dd z III ►-7 �r m 0 ch 4 m 0 m 0 U I N 02/09/95 14 9304.030