Loading...
HomeMy WebLinkAbout06020015 Carmel Arts Building Electrical Plans (18in x 13in reduced prints) issue date 3/10/06T :3. CD CL Cr m 0) CD CD CD (0 o T oo T5 60 00 Q9 0 1 1 I I 2 (Do 5 000 SECOND FLOOR LIGHTING PLAN SCALE. 1/8"= V-10" N 1 I I I I 0 .. I I ............ ... .......... . _ .......... r 0 0 30 6 �o a I I I I I I 'S1' 'Si' 'S1' si, 'S1' HP9 HP9 HP9 i HP9 HP9 — -- — - -- — j j Garc e Gara e ' I Cara e Gara Gara e I 109 lI0� 111 t12 .. 113 j ,q, 'A' 'A 'q' i CON to —I6 C N 2A '6 CON 3A —j6 C N 4A--6 j t , ;I Cl — i Corridor t t t ............. 'C' C 1aa C 'C' E tCTHP t H PI HP5! NL HP1 HPS NL HP1 HP HP1N•1 HP1 - L_.....__.._- ._.._ -....— — a: - -- — -- — — ] 1 i PE,ti, t i IC, i 3 T1 -1 F I HP5 '•' I' ,q, T1 -1 T 't et T i { T1 —2 I tq, -� , , '•, �, I Pi NL T1 -1 1 i �NL ...................... ... .... I I 1--+ .............. ............................. ........... ..............................� } ......... _ . F ! I o i I 'C i? HP5 3 C' , i I uE i i t /qt I I P i A' 3 tC,+ i T1 -2 1 11 -2 H i I I 1 3 C H P i i r 0 I! I . Ii i Elec. i !! C 106 �HP" ! 2 I I I 1 NL 41, -- LH — — — E 1 ' � : ! �C�� i Unfinished HP5 jEu HP7 Tenant S ace II El I i 1 1 is 4 ! _ ............................. I P1 .................... A 'A' T1 —2 I I t HP2 ! NL T1 -1 C I ! Elevator i !' ! i NL I I I �jtE, 3 HR Stair � � j p I I Corridor j 3 I j F1-04—] I ,C, ii N HP1 ! (I I I I 'E' -lA f ,q, j ,q, HP 1 i it 1C/ \� t { ,! ! TI-2 T1 —2 HP1 ( ; '••NLHP1 i i 1 H Lobb E H 11 L 0 ; 03 HP1 1 - I - - - ���1— — — — ; , B.9 I I I 'A' 'A' , T1 -2 I NL T1 -1 I I T1 -2 J1 1 I I ! I I I _- i A I I 1 I I I 0 0 30 06 7o 0 FIRST FLOOR LIGHTING PLAN SCALE: 1 /8 " =1 ' -0" N GENERAL NOTES; 1. COORDINATE ROUTINGS WITH OTHER TRADES BEFORE INSTALLATION OF ANY EQUIPMENT 2. ALL WORK SHALL COMPLY WITH THE N.E.C. & ALL LOCAL CODES & ORDINANCES 3. ALL WIRING SHALL BE #12 UNLESS OTHERWISE NOTED 4. EACH CONDO UNIT SHALL HAVE STAND ALONE SELF - CONTAINED 120V SMOKE DETECTOR INSTALLED IN COMMON HALLS / SITTING AREA'S OUTSIDE EACH INDIVIDUAL BEDROOM. VERIFY WITH LOCAL FIRE MARSHALL BEFORE ROUGH -IN INSTALLATION i. EACH CONDO UNIT SHALL HAVE MINI -HORN / STROBE WHICH WILL BE PART OF THE BUILDING FIRE ALARM SYSTEM INSTALLED IN THE COMMON AREA'S ON EACH FLOOR >. EACH CONDO UNIT SHALL HAVE SELF - CONTAINED 120V SMOKE DETECTOR IN & OUTSIDE SLEEPING AREA'S PLAN NOTES: 10 3 #12 TO EACH RESPECTIVE TENANT PANEL 20 PANEL 'HP' HOUSE PANEL - 120/208 VOLT 3 PHASE, 4W - 200 AMP 3o PANEL 'T1' TENANT 1 PANEL - 120/208 V, H 3 PHASE, 4W - 600 AMP O4 3 #12 TO PANEL 'HP' O PANEL 'T2' TENANT 2 PANEL - 120/208 V, 3 