HomeMy WebLinkAboutSpohn Associates - $669,951Disbursement Instructions
Regions Bank hereby is instructed to make a disbursement of Loan Proceeds from the Borrower Loan
Account to (or for the account of) Borrower in: (a) the amount of the "Total Due" line in the "Amount of Current
Authorized Disbursement" column below; and (b) accordance with the terms and conditions of the Agreement,
the other Loan Documents, and the Disbursement Instructions.
Description of Work
.
Scheduled
Volvo or
Contract
Amount
Percent
Compton? or
Contract
Amount Owed
Amount of
Prior
Authorized
Dlaburoament
Amount of
Current
Authorized
Disbursement
A MAYAS 't) ki; p&■ d ‘,1 CII)C
(Si kh ( Assoc iAes) Jan.
559,73810
(Spo)1 h 4ssocin (;) e\ic
1 It? 212.20
7
Grand Total
alifai ova > . ,rte: ° :, m
er6 j9ti; =4
CRC has inspected the portions of the PAC Equipment 'completed, by Borrower to
confirm the Percent Complete In the applicable column above.
CRC either has received or waived receipt of conditional lien waivers and other
submittals required to be made by Borrower in connection with a disbursement of
Loan Proceeds from the Borrower Loan Account to (or for the account of) Borrower.
All terms used In these Disbursement Instructions without definition shall have the meanings ascribed thereto
in that certain Loan Agreement (Theater Building Base Structure), dated as of June 30, 2009, by and between
Lender and Carmel Theater Development Company, LLC., as amended by that certain Amendment to Loan
Agreement, dated, January 28, 2010, by and between the same parties.
Dated:
3
CITY OF CARMEL REDEVELOPMENT
CO ISSION
By
Printed Lis S. GL/2 J
Title 6—'X6-Ccl7' p 111 et7t/
Draft
PAC Interior Ornamental
(Spohn Associates)
Up Through November 2009
Total Contract Amounts through application 5
Completed and Stored to date $ 227,259.00
Retention held $ 22,725.90
Paid to date $ 204,533.10
Amount reimbursed to CRC $ 204,533.10
December 2009
Total Contract Amount for application 6
Completed and Stored to date $ 73,585.00
Retention held $ 7,358.50
To be paid $ 66,226.50
Paid by Carmel Theater Development Company $ 66,226.50
January 2010
Amount to be paid by Carmel Theater Development Company $ 559,738.80
February 2010
Amount to be paid by Carmel Theater Development Company $ 110,212.20
APPLICATION AND CERTIFICATE FOR PAYMENT
AM DOCUMENT G702 /CMa
CONSTRUCTION MANAGER- ADVISER EDITION
PAGE ONE OF PAGES
TO OWNER: PROJECT:
CITY OF CARMEL, INDIANA REGIONAL PERFORMIN
ONE CIVIC SQUARE
CARMEL, IN 46032
FROM CONTRACTOR:
SPOHN ASSOCIATES, INC.
7150 WINTON DRIVE, SUITE 100
INDIANAPOLIS, IN 46268
RTS CENTER
VIA CO1 UCTfON MANAGER:
CONTRACT FOR: ORNAMENTAL RAILINGVIA ARCHITECT:
APPLICATION NO: 7
PERIOD TO: 1/31/2010
PROJECT NO:
CONTRACT DATE: 11/17/08
Distribution to:
1
OWNER
CONSTRUCTION
MANAGER
ARCHITECT
CONTRACTOR
CONTRACTOR'S APPLICATION FOR PAYMENT
Application is made for payment, as shown blow, in connection with the Contract.
Continuation Sheet, AIA Document 0703, is attached.
