IMmS2 Miami silt loam, 2 to 6 percent slopes, eroded
This moderately well drained soil has a seasonal high watertable at 2.0 to 3.5
ft. and is on rises on uplands. Slopes are 2 to 6 percent. The native vegetation
Is hardwoods. The surface layer is silt loam and has moderately low organic
matter content (1.0 to 2.0 percent). Permeability is very slow (< 0.06 in/hr) in
the most restrictive layer above 60 inches. Available water capacity is moderate
(6.2 inches in the upper 60 inches). The pH of the surface layer in non —limed
areas is 4.5 to 5.5. Droughtiness and water erosion are management concerns for
crop production."
Sr Brookston silty clay loam. 0 -2 percent slops, This soil is dark grayish brown, silty
in texture and is in typically broad depressions, swales and narrow drainage ways of till
plains. it consist of deep, very poorly drained, moderately permeable soil. Its water table
is high and the water capacity and content of organic matter in surface later is high for
good plant growth and is commonly use for cultivated crops. The soil has a loamy glacial
till underlayment. The main soil features that affect urban development uses are a
seasonal high water table, high potential frost action, moderate shrink —swell potential and
moderate permeability.
Because of these Engineering limitations, roads and streets should be designed with
adequate drainage to minimize frost action and dwelling units with basement should have
adequate footing and foundation drainage due to wetness in the soils.
CrA Crosby silt loom, 0 -3 percent slopes — This soil is dark grayish brown colored,
silty in texture and on sloping uplands. It is deep and somewhat poorly drained with slow
permeability. it has high available water for plant growth and medium organic matter
content. The soil has compact till starting at a depth between 2n-40 inches. The
main soil features that affect urban development uses are seasonal high water table,
moderate shrink —swell potential, high potential frost action and slow permeability.
Because of these engineering limitations, roads and streets should be design with
adequate drainage to minimize frost action and dwelling units with basements should
have adequate footing and foundation drainage due to wetness in the soils.
SANDBAGS OVERLAP ONTO THE CURB
SANDBAG CURB INLET SEDIMENT BARRIER
Z J
00
ui 1� �2
wom
5'
SEE DEVELOPMENT PLAN FOR WIDTH (VARIES)
MIN.
B TO BACK OF WALL
CAP BETWEEN BAGS ACTS AS
A S5311 i WAY
Z J
0N
Nf5F
0Z�
crom
5 1
CHANNEL RELOCATION SECTION
SEE EROSION CONTROL PLAN FOR
EROSION CONTROL BLANKET AND SEEDING
CONSTRUCTION SEQUENCE FOR BUILDING SITE EROSION CONTROL PRACTICES
NOTES: 1. EROSION/ SEDIMENT CONTROL MEASURES MUST BE FUNCTIONAL AND BE
MAINTAINED THROUGHOUT CONSTRUCIION.
2. MAINTAIN POSITIVE DRAINAGE AWAY FROM THE STRUCTURE,
STORM WATER POLLUTION & PREVENTION NOTES- .
(A) All storm water quality measures, including erosion and sediment control, necessary to comply with this rule must be implemented in accordance with the plan and sufficient to satisfy
subsection (b).
(8) Provisions for erosion and sediment control on individual building lots regulated under the original permit of a project site owner must include the following requirements:
(1) The individual lot operator, whether owning the property or acting as the agent of the property owner, shall be responsible for erosion and sediment control requirements associated
with activities on individual lots.
(2) Installation and maintenance of a stable construction site access.
(3) Installation and maintenance of appropriate perimeter erosion and sediment control measures prior to land disturbance.
(4) Sediment discharge and tracking from each lot must be minimized throughout the land disturbing activities on the lot until permanent stabilization has been achieved.
(5) Clean —up of sediment must be redistributed or disposed of in a manner that is in compliance with all applicable statutes and rules.
(6) Adjacent lots disturbed by and individual lot operator must be repaired and stabilized with
temporary or permanent surface stabilization. '
(7) For individual residential lots, final stabilization meeting the criteria in section 7(b)(20) or this rule will be achieved when the individual lot operator.