PHASE, 4W - 800 AMP O6 TO PANEL 'HP' THRU TIMECLOCK O7 3 #12 TO PANEL 'T1' N Drawn By LH H U Drawing Nmber. E101 f rged Number; 06044 o - x Csw N W � F3 F 0 ¢� z __j w w .JL.J (r= V Scope Drawirtgs 7 d� k1 to te"m d d6.; q » =1tp lo: tlw ttuidng, ttw moyor a,dAbctural ek+rtwnb and the type Of etractwa4 macJsartkd mld *6cbicd ar.twm nw not n.w..arNy Irldwte or d..cree d wrk rmpked far iw pwiomtartce and vwrooUm of ftra mqu*wm ft of ew C *mt. On to basic of the aerwral �copr Ind oMW or duel"d . uW trade aonlraebre d a drnf�h ae Berrw "irW far Uw proper erecutton and oamoolan of the work. Dmerg ikc FIRST &SECOND FLOOR LIGHTING PLANS (1GYDions: Issue Cate 02/28/06 Drawn By LH atedced By LS U Drawing Nmber. E101 f rged Number; 06044 o - ¢� z __j w w .JL.J (r= V Scope Drawirtgs 7 d� k1 to te"m d d6.; q » =1tp lo: tlw ttuidng, ttw moyor a,dAbctural ek+rtwnb and the type Of etractwa4 macJsartkd mld *6cbicd ar.twm nw not n.w..arNy Irldwte or d..cree d wrk rmpked far iw pwiomtartce and vwrooUm of ftra mqu*wm ft of ew C *mt. On to basic of the aerwral �copr Ind oMW or duel"d . uW trade aonlraebre d a drnf�h ae Berrw "irW far Uw proper erecutton and oamoolan of the work. Dmerg ikc FIRST &SECOND FLOOR LIGHTING PLANS (1GYDions: Issue Cate 02/28/06 Drawn By LH atedced By LS Certified By: Drawing Nmber. E101 f rged Number; 06044 r-« fD CL Cr M v Cn r4. CD4 M cc CD CD �!i 'J I I I 12 O 6 I a 1 I I_ f� ' 4; Bath S — ' 437 10+<7 200 6 [ _ _S3 S air Bedroom I ` 435 OI2 012 1 012 I ..... . I2 4 r........ . ` 012 012 1 012 _ _I 012 012 1 012 v)l 12 1 I Bedroom �` I 4 1 I I 1 5 6 I I i I I I I I I I I I � .... . . ...... ....... 1os�er_. Bah —= 4418 I o- I ao6 I � - ........__. 1 Master 10 443 I 8 ,,1 I =i 100 10 I I Sittin I Terrace 4 _g `. 10@ 10 '—�- ................... =1�= q I I I I U d r 10@) 104 444 ............... ............................. ..... Lc ©. l 12 r 0 ° Bath I._ 445 lCQ ° D 012 O 1 �...........,. �- ,, Bedroom 447 _I_ I 12 I 012 © 12`(� OE Bedroom 408 �I Q12 Q12 01c !14 I °112 °I 12 n. Sc . o 1 i210 12.........� _ ............._ 410 12 �... -\_.: W_..._ .............._ - - - I 2 10 to Closet S all_...........W.- - 1 rn 01 ! .....!... :...._ I ur ry ° 411 10@ C t0 .............. R.q a 6 a 6 ....- I - Moster Eedroom S.. I...� ................ 404 �- I O O a 6 a 6 1 fc i - I I I I I .......... ao6 ao6 �^ - .............. - -- ... -_tt t- - - A I 1 1 I I I I I I I I I I I I I I 2 3 4 5 6 7( 8) FOURTH FLOOR LIGHTING PLAN SCALE: 1/8 " =1' -0" N I I I I I o _ a 5 �_I I — I —� — R — 336 I aset 4 ° 332 p°4 ao4 � I � I n 4 ao4 BedrH33, Den - ......._.. F - Bedroom Den 319 ao4 X04 I ao4 ao4 I_ Closet - _..