L ORIGINAL CONTRACT SUM
2. Net change by Change Orders
3. CONTRACT SUM TO DATE (Line 1.± 2)
4. TOTAL COMPLETED & STORED TO DATE
(Column G on 0703)
5. RETAWAGE:
a- 10'.' %ofCompleted Work
((Colwnn D 4- E on 0703)
b. 10 % of Stored Material
(Column F on 0703)
Total Retainage (Lines 5a + 5b or
Total in Column I of G703)
6. TOTAL EARNED LESS RETAINAGE
(Line 4 less Line 5 Total)
7. LESS PREVIOUS CERTIFICATES FOR
PAYMENT (Line 6 from prior Certificate)
8. CURRENT PAYMENT DUE
9. BALANCE TO FINISH, INCLUDING RETAINAGE S
(Line 3 less Line 6)
S 14,276.60
S 58,001.00
$ 2.173.370.00
$ (55,412.00)
$ 2,117,958.00
$ 922,776_ M
$
$
92,777 _60
830,498.40
$ 270,759.60
$ 559,738.80
1.287.459.60
CHARGE ORDER SUMMARY
ADDITIONS
UEDUU [IONS
Total changes approved
in previous months by Owner
55,412.00
Total approved this Month
- TOTALS
$0.00
55,412.00 I
NET CHANGES by Change Order
(55,412 00 )
-.,,• , y 7• , 1A • . U • • 1• -,• t Y • •
The undersigned Contractor certifies that to the best of the Contractor's knowledge,
information and belief the Work covered by this Application for Payment has been
completed in accordance with the Contract Documents, that all amounts have been paid
by (he Contractor for Work for which previous Certificates for Payment were issued and
payments received from the Owner, and that current payment shown herein is now due.
CONTRACTOR: SPOHN ASSOCIATES, Inc.
By:
State of INDIANA
Subscribed and swot to before me this
Notary Public:
My Com+nissiorl expires:
County of:
25th day of January, 2010
1/9/2016
Date: 1/25/10
MARION
CERTIFICATE FOR PAYMENT
In accordance with the Contract Documents, based on on -site observations and the data
comprising this application, the Construction Manager and Architect certify to the
Owner that to the best of their knowledge, infomtation and belief the Work has
progressed as indicated, the quality of the Work is in accordance with the Contract
Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED.
AMOUNT CERTIFIED $ S-561, 7?'. $D
(Attach explanation if amount certified di.(fers from the amount applied for. Initial all
on Sheet that changed to conform to the
figures on this Application and on the Conlin
anronnl certified,
CO TRUCTIIt �r `AGER:
By:
AR
By:
Date: o112_bfl jD
Date: OAF. ROOD
This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the
Contractor named herein. Issuance, payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract.
• , • •�
• „ 3•. r, p• I ,• , +/ ,
THE AMERICAN IItSTfrUTE OF ARCHITECTS, 1745 NEW YORK AVE., U.W. V.'ASHINGTOIt. DC 20006.5292
• r- 1
1 norr . fAT
1 rl In"'1 1'1'l1.i1 11
SCHEDULE OF VALUES
Project City of Carmel, Indiana
One Civic Square
Carmel, iN 46032
Job No: 2895
Trade Item: Contract 5030 - Interior Ornamental Steel and Railings
SPOHN ASSOCIATES
Application Number
Period To: 1/31/2010
Spohn Project No: 28 -1062
NC.
7
A
$
C
D E
r
G
H
l
!tern No.
'ctwcription or work
Schogt too Value
tMnii, ConVeted
i tenats
Preserriy Stored t
(Not in D or 0) t
Tote
Consptem 1 to Date
01 " 0)
COn1-
piete
PG)
Balance
F inlob.
to
(C-G)
Retalnage
From Previous
Application
This
Porioct
1
Performance and Payment Bonds
13,860
$ 13,860
$ -
$
$ 13,860
100°in
5
5 1,386.00
2
Engineering - Submittal
i 5 105,000
$ 99;750
5 5.250
5
-
5 105,000
1006/0
$
-
5 10,500.00
3
Engineering - File and Field i 5 102,944
5 30,883
5 0
$
$ 30,883
30%
$
72,061
5 3,088.30
4
Contract Allowance ! $ 100.000
$ -
5 59,470 1 5
-
5 59.479
50%
$
40,521
5 5,947.90
5
CAD'- as built drawings 1 $ 10,000
5 - 5 5.000 $
$ 5,000
50%
$
5,000
$ 500.00
Temporary Rail Removal
5 6,000
5 -
0%
5
6,000
6
Elevator Cab Cladding
5 90.670
$ - g - 5
-
$ -
0%
5
90,670
$
Steel Stairs
Stair #9
i
7
Material
$ 72,565
8 14.513
5 - S
-
5 14,513
20%
5
58,052
5 1,451.30
8
Labor
5 26,816
$ 5.363
5
;s 5,363
20%
$
21,453
$ 536.30
Stair #10
9
Material
5 72,585
5 14,513.
