Loading...
HomeMy WebLinkAboutCorrespondence: TAC 10-23-08 • The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone:317.826.7100 Fax:317.826.7200 INDIANA October 23, 2008 Corporate Headquarters Historic Fort Harrison Greg Ilko 8901,4tis Avenue Crossroad Engineers, PC 1. � ���� ..4� Indianapolis, IN 46216 3417 South Sherman Drive r,,_•; ` Toll-Free: 866.973.7100 Beech Grove, IN 46107 • Avon Office ' OCS Building 1000 5250 E US Highway 36 RE: Stafford Place Section 2 & 3 Suite 250 �. '. Avon,IN 46123 Dear Greg, Carmel Office 12821 E New Market Street Please find enclosed one set of Secondary Plats, Site Construction Plans, Drainage Report, Suite 301 for Stafford Place, Section 2 & 3. The plans have been revised per your letter dated August Carmel, IN 46032 20, 2008. I have addressed each of your items individually with a numbering system Merrillville Office consistent to your letter. 9800 Connecticut Drive Suite B1-508 Please NOTE that your August 20, 2008 comment letter pertained to Section 1 and Merrillville,IN 46307 Sections 2 & 3. We applied your comments where noted to Sections 2 & 3. West Lafayette Office Responses below are the same that was submitted for Section 1. Please note 1330 Win Hentschel Boulevard p Suite 100 additional changes to construction plans Section 2 & 3 at the end of the letter. West Lafayette. IN 47906 1. See responses below IOWA a. Denoted emergency flood routing path with an arrow. Ames Office b. Drainage summary is shown on C805 on Section 1 plans and C804 for 1606 Golden Aspen Drive Section 2 and 3 plans. Suite 110 c. See C101 on Section 1 plans and C102 on Section 2 plans for pond outlet Ames,IA 50010 information. d. Not all lots have pads. Lots that will be constructed with pads have the pad NORTH CAROLINA elevations shown. See General Note#15 on Development Plan for flood Charlotte Office protection grade note. 8001 Arrowridge Boulevard 2. Hydraulic grade line calculations have been added in the drainage report. Charlotte,NC 28273 3. An exhibit showing the offsite drainage path from 2' Hamilton County GIS contours for • Pond 1 has been inserted into the drainage report. After a visual site inspection, Greg TENNESSEE Hoyes of the Hamilton County Surveyor's Office approved the location of the Pond 1 _ Nashville office _ outlet. The Hamilton County Surveyor's Office was unable to produce a drainage 624 Grassmere Park Drive report for Wedgewood Section 2 that would supply drainage basin and storm pipe Suite 30 information downstream from the beehive the subject site ties into. Therefore, since Nashville.TN 37211 the release rate has been reduced, it can be assumed that the existing storm sewer will have adequate capacity. • 4. See General Note#15 on Development Plan for flood protection grade note. Lowest Adjacent Grade elevations for lots adjacent to the ponds are listed with the other pond elevation information. 5. Proposed condition curve numbers have been revised to be the next less infiltrating capacity category as compared to the existing condition curve numbers. 6. Both ponds have a 12" outlet pipe with a 6" restrictor plate orifice at the pond outlet. During the 10-year storm event, the developed release rate is not lower than the allowable, but since the minimum orifice size is 6", the developed release rate is accepted. During the 100-year storm event, both ponds could have a larger than 6" R:\5k\5622\002\Docs\Section 2&3\IIkoI02308.doc `� s wwwschneidecorp com"?: orifice in the restrictor plate and have the developed release rate still lower that the allowable release rate. Each pond outlet will have a 6" outlet however, in order to lower the developed release rate of the 10-year storm event. Therefore during the 100-year storm event, both ponds are slightly over-detaining what they are required to. 7. The City of Carmel Engineering Department has stated that the limits of the topographic survey will be sufficient. An exhibit showing the offsite drainage path from 2' Hamilton County GIS contours for Pond 1 has been inserted into the drainage report. 8. An exhibit showing the offsite drainage path from 2' Hamilton County GIS contours for Pond 1 has been inserted into the drainage report. After a visual site inspection, Greg Noyes of the Hamilton County Surveyor's Office approved the location of the Pond 1 outlet. 9. Per a meeting with Gary Duncan of the City of Carmel Engineering Department on 9/19/07, the method for calculating release rates is sufficient because the directly discharged watershed basins are included in the proposed release rates and the timing of the peak discharge of the ponds and direct discharge basins are taken into consideration. 