� . 320 ..W......W...._ Dinln 324 Levin 325 I ° a S 5 o b T 5 6 7 8 TTT ICI I I I I I I I I I I I I I I I I I 1 2 3 4 5 6 7 8 THIRD FLOOR LIGHTING PLAN SCALE:1 /8" =1' -0" N gal I I 9 - - - __ - ____(D - - - - - ___(0 — - - - C gq A GENERAL NOTES, 1, COORDINATE ROUTINGS WITH OTHER TRADES BEFORE INSTALLATION OF ANY EQUIPMENT 2, ALL WORK SHALL COMPLY WITH THE N.E.C. & ALL LOCAL CODES & ORDINANCES 3. ALL WIRING SHALL BE 412 UNLESS OTHERWISE NOTED 4, EACH CONDO UNIT SHALL HAVE STAND ALONE SELF — CONTAINED 120V SMOKE DETECTOR INSTALLED IN COMMON HALLS / SITTING AREA'S OUTSIDE EACH INDIVIDUAL BEDROOM, VERIFY WITH LOCAL FIRE MARSHALL BEFORE ROUGH —IN INSTALLATION 5, EACH CONDO UNIT SHALL HAVE MINI —HORN / STROBE WHICH WILL BE PART OF THE BUILDING FIRE ALARM SYSTEM INSTALLED IN THE COMMON AREA'S ON EACH FLOOR 6. EACH CONDO UNIT SHALL HAVE SELF — CONTAINED 120V SMOKE DETECTOR IN & OUTSIDE SLEEPING AREA'S PLAN NOTES: 1 2 412 , 1 #12 grd TO RESPECTIVE PANEL "C ❑N -1 -4' O 3 412 , 1 #12 grd TO RESPECTIVE PANEL 'CON -1 -4' N H vl � .�__. N N N \D rv, ` K\ Lu C8x z LU w �w F 0 V Scope Drawings; These dr=y krdcote ft 9envo1 *cop of bu ppmm*1 M Mans of archftaaturd de*n oaoceat, the dhnwrtorw of the building, the mapr architectural WWMOA and ffm type of etruciwrd mochonicd w eiocirncal eyebn». The drawlr� bo rwt rweweorgy kulkab or deocrba oM work requke4 for to perfomwnce and cc*e6w of the requ'reewnM of the Contract. On the bolo of the l w kdk aW or deoor$4 the trade eonowtore sho furn}if d Items required for the props en°ution and aomp4tion of the wort THIRD &FOURTH FLOOR LIGHTING PLANS Revision Issue Date Drawn By Checked By Certified By Crowing Number. E102 Project Number. 06044 �._ .. vl � .�__. N N N \D rv, ` K\ Lu Scope Drawings; These dr=y krdcote ft 9envo1 *cop of bu ppmm*1 M Mans of archftaaturd de*n oaoceat, the dhnwrtorw of the building, the mapr architectural WWMOA and ffm type of etruciwrd mochonicd w eiocirncal eyebn». The drawlr� bo rwt rweweorgy kulkab or deocrba oM work requke4 for to perfomwnce and cc*e6w of the requ'reewnM of the Contract. On the bolo of the l w kdk aW or deoor$4 the trade eonowtore sho furn}if d Items required for the props en°ution and aomp4tion of the wort THIRD &FOURTH FLOOR LIGHTING PLANS Revision Issue Date Drawn By Checked By Certified By Crowing Number. E102 Project Number. 