$ $
-
5 14,513
20%
5
58.052
$ 1,451.30
10
Labor
5 26,816
5 5,363
$
5 5,363
20%
55
21.453
5 536.30
Stair #15
11 Material
$ 20,034
$ 10,017
$ - 5
-
$ 10,017
.50%
$
10,017
5 1,001.70
12 Labor
.5 4,253
5 2,142
5 - $
$ 2,142.
50%
5
2,141
$ 21420
Stair #16
13 Material
$ 20,034
$ 10,017
$ 5
$ 10,017
50%
,5
10,0'17
5 1,001.70
14 Labor
5 4,2.83
5 2,142
$ - $
-
$ 2,142
50%
'5
2,141
5 214.20
Stair #29
15 Material
.5 19,850
5 1,588
5 - $
5 1,588
8%
5
18,262
5 158.80
16 Labor
S 5.125
5
S 1$
S
0%
$
5,125
u
Stair #30
17
Material
5 19,850
5 1,588
5 -
$
5 1,588
8%
$
18,262
5 158.80
18
Labor
5 5,125
$ - $
5
-
5 -
0%
5
5,125
$ -
i
Ornamental Railings
1
19
Low t High Orchestra Lobby
Material
5 18,200
S
$ - 1 S -
3
13,650
$ '13,550
75%
$
4,550
$ 1,365.00
20
Labor
$ 7,800
5 -
$ 390
$
-
5 390
$°/n
$
7410
5 39.00
Sub - Totals
1 5 751,820
1 5 211,739
$ 70.119
5
13,650
$ 295,508
.0%
$
456,312
$ 29,550:80
SCHEDULE OF VALUES
Project: City of Carmel, Indiana-
One Civic Square
Carmel, IN 46032
SPOHN ASSOCIATES INC.
Job No; 2695
Trade Item: Contract 5030 - Interior Ornamental Steel and Railings
Application Number: 7
Period To 11310010
Spahn Project No: 28-1062
A
„ C
D
5
F
0
Item No.
Opseocclert Qr work
Scheduled Value
Wort
Cornplemd
Material5
Presenlly Stored
:NOt fo 0 or i.':
Tole!
Completed le Dale
03 + E) •
Compel
P
mr4j
fiolanee to
0no t‘ (8-GI
RelaMage
From Ete.vgAi5z
ApNICDn
Ms
Pet!CH1
Orchestra Higl Hall
21
Material
5 32,500
-
$ .
5 , 22,750
5 22.750
70%
5 9,750
$ 2,275.00
22
Labor
5 20,800
5 -
$ 1,040
5 -
5 1,040
5%
3 19760
5 104.00
Box Tier- Hall
23
Material
$ 78,000
$ -
S -
$ 54,600
5 54,600
70%
$ 23,400
5 5,460.00
24
Labor
5 32,500
$ -
5 1,625
3 -
$ 1,625
5%
$ 30;875
3 162.50
Balcony Levi,- Hall
25
Matetial
'5 58.500 '
5 -
5 .
40,950
$ 40,950
70%
$ 17,550
5 4,095.00
26
.Labor
'5 32,500
5 -
3 1,625
-
$ 1,625
5%
$ 30,675
.5 162.50
Balcony HO -, Hall
27
Material
5 78,000
$ -
$ ...
5 54,600
$ 54,600
70%
$ 23,400
$ 5.460.00
28
Labor
$ 58,500
$
$ 2,925
$ -
3 2.925
5%
5 55.57
5 292.50
Railing,0):St,alrs.& Ramps in Hall
Ramps & Stairs'#11, 12, 13, and 14
29
Material
5 26.000
5 -
5 -
$ 18,200
$ 18.200
70%
5 7,800
5 1,820.00
30
Labor
5 16,900
3 -
6 -
6 -
$ -
0%
5 16.900
3
Railing 0 Monumental
Stair #9
31
SteeliBronzeMaterlal
$ 160.000
5 16.000
5 -
5 96,000
$ 112000
70%
3 48,000
5 11,200.00
32
SteeltBronze Labor
5 70,000
3 2,800
$ -
5 -
5 2.800
4%
5 67,200
3 28000
33
Glass Materiel
$ 5,000
3
5
$ -
3
0%
$ 5,000
$
34
Glass Labor
Stair 410
5 2,000
5 ,
5 -
8 -
5 -
0%
$ 2,000
5 ..
