HomeMy WebLinkAboutP10
r
PLUMBING SPECIFICATIONS:
1. FURNISH ALL LABOR, MATERIAL AND APPURTENANCES FOR A COMPLETE AND
OPERATIONAL PLUMBING SYSTEM AS SHOWN OR REQUIRED.
ALL WORK SHALL CONFORM TO APPLICABLE CODES AND AUTHORITIES HAVING
JURISDICTION. PLUMBING CONTRACTOR SHALL SECURE AND PAY FOR ALL
PERMITS, TESTS AND INSPECTIONS AS REQUIRED BY AUTHORITIES HAVING
JURISDICTION FOR HIS OWN WORK.
3. WORKMANSHIP SHALL REPRESENT THE HIGHEST STANDARD OF THE INDUSTRY.
4. GUARANTEE ALL MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE YEAR
AFTER ACCEPTANCE.
5. CONTRACTOR SHALL VISIT SITE TO BECOME FAMILIAR WITH EXISTING
CONDITIONS AS MAY EFFECT HIS OWN WORK.
6. PERFORM ALL TESTS, ADJUSTMENTS, ETC. AS REQUIRED BY EQUIPMENT MFG
OR AUTHORITIES HAVING JURISDICTION.
7. PROPOSALS SHALL BE BASED ON MATERIAL & EQUIPMENT ACTUALLY SPECIFIED.
ONLY THOSE SUBSTITUTIONS OFFERED AT BID TIME WILL BE GIVEN CONSIDERATION.
8. SUBMIT MANUFACTURER'S 0 &M MANUALS FOR ALL EQUIPMENT & FIXTURES.
9. WATER PIPE - TYPE "M" ABOVE GROUND /LEAD FREE SOLDIER. PIPE STRAP TYPE
HANGERS. TYPE "K" SOFT COPPER BELOW GROUND /NO JOINTS. INSULATE ALL
PIPES THROUGH FLOOR SLAB WITH 'z" ARAMAFLEX CUT FLUSH WITH FINISH FLOOR.
10. SOIL, 'WASTE & VENT - SCH 40 PVC DWV PIPE & FITTINGS.
11. PLUMBER TO SUPPLY & INSTALL PRESSURE REDUCING VALVE IF WATER PRESSURE
EXCEEDS 60 PSI.
12. PLUMBING CONTRACTOR SHALL PACK & SLAL ALL PLUMBING OPENINGS IN
INSULATED WALLS & CEILINGS AIR -TIGHT WITH INSULATION.
13. PLUMBING CONTRACTOR SHALL INSTALL MAIL PLATES TO PROTECT PIPING IN
WALLS & CEILINGS.
14. INSTALL CHROME EXCUTCHEON PLATES AF ALL EXPOSED PIPING PENETRATIONS
THROUGH FINISH WALLS & CEILINGS.
FIXTURES:
MARK
P -1
WATLR CLOSET
MANSFIELD MOHICAN ;126 -35 WITH BENEKE 210OTM SEAT
TRAP
kW ;C
& BRASSCRAFT R- 1912DL SUPPLIES
P -%
LAVATORY
CULTURE`S MARBLE 13Y OTHERS - PC TO FUR(YISH & INSTALL
MOEN »64625 FAUCI =TS, P -TRAP & WALL SUPPLIES.
P -3
TSB
AMERICAN ST AiDARD »'0135.137 OR 0135.133 WITH MOEN
�y4
1¢
62720 VALVE, 12411 TRIM & STERLING 16 -175 WASTE.
P -4
KITCHEN SINS;
S.S. ST INK FURNISHED IN PLACE BY OTHERS - PC TO
I y2
1'12
FURNISH & INSTALL MOEN -17533 FAUCET, TRAP, WALL
'/2
VZ
SUPPLIES & BADGER V, '-z HP DISPOSER.
P -5
WASHER BOX
WATERTITE = S312ST
P -7
SHOWER
FIAT 54WL MOLDED STONE BASE, MOEN #62620 VALVE &
P -5 1
WASHER Box
12473 TRIM
WATER
HEATER
A.O. SMITH fl-7= -40
HEATER PAN
C.P. INDUSTRIES HP -22 OR HP -24
C,O.1 =1JD ut11T5
END UNITS - Cc
wiNVow a EI,
w�w.-
owwAr.. c roc
w^L'L-
41 1"
PLUMBING FIXTUP'E CONNKTeM SCHEDULE
MARK
DESCKIPTl0N
W
V
TRAP
kW ;C
P- I
WATEIC CLOSET
3
1 �/Z
P -2
LAVA -TOK`i
►' /z
�y4
1¢
1/Z
Vz
-P - 3
T u S
I y2
1'12
1' /Z
'/2
VZ
P -4
KITCHEN SINK
i' /2
1'/z
I%Z
Y2
'/2
P -5 1
WASHER Box
2
I'y2
2
1/z
'/Z
P-w
DISHWASHER
-
-
-
VZ
-
P-T
SHOWER
Z
1 '/2
2
'/z
1/Z
0 FcM z STORY SLr-as
SEF u- C\L.1TY PLm4 S4A.T 4-
FLOOR PLAN -UNIT EXP
V411's 11.011
PLUMBING PLAN
6224
6844
Y 4 STATE Of Al
G� INDIANA t
"e, °gal �r4