HomeMy WebLinkAbout06080001.30ALUM. CURTAINWALL FRAMING.
SPANDRAL GLASS
ALL CONNECTIONS REQUIRED BY
CURTAINWALL ENGINEER ARE THE SOLE
RESPONSIBILITY OF THE CURTAINWALL
CONTRACTOR. SUBMIT STAMPED
ENGINEERING DRAWINGS PRIOR TO
CONSTRUCTION.
SPANDRAL GLASS
SEALANT JOINT.
SOLID SURFACE MATERIAL WINDOW STOOL
WITH I" PROJECTION FROM FACE OF GYP
BD. BELOW.
-" PLYWOOD AT TOP OF STUD KNEE WALL.
TIE STUD FRAMING BACK TO FACE OF
CURTAINWALL AS REUIRED.
5/8" TYPE "X" GYP.
BY TENANT
M
6" METAL STUDS @ 16" O.C.
BY TENANT
I '° a e n d e v e °
o Q d d e- �r r
I
WINDOW SILL @ CURTAINWALL
1 112 " =1' -0"
PROVIDE STRUCTURAL ELEMENTS AS STEEL ROOF DECK.
REQUIRED FOR SOFFIT SUPPORT.
S.S. ANCHOR -BY STONE CONT.
2X TREATED BLOCKING
SOFFIT
114' -1" EFS SYSTEM ON DENSGLASS SHEATHING.
PROVIDE PERIMETER SOFFIT VENTS.
1/2" SEALANT JOINT -TYP ® PERIMETER
STEEL CHANNELS INFILLED WITH STL STUDS
MOISTURE BARRIER -LAB OVER FLASHING
THRU WALL FLASHING
CAST STONE
CAVITY PROTECTION MATERIAL.
WEEP TUBES AT STONE LOCATIONS
TYP- PAINT ALL EXPOSED STEEL
WITH RUSTPROOFING.
ALUM STOREFRONT FRAMING.
z ENLARGED DETAIL
6- 6"
N
e
r
DRIP CUT BY
INSTALLER. TYPICA
TOP AND BO
FEATL
ALUM. STOREFRONT FRAMING.
PROVIDE SILL RECEPTOR (BY STOREFRONT
MANU) ON TOP OF CONT SEALANT BED.
CAST STONE WINDOW SILL AS DETAILED.
1/2' DENS GLASS GOLD
THRU -WALL FLASHING.
WEEP TUBES AT STONE LOCATIONS-
TWO PIECE FLASHING /COUNTERFLASHING
3/4" TREATED PLYWOOD SHEATHING
6" STEEL STUDS
RUN ROOFING UP STUB WALL.
STEEL ROOF DECK.
i
N
No
-1, E-1
Ell
1 ■I
I
10 0
1 1/2"= 1'-0"
COLUMN LINE-SEE FLOOR
PLANS FOR INFORMATION.
SEALANT JOINT.
SOLID SURFACE M TERIAL WINDOW STOOL
WITH" PROJECTI N FROM FACE OF GYP
BD. BELOW.
" PLYWOOD AT TOP OF STUD KNEE WALL.
CONTIN. TREATED OOD 2X BLOCKING.
5/8" TYPE "X" G P.
BY TENANT
SEE STRUCTURAL
SEE STRUCTURAL.
1' -4"
PARAPET DETAIL
OVER
VCHOR
ATED
AT
)OF.
SEE
;KING
ALUM. STOREFRONT FRAMING.
PROVIDE SILL RECEPTOR (BY STOREFRONT
MANU) ON TOP OF CONT SEALANT BED.
CAST STONE WINDOW SILL AS DETAI
MOISTURE BARRIER. LAP
OVER FLASHING.
1/2" DENS GLASS GOLD
FORMED ALUM. COPING. SEE All AND
A3.2 FOR MATERIAL NOTES.
EIFS COMPATIBLE SEALANT WITH BOND
BREAKER. TYPICAL ® ALL SIM CONDITIONS
z
DRIP CUT BY EIFS
INSTALLER. TYPICAL
AT TOP AND BOTTOM
FEATURES.
M
EIFS SYSTEM -SEE All
AND A3.2
1/2" DENGLAS SHEATHING.
6" STEEL STUDS TO BUILD
WALL OUT.
N
� M
M
cn
mail
►I,L
I°
N
WINDOW SILL @ 2ND FLOOR
1 1/2"= V-0"
2"
2"
8"
8'
C'
I
I
DRIP CUT BY EIFS '
INSTALLER. TYPICAL AT
TOP AND BOTTOM
FEATURES. 1
" SEALANT AND BACKER ROD- TYPICAL AT
ALL SIMILAR CONDITIONS
2X TREATED WOOD BLOCKING
4 PARAPET DETAIL
1' -4"
1' -4"
COLUMN LINE- -SEE FLOOR
PLANS FOR INFORMATION.
SEALANT JOINT.
SOLID SURFACE MATERIAL WINDOW STOOL
WITH J" PROJECTION FROM FACE OF GYP
BD. BELOW.
4" PLYWOOD AT TOP OF STUD KNEE WALL.
CONTIN. TREATED WOOD 2X BLOCKING.
SEE 3/A1.4 FOR WALL
INFORMATION.
5/8" TYPE "X" GYP.
BY TENANT
REFER TO STRUCTURAL DRAWINGS
FOR SLAB CONST AND STUD
ATTACHMENT DETAILS TO EDGE ANGLE.
o.
a e d o
D.9
B.1
RUN ROOFING MEMBRANE OVER TOP OF
PARAPET AND ANCHOR AT FRONT EDGE.
—T- TWO LAYERS OF J" TREATED PLYWOOD
WITH IX SHIM AT FRONT EDGE TO PROVIDE
POSITIVE DRAINAGE TO ROOF.
ONE LAYER OF TREATED PLYWOOD.
6'
I
6" STEEL STUDS.
I
6"
ui
z
0
Nu
Ak
U
XJ fw"
-Z UJ
=
W
SL
¢itiUUAr
VfW Qji V
Lu
f
01- Zz0
w
Vi L
�zU��! ¢
U
pwO00U�
p
Q
=
�°�a�zu
LUo
Z
CL L4
<f- O�OQ�e° -i
Z o- F- a
OC
d�uw0 ~�
d z >-
•
p�uJaJ No
wp0zu �zt-
U
_
Qu?�vO
W
w
o
CJ
J
Q
r ^
O00
7
Z
O
ON
0�
Q
0
W
0
M
N
mzm�
CD
O
N N
n
•
A.
1
C1;
N
J
�'
_
M
0 = w
O
�
M
z
m m 0 w
W
_1
z Y Q
p
W W
m
O
W
oTan
Z
z
O �
H
w �
c
z
O
u
w
u
a
z
44
d J
J �
Q N
UZ
Z
W
uj
uj
j Z a Z
m -za
u,�ac
U W p Z
LL J �
Un u ui
0 Lu
Z
Z j
C GC
ZdOU
ACGO5002
u 2