35
Steel/Bronze Material
5 160,000
3 16,000
5 -
S 95,000
3 112,000
70%
$ 48,000
5 11.200 00
36
Steel/Bronze Labor
$ 70,000
3 2,800
3 -
$ -
$ 2,800
4%
5 67.200
5 280.00
37
Glass Material
5 5,000
3 -
, , -
3 -
S
0%
$ 5,000
'5
33
Glass Labor
$ 2,000
5 -
$ -
$ -
5 .
0%
5 2.000
3
Stair #15
39
Steel/B'rone.Material
5 12,500
3 375
5 -
$ 8.375
5 8,750
70%
5 3,750
$ 875.00
40
Steel/Bronze Labor
$ 5,500
5 165
$ -
5 -
5 165
3%
5 5.335
$ 16.50
41
Glass .Material
5 1,500
5 -
s
$ -
3
01/4
s 1,500
3
42
Glass Labor
S 500
3 -
$ -
$ -
5 .
0%
5 500
Stair #16
43
Steel/Bronze Material
5 12,500
5 375
5 -
5 8.375
3 8.750
70%
5 3,750
5 875.00
44 .
Steel/Bronze Labor
3 5,500
5 165
3 ,
$ -
5 165
3%
5 5.335
5 76.50
45
Glass Material
5 1,500
$ -
5 -
$ -
3
0%
$ 1.500
3
46,
Glass Labor
5 500
3 -
5 -
$ -
$ -
0%
$ 500
5 -
Sub-Totals
$ 1,700,020
5 250,419
5 71.334
$ 413,500
2 741,253
0%.
5 958,767
'3 74,125.30
SCHEDULE OF VALUES
SPOHN ASSOCIATES INC.
Project: City of Carmel, Indiana
One Civic Square
Carmel, IN 46032
Job No; .2695
Trade Item: Contract 5030 - interior Ornamental Steel and Railings
Appiication Nurnbe 7
Period To: 1/310010
Spohrl Project No: 28 -1062
A
B
G
Q j E 1 F
G
H
t
lien, No
Description ot'work
Scheduled Value
Woes Completed
Materials
Presently Stored
(Not in D or 5)
Total
Completed to trite
(D +. 5)
Comple
to
(C/0)
Halanr.e
'lo Finish
PG)
Relair-age
From Previous
Apnlisation
This ,1
Period
Railing G Monumental Stair: (Con't)
Stair #29
i
47
Steel /Bronze Material
$ 12,500
375
$ ` S 8.375
5 8,750
70%
5 3.,750
5 675,00
48
Steel /Bronze Labor
$ ' 5,500
165
5 - 1 5 -
5 165
3%
$ 5,336
5 16.50
49
Glass Material
$ 1.500
$ 1 5 -
$
0%
$ 1,500
$ -
50
Glass Labor
5 500
-
5 - 1 5
$ -
0%
$ 500
$
Stair #30
51
Steel!Brortze Material
$ 12,500
375.
$
$ 8,375
$ 8,750
70%
5 3,750
$ 875.00
52
Steel(Bronze Labor
$ 5,500
165
$ -
S -
5 165
3%
$ 5,335
$ 16.50.
53
Glass Material
5 1,500
-
S -
$ -
S _
0%
$ 1,500
5 -
54
Glass Labor
$ 560
-
$ -
S -
$ -
0%
.$ 500
$
Railing. I, Lobby Balconies
East.Lobby
55
Steel!Bron±e Material
$ 85,000
8,500
$ -
$ 51,000
5 59,500
70%
'5 25,500
$ 5,950.00'
56
Steel/Bronze Labor
5 40,100
1,203
5
5 -
$ 1,203
3%
$ 38,897
$ 120.30'
57
Glass Material
$ 1,400
-
5 . .
5 -
5 -
0%
5 1,400
$
58
Grass Labor
5 500
-
S ..
5 -
S -
0%
5 500
$ -
West Lobby .
