Loading...
HomeMy WebLinkAbout06020007.19RO 7 a Ln O N s--I M rl 7 vF t lv 0 N to N O 00 m N N 0 �o A—I SI PAVEMENT SURFACE PLACE EXPANSION JOINT RAMP, AT BACK OF CURB LINE B B OR AT SIDEWALK LINE C L �Q 2' ROLL CURB \�� MAX. RAMP SLOPE 1 " /FT. A-J CLASS "A" CONC. SIDEWALK PLAN VIEW RAMP PAVEMENT VAR. VAR. I 4" SECTION A -A CONTRACTION JOINT (TYP.) SECTION C -C WIDTH OF RAMP SIDEWALK 4' MIN SECTION B -B TYPICAL SIDEWALK RAMP DETAIL FOR HANDICAPPED NOTE: WHERE STORM DRAINS CONFLICT WITH RAMP, RAMPS SHALL BE MOVED TO SIDE OF DRAIN. 6' -0" & 10' -0" SLOPE ASPHALT PATH TO ROAD OR TOWARD TOP OF BANK OF DITCH 1 /4 " /FT. MIN. TYPICAL ASPHALT PEDESTRIAN PATH X- SECTION ttrsa 100' TOP OF CURB PAVEMENT BOTTOM OF CURB —� TRANSVERSE EXPANSION JOINTS TRANSVERSE CONTRACTION JOINTS * * * ** WHEN BUILT IN CONJUCTION WITH CONCRETE PAVEMENT, EXPANSION AND CONTRACTION JOINTS SHOULD BE PLACED AT THE SAME LOCATIONS AS IN THE PAVEMENT SLABS. THE CURB AND GUTTER SHOULD BE TIED TO THE PAVEMENT BY 1/2" ROUND DEFORMED BARS AT ABOUT 3 FOOT INTERVALS. IF NO CONCRETE PAVEMENT IS BEING BUILT AT THE TIME THE CURB IS CONSTRUCTED, EXPANSION JOINTS SHOULD BE PLACED AT THE ENDS OF ALL RETURNS AND AT INTERVALS NOT TO EXCEED 100 FEET. CONTRACTION JOINTS SHOULD BE INSTALLED AT 20 FOOT SPACING. CURB JOINT DETAIL Li z J �/J/ i 3' TOPSOIL, SEED OR SOD AS REQUIRED TO MATCH EXISTING EXISTING GRADE STANDARD FULL DEPTH GRANULAR BACKFILL DETAILS NOT —TO —SCALE SAW CUT FOR l' -0" MIN. BOTH SIDE`. NOTE: OF TRENCH 1. NEW SURFACE IS TO BE SLOPED AT THE SAME RATE AS THE EXISTING SURFACE. 2. EXISTING PAVEMENT IS TO BE SAW CUT FOR A CLEAN BREAK. 3. TRENCH SPOIL IS TO BE REMOVED FROM SITE. 4. 1.5" H.A.C. #11 SURFACE 5. BITUMINOUS TACK APPLIED AS PER "INDIANA DEPT. OF HIGHWAYS STANDARD SPECIFICATION 409 & 902. 6. ALL LANE MARKINGS, STRIPING, STOP BARS, ETC. DISTURBED OR REMOVED DURING EXCAVATION ACTIVITIES, SHALL BE RETURNED TO THEIR ORIGINAL CONDITION. 7. PLAIN CONCRETE IS TO BE FINISHED 1.5" BELOW THE EXISTING PAVEMENT. 8, CUT SHALL BE STEEL PLATED DURING CONCRETE CURE TIME AND UNTIL ASPHALT IS APPLIED. 1.5" H.A.C. SURFACE \\ X 12" THICK PLAIN CONCRETE TO BE FINISHED 1.5" BELOW THE EXISTING PAVEMENT FLOWABLE FILL TO BE PLACED ENTIRE TRENCH TO BOTTOM OF CONCRETE ELEVATION. 50' R/W 30' -0" TYPICAL STREET CROSS- SECTION NOT —TO —SCALE 1.5" H.A.C. SURFACE #11 2" H.A.C. BINDER #8 3" H.A.C. BASE #5D 7" COMPACTED #53 STONE 7. COMPACTED SUBGRADE PAVEMENT COMPOSITIONS NOT —TO —SCALE NOTE: Minimum Cover for Pipe Crossings of City Streets For installation of Storm Mains, Water Mains, Sanitary Mains, Water Service Laterals, Sanitary Service Laterals under City streets, regardless of the jurisdiction of the utility, the minimum cover from the top of the installed pavement to the top of the installed pipe shall be the pavement section thickness (all bituminous and aggregate material above the subgrade) plus 1 -0 ". If the standard practice of the utility that has jurisdiction over the installation has a more stringent cover requirement, the more stringent requirement shall govern. = el RCP Installation Review02- 01- 05\ MinimumCoverForPipeCrossingOfCitySt =ts.dm 6" 18" L TOPSOIL 2 "R. 2 "R. 4" SLOPE 1/4" PER FOOT d � _ 12 -3/4" ° d d e 9 -3/ d d ° ° a ASPHALT PATH - d ° 110# SYD. BITUM SURFACE NO. 11. LV ON 00000 - -- 000000 0000 A °00000 0000 220# SYD. BITUM BINDER NO. 8, LV ON o 0 0 0 00000 Q 5" COMPACTED AGGREGATE BASE, SIZE NO. 53 COMPACTED BACKFILL 00000000000000 o000000� bo COMPACTED 0 o g„ o 0 00 00 00 00 o d� 00000000 0 0 00 oo �o 0 000 #53 STONE COMPACTED SUBGRADE 24" REVERSE GUTTER CHAIRBACK CURB NOT -TO -SCALE RESIDENTIAL STREETS ONLY LIMITS OF FULL DEPTH GRANULAR BACKFILL SHOULDER, TOPSOIL, SEED Z SIDEW LK, TOPSOIL, SEED OR SOD, AS REQUIRED TO OR SOD, AS REQUIRED TO MATCH EXISTING GRANULAR PAVEMENT WIDTH VARIABLE GRANULAri J MATCH EXISTING z BACKFILL BACKFILL 3 I o: d♦ SHOULDER SECTION CURB SECTION ALL CUTS MADE IN OR UNDER ANY ROAD SURFACE SHALL BE BACKFILLED WITH B. BORROW WHERE A CUT EITHER TRANSVERSES OR PARALLELS THE ROAD SURFACE. GRANULAR BACKFILL SHALL BE PLACED IN THAT PORTION OF THE CUT. THE ENTIRE EXCAVATED AREA WITHIN THE RIGHT —OF WAY. i� NOTE TO CONTRACTOR: THE CITY OF CARMEL AND THE HAMILTON COUNTY SURVEYORS OFFICE NOW REQUIRES DOUBLE WALL HANCOR HI —Q SSD PIPE OR EQUAL TO BE USED. Vi -2� -£095 WED 1133 llM :'.'7 CF C9NtLL FPX NC, 3:7 571 2436 P. 34 Property Une eo�k ar cup S x'_M M,. rI and l� ornil �.4 5'tlex :la ' ... 4" ToP Soil y * BatkG6 Pnpantl Subgreee { TYPICAL SIDEWALK SECTION NOT TO SCALE * THE SPACE BEHIND THE CURB SHAI!_ BE FILLED WI -H SUITABLE MATERIAL TO THE REOUIREO ELEVATION AND COMPACTED IN LR ERS NOT TO EXCEED 6 IN DEPTH. SUBGRADE OR BASE UNDER AFL CURES, SIDEWALKS, AND DRIVES SHALL BE COMPACTED IN ACCORDANCE WITH SECTION 207.02 OF THE STANDARD SPECIFICATLONS. 'come Or Sowee Joints %4 Thcknees If ' Claaa 'A" Cancreee .� '- 4• Minimum Sidewalk Butt wP r."kewerys Snau Nave ma,. um lhickness Of S Or'hckncss 01 cry .y which Ere, iy Cr ater. I CONCRETE SIDEWALK NOl 10 SCALE CITY OF CARMEL STANDARDS SIDEWALK DETAILS eensEG riG.ftE 10 -14 ROLL CURB & GUTTER TYPE I SIDEWALK 14" THIC K 5' -0" z J --\\ MATERIAL �xr,�.��r,�, �f V -0" -TOEPp it, No. s 19358 STATE OF : �A `S%NAL NOTE: Water and Sewer Under City Streets Bedding, Hounching, Initial Backfill Bedding, haunching, and initial backfill materials, placement and compaction for water mains, water service laterals, sanitary mains and sanitary service laterals shall be in accordance with the standard practice of the utility that has jurisdiction over the installation. Final Backfill Final backfill for water mains, water service laterals, sanitary mains and sanitary service laterals under and within 5 —feet of pavement shall be B— Borrow for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6 —inch maximum lifts to not less tharl 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6— inches of the excavation below the start of the aggregate subbase of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less then 95% Standard Proctor Density. If the standard practice of the utility that has jurisdiction over the installation has a more stringent final backfill requirement, the more stringent requirement shall govern. S:\Legal \Carmel RCP Installation