10. An exhibit showing the offsite drainage path from 2' Hamilton County GIS contours for Pond 1 has been inserted into the drainage report. 11. Top of bank elevation for Pond 1 has been raised to achieve 2' of freeboard. 12. The Hamilton County Surveyor's Office was unable to produce a drainage report for Wedgewood Section 2 that would supply drainage basin and storm pipe information downstream from the beehive the subject site ties into. Therefore, since the release rate has been reduced, it can be assumed that the existing storm sewer will have adequate capacity. 13. Per a discussion with Gary Duncan of the City of Carmel Engineering Department on 9/19/07, the method for calculating release rates is sufficient because the directly discharged watershed basins are included in the proposed release rates and the timing of the peak discharge of the ponds and direct discharge basins are taken into consideration. 14. Swale grading has been revised to meet requirements. 15. Revised structures 635 and 643 to get 2.5'of cover over pipes. Requesting permission from City Engineer for cover at structures 608, 665, and 666. Changes since last submittal that may override previous responses: Please note that the lot configuration for Lots 10, 11, and 12 was modified. Please note that the storm sewer system along the east property line was modified to achieve cover over the storm sewer pipes along the property line without significant fills. The drainage report has been revised to reflect the small change in watershed routing and is being submitted for review. Some minor grading revisions have occurred to achieve earthwork balance impacting some storm sewers in Section 2 & 3. Revised construction plans are being submitted to all TAC agencies for final.review. The developer would_like to secure approvals as soon as possible.to_prepare Sections 2 & 3 for infrastructure construction this winter/spring. Paving will occur in the spring. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, T CHNEIDER CORPORATION Brandon T. Burke, P.E. Project Manager Enclosure R:\5k\5622\002\Does\Section 2&31IIko 102308.doc • i The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone:317.826 7100 Fax:317 826.7200 INDIANA October 23, 2008 Corporate Headquarters Historic Fort Harrison Nicholas J. Redden 8901 Otis Avenue City of Carmel Engineering Department Indianapolis, IN 46216 One Civic Square Toll-Free:866.973.7100 Carmel, IN 46032 Avon Office Building 1000 5250 E US Highway 36 RE: Stafford Place Section 2 & 3 Suite 250 Avon,IN 46123 Dear Nick, Carmel Office • 12821 E New Market Street Please find enclosed one set of Secondary Plats, Site Construction Plans, and Drainage Suite 301 Report for Stafford Place, Sections 2 & 3. The plans have been revised per your letter dated Carmel,IN 46032 September 11, 2008. I have addressed each of your items individually with a numbering system consistent to your comment letter. Merrillville Office 9800 Connecticut Drive Suite B1-508 GENERAL INFORMATION Merrillville,IN 46307 1. Noted, the comments represent the department's first review. West Lafayette Office 2. Noted, all responses to comments will be made in writing. 1330 Win Hentschel Boulevard 3. Noted, all modifications of the construction plans resulting from reviewing parties will Suite 100 ruc p g revew g p West Lafayette,IN 47906 be noted at the end of our response letters or copies of their review and responses will be provided. 4. Noted, we have received Crossroad Engineer's comments dated August 20, 2008 IOWA and the revised plans address their review. Crossroads Initial review covered Section Ames Office 1 and Sections 2 & 3. We are sending current revised plans to Crossroads for further 1606 Golden Aspen Drive g curren rev p Suite 110 review and approval. . Ames,IA 50010 5. Noted. Please find enclosed a copy of the recorded offsite sanitary sewer easement. 6. Noted. 7. Noted, we are working with Amanda Foley on review and approval of the project to NORTH CAROLINA obtain a Stormwater Permit. Charlotte Office 8001 Arrowridge Boulevard 8. Noted, the contractor shall secure the right-of-way permit once construction plans are Charlotte,NC 28273 reviewed and approved by the Engineering Department, if applicable. ... 9. Noted. 10. Noted, digital files shall be submitted once review is completed by all TAC agencies. TENNESSEE 11. Noted. Nashville-Office- - --.- -- 624 Grassmere Park Drive 12. Noted. Suite 30 13. Noted, we are working with the City of Carmel Utilities and the revised construction Nashville,TN 37211 plans submitted include their review comments. 