59
Steel /BronzeMaterial
5 80,600
8,060
$ -
$ 46,360
$ 56,420
70%
'5 24,180
$ 5,642.00
60
Steel /Bronze Labor
$ 36,250
1,147
$ -
$
$ 1,147
3%
5 37,103
5' 114.70
61
Glass Material
5 1,000
-
$ -
5
5 -
0%
$ 1,000
$ -
62
Glass Labor
$ 500
-
$
5 -
5 -
0%
$ 500
5 -
Soiutn Lobby
63'
Steel/Stanza Material
$ 84,000
8,400
$ -
5 50,400
5 .58,800
70%
5 25.200
5 5,880.00
64
Steel /Bronze Labor
5 34,500
1.035
5 -
5 -
5 1,035
3%
S 33.465
$ 103.50
65
Glass Matelot
$ 1,000
$
S
5
0t4
5 1,000
5
66
Glass Labor
5 500
67
'68
Field Survey Stairs
5 16;000
56,000
5 -
5 -
5 16,000
100%
S -
5 1,600.00
Field Survey Rails
5 50,000
.5,000
S 20,000
5 -
5 25;000
50%
$ 25.000
$ 2,500.00
69
Change Order #1
5 (55,412)
-
$ (55,412
$ (55,412)
100%
S
. $ (5,541.20)
Totals
1 $ 2,117,956
5 300,844
5 4.1,922
$ 580,010
$ 922,776
44%
5 1,195,182.
5 95,277.60.
APPLICATION AND CERTIFICATE FOR PAYMENT
AJA DOCUMENT G702 /CMa
CONSTRUCTION MANAGER- ADVISER EDITION
PAGE ONE of PAGES
TO OWNER:
CITY OF CARMEL, INDIANA
ONE CIVIC SQUARE
CARMEL, IN 46032
FROM CONTRACTOR:
SPOHN ASSOCIATES, INC.
7150 WINTON DRIVE, SUITE 100
INDIANAPOLIS, IN 46268
PROJECT: APPLICATION NO: 8
REGIONAL PERFORMING ARTS CENTER
PERIOD TO: 2/2S/10
PROJECT NO:
VIA CONSTRUCTION MANAGER:
CONTRACT FOR: ORNAMENTAL RAILING VIA ARCHITECT:
CONTRACTOR'S APPLICATION FOR PAYMENT
Application is made for payment, as shown below, in connection with the Contract.
Continuation Shcet, AiA Document G703, is attached.
1. ORIGMAL CONTRACT SUM
2. Nct change by Change Orders
3. CONTRACT SUM TO DATE (Line 1 t 2)
4. TOTAL COMPLETED & STORED TO DATE
(Column G an 0703)
5. RETAINAGE:
a. 10 % of Completed Work
((Column D + E on G703)
b. 10 %of Stored Material
(Column F on 0703)
Total Retainagc (Lines Sa Jr 5b or
Total in Column 1 of 0703)
6. TOTAL EARNED LESS RETAINAGE
(Line 4 less Linc 5 Total)
7. LESS PREVIOUS CERTIFICATES FOR
PAYMENT (Line 6 from prior Certificate)
8. CURRENT PAYMENT DUE
9. BALANCE TO F[NISH, INCLUDING RETAINAGE
(Line 3 Tess Line 6)
S 100,169.40
$ 4,354.00
CONTRACT DATE:
Distribution to:
OWNER
CONSTRUCTION
MANAGER
nARCHITECT
11/17/08 nCONTRACTOR
$ 2,173,370.00
$ (J59.41200)
$ 2.117.95R.00
$ 1,045,734 nn
$ 104,523.40
$ 940,710.60
S
5 830,498.40
$: 110,712.70
S 1,177,247.40
CNANUE ORDER SUMMARY
ADDI t IONS
DEDUCTIONS
Total changes approved
in previous months by Owner
55.412.00
Total approved this Month
TOTALS
$0.00
55 ,412.000.00
NET CHANGES by Change Order
(55, 41 4.0d)
The undersigned Contractor certifies that to the best of the Contractor's knowledge,
information and belief the Work covered by this Application for Payment has been
completed in accordance with the Contract Documents, that all amounts have been paid
by the Contractor for Work for which previous Certificates for Payment were issued and
payments received from the Owner, and that current payment shown herein is now due.
CONTRACTOR: SPOHN ASSOCIATES, Inc.
By: Date: 2/16/10
State of: N ix County of: %y%r /o A)
Subscribed and swo to before me this / G7` H day of F� • t 2-o O
Notary Public:
My Commission expires: / `tj /2 o / {o
CERTIFICATE FOR PAYMENT
In accordance with the Contract Documents, based on on -site observations and the data
comprising This application, the Construction Manager and Architect certify to the
Owner that to the best of their knowledge, information and belief the Work has
progressed as indicated, the quality of the Work is in accordance with the Contract
Documents, and the Contractor is entitled to payment of the. AMOUNT CERT[FIED.