(A) completes final stabilization; or
(B) has installed appropriate erosion and sediment control measures for an individual lot prior to occupation of the home by the homeowner and has informed the homeowner of the
requirement for, and benefits of, final stabilization. 7(b)(20) Final stabilization of a project site is achieved when: (A) all land disturbing activities have been completed and a uniform (for
example, evenly distributed, without large bare areas) perennial vegetative cover with a density of seventy percent (707o) has been established on all unpaved areas and areas not covered
by permanent structures, or equivalent permanent stabilization measures have been employed; and
(B) construction projects on land used for agricultural purposes are returned to its preconstruction agricultural use or disturbed areas, not previously used for agricultural production, such
as filter strips and areas that are not being returned to their preconstruction agricultural use, meet the final stabilization requirements in clause (A).
INDIVIDUAL LOT
STORM WATER POLLUTION &: PREVENTION DETAIL
NOT— TO —SCALE
EROSION CONTROL SCHEDULE
I EROSION CONTROL MEASURE I MAINTENANCE I INSTALLATION SEQUENCE
INSPECT FOR AREAS OF EROSION BELOW THE BLANKET AFTER EACH L
EROSION CONTROL BLANKET STORM EVENT; REPAIR AREAS OF EROSION BY REMOVING AFFECTED AFTER FINISH GRADING
PORTION OF BLANKET, ADD SOIL, RESEED, RELAY AND STAPLE BLANKET;
INSPECT PERIODICALLY AFTER VEGETATION IS ESTABLISHED
INSPECT THE BALES AFTER EACH STORM EVENT, REMOVE SEDIMENT
STRAW BALES DEPOSITS TO PROVIDE STORAGE FOR THE NEXT STORM BEING CAREFUL AFTER FINISH GRADING
NOT TO DAMAGE OR UNDERCUT THE BALES; REPLACE DAMAGED OR
DETERIORATED BALES IMMEDIATELY
I INLET PROTECTION I
INSPECT FABRIC BARRIER REPAIAVOIDING DAMAGING IMMEDIATELY; R REMOVE U C EDIME THE B HE POAOL AREA WHILE I AFTER EACH INLET IS PLACED I
SEED, SOD & LANDSCAPE KEEP SOD MOIST UNTiL FULLY ROOTED; WATER AS NEEDED
AROUND UNITS FINISHED
REMOVAL OF STRAW BALES N/A
REMOVAL OF INLET PROTECTION N/A
REMOVAL OF SILT FENCE N/A
AFTER FINISHED GRADING AROUND FINISHED UNITS
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
U
INSPECT WEEKLY, AFTER STORM EVENTS, AND AFTER HEAVY USE;
FINAL CONSTRUCTION PLANS
STONE ENTRANCE
RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL;
PRIOR TO CLEARING AND GRADING
TOPDRESS WITH CLEAN STONE AS NEEDED; REMOVE ALL MUD AND
SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS IMMEDIATELY
o0
0
m
INSPECT AFTER STORM EVENTS; REPAIR ANY AREAS OF DECOMPOSITION
SILT FENCE
OR DAMAGE TO FENCE MATERIAL; REMOVE SEDIMENT AT DEPTH OF ONE
PRIOR TO CLEARING AND GRADING
HALF FENCE HEIGHT AT LOWEST POINT OR IF FABRIC BULGES; AVOID
UNDERMINING DURING CLEANOUT
EXISTING INLET PROTECTION
WEEKLY, AFTER STORM EVENTS, AND AS NEEDED
PRIOR TO CLEARING AND GRADING
TREE PROTECTION
WEEKLY, AFTER STORM EVENTS, AND AS NEEDED
PRIOR TO CLEARING AND GRADING
DETERMINE DEPTH AND SUITABILITY OF TOPSOIL AT THE SITE. (FOR HELP, CONTACT
YOURLOCAL SWCD OFFICE TO OBTAIN A COUNTY SOIL SURVEY REPORT OF CONSULT
Z
TOPSOIL STOCKPILE
WITH A SOIL SCIENTIST.)
PRIOR TO CLEANNING AND GRADING
ca-�n
PRIOR TO STRIPPING TOPSOIL. INSTALL ANY SITE — SPECIFIC DOWNSLOPE PRACTICES
NEEDED TO CONTROL RUNOFF AND SEDIMENTTATION.