14. Noted. 15. Noted. BOARD OF PUBLIC WORKS AND SAFETY 16. Noted. All Board of Public Works items have been addressed during Section 1 approvals. 17. Noted. 18. Noted. 19. Noted. 146th Street entrance permit was obtained from the Highway Department R:\5k\5622\002\Docs\Section 2&3\Redden102308.doc wwwschneldercorp comb;; l ' 20. during Section 1 approvals. 21. Noted. The temporary construction entrance will be consistent with the street extension. • 22. Noted. 23. Noted 24. Noted. 25. Noted. BONDING REQUIREMENTS 26. Performance Guarantees will be submitted once the final review has been completed by the Engineering Department. 27. Noted, Engineer's estimates will be submitted once the final review has been completed by the Engineering Department. 28. Noted. 29. Noted. 30. Noted. RIGHT OF WAY PERMIT AND BONDING 31. Noted. 32. Noted. 33. Noted, the contractor shall secure the applicable right of way permits once the all review and approvals have been completed by TAC members. AVAILABILITY AND CONNECTION FEES 34. Noted. Handled during Section 1 approvals. 35. Noted. 36. Noted. Handled during Section 1 approvals. 37. Noted. CONSTRUCTION DRAWING REVIEW COMMENTS 38. Noted. 39. Noted. 40. Sections 2 & 3 are submitted for approval as one set of construction plans. The secondary plats are separate. 41. Noted. The Construction plans and plats have been revised to reflect Stafford Place. 42. Noted. The drainage summary has been moved from sheet C803 to C101. -43.--Noted. 44. Please see sheet C302. The stop signs have been modified for Prevail Drive West/Alderbrook Trail and Alderbrook Trail/Queensborough Drive to remove the multi-stop stops. 45. Noted, please see sheet C801. Details 1/C801, 2/C801, and 10/C801 have been darkened. 5/C801 has been revised to show max spacing of tranverse contraction joints at 10 feet on tangents and 5 feet on radii. 46. Noted, sheet C805 has been reviewed and appropriate details were darkened. Please note that the lot configuration for Lots 10, 11, and 12 was modified. Please note that the storm sewer system along the east property line was modified to achieve cover over the storm sewer pipes along the property line without significant fills. The drainage report has been revised to reflect the small change in watershed routing and is being submitted for review to Crossroads Engineers. Some minor grading revisions have occurred to achieve earthwork balance. R:\5k\5622\002\Docs\Section 2&3\Redden I02308.doc Revised construction plans are being submitted to all TAC agencies for final review. I will forward Engineer's Estimates shortly for review by your Department, the developer will secure the bonds once approved. I will submit 9 sets of construction plans and digital submittal once approved. The developer would like to secure approvals as soon as possible to prepare Sections 2 & 3 for infrastructure construction this winter/spring. Paving will occur in the spring. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION Brandon T. Burke, P.E. Project Manager Enclosure R:\5k\5622\002\Docs\Section 2&3\Redden 102308.doc The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone 317.826.7100 Fax: 317.826:7200 INDIANA October 23, 2008 Corporate Headquarters Historic Fort Harrison Paul Arnone 8901 Otis Avenue City of Carmel Utilities Collection Indianapolis, IN 46216 901 North Rangeline Road Ton-Free: 866.973.7100 Carmel, IN 46032 Avon Office Building 1000 5250 E US Highway 36 RE: Stafford Place Section 2 & 3 Suite 250 Avon,IN 46123 Dear Paul, Carmel Office 12821 E New Market Street Please find enclosed one set of Secondary Plats and Site Construction Plans for Stafford Suite 301 Place, Section 2 & 3. The plans have been revised per your letter dated August 15, 2008. Carmel.IN 46032 have addressed each of your items individually with a numbering system consistent to your Merrillville Office letter. 9800 Connecticut Drive Suite B1-508 1. An 8"valve was added at common area G beside the fire hydrant. Merrillville, IN 46307 2. Curb Stops were added to for lots 22 &23. West Lafayette Office 1330 Win Hentschel Boulevard Please note, the lot configuration for Lots 10, 11, and 12 were modified. There were some Suite 100 g West Lafayette. IN 47906 minor grading revisions to achieve earthwork balance. Sanitary and water laterals were adjusted to orientate them at the midpoint of the lots, following comments received for Section 1. IOWA Ames Office If you have any questions or require additional information, please feel free to contact me at 1606 Golden Aspen Drive Suite 110 your convenience. Ames,IA 50010 Sincerely, NORTH CAROLINA THE