06044 �._ .. � Z Lu LU Lu J Scope Drawings; These dr=y krdcote ft 9envo1 *cop of bu ppmm*1 M Mans of archftaaturd de*n oaoceat, the dhnwrtorw of the building, the mapr architectural WWMOA and ffm type of etruciwrd mochonicd w eiocirncal eyebn». The drawlr� bo rwt rweweorgy kulkab or deocrba oM work requke4 for to perfomwnce and cc*e6w of the requ'reewnM of the Contract. On the bolo of the l w kdk aW or deoor$4 the trade eonowtore sho furn}if d Items required for the props en°ution and aomp4tion of the wort THIRD &FOURTH FLOOR LIGHTING PLANS Revision Issue Date Drawn By Checked By Certified By Crowing Number. E102 Project Number. 06044 �._ .. T CD a m v Cn rn 1 5 CD CD M. (m � CC CCO 4 - --OG - o ... .......... . ­­­­ . ........ ...... .." o I I I 0 0 30 0) T 0G) 0 SECOND FLOOR POWER PLAN SCALE:1 /8 " =1' -0" N If1 ILI 00 00 0 OVERHEAD DOOR FURNISHED & INSTALLED BY OTHERS (TYPICAL OF 5) LH H i 1 s 1 1 � Gara e I j 113 FI j GFI 8 1 8 j l8 6 8 ; Ell - ..................... i O O O 4 TT O(D O FIRST FLOOR POWER PLAN ' �7D SCALE 1 ,8 „_1 1 _01. N ..................I..........0 DETECTOR @ TOP OF )R SHAFT AS REQUIRED - B.9 A a GENERAL NOTES: 1. COORDINATE ROUTINGS WITH OTHER TRADES BEFORE INSTALLATION OF ANY EQUIPMENT 2. ALL WORK SHALL COMPLY WITH THE N.E.C. & ALL LOCAL CODES & ORDINANCES 3. ALL WIRING SHALL BE #12 UNLESS OTHERWISE NOTED 4. EACH CONDO UNIT SHALL HAVE STAND ALONE SELF — CONTAINED 120V SMOKE DETECTOR INSTALLED IN COMMON HALLS / SITTING AREA'S OUTSIDE EACH INDIVIDUAL BEDROOM. VERIFY WITH LOCAL FIRE MARSHALL BEFORE ROUGH —IN INSTALLATION 5. EACH CONDO UNIT SHALL HAVE MINI —HORN / STROBE WHICH WILL BE PART OF THE BUILDING FIRE ALARM SYSTEM INSTALLED IN THE COMMON AREA'S ON EACH FLOOR 6. EACH CONDO UNIT SHALL HAVE SELF -- CONTAINED 120V SMOKE DETECTOR IN & OUTSIDE SLEEPING AREA'S PLAN NOTES; �1 PANEL 'HP' HOUSE PANEL — 120/208 VOLT 3 PHASE, 4W — 200 AMP O PANEL 'T1' TENANT 1 PANEL — 120/208 V, 3 PHASE, 4W — 600 AMP 0 PANEL 'T2' TENANT 2 PANEL — 120/208 V, 3 PHASE, 4W — 600 AMP O4 'MDC' MAIN DISTRIBUTION CENTER 120/208 VOLT, 3 PHASE, 4 W, 1600 AMP, MULTI METERING CENTER. SEE RISER DIAGRAM ON DWG. E601 O ELEVATOR EQUIPMENT — 240 V. 200 AMP, 3 POLE FUSED DISCONNECT SWITCH O TO RESPECTIVE TENANT PANEL — 3 #12 — 112” CONDUIT O E.C. SHALL FURNISH & INSTALL (2) 120/208V— 1 PHASE- 3W -200A M.C.B. LOAD CENTERS WITH OVERCURRENT PROTECTION DEVICES AS SHOWN ON PANEL SCHEDULE. SEE DRAWING E3.1 OS FIRE ALARM CONTROL PANEL 'FRCP' 0 E.C. SHALL FURNISH & INSTALL A 4'x4' TELEPHONE BACKBOARD WITH A DEDICATED QUADRAPLEX RECEPTACLE 10 FIRE ALARM ANNUNCIATOR PANEL 1 1 3 #3, 1 #4 GRD -1 1/2" C TO PANEL 'HP' 12 3 # 12 TO PANEL 'HP' 13 PROVIDE FIRE ALARM FLOW & TAMPER SWITCHES FOR EACH RISER / VALVE 14 PROVIDE FIRE ALARM ELEVATOR RECALL RELAYS IN EQUIPMENT ROOM AS REQUIRED 15 E.C. SHALL FURNISH & INSTALL