REMOVE THE SOIL MATERIAL NO DEEPER THAN WHAT THE COUNTY SOIL SURVEY
BESCREBES AS SURFACE SOiL- (I.E. A OR AP HORIZON).
o:
�-- -co
STOCKPILE THE MATERIAL IN ACCESSIBLE LOCATIONS THAT NEITHER INTERFERE WiTH
o.
OTHER CONSTRUCTION ACTIVITIES NOR BLOCK NATURAL DRAINAGE: AND INSTALL SILT
FENCES, STRAW BALES, OR OTHER BARRIERS TO TRAP SEDIMENT (SEE EXHIBIT
3.02 —B). (SEVERAL SMALL PILES AROUND THE CONSTRUCTION SiTE ARE USUALLY
W
J
W
MORE EFFICIENT AND EASIER TO CONTAIN THAN ONE LARGE PILE.)
w
IF SOIL IS STOCKPILED FOR MORE THAN 6 MO., R SHOULD BE TEMPORARILY
Z
1Z
SEEDED OR COVERED WiTH A TARP OR SURROUNDED BY A SEDIMENT BARRIER.
~ ; O V- O
INSPECT WEEKLY AND AFTER EACH STORM EVENT; REMOVE SEDIMENT
FROM CHANNEL AND REINFORCE RIDGE AS NEEDED; REPAIR OUTLET
L
TEMPORARY DIVERSIONS
DAMAGE IMMEDIATELY; REMOVE SEDIMENT FROM TRAPS WHEN 50% FULL;
ALONG WITH ROUGH GRADING
WHEN WORK AREA IS STABILIZED, REMOVE RIDGE, FILL CHANNEL, REMOVE
z
TEMPORARY SLOPE DRAINS, AND STABILIZE ALL DISTURBED AREAS
INSPECT AFTER STORM EVENTS; REMOVE SEDIMENT AT ONE HALF DESIGN
CLV
TEMPORARY SEDIMENT TRAP
DEPTH; REPLACE SPILLWAY GRAVEL FACING IF CLOGGED; REPAIR EROSION
DURING CLEARING AND PRIOR TO GRADING
AND HOLES AS NEEDED; REPLACE DISPLACED RIPRAP
INSPECT THE ROCK DAM AND BASIN FOLLOWING ENACH STORM EVENT.
0 CO T-
InnZ "�"
REMOVE SEDIMENT WHEN ii ACCUMULATES TO HALF THE DESIGN VOLUME (MARKED
ROCK DAM
BY STAKE).
CHECK THE DAM AND ABUTMENTS FOR EROSION, PIPING, AND ROCK DISPLACEMENT,
AFTER ROUGH GRADING
EL
AND REPAIR IMMEDIATELY.
IF THE BASIN DOES NOT DRAIN BETWEEN STORMS, REPLACE THE STONE ON THE
E�tti�rtt�it<<
UPSTREAM FOACE OF DAME.
IF THE BASIN DRAINS TO REPIDLY FOLLOWING A STORM, (LESS THAN 6 HRS.),
ADD INDOT CA NO. 5 GRAVEL ON THE UPSTREAM FACE OF THE DAM.
ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN PERMANENTLY STABIUZED, o.
REMOVE WATER AND SEDIMENT FROM THE BASIN. b. REMOVE THE DAM, DISPOSING
OF THE ROCK IN THE DESIGNATED DISPOSAL AREAS. c. SMOOTH THE SITE TO
BLEND THE SURROUNDING AREA. d. STABILIZE.