SCHNEIDER CORPORATION Charlotte Office 8001 Arrowridge Boulevard Charlotte.NC 28273 TENNESSEE Brandon T. Burke, P.E. .Nashville Office 624 Grassmere Park Drive Project Manager Suite 30 Nashville,TN 37211 Enclosure CC: John Duffy- City of Carmel Utilities Steve Cook- City of Carmel Utilities Paul Pace- City of Carmel Utilities Distribution R:\5k\5622\002\Docs\Section 2&3\Arnone102308.doc '' _stF., ., wwwsch,neidercorp coin'`:; Cs, The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone:317.826.7100 Fax:317 826.7200 INDIANA October 23, 2008 Corporate Headquarters Historic Fort Harrison Steve Cook 8901 Otis Avenue City of Carmel Utilities Indianapolis, IN 46216 3450 W. 131St Street Toll-Free: 866.973.7100 Westfield, IN 46074 Avon Office Building 1000 5250 E US Highway 36 RE: Stafford Place Section 2& 3 Suite 250 Avon. IN 46123 Dear Steve, Carmel Office 12821 E New Market Street Please find enclosed one set of Secondary Plat and Site Construction Plans for Stafford Suite 301 Place, Section 2 & 3. The plans have been revised per your letter dated August 15, 2008. I Carmel,IN 46032 have addressed each of your items individually with a numbering system consistent to your Merrillville Office letter. 9800 Connecticut Drive Suite B1-508 1. An 8" valve was added at common area G beside the fire hydrant. Merrillville,IN 46307 2. Curb Stops were added to for lots 22 &23. West Lafayette Office 1330 Win Hentschel Boulevard Suite 100 g Please note, the lot configuration for Lots 10, 11, and 12 were modified. There were some West Lafayette, IN 47906 minor grading revisions to achieve earthwork balance. Sanitaryand water laterals were adjusted to orientate them at the midpoint of the lots, following comments received for Section 1. IOWA Ames Office If you have any questions or require additional information, please feel free to contact me at 1606 Golden Aspen Drive y y q q p Suite 110 your convenience. Ames.IA 50010 Sincerely, NORTH CAROLINA THE SCHNEIDER CORPORATION Charlotte Office 8001 Arrowridge Boulevard ,r—-•Charlotte,NC 28273 7 1 TENNESSEE Nashville_Office Brandon T. Burke, P.E. 624 Grassmere Park Drive Project Manager Suite 30 Nashville,TN 37211 Enclosure CC: John Duffy- City of Carmel Utilities Paul Arnone- City of Carmel Utilities Collection Paul Pace- City of Carmel Utilities Distribution R:\5k\5622\002\Docs\Section 2&3\Cook102308.doc www schneidercorp eom<<r ‘.1 The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826 7100 Fax: 317 826.7200 INDIANA October 23, 2008 Corporate Headquarters Historic Fort Harrison John Duffy • 8901 Otis Avenue City of Carmel Utilities Indianapolis, IN 46216 760 Third Avenue S.W. Toll-Free: 866.973.7100 Carmel, IN 46032 Avon Office Building 1000 5250 E US Highway 36 RE: Stafford Place Section 2 & 3 Suite 250 Avon. IN 46123 Dear John, Carmel Office 12821 E New Market Street Please find enclosed one set of Secondary Plat and Site Construction Plans for Stafford Suite 301 Place, Section 2 & 3. The plans have been revised per your letter dated August 15, 2008. I Carmel, IN 46032 have addressed each of your items individually with a numbering system consistent to your Merrillville Office letter. 9800 Connecticut Drive Suite B1-508 1. An 8" valve was added at common area G beside the fire hydrant. Merrillville,IN 46307 2. Curb Stops were added to for lots 22 &23. West Lafayette Office 1330 Win Hentschel Boulevard Please note, the lot configuration for Lots 10, 11, and 12 were modified. There were some Suite 100 g West Lafayette, IN 47906 minor grading revisions to achieve earthwork balance. Sanitary and water laterals were adjusted to orientate them at the midpoint of the lots, following comments received for Section 1. IOWA Ames Office If you have any questions or require additional information, please feel free to contact me at 1606 Golden Aspen Drive Suite 110 your convenience. Ames,IA 50010 Sincerely, NORTH CAROLINA THE SCHNEIDER CORPORATION Charlotte Office 8001 Arrowridge Boulevard Charlotte,NC 28273 1 - TENNESSEE Brandon T. Burke, P.E. Nashville_Office.- 624 Grassmere Park Drive Project Manager Suite 30 Nashville,TN 37211 Enclosure CC: Steve Cook- City of Carmel Utilities Paul Arnone- City of Carmel Utilities Collection Paul Pace- City of Carmel Utilities Distribution R:\5k\5622\002\Docs\Section 2&3\Duffy102308.doc . wwwschneidercorp,com= The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone: 317.826.7100 Fax: 317 826.7200 INDIANA October 23, 2008 Corporate Headquarters Historic Fort Harrison Paul Pace 8901 Otis Avenue City of Carmel Utilities Distribution Indianapolis, IN 46216 3450 W. 131St Street Toll-Free: 866.973.7100 Westfield, IN 46074 Avon Office Building 1000 5250 E US Highway 36 RE: Stafford Place Section 2 & 3 Suite 250 Avon, IN 46123 Dear Paul, Carmel Office 12821 E New Market Street Please find enclosed one set of Secondary Plat and Site Construction Plans for Stafford Suite 301 Place, Section 2 & 3. The plans have been revised per your letter dated August 15, 2008. Carmel, IN 46032 have addressed each of your items individually with a numbering system consistent to your Merrillville Office letter. 