AMOUNT CERTIFIED S L' Z�2
(dltach eplonotion if amount certified dWers from the amount applied for. Initial all
figures on this application and on the Conti all • :Sheet that changed to conform to the
amount cerlifre�1
C• ;RU '1► ,.ri •
By ��%.' � %!= /� /i�ifr - - _
ByC / t J / Date:
This Certificate is not negotiable. The AMOUNT CERTIFIED is paya•Ic o ly to the
Contractor named herein. Issuance, payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract.
Date: 1;;)5
AAUGCUIIf} 4r1. 7UJC1AauAPVLitAiiWrANU[ :EHLIS- ICAIiWr4}UttWAYUENI0I:UH FtUCIIUNMAHAt .}{•AiiVibEH 1 1 EDHIL I ALA Ub1 �
T,7LJLMa•ssui
THE AMERICAN IIISTTTUTE OF ARCHII ECT6.1745 NEW YORK AVE., ILLY„ W?SHINGT011, DC 208766292
h? 1 1-11.1
1.
-1-1-11.11 11 IT ..1
SCHEDULE OF VALUES
SPOHN ASSOCIATES INC.
Project:, City of Carmel, Indiana
One Civic Square
Carmel, IN 46032
Job No: 2695
Trade item: Contract 5030 - Interior Ornamental Steel and Railings
Application Number: 8
Period To: 2/28/2010
Spohn' Project No: 28 -1062
A
B
C
D I E
F
G
H
I
Item No.
Description of work
Scheduled Value'
Work Completed
Materials
Presently Slored
(Not in D or E)
Total
Completed to Date
(0 + E)
Com-
plate
(C/G)
Balance to
Finish (C-G)
Retalnage
From Previous
' Application
This
Period
1
Performance and Payment Bonds
$ 13,860
5 13,860
$ -
$ -
5 13,860
100%
$ -
5 1,386.00
2
Engineering - Submittal
$ 105,000
'5 105,000
$ -
$ -
S 105,000
100%
$ -
$ 10,500.00
3
Engineering - File and'Field
.5 102,944"
$ 30:883
$ 5,147
5 -
5 36;030
35%
5 66,914
$ 3,603.00
4
Contract Allowance
$ 100,000
5 59,479
5 -
.5 -
5 59,47.9
50%
'5 40,52.1
$ 5,947.90
5
CAD - as built.drawings.
$ 10,000
$ 5,000
$ -
$ -
$ 5,000
50%
$ 5,000
$ 500.00
Temporary Rail Removal
$ 6,000
S -
0%
$ 6,000
6
Elevator Cab Cladding
$ 90,670
$ -
$ -
$ -
S -
0%
$ 90,670
$ -
Steel Stairs
Stair #9
7
Material
$ 72,565
$ 14,513
$ 21,770
$ 36,283.
50%
$ 36,282
$ 3,628.30
8
Labor
5 26;816
$ 5,363
5. 1,3'40
$ -
5 6,703
25%
5 20,113
$ 670.30
Stair #10
9
Material
$ 72;565
5" 14,513
$ 21,770
$ 36,283
50%
S 36,282
$ 3;628.30
10
Labor
$ 26;816
S 5,363
5' 1,341
$ -
B 6,704
25%
$ 20,112
$ 670.40
Stair #15
11
Material
$ 20,034
$ 10,017
$ 10,017
$ -
$ 20,034
100%
$ -
S 2,003.40
12
Labor
$ 4,283
$ 2,142
$ 2,141
$ -
:5 4,283.
100%
$ -
5 428.30
Stair #16
13
Material
$ 20,034
5 10,017
5 10,017
$ -
$ 20,034
100%
$ -
$ 2,003.40
14
Labor
$ 4,283
$ 2,142
$ 2,141
$ -
$ 4,283
100%
5 -
$ 428.30
Stair #29
15
Material
$ 19,850
$ 1,588
$ 18,262
$ -
.5 19,850
100%
S -
$ 1,985.00
16
Labor
$ 5,125
$ -
5 5,125
5 -
.5 5,125
100%
$ -
$ 512.50
Stair #30
17
Material
$ 19 :850
$ 1,588`
$ 18;262
5 -
$ 19 ;850
100%
:S -
$ 1,985.00
18'
Labor
$ 5,125
$ -
$ 5,125'
'5 -
5 5125
100%
.5 -
5 512.50
Ornamental Railings
Low / High Orchestra Lobby
19
Material
'5 18,200
5 13,650.
