Loading...
HomeMy WebLinkAbout0959.95.13�J� V i.VV l+v v SEASONAL SOIL PROTECTION CHART STABILIZATION PRACTICE JAN. FEB. MAR. APR. MAY JUN. JUL. AUG. SEPT. OCT. NOV. DEC. ------------------------------------------------ :# PERMANENT A )IE / / / / /// I / / / / /CIF —CIE /I/ D SEEDING --------------------------------------------------------------- DORMANT B —y B to SEEDING --------------------------------------------------------------- C D, 0 " SEEDING E / / / /I / /// ---------------------------------------- - - - - -- --------------- - SODDING F * — / / / / / / /I / / / / /// fi --------------------------------------------------------------- MULCHING G --------------------------------------------------------------- A • KENTUCKY BLUEGRASS 40 LBS /ACRES CREEPING RED FESCUE 40 LBS /ACRE: PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE. B • KENTUCKY BLUEGRASS 60 LBS /ACREi CREEPING RED FESCUE 60 LBS /ACREi PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE. C • SPRING OATS 3 BUSHEL /ACRE D • WHEAT OR RYE 2 BUSHEL /ACRE E • ANNUAL RYEGRASS 40 LBS /ACRE. (1 LB/1000 SO. FT.) F • SOD G • STRAW MULCH 2 TONS /ACRE. */I/* IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPT. **IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLING SOD. CONSTRUCTION 'SEQUENCE 0 INSTALL SILT TRAPS 2) CONSTRUCT DETENTION BASIN AND OUTFACE STRUCTURE 3) STRIP AND STOCKPILE TOPSOIL 4) ROUGH GRADING 5) CONST&C'T SWALES AND STORM SEWERS.INSTALLING SUMPS AND SILT FENCE 6) UTILITY INSTALLATION 7) CURBING AND PAVING 8) FINAL GRADING 9) FINAL SEEDING AND LANSCAPING 10) MAINTENANCE OF THE EROSION CONTROL PRACTICES UNTIL ADEQUATE GROUND COVER EXISTS. NOTES: Al EROSION CONTROL BLANKETS TO HAVE A MINIMUM VELOCITY RATING QF 3 FT /SEC: B) LAKE BANK SEEDING - USE SEEDING CHART THIS SHEET. C) LAKE BANK SEEDING TO BE PERMANENT SEEDING. O) DISTURBED AREAS SHALL BE SEEDED AS PER GOLF COURSE ARCHITECTS GRASSING PLAN. OUTLET PROTECTION DETAIL (NO SCALE) ROCK RIP -RAP APRON OVER GEOTEXTILE NS SHALL HAVE A GEOTEXTILE POLYFELT TS650 OR EQUIVALENT. �3 STONE L w d50 DEPTH 9' 12.75' 6' 18' 6' 10' 6' 18' OUTLET PIPE O 5' 8' 6' 18' 6' 10' 6' 18' 11' 14' 6' 18' o FLOW o Q 3 NS SHALL HAVE A GEOTEXTILE POLYFELT TS650 OR EQUIVALENT. �3