9800 Connecticut Drive Suite B1-508 1. An 8"valve was added at common area G beside the fire hydrant. Merrillville, IN 46307 2. Curb Stops were added to for lots 22 &23. West Lafayette Office 1330 Win Hentschel Boulevard Please note, the lot configuration for Lots 10, 11, and 12 were modified. There were some Suite 100 West Lafayette,IN 47906 minor grading revisions to achieve earthwork balance. Sanitary and water laterals were adjusted to orientate them at the midpoint of the lots, following comments received for Section 1. IOWA Ames Office If you have any questions or require additional information, please feel free to contact me at 1606 Golden Aspen Drive Suite 110 your convenience. Ames.IA 50010 Sincerely, NORTH CAROLINA THE SCHNEIDER CORPORATION Charlotte Office 8001 Arrowridge Boulevard .- Charlotte,NC 28273 Yo' TENNESSEE Brandon T. Burke, P.E. _ _.Nashville.Office . 624 Grassmere Park Drive Project Manager Suite 30 Nashville,TN 37211 Enclosure CC: John Duffy- City of Carmel Utilities Paul Arnone- City of Carmel Utilities Collection Steve Cook- City of Carmel Utilities • R:\5k\5622\002\Docs\Section 2&3\Pace102308.doc r ;,vvww schneidercorp com;' • The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone:317.826.7100 Fax: 317 826.7200 INDIANA October 23, 2008 Corporate Headquarters Historic Fort Harrison Amanda Foley 8901 Otis Avenue City of Carmel Engineering Department Indianapolis,IN 46216 One Civic Square Toll-Free: 866.973.7100 Carmel, IN 46032 Avon Office Building 1000 RE: Stafford Place Section 2 & 3 5250 E US Highway 36 Suite 250 Dear Amanda, Avon,IN 46123 Carmel Office Please find enclosed one set of Secondary Plats, O&M Manual, and Site Construction Plans 12821 E New Market Street for Stafford Place, Section 2 & 3. The plans have been revised per your email dated Suite 301 September 15, 2008. I have addressed each of your items individually with a numbering Carmel, IN 46032 system consistent to your comment letter. Merrillville Office 9800 Connecticut Drive Mass Grading Sequence: Suite B1-508 1. The tree protection fencing has been updated on C103/C104. Noted, the revised Merrillville.IN 46307 plans take into account Scott Brewer's comments. 2. Note#7 was revised to indicate lots 48 &51. West Lafayette Office 3. The sheet number(s)were item to note#9. 1330 Win Hentschel Boulevard Suite 100 West Lafayette. IN 47906 Construction and Post Construction Sequencing: • 4. Noted, silt fence protection for the end section/inlet was added to structure#581. See sheet C105. IOWA 5. Noted, a note was added to the concrete washout note that if relocated, the concrete Ames Office washout facility should be located away from all storm inlets or other storm structures 1606 Golden Aspen Drive y y Suite 110 to eliminate potential for pollution of the storm sewer system. Ames,IA 50010 6. Erosion control blankets are proposed on the back half of the lots, those that will be graded as Walk Outs or Daylight Window lots. There will be grade transition from the NORTH CAROLINA midpoint of the building limit to the back. Charlotte Office 8001 Arrowridge Boulevard Please note that the lot configuration for Lots 10, 11, and 12 was modified. Please note that Charlotte,NC 28273 the storm sewer system along the east property line was modified to achieve cover over the storm sewer pipes along the property line without,significant fills. The drainage report has TENNESSEE been revised to reflect the small change in watershed routing and is being submitted for TENNESSEE ce __ _ review. Some minor grading revisions have occurred to achieve earthwork balance. 