HomeMy WebLinkAbout06010010.54�
-c
M
....878.74
60' RCP
877,49
60' RCP
—137UCK "A"
COMMONS
BEAUFI!
EN Cr
Z4�
COMMONSi
2) 0 0
NOTE:
EARTH MOVING MAY NOT COMMENCE UNTIL ITEMS
1-11 OF "SPECIFIC STORMWATER POLLUTION
PREVENTION PLAN NOTES" ON C805 HAVE BEEN
COMPLETED IN ADDITION TO ITEMS DEPICTED ON
PLAN. I
CONTACT PERSON:
KEVIN KRULIK
BRENWICK DEVELOPMENT
12821 E. NEW MARKET ST.
SUITE 200
CARMEL, IN 46032
(317) 574-3400
ASSUMED NORTH
SCALE: 1"=50 '
HOLEY MOLEY. SAYS'
DON'T
DIG
BLIND In
"IT'S THE LAW"
CALL 2 WORKING DAYS BEFORE YOU DIG
11-800-382-5544
"ALL TOLL FREE
PER INDIANA STATE LAW IS-69-1991.
IT IS AGAINST THE LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCAflON SERVICE TWO (2) WORKING
DAY`, BEFOPE CaIMENCiN1G INORK.
WARNING
THIS SHEET TO BE USED FOR S 1`0 R M WA
POLLUTION PREVENTION PURPOSES ONLY. Fr-0 4�N
OTHER INFORMATION SEE DEVELOPMENT PI-14N.
�M WMIJA
EEEEMEN� 7m]
SEE SHEETS C804 & C805 FOR ALL STORMWATER
POLLUTION PREVENTION PLAN DETAILS & NOTES]
I I wmmmmm�
NOTE:
ADDITIONAL STORMWATER POLLUTION
PREVENTION MAY BE REQUIRED IN THE
FIELD BY HAMILTON COUNTY SURVEYOR'S
OFFICE OR HCSWCD INSPECTOR
NOTE:
RULE 5 REQUIRES ALL DISTURBED AREAS THAT
WILL POTENTIALLY BE IDLE FOR 15 DAYS OR
MORE TO BE STABILIZED (SEEDED, MULCHED, E-TC,
IMMEDIATELY.
RECEIVING WATER: ELLIOT CREEK
I
Existing Storm Sewer
New Storm Sewer
Existing Sanitary Sewer
New Sanitary Sewer
Existing Con+our
j
N
�O
DATE: 12/301/05
THIS DRAWING AND THE IDEAS, DESi,-,!,-
CONCEPTS CONTAINED HEREIN ARE THEN
INTELLECTUAL PROPERTY OF THE SC dEiiE
CORPORATION, AND ARE NOT TO BE OR
REPRODUCED, IN WHOLE OR IN PART, �,
A" `I'jUT
THE WRITTEN CONSENT OF THE SC'
CORPORATION.
(K) COPYRIGHTED BY THE SCHNEIDER
11E SCHNEIDER
e w 11,1 cr k i
z! g
e c e, c c, rr
0d, c t u,-
ng n
B ui 1 der
s; ar
7—Id—c-
-Frcinsport:ifior,
:31;
HATCH PATTERN DENOTES TEMPORA EE- D1 1% R
HATCH PATTERN DENOTES PERMANEN-i-
HATCH PATTERN DENOTES EROSION CO-6—iROL I-LANKET
CURB INLET SEDIMENT BARRIER (TYP)
BEEHIVE INLET PROTECTION
PAVED AREA INLET SEDIMENT BARRIER (TYP)
STRAW BALES (TYP)
SILTATION FENCE
CONSTRUC11ON LIMITS
Ts
TEMPORARY SEDIMENT FILTER/BARRIER
j
N
�O
DATE: 12/301/05
THIS DRAWING AND THE IDEAS, DESi,-,!,-
CONCEPTS CONTAINED HEREIN ARE THEN
INTELLECTUAL PROPERTY OF THE SC dEiiE
CORPORATION, AND ARE NOT TO BE OR
REPRODUCED, IN WHOLE OR IN PART, �,
A" `I'jUT
THE WRITTEN CONSENT OF THE SC'
CORPORATION.
(K) COPYRIGHTED BY THE SCHNEIDER
11E SCHNEIDER
e w 11,1 cr k i
z! g
e c e, c c, rr
0d, c t u,-
ng n
B ui 1 der
s; ar
7—Id—c-
-Frcinsport:ifior,
,71]4
DPOJECT N1,,
12/30/05 12-18, 150!
DRAWN BY: CHECKED 2�
DCC
SHEET TITLE:
?RE— CONSTRUCTION S TO R"J'Kili 1 EIR,
POLLUTION PREVENTION PLAN
DRAWING FILES:
N: \1238 \1501 \DWGS\Cl 02.DWG
XREF: 1005-BS.DWG, 1006-BS.DWG
XREF: 1012-OS.DWG, 9001-BS.DWG
XREF: CA15.DWG, CA16.DWG
SHEET NO.:
f
LO
,71]4
DPOJECT N1,,
12/30/05 12-18, 150!
DRAWN BY: CHECKED 2�
DCC
SHEET TITLE:
?RE— CONSTRUCTION S TO R"J'Kili 1 EIR,
POLLUTION PREVENTION PLAN
DRAWING FILES:
N: \1238 \1501 \DWGS\Cl 02.DWG
XREF: 1005-BS.DWG, 1006-BS.DWG
XREF: 1012-OS.DWG, 9001-BS.DWG
XREF: CA15.DWG, CA16.DWG
SHEET NO.:
f