$ -
$ -
5' 13,650
75%
$ 4,550
5 1,365.00
'20
Labor
.5 7,800
$ 390
$ -
$ -
$ 390
5%
$ 7,410
$ 39.00
Sub - Totals
'5 751,820
$ 295,508
$ 78,918,
$ 43 ;540
S 417,966
56%
S 333 ;854
$ 41,796.60
SCHEDULE OF VALUES
SROHN ASSOCIATES INC.
Project: City of Carmel, Indiana
One Civic Square
Carmel, IN 46032'
Job No: 2695
Trade Item: Contract 5030 - Interior Ornamental Steel and Railings
Application Number: 8
Period To: 2/28/2010
Spohn Project No: 28 -1062
A
8
C
D
E
F
G
H
I
Item No.
-
Description of work'
Scheduled Value.
Work
Completed
Materials
Presently Stored
(Nol in'D or E)
Total
Complolad to Date
(D + E)
Complet
e
,(C /G)
Balance
Finish
to
(C -G)-.
Retainage
From Previous
Application
This
Period
Orchestra High - Hall
21
Material
5 32,500
$ 22,750
$ -
.5
-
$ 22,750
70%
$
9,750
$ 2,275.00
22
Labor
$ 20,800
$ 1,040
.5 -
$
-
$ 1,040
5%
$
19,760
5 104.00
Box Tler- Halt
23
Material
$ 78,000
5 54;600
5 -
$
-
$ 54,600
70%
$
23,400
$ 5,460.00
24
Labor
5 32,500
5- 1 ;625
5 -
5
-
5 1,625
5%
$
30,875
5 162.50
Balcony Low - Hall
25
Material
$ 58,500
$ 40,950
$ -
$
-
5 40,950
70%
$
17,550
$ 4,095.00
26
Labor
'5 32,500
$ 1,625
5 -
5
-
'5 1;625
5%
$
30,875
5 162.50
Balcony High Hall
27
Material
'S 78 ;000
5 54,600
$ -
$
-
S 54,600
70%
$
23,400,
5 5,460.00
28
Labor
$ 58,500
$ .2,925
$ -
S
-
S •2,925.
5%
5
55,575
'5 292.50
Railing @ Stairs & Ramps'in Hall
Ramps & Stairs #11, 12, '13, and 14
29
Material
5 26,000
S 18,200
$ -
$
-
S 18,200
70%
5
7,800
5 1,820.00
30
Labor
S 16,900
$ -
$ -
$
-
5 -
0%
5'
16,900
$ -
Railing'@ Monumental Stairs
Stair #9'
31
SteeVBronze Material
$ 160,000,
$ 112,000
5 -
$
-
$ 112,000
70%
5
48,000
5 11,200.00
32
Steel\Bronze Labor
$ 70,000.
5 2,800
5 -
$
-
$ 2,800
4%
$
67,200
$ 280.00
33
Glass Material
$ 5,000
:$ -
$ -
$
-
-5 -
0%
5
5 ;000
5 -
34
Glass Labor
$ 2;000
S -
$ -
5
-
$ -
0%
sr
2,000
5 -
Stair #10
35
Steel /Bronze Material
.5 160000
$ 112,000
$ -
5
•
-
5 112;000
70%
$
48,000
S 11,200.00
36
Steel /Bronze Labor
$ 70,000
-5 2,800
$ -
$
-
5 2,800
4%
$
67,200
-5 280.00
'37
Glass Material
:$ 5,000
$ -
$ -
5'
-
$ -
0%
$
5,000
5 -
38
Glass Labor
$ 2,000.
$ -
$ -
5-
-
$ -
0%
5
2,000
S -
Stair #15
39
Steel /Bronze Material
$ 1200
5 8;750
$ -
5
-
5 8,750
70%
$
3,750
5 875.00
40
Steel/Bronze Labor
$ 5 ;500
'5 ,165
5 -
$
-
5 165.
'3%
.$
5,335
5 16.50
41
Glass Material
$ 1,500
5 -
$ -
5
-
5 -
0%
$
1,500
$ -
42
Glass Labor
-5 500
:5 -
5 -
S
-
5 -
0%
5
500
$ -
Stair #16
43
Steel /Bronze Material
$ 12,500
'5 8,750
$ -
5
-
5' 8,750
.70%
$
3,750
$ 875.00
44.