624 Grassmere Park Drive Suite 30 If you have any questions or require additional information, please feel free to contact me at Nashville,TN 37211 your convenience. Sincerely, THE SCHNEIDER CORPORATION andon T. Burke, P.E. Project Manager Enclosure R:\5k\5622\002\Docs\Section 2&31Foiey102308.doc • www schneldercorp com The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Phone:317.826 7100 Fax:317.826.7200 INDIANA October 23, 2008 Corporate Headquarters Historic Fort Harrison Greg Noyes 8901 Otis Avenue Hamilton County Surveyor's Office, Suite 188 Indianapolis. IN 46216 One Hamilton County Square Toll-Free: 866.973.7100 Noblesville, IN 46060 Avon Office Building 1000 5250 E US Highway 36 RE: Stafford Place Section 2 & 3 Suite 250 Avon.IN 46123 Dear Greg, Carmel Office 12821 E New Market Street Please find enclosed one set of Secondary Plats, Site Construction Plans, and Drainage Suite 301 Report for Stafford Place, Section 2 & 3. The plans have been revised per your letter dated Carmel. IN 46032 August 13, 2008. I have addressed each of your items individually with a numbering system Merrillville Office consistent to your letter. 9800 Connecticut Drive Suite B1-508 1. Noted, project falls within an incorporated area& MS4 jurisdiction of the City of Merrillville,IN 46307 Carmel. 2. Noted, the project does fall within a Carmel Wellhead Protection Zone. West Lafayette Office 3. Noted, the project falls within the UG Mitchner regulated drain watershed. 1330 Win Hentschel Boulevard 4. Noted, an indirect outlet permit is being processed and will be submitted to your office Suite 100 p p y West Lafayette. IN 47906 along with the FINAL construction plans. Plans are being sent to all TAC members for final review. 5. Noted. IOWA Ames Office Please note that the lot configuration for Lots 10, 11, and 12 was modified. Please note that 1606 Golden Aspen Drive g Suite 110 the storm sewer system along the east property line was modified to achieve cover over the Ames,IA 50010 storm sewer pipes along the property line without significant fills. The drainage report has been revised to reflect the small change in watershed routing and is being submitted for review. Some minor grading revisions have occurred to achieve earthwork balance impacting NORTH CAROLINA some storm sewers in Section 2 & 3. Charlotte Office 8001 Arrowridge Boulevard Charlotte,NC 28273 If you have any questions or require additional information, please feel free to contact me at your convenience. TENNESSEE Sincerely, Nashville Office _ __ _ _ _ 624 Grassmere Park Drive • Suite 30 THE SCHNEIDER CORPORATION Nashville,TN 37211 Brandon T. Burke, P.E. Project Manager Enclosure • R:\5k\5622\002\Docs\Section 2&3\Hoyes102308.doc _. . wwwschneidercorp,coin�,.;` The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis.IN 46216-1037 Phone:317.826.7100 Fax:317.826.7200 TRANSMITTAL TO: Scott Brewer DATE: 10/27/08 Urban Forester JOB #: 5622 002 City of Carmel— DOCS 3rd Floor PROJECT: Stafford Lane—Section 2/3 One Civic Square RE: Construction Plans Carmel, IN 46032 FROM: Brandon T. Burke, PE FAX: 317 826 7300 DIRECT DIAL: 317 826 6403 WE ARE SENDING YOU: ❑ Attached Via: ❑ Mail ❑ Fed Ex ® UPS ❑ Courier ❑ Pick Up ❑ Other #Copies Date Description 1 Revised Stafford Place Section 2/3-Construction plans&Secondary Plats 1 Landscape plans(sheets L1.01 &L1.02) THE ABOVE ARE TRANSMITTED as checked below: For approval ❑ As requested ❑ FOR BIDS DUE ❑ For your use ❑ For review and comment ❑ Other REMARKS: Scott- Please find enclosed revised construction plans for Stafford Place Section 2/3. Please note sheets C103-C106 have been revised to reflect your comments regarding the 10 foot perimeter landscape easement A Tree Protection fence has been shown along the Landscape easement line, with a silt fence just inside. The hatching that indicated seeding within the easement has_been_removed. After reviewing the landscape plans, the trees identified as being saved within Section 2/3 now have tree protection fencing around them on sheets C103-C106. A typical tree protection fencing detail is located on sheet C803, and the fence symbol has been added to the legends. I believe these changes have addressed the intent of your comments. Please call or forward any questions or comments you may have. Sincerely, Brandon If enclosures are not as noted, kindly notify us at once. , .` uv.scitri®[deroortcosil. r:15k1562210021docslsection 2&3lbrewer102708.doc ‘44) The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis.IN 46216-1037 Phone:317.826.7100 Fax:317.826.7200 TRANSMITTAL TO: Shirley Hunter DATE: 10/27/08 Duke Energy JOB #: 5622 002 16475 Southpark Drive PROJECT: Stafford Lane — Section 2/3 Westfield, IN 46074 RE: Construction Plans FROM: Brandon T Burke, PE FAX: 317 826 7300 DIRECT DIAL: 317 826 6403 WE ARE SENDING YOU: ❑ Attached Via: ❑ Mail ❑ Fed Ex ® UPS ❑ Courier ❑ Pick Up ❑ Other #Copies Date Description 1 Stafford Place Section 2/3-Secondary Plats, Cover Sheet, Development Plans THE ABOVE ARE TRANSMITTED as checked below: ® For approval ❑ As requested ❑ FOR BIDS DUE ❑ For your use ❑ For review and comment ❑ Other REMARKS: Shirley- Please