Review02 -01 -05\ Water &SewerUnderCitySu=ts.doc NOTE: All paving within the existing and proposed City right —of —way shall conform to the requirements of the department of Engineering. Please add a note to the drawings that the Contractor shall contact the Department of Engineering to schedule a pre — construction meeting to review the Department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right—of—way. SALegal\Carmel RCP Installation Review02- 01- 05\ DepartmentOfEngineeringNote.doc tl :11- 2E -3C05 W.0 1 Jdc 411 ;.L`' OF 0 +iRILI F3K hJ. '31' 571 ?4 "i3 P 0�, vt- � I 4 ' r —� PILL (Iypiciv NO7E: LFf SR L C,0r4"* M I;. I:TTO', 506.17 t,F LTf,ND -K9 bPE ihN s r,'; ,S iYsS7AL�AT1'4 kF,ljKi'i) Eii:71i SIJ_', 01 .'A It fd r -tl ",EIERr HE :UIP :D H',' _ Lt1P1'ii Frt. iITY -lei° i..-.iit.1C - - -L ;�1 fJl� FiL�E_..... __.. _ H4Y- 2S -2C05 WEE 11:53.111 CIT4 OF CARMEL Fk NC. 317 571 2439 P, r Top sell / 7 ;1 Low Part L C —piety w� 0ocddl �•.� � V a v Cices'A Concrete I ° � i � s ep�cne BCtweC I a �� \_CompoCUd Subaratle of Ag�regole Boae __ _ 14' k�inimarr � � : i�ona+ene Jo�rls 3 $ncu nCl Exceee - L25 Times Width - ROLL CURB & GUTTER TYPE I SIDEWALK 14" THIC K 5' -0" z J --\\ MATERIAL �xr,�.��r,�, �f V -0" -TOEPp it, No. s 19358 STATE OF : �A `S%NAL NOTE: Water and Sewer Under City Streets Bedding, Hounching, Initial Backfill Bedding, haunching, and initial backfill materials, placement and compaction for water mains, water service laterals, sanitary mains and sanitary service laterals shall be in accordance with the standard practice of the utility that has jurisdiction over the installation. Final Backfill Final backfill for water mains, water service laterals, sanitary mains and sanitary service laterals under and within 5 —feet of pavement shall be B— Borrow for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6 —inch maximum lifts to not less tharl 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6— inches of the excavation below the start of the aggregate subbase of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less then 95% Standard Proctor Density. If the standard practice of the utility that has jurisdiction over the installation has a more stringent final backfill requirement, the more stringent requirement shall govern. S:\Legal \Carmel RCP Installation Review02 -01 -05\ Water &SewerUnderCitySu=ts.doc NOTE: All paving within the existing and proposed City right —of —way shall conform to the requirements of the department of Engineering. Please add a note to the drawings that the Contractor shall contact the Department of Engineering to schedule a pre — construction meeting to review the Department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right—of—way. SALegal\Carmel RCP Installation Review02- 01- 05\ DepartmentOfEngineeringNote.doc tl :11- 2E -3C05 W.0 1 Jdc 411 ;.L`' OF 0 +iRILI F3K hJ. '31' 571 ?4 "i3 P 0�, vt- � I 4 ' r —� PILL (Iypiciv NO7E: LFf SR L C,0r4"* M I;. I:TTO', 506.17 t,F LTf,ND -K9 bPE ihN s r,'; ,S iYsS7AL�AT1'4 kF,ljKi'i) Eii:71i SIJ_', 01 .'A It fd r -tl ",EIERr HE :UIP :D H',' _ Lt1P1'ii Frt. iITY -lei° i..