'Steel /Bronze.Labor
$ 5 ;500
$ -65
5 -
$
-
$ 165
3%
;$
5,335
$ 16:50
45
Glass Material
$ 1,500
$ -
$ -
$
-
$ -
-0%
5
1,500
5 -
46
Glass Labor
$ .500
$ -
$ -
$
-
$ -
0%
$
500
$ -
Sub-Totals
5 1,700,020
.5 741,253
-5 78,918
$
43,540
$ 863,711
51%
$
836,309
$ 86,371.10
SCHEDULE OF VALUES
SPOHN ASSOCIATES INC.
Project: City of Carmel, Indiana
One Civic Square
Carmel, IN 46032
Job No: 2695
Trade Item: Contract 5030 - Interior Ornamental Steel and Railings
Application Numbe 8
Period To: 2/28/2010
Spohn Protect No: 28-1062
A
B
C
D ( E
F
G
I-1.
Item No.
Description of work
Scheduled Value
Work Completed
Materials
Presently Stored
(Not In D or E)
Total
Completed to Dale
(D + Ej
Comple
to
(GIG)
Balance
to Finish
(C-G)
Retainago
From Previous
Application
This
Period
Railing @ Monumental Stairs (Can't)
Stair #29
47
Steel /Bronze Material
$ 12,500,
8,750
$
5 -
S 8,750
70%
$ 3;750
$ 875.00
48
Steel /Bronze,Labor
$ 5,500
165
$ -
$ -
$ 165
3%
$ 5,335
S 16:50
49
Glass Material
$ 1,500
-
$ -
$ -
$ -
0%
$ 1,500
$ -
50
Glass Labor
.5 500
-
$ -
5 -
5 -
0%
5 500
$ -
Stalr #30
51
Steel /Bronze Material
5 12,500
8,750
$ -
5 -
5 8,750
70%
$ 3,750
$ 875.00
52
Steel /Bronze Labor
5 5,500
165
$ -
5 -
5 165
3%
$ '5,335
5 16.50
53
Glass Material
$ 1,500
-
.5 -
$ -
5 -
0%
5 1,500
5 -
54
Glass Labor
5 500
-
5 -
'S -
$ -
0%
$ 500
$ -
Railing @ Lobby Balconies
East Lobby
55
Steel /Bronze Material
.$ 85,000
59,500;
.$ -
$ -
$ 59,500.
5 25,500
$ 5,950:00
56
•Steel /Bronze Labor
$ 40,100
1,203
5 -
$ -
$ 1,203
,70%
3%
$ 38,897
$ 120.30
57
Glass Material
$ 1,400
-
$ -
5
:5 -
0%
$ 1,400
.$ -
58
Glass Labor
$ 500
-
S -
5 -
$ -
0%
$ 500
$ -
West Lobby
59
Steel /Bronze Material
$ 80,600
56,420
$ -
5 -•
5 56,420
70%
5 24,180
$ 5,642.00
60
Steel /Bronze Labor
$ 38,250
1,147
$ -
$ -
$ 1,147
3%
5 37,103
5 114.70
61
Glass Material
$ 1,000
-
.5 -
$ -
5 -
0%
$ 1,000
5 -
62
Glass Labor
5' 500
-
, $ -
$ -
$ -
0%
5 500
$ -
63
SouthLobby,
Steel /Bronze Material
$ 84,000
58,800
5 -
$' -
$ 58,800
70%
$ 25;200
$ 5,880.00
64,
Steel /Bronze Labor
$ 34,500
1,035
$ -
$ -
5 1,035
3%
S 33,465
$ 103.50
65
Glass Material
$ 1,000
-
5 -
$ -
$ -
0%
$ 1,000
5 -
66
Glass Labor
$ .500
67
Field Survey Stairs
5 16,000
16,000
$ -
$ -
$ 16,000
100%
$ -
$ 1,600.00
68
Field Survey Rails
$ 50,000
25,000
$ -
$ -
$ 25,000
50%
5 25,000
5 2,500.00
69
Chan 'e:Order #1
5. 55,412
55,412
5 -
S (55,412
100%
5 -
5 (5,541.20
Totals
$ 2,117,958
$ 922,776
$ 78,918
$ 43,540
5 1,045;234
49%
5 1,072,724
5 104,523.40