find enclosed revised construction documents per Carmel TAC review. Please note the lot configuration for Lots 10-12 may have been changed since the original submittal. Please let me know if you need additional information. COPY TO: file If enclosures are not as noted, kindly notify us at once. r:15k1562210021docs\section 2&3lhunter102708.doc The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis,IN 46216-1037 Phone:317.826.71.00 Fax:317.826.7200 TRANSMITTAL • TO: Chuck Shupperd DATE: 10/27/08 Vectren Energy JOB #: 5622 002 16000 Allisonville Road PROJECT: Stafford Lane —Section 2/3 P.O. Box 1700 RE: Construction Plans Indianapolis, IN 46060 FROM: Brandon T Burke, PE FAX: 317 826 7300 DIRECT DIAL: 317 826 6403 WE ARE SENDING YOU: ❑ Attached Via: ❑ Mail ❑ Fed Ex ® UPS ❑Courier ❑ Pick Up ❑ Other #Copies Date Description 1 _ Stafford Place Section 2/3-Secondary Plats, Cover Sheet, Development Plans THE ABOVE ARE TRANSMITTED as checked below: ® For approval ❑ As requested ❑ FOR BIDS DUE ❑ For your use ❑ For review and comment ❑ Other REMARKS: Chuck- Please find enclosed revised construction documents per Carmel TAC review. Please note the lot configuration for Lots 10-12 may have been changed since the original submittal. Please let me know if you need additional information. COPY TO: file If enclosures are not as noted, kindly notify us at once. www.schneittereorp.com i=; r.15k1562210021docslsection 2&31shupperd102708.doc Cb, The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis.IN 46216-1037 Phone:317.826.7100 Fax 317.826.7200 TRANSMITTAL TO: Rob Morris DATE: 10/27/08 Indianapolis Power & Light JOB #: 5622 002 3600 North Arlington Ave PROJECT: Stafford Lane — Section 2/3 Indianapolis, IN 46218 RE: Construction Plans FROM: Brandon T Burke, PE FAX: 317 826 7300 DIRECT DIAL: 317 826 6403 WE ARE SENDING YOU: ❑ Attached Via: ❑ Mail [' Fed Ex ® UPS ❑ Courier ❑ Pick Up ❑ Other #Copies Date Description 1 Stafford Place Section 2/3-Secondary Plats, Cover Sheet, Development Plans THE ABOVE ARE TRANSMITTED as checked below: For approval ❑ As requested ❑ FOR BIDS DUE ❑ For your use ❑ For review and comment ❑ Other REMARKS: Ron- Please find enclosed revised construction documents per Carmel TAC review. Please note the lot configuration for Lots 10-12 may have been changed since the original submittal. Please let me know if you need additional information. COPY TO: file If enclosures are not as noted, kindly notify us at once. v:'rw.schneldercorpcom c: r:15k1562210021docslsection 2&3lmorris102708.doc ‘7) The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis.IN 46216-1037 Phone:317.826.7100 Fax:317.826.7200 TRANSMITTAL TO: Dave Lucas DATE: 10/27/08 Highway Department JOB #: 5622 002 Hamilton County PROJECT: Stafford Place Section 2/3 1700 S 10th Street RE: Revised Construction Plans Noblesville IN 46060 FROM: Brandon T Burke FAX: 317 826 7300 DIRECT DIAL: 317 826 6403 WE ARE SENDING YOU: ❑ Attached Via: ❑ Mail ❑ Fed Ex ® UPS ❑ Courier ❑ Pick Up ❑ Other Date Description 1 Stafford Place Section 2/3-Secondary Plats, Cover Sheet, Development Plans THE ABOVE ARE TRANSMITTED as checked below: ® For approval ❑ As requested ❑ FOR BIDS DUE ❑ For your use ❑ For review and comment ❑ Other REMARKS: Dave- Please find enclosed revised construction documents per Carmel TAC review. Please note the lot configuration for Lots 10-12 may have-been-changed since-the-original submittal. Please-let me know if you need-additional information. COPY TO: file If enclosures are not as noted, kindly notify us at once. v:?ww.sch noidercorp.corn r:15k1562210021docslsection 2&3Uucas102708.doc The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis,IN 46216-1037 Phone:317.826.7100 Fax:317.826.7200 TRANSMITTAL TO: David Littlejohn DATE: 10/27/08 Transportation Systems Coord. JOB #: 5622 002 City of Carmel — DOCS 3rd Floor PROJECT: Stafford Lane—Section 2/3 Carmel, IN 46032 RE: Construction Plans FROM: Brandon T Burke, PE FAX: 317 826 7300 DIRECT DIAL: 317 826 6403 WE ARE SENDING YOU: ❑ Attached Via: ❑ Mail ❑ Fed Ex ® UPS ❑ Courier ❑ Pick Up ❑ Other #Copies Date Description 1 Stafford Place Section 2/3-Secondary Plats, Cover Sheet, Development Plans THE ABOVE ARE TRANSMITTED as checked below: ® For approval ❑ As requested ❑ FOR BIDS DUE ❑ For your use ❑ For review and comment ❑ Other REMARKS: David- Please find enclosed revised construction documents per Carmel TAC review. Please note the lot configuration for Lots 10-12 may have been changed since the original submittal. Please let me know if you need additional information. COPY TO: file If enclosures are not as noted, kindly