A 250 VOLT 60 AMP -3 PHASE NON —FUSED DISCONNECT SWITCH IN A NEMA 1 ENCLOSURE 16 3 #6, 1 #10 GRD -1" C TO PANEL 'T1' 17 3 #6, 1 #10 GRD -1" C TO PANEL 'T2' 18 12 -2 TO RESPECTIVE CONDO 'B' PANEL 19 12 -3 TO RESPECTIVE CONDO 'B' PANEL 20 TO IST FLOOR DETECTORS 21 10 -3 TO RESPECTIVE CONDO 'B' PANEL 22 4 -3 TO RESPECTIVE CONDO 'B' PANEL N H .0 Q UNN� rte••+ \D Lu J � I � w r F V I V .0 Q UNN� z \D Lu J � V Scope DrawhF Thor drar a tndicat* the gemrd e " of Uw pro)ect In tsrme of o urd design canarpt the dYnon.,am d the taitdlny. 1M miar arthtectrd * men4 and Uw type of alructurnl, mddwricd ord swcmw eysterm The dm do oak aseeesarly Indkate ar deearlbe al Ifed requkement d the Coot 1 d tM on the bade d the gerfsral seopa krdkated or davAbed, tho trod# aontracton o1wM hrnWf dl kerns requk.d far Um Wapor execution and eanpletion at Uw nark. Owing Titic FIRST &SECOND FLOOR POWER PLANS Acwisions; Issue Date Drawn By Checked By 02/28/06 LH LS Certified By, Dra Arg Number E201 Project Number. 06044 Q rylo z W Lu J � V Scope DrawhF Thor drar a tndicat* the gemrd e " of Uw pro)ect In tsrme of o urd design canarpt the dYnon.,am d the taitdlny. 1M miar arthtectrd * men4 and Uw type of alructurnl, mddwricd ord swcmw eysterm The dm do oak aseeesarly Indkate ar deearlbe al Ifed requkement d the Coot 1 d tM on the bade d the gerfsral seopa krdkated or davAbed, tho trod# aontracton o1wM hrnWf dl kerns requk.d far Um Wapor execution and eanpletion at Uw nark. Owing Titic FIRST &SECOND FLOOR POWER PLANS Acwisions; Issue Date Drawn By Checked By 02/28/06 LH LS Certified By, Dra Arg Number E201 Project Number. 06044 CD CL M a� CD CD ■ B7 BII Terrace — 429 I WP GFI ................... ............................... .... � ... ............................... Bath ........ ... 437 BIO BI Bedroom 4 B10 10 ............ ....................1.......... Closet 422 _ ._ .. B 9�.:....W _. w Master 9.... Bath F4211 iB9 r��..I. �O 5 000 0 I I I ....................... .............................. ..... 1 I I I I I i 0 2 O(D 5 oao FOURTH FLOOR POWER PLAN SCALE: 1 f8 "= 1' -0" N ,I B.9 — — A (D 6 7 I i O O 00 O6 67O O THIRD FLOOR POWER PLAN SCALE: 1 /811= 1 —011 N 0 B GENERAL NOTES: 1. COORDINATE ROUTINGS WITH OTHER TRADES BEFORE INSTALLATION OF ANY EQUIPMENT 2. ALL WORK SHALL COMPLY WITH THE N,E,C, & ALL LOCAL CODES & ORDINANCES 3, ALL WIRING SHALL BE 412 UNLESS OTHERWISE NOTED 4. EACH CONDO UNIT SHALL HAVE STAND ALONE SELF- CONTAINED 120V SMOKE DETECTOR INSTALLED IN COMMON HALLS / SITTING AREA'S OUTSIDE EACH INDIVIDUAL BEDROOM. VERIFY WITH LOCAL FIRE MARSHALL BEFORE ROUGH -IN INSTALLATION 