-.iit.1C - - -L ;�1 fJl� FiL�E_..... __.. _ H4Y- 2S -2C05 WEE 11:53.111 CIT4 OF CARMEL Fk NC. 317 571 2439 P, r Top sell / 7 ;1 Low Part L C —piety w� 0ocddl �•.� rT � T V a v Cices'A Concrete I ° --\\ MATERIAL �xr,�.��r,�, �f V -0" -TOEPp it, No. s 19358 STATE OF : �A `S%NAL NOTE: Water and Sewer Under City Streets Bedding, Hounching, Initial Backfill Bedding, haunching, and initial backfill materials, placement and compaction for water mains, water service laterals, sanitary mains and sanitary service laterals shall be in accordance with the standard practice of the utility that has jurisdiction over the installation. Final Backfill Final backfill for water mains, water service laterals, sanitary mains and sanitary service laterals under and within 5 —feet of pavement shall be B— Borrow for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6 —inch maximum lifts to not less tharl 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6— inches of the excavation below the start of the aggregate subbase of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less then 95% Standard Proctor Density. If the standard practice of the utility that has jurisdiction over the installation has a more stringent final backfill requirement, the more stringent requirement shall govern. S:\Legal \Carmel RCP Installation Review02 -01 -05\ Water &SewerUnderCitySu=ts.doc NOTE: All paving within the existing and proposed City right —of —way shall conform to the requirements of the department of Engineering. Please add a note to the drawings that the Contractor shall contact the Department of Engineering to schedule a pre — construction meeting to review the Department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right—of—way. SALegal\Carmel RCP Installation Review02- 01- 05\ DepartmentOfEngineeringNote.doc tl :11- 2E -3C05 W.0 1 Jdc 411 ;.L`' OF 0 +iRILI F3K hJ. '31' 571 ?4 "i3 P 0�, vt- � I 4 ' r —� PILL (Iypiciv NO7E: LFf SR L C,0r4"* M I;. I:TTO', 506.17 t,F LTf,ND -K9 bPE ihN s r,'; ,S iYsS7AL�AT1'4 kF,ljKi'i) Eii:71i SIJ_', 01 .'A It fd r -tl ",EIERr HE :UIP :D H',' _ Lt1P1'ii Frt. iITY -lei° i..-.iit.1C - - -L ;�1 fJl� FiL�E_..... __.. _ H4Y- 2S -2C05 WEE 11:53.111 CIT4 OF CARMEL Fk NC. 317 571 2439 P, r Top sell / 7 ;1 Low Part L C —piety w� 0ocddl �•.� rT � T V a v Cices'A Concrete I ° a �� \_CompoCUd Subaratle of Ag�regole Boae __ _ 14' k�inimarr NOTES. INTEGRAL CURB W :TH CONCRtTE PAVLMENT SHALL UE SIMILAR SHAPE. CURE ALL EXPJSLD SURFACE',_ DAMPEN SUBCRADE BEFORE PLACING CONCRETE. CITY OF CAFIMEL STANDARDS CONCRETE ROLL C'JRE1 4 GUT-ER i7GUgr —, in-if) r CID 0 Z 0 (n W Y Q w a 0 LLJ 0 = m LL_ J z �\ Q Y W U O Q- M U W n z O\ 0 r0 0 W F— W U w ♦j a of -t z 0, Q O ° >- 1 - LJJ > 00 W __ 0 X Z Q Q J I 0i) U) I Do Iz N N W r` W 1 Z 0 O 00 Z W 0 Z Ln J cn 0 Z Q O o z Q z Q C) z V) ry Q ` W a-N C)Z �0 W �~ W U Z uj QV! V) V) J W Q U SHEET NO. C802 Joe No46600S2B 0 r0 0 W F— W U w ♦j a of -t z 0, Q O ° >- 1 - LJJ > 00 W __ 0 X Z Q Q J I 0i) U) I Do Iz N N W r` W 1 Z 0 O 00 Z W 0 Z Ln J cn 0 Z Q O o z Q z Q C) z V) ry Q ` W a-N C)Z �0 W �~ W U Z uj QV! V) V) J W Q U SHEET NO. C802 Joe No46600S2B J W Q U SHEET NO. C802 Joe No46600S2B