notify us at once. ,www.schneidercer0;corn r:15k1562210021docslsecUon 2&311ittlejohn102708.doc ‘71 The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis.IN 46216-1037 Phone:317.826.7100 Fax 317.826.7200 TRANSMITTAL TO: Steve Krebs DATE: 10/27/08 SBC JOB #: 5622 002 5858 North College Avenue PROJECT: Stafford Lane —Section 2/3 Indianapolis, IN 46220 RE: Construction Plans FROM: Brandon T Burke, PE FAX: 317 826 7300 DIRECT DIAL: 317 826 6403 WE ARE SENDING YOU: ❑ Attached Via: ❑ Mail ❑ Fed Ex ® UPS ❑ Courier ❑ Pick Up ❑ Other #Copies Date Description 1 Stafford Place Section 2/3-Secondary Plats, Cover Sheet, Development Plans THE ABOVE ARE TRANSMITTED as checked below: ® For approval ❑ As requested ❑ FOR BIDS DUE ❑ For your use ❑ For review and comment ❑ Other REMARKS: Steve- Please find enclosed revised construction documents per Carmel TAC review. Please note the lot configuration for Lots 10-12 may have been changed since the original submittal. Please let me know if you need additional information. COPY TO: file If enclosures are not as noted, kindly notify us at once. < .<I,vwwr schneidercorp.com'„ r:15k1562210021docslsection 2831krebs 102708.doc .4 1 Cal The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis,IN 46216-1037 Phone:317.826.7100 Fax:317.826.7200 TRANSMITTAL TO: Jason Kirkman DATE: 10/27/08 Brighthouse Networks JOB #: 5622 002 3030 Roosevelt Avenue PROJECT: Stafford Lane — Section 2/3 Indianapolis, IN 46218 RE: Construction Plans FROM: Brandon T Burke, PE FAX: 317 826 7300 DIRECT DIAL: 317 826 6403 WE ARE SENDING YOU: ❑ Attached Via: ❑ Mail ❑ Fed Ex ® UPS ❑ Courier ❑ Pick Up ❑ Other #Copies Date Description 1 Stafford Section 2/3-Secondary Plats, Cover sheet, Development Plans THE ABOVE ARE TRANSMITTED as checked below: ® For approval ❑ As requested ❑ FOR BIDS DUE ❑ For your use ❑ For review and comment ❑ Other REMARKS: Jason- Please find enclosed revised construction documents per Carmel TAC review. Please note the lot configuration for Lots 10-12 may have been changed since the original submittal. Please let me know if you need additional information. • COPY TO: file If enclosures are not as noted, kindly notify us at once. - ±nn.wscFriieidetco�p;con3�'. r:15k1562210021docs\section 2&31kirkman102708.doc The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis,IN 46216-1037 Phone:317.826.7100 Fax:317.826.7200 TRANSMITTAL TO: Bill Akers DATE: 10/27/08 Carmel Communications JOB #: 5622 002 31 First Avenue NW PROJECT: Stafford Place Section 2/3 Carmel IN 46032 RE: TAC Revision submittal FROM: Brandon T Burke, P.E. FAX: 317 826 7300 DIRECT DIAL: 317 826 6403 WE ARE SENDING YOU: ❑ Attached Via: ❑ Mail ❑ Fed Ex ® UPS ❑ Courier ❑ Pick Up ❑ Hand Delivered Date Description 1 Stafford Section 2/3 Secondary Plats, Cover sheet, Development Plans THE ABOVE ARE TRANSMITTED as checked below: ❑ For approval ❑ As requested ❑ FOR BIDS DUE ® For your use ❑ For review and comment ❑ Other REMARKS: Bill- Please note that the lot configuration for lots 10-12 may have been altered since the original submittal. Please review and re- issue an address list if there are any changes needed. If enclosures are not as noted, kindly notify us at once. Itdw:scht eidercorp;cont c 5k1562210021docslsection 2831akers102708.doc v • 411111$ The Schneider Corporation Schneider Historic Fort Harrison 8901 Otis Avenue Indianapolis.IN 46216-1037 Phone:317.826.7100 Fax:317.826.7200 TRANSMITTAL TO: Gary McNamee DATE: 10/27/08 Asset Protection Associate JOB #: 5622 002 Duke Energy Indiana, LLC PROJECT: Stafford Lane — Section 2/3 Columbus, IN 47201 RE: Construction Plans FROM: Brandon T Burke, PE FAX: 317 826 7300 DIRECT DIAL: 317 826 6403 WE ARE SENDING YOU: ❑ Attached Via: ❑ Mail ❑ Fed Ex ® UPS ❑ Courier ❑ Pick Up ❑ Other #Cosies Date Descristion 1 Stafford Place Section 2/3- Seconda Plats, Cover Sheet, Develo•ment Plans THE ABOVE ARE TRANSMITTED as checked below: ® For approval ❑ As requested ❑ FOR BIDS DUE ❑ For your use ❑ For review and comment ❑ Other REMARKS: Gary- Please find enclosed revised construction documents per Carmel TAC review. Please note the lot configuration for Lots 10-12 may have been changed since the original submittal. Please let me know if you need additional information. I believe only Section 1 involved a D uke Energy easement corridor. However, if you desire a full set of construction plans please contact me at 317-826-6403 and I would be more than happy to send-a full set out. Thanks Brandon COPY TO: file If enclosures are not as noted, kindly notify us at once. ;rww.schneidercorp.c0n7.•,, r:15k1562210021docslsection 2831mcnamee102708.doc •