5, EACH CONDO UNIT SHALL HAVE MINI -HORN / STROBE WHICH WILL BE PART OF THE BUILDING FIRE ALARM SYSTEM INSTALLED IN THE COMMON AREA'S ON EACH FLOOR 6, EACH CONDO UNIT SHALL HAVE SELF - CONTAINED 120V SMOKE DETECTOR IN & OUTSIDE SLEEPING AREA'S N Ideate .0 v the general ,r" droMfrga I wd the g oncl scope d w "Jack In brine of archltadud design concept, be dirnwrf of of uNN� the bolding the major wchibctwd ebnwnts and the type of etructwd mechanl al and sleclrbal ystems. lO 12 - 2 T ❑ RESPECTIVE CONDO PANEL Z wA �j n On the basis of " gwwd cope Indicoted or deecrbed. pr ands catdractad .hdi wmNh aN rteme royured for the proper eucecutlan mid cwnplettan of the rark. N Lu w � n � M F Ln V PLAN NOTES: Ideate .0 v the general ,r" droMfrga I wd the g oncl scope d w "Jack In brine of archltadud design concept, be dirnwrf of of uNN� the bolding the major wchibctwd ebnwnts and the type of etructwd mechanl al and sleclrbal ystems. lO 12 - 2 T ❑ RESPECTIVE CONDO PANEL Z 2O 12 - 3 T ❑ RESPECTIVE CONDO PANEL G\ zEl- PLAN NOTES: Ideate the general ,r" droMfrga I wd the g oncl scope d w "Jack In brine of archltadud design concept, be dirnwrf of of the bolding the major wchibctwd ebnwnts and the type of etructwd mechanl al and sleclrbal ystems. lO 12 - 2 T ❑ RESPECTIVE CONDO PANEL Z 2O 12 - 3 T ❑ RESPECTIVE CONDO PANEL Lu On the basis of " gwwd cope Indicoted or deecrbed. pr ands catdractad .hdi wmNh aN rteme royured for the proper eucecutlan mid cwnplettan of the rark. Lu L1 1 V PLAN NOTES: Ideate the general ,r" droMfrga I wd the g oncl scope d w "Jack In brine of archltadud design concept, be dirnwrf of of the bolding the major wchibctwd ebnwnts and the type of etructwd mechanl al and sleclrbal ystems. lO 12 - 2 T ❑ RESPECTIVE CONDO PANEL � dra�r6q� do at o�rnn c� and Completion d of ft all •ork roquked for iWl erf "kernw" a the Cordraot 2O 12 - 3 T ❑ RESPECTIVE CONDO PANEL On the basis of " gwwd cope Indicoted or deecrbed. pr ands catdractad .hdi wmNh aN rteme royured for the proper eucecutlan mid cwnplettan of the rark. 0 10 - 2 TO RESPECTIVE CONDO PANEL 0 10 - 3 TO RESPECTIVE CONDO PANEL 5O 6 - 3 TO RESPECTIVE CONDO PANEL 60 TO PANEL "HPH ON 1ST FLOOR O E,C, SHALL FURNISH & INSTALL (2) lPni;DnAv— i PHACP— mw —PnnA M r R LUJ )U LLN I LKJ W1 1 H UVLKLUKKLN I PROTECTION DEVICES AS SHOWN ON PANEL SCHEDULE, SEE DRAWING E3,1 O 12 -2 TO RESPECTIVE CONDO 'B' PANEL O 12 -3 TO RESPECTIVE CONDO 'B' PANEL 10 TO IST FLOOR DETECTORS 11 10 -3 TO RESPECTIVE CONDO 'B' PANEL 12 4 -3 TO RESPECTIVE CONDO 'B' PANEL �SJe Date Drawn By Gem By Certified By: Drawing Number; E202 ftj d Number: 06044 (D CL Cr m w Cn CD 3 m co CD CD N H g3 a� W Csx � y � W V n � ern n E ,O V V Scope Crawings: mra f .hqe indlaote ttn yerb►� aeope of the project In terms of archltecturd deelgn oorrrpf, 4M dlrtrplar» 01 the bul&ig, ttr major achHwturd eln w-As and the type of etructwat, nuct m"I and *WMcal systems. The droek+ga do not naceBeorly Mdkab or desMbe d .