Loading...
HomeMy WebLinkAbout0904.95.24r DETAILS OVER WOOD DECK RIDGE URETHANE SEALANT POP RIVET LOKSEAM 2� PANEL 1 MOISTURE \ BARRIER ,L-- WOOD DECK 10XI' TYPE A PANCAKE- HEAD FASTENER FIXED RIDGE FLASH LOKSEAH PANEL • DOUBLE BEAD TAPE SEALER ISOMETRIC - VIEW OF RIDGE DOUBLE DEAD TAPE 6[AL[R --- LOXI" WOOD ®RIP FASTENER a "O.C. STANDARD RIDGE OVER WOOD DECK POP RIVET FIXED RIDGE FLASH UL90 CLIP Iw "Z" CLOSURE URETHANE SEALANT L "2' CLOSURE WOOD OECK NDISTURE OVER WOOD DECK w RARR:ER NOTES 1- Do not use this detail with the Weed save or valley deiaNs. 2. Field cut "Z" closures to fit panel width. 3. install double bead tape sealer to pan of panels. Center of tape sealer should be 11f2" kom end of panel. 4. Install "Z" closures to panels with t0x1" Woodgrfp fasteners e" o.c. leg of "Z" closure should be 2' from end of panel. Fasteners must go through tape sealer. 5. Seal end of "Z" closure to panel seams with urethane sealant. 6. Clip spacing should not exceed 4'-O" o.c. for 24 poop[ panalo or 5' -0" o.c, for 22 ga4 ge. panels. I ! . 1 I i I i1 i i i WTELbDM POST 1 t1AS -20 - 24 x 36 DETAILS OVER WOOD DECK VALLEY WITH OFFSET CLEAT 16X1• TYPE A UL" CLIP PANCAKE HEAD FA6TE146R ' LOK6[A11 ROOTING -7 /� VALLay 4M• PANEL FELT / / . \�_ . -W- A6PHALT � HEMORANE 10X1' TYPE A PANCAKE HEAD FASITEMER WOOD DECK RUBHEHIZED ASPHALT MEN9RANE PANEL END DETAIL PANEL END SEALANT OMITTED FOR CLARITY —7 L omrstT ` DOUBLE e[AO CLEAT TAPE SEALER CROSS SECTION OF VALLEY OVER WOOD DECK I ROOrINe FELT e[VULfOUT PANEL TO MATCH 61.OK OF VALLEY TRIM. TO FZ9LO HEM PAHti, ESE LID-90 . LOK�[AM PANEL VALLEY TRzM i ( I T.... I ' I ! i � E I I I j 3 I I { ' I { { i I 1►� 9 ROOFING FELT FIELD PANEL I' ISOMETRIC VIEW OF :AM. VALLEY OVER WOOD DECK NOTES 1. For valleys longer than 30', use extended valley trim (see page LS -10). 2. The offset cleat method of attachment should be used when peril runs are 50' or bas. Panels must be attached to substructum at the ridge or hip to proved ftm fvm eliding dowuetope. 3. OftW cleat is installed continuous abrp slope of valley over double bead tape sealer with 10x1" Type A Pancake Mead fasteners 1' -0" o.c. Fasteners must go through k )e sealer. 4. Clip spacing should not exceed 4' -0" o.c. for 24 gouge tanels or 5' -0' o.c. for 22 gauge panels. 5. Add 1 " to the panel length for penal hem• 6. See "Panel End SeelaM De tall" at pogo 1.8-/4 to er if pens! ends at velley. 04A'V wo r4•AC7 .'k 70 ti� C veGk �"i.vi".y 4 e— It 4' C? 0 A P-- 1/ A4 B C i r e Az I2 6 t P1 n j l ri I 1 r ' r i � s i : I � i iiiiii; r - - 7r h e � � 1 + n - � ► T r � a-- p T it ..i - I� a IT i A i 1 Itsw 0