INSPECT PERIODICALLY TO VERIFY ADEQUATE ESTABLISHMENT OF
VEGETATIVE STANDS; RESEED AND MULCH AS NEEDED; INSPECT AFTER
TEMPORARY SEEDING
STORM EVENTS AND REPAIR EROSION DAMAGE; TOPDRESS FALL SEEDED
AFTER ROUGH GRADING
WHEAT OR RYE SEEDINGS WITH 50 LBS /AC OF NITROGEN IN FEBRUARY
OR MARCH IF NITROGEN DEFICIENCY IS APPARENT, WATER AS NEEDED
INSPECT PERIODICALLY AND AFTER STORM EVENTS UNTIL VEGETATIVE
STAND IS ESTABLISHED; ADD FERTILIZER AFTER GROWING SEASON PER
PERMANENT SEEDING
SOIL TEST RECOMMENDATIONS; REPAIR DAMAGED, BARE, OR SPARSE
AFTER FINISH GRADING OF EACH AREA
AREAS BY FILLING, REPREPARING THE SEED BED, FERTILIZING, AND /OR
SEEDING AND MULCHING
INSPECT FOR AREAS OF EROSION BELOW THE BLANKET AFTER EACH L
EROSION CONTROL BLANKET STORM EVENT; REPAIR AREAS OF EROSION BY REMOVING AFFECTED AFTER FINISH GRADING
PORTION OF BLANKET, ADD SOIL, RESEED, RELAY AND STAPLE BLANKET;
INSPECT PERIODICALLY AFTER VEGETATION IS ESTABLISHED
INSPECT THE BALES AFTER EACH STORM EVENT, REMOVE SEDIMENT
STRAW BALES DEPOSITS TO PROVIDE STORAGE FOR THE NEXT STORM BEING CAREFUL AFTER FINISH GRADING
NOT TO DAMAGE OR UNDERCUT THE BALES; REPLACE DAMAGED OR
DETERIORATED BALES IMMEDIATELY
I INLET PROTECTION I
INSPECT FABRIC BARRIER REPAIAVOIDING DAMAGING IMMEDIATELY; R REMOVE U C EDIME THE B HE POAOL AREA WHILE I AFTER EACH INLET IS PLACED I
SEED, SOD & LANDSCAPE KEEP SOD MOIST UNTiL FULLY ROOTED; WATER AS NEEDED
AROUND UNITS FINISHED
REMOVAL OF STRAW BALES N/A
REMOVAL OF INLET PROTECTION N/A
REMOVAL OF SILT FENCE N/A
AFTER FINISHED GRADING AROUND FINISHED UNITS
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
U
O
FINAL CONSTRUCTION PLANS
Z
W
CU
o0
0
m
IX
o
�'T LU
o
W
Z
�QZ�
a
ca-�n
V
=za0
W
a
o:
�-- -co
W
o.
o
W
J
W
C),JC::)LnN
00,�
w
z
o
Z
1Z
j
~ ; O V- O
U)
L
o
U
z
OWr -- cooti
CLV
1�;
Z
I-ml-0i
0 CO T-
InnZ "�"
DATE DESCRIPTION
O
FINAL CONSTRUCTION PLANS
m
o
W
a
ca-�n
V
W
o:
�-- -co
W
o.
o
W
w
z
o
Z
1Z
U)
W
o
U
z
W
W
CLV
1�;
/
EL
Q
F-
E�tti�rtt�it<<
DATE DESCRIPTION
CLIENT NAME:
TONY ALDERSON
ALLEN COMMERCIAL GROUP
489 S. STATE ROAD 135, SUITE C
GREENWOOD, IN 46142
PHONE: 317 - 882 -7850
AUIN 1 FAX: 317-865-7213
C 2005 DeBoy Land Development Services, Inc.
DESIGNED:MLD APPROVED: MLD
DRAWN: RCB CHECKED BY: MLD
SCALE: NTS DATE:11 -31 -05
PROJECT NO.: 2005 -0052
C8.0
05 -30-06
FINAL CONSTRUCTION PLANS
ca-�n
V
�-- -co
W
o
W
w
z
o
Z
1Z
U)
W
o
U
z
W
W
CLV
/
CLIENT NAME:
TONY ALDERSON
ALLEN COMMERCIAL GROUP
489 S. STATE ROAD 135, SUITE C
GREENWOOD, IN 46142
PHONE: 317 - 882 -7850
AUIN 1 FAX: 317-865-7213
C 2005 DeBoy Land Development Services, Inc.
DESIGNED:MLD APPROVED: MLD
DRAWN: RCB CHECKED BY: MLD
SCALE: NTS DATE:11 -31 -05
PROJECT NO.: 2005 -0052
C8.0