Loading...
HomeMy WebLinkAboutM1SPECIFICATIONS - HVAC 1. FURNISH ALL LABOR, MATERIAL & APPURTENANCES NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM AS SHOWN OR REQUIRED. 2. ALL WORK SHALL CONFORM TO APPLICABLE CODES AND AUTHORITIES HAVING JURISDICTION. THE HVAC CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, TESTS AND INSPECTIONS AS REQUIRED BY AUTHORITIES HAVING JURISDICTION FOR HIS OWN WORK. 3. WORKMANSHIP SHALL REPRESENT THE HIGHEST STANDARD OF THE INDUSTRY. 4. GUARANTEE ALL MATERIAL & WORKMANSHIP FOR A PERIOD OF ONE YEAR AFTER ACCEPTANCE. 5. PERFORM ALL TESTS, ADJUSTMENTS, ETC. AS REQUIRED BY EQUIPMENT MANUFACTURER OR AUTHORITIES HAVING JURISDICTION. 6. BALANCE SUPPLY & RETURN AIR QUANTITIES AS REQUIRED FOR COMFORT CONDITIONING. 7. INSULATE ALL SUPPLY AIR DUCTWORK IN ATTIC WITH 12" THICK DUCT WRAP/ VAPOR BARRIER INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. 8. SHEET METAL DUCTWORK SHALL BE 24 GAUGE MINIMUM GALVANIZED SHEET METAL FABRICATED AND INSTALLED IN ACCORDANCE WITH SMACNA. SEAL ALL SEAMS WITH DUCT TAPE. 9. FLEXIBLE DUCT SHALL BE FACTORY FABRICATED METAL AIR DUCT AS MADE BY ,ATCO - VAL_.,LEX INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. 10. CONDENSATE DRAIN PIPING SHALL BE PVC PIPE & FITTINGS OR AS REQUIRED BY LOCAL CODE. 11. PROPOSALS SHALL BE BASED ON MATERIAL & EQUIPMENT LISTED. ONLY THOSE SUBSTITUTIONS OFFERED AT BID TIME WILL BE GIVEN CONSIDERATION. 12. SUBMIT MANUFACTURER'S 0 & M MANUALS FOR ALL HVAC EQUIPMENT 13. HVAC CONTRACTOR SHALL PACK & SEAL ALL HVAC OPENINGS IN INSULATED WALLS AND CEILINGS AIR -TIGHT WITH INSULATION. GENERAL NOTES: 1. COORDINATE ALL GRILLE, REGISTER, EQUIPMENT, DUCT, ETC. LOCATIONS WITH OTHER TRADES. 2. CONTROL WIRING FURNISHED & INSTALLED BY THE HVAC CONTRACTOR. 3. POWER WIRING FURNISHED & INSTALLED BY THE ELECTRICAL CONTRACTOR. 4. FURNISH ALL CUTTING REQUIRED FOR OWN WORK. �. LOWER FLOOR - DUCTS RUN BETWEEN OR THRU FLOOR /CEILING JOISTS. TOP FLOOR - DUCTS RUN IN ATTIC & INSULATED WITH 12" THICK FIBERGLASS WITH VAPOR BARRIER. 6. EXHAUST FAN DUCTS UP IN CHASE WALL TO ATTIC WITH ROOF CAP. 7. ALL UNITS TYPICAL UNLESS NOTED OTHERWISE. FIRE DAMPERS SHALL BE INSTALLED IN ALL CEILING DIFFUSERS AND IN FURNACE BONNET AT CEILING. 9. DRYER VENT DOWN THRU CEILING 6 ". 10. 6" PVC UP THRU SLAB FOR REFRIGERANT LINES. 11. PROVIDE SHEET METAL FITTINGS FOR BRANCHES OFF MAIN DUCT. 12. BOXES SHOW CFM & DUCT SIZES FOR TOP FLOORS. 13. NUMBERS SHOWN ON AIR DEI ICES ARE HART & COOLEY EQUIPMENT: FURNACES: LOWER FLOORS: CARRIER 40RC018300CF, 7.5 KW 23011 TOP FLOORS: CARRIER 40RCO24300CF, 7.5 KW, 230/1 CONDENSERS: LOWER FLR: CARRIER 38TG018 230/1 TOP FLOOR: CARRIER 38TG024 23011 j!VIGIK ® 6N0 W^Llt. s A1AIf11 cA NoTE49 ATi' )c - WOTE #(a 41��1" FLOOR PLAN - UNIT EXP 1/411"11.011 MECHANICAL PLAN ,G & �w 6224 `�'' � 6844 'O STATE OF o 0 v I