& tequlred for ml pen'ormarxe and completion of tM roqui wwft of the Contract. On ft hoele of the ponerd xMkated a deecrtaed, !Fw ,rode caniro w. L fumhh Rmu raaJnd for the proper a acWm and cotnpWdm of the w" Draw Tide: ROOF POWER PLAN moons; bsue we Drawn BY Checked 4 Drawing Number E203 ftjed Number: 06044 � z �. .0 V 1 C Z NNN LU � LU V Scope Crawings: mra f .hqe indlaote ttn yerb►� aeope of the project In terms of archltecturd deelgn oorrrpf, 4M dlrtrplar» 01 the bul&ig, ttr major achHwturd eln w-As and the type of etructwat, nuct m"I and *WMcal systems. The droek+ga do not naceBeorly Mdkab or desMbe d .& tequlred for ml pen'ormarxe and completion of tM roqui wwft of the Contract. On ft hoele of the ponerd xMkated a deecrtaed, !Fw ,rode caniro w. L fumhh Rmu raaJnd for the proper a acWm and cotnpWdm of the w" Draw Tide: ROOF POWER PLAN moons; bsue we Drawn BY Checked 4 Drawing Number E203 ftjed Number: 06044 � z �. C Z LU � LU � LU V Scope Crawings: mra f .hqe indlaote ttn yerb►� aeope of the project In terms of archltecturd deelgn oorrrpf, 4M dlrtrplar» 01 the bul&ig, ttr major achHwturd eln w-As and the type of etructwat, nuct m"I and *WMcal systems. The droek+ga do not naceBeorly Mdkab or desMbe d .& tequlred for ml pen'ormarxe and completion of tM roqui wwft of the Contract. On ft hoele of the ponerd xMkated a deecrtaed, !Fw ,rode caniro w. L fumhh Rmu raaJnd for the proper a acWm and cotnpWdm of the w" Draw Tide: ROOF POWER PLAN moons; bsue we Drawn BY Checked 4 Drawing Number E203 ftjed Number: 06044 � z �. -0 r+ CD CL Cr m 03 CA r* m CD co N W � � z -s � N Lu "J LU W � CS z 10, on w � F 0 V Scope Dr. These drawhw k4catt tw yen�raanced pl. � "h of tM pro�Ct fn lean. o, ae ecturd dwsigrt the dlmegdaee at d . t'�v<a4i a� kd mid �ac�tric4i w w the tpe mm y The drawing� do not neeesarlly ands or desarbe al work required far KA performance and omostbn wt the requ'ewnwde of tin Contract On the beefs of the gmetal stepp• h4caled or dsm%ed. Hw trade contfacfon etwl iumfeh d Iterne requkwd for the proper execution WW complatka of the rock oa»+nyrme: ELECTRICAL RISER DIAGRAM PANEL I FIXTURE SCHEDULES Wslons: Issue Date Drawn By Chedred By Certified By: Drawing Nurnber. E301 Project Number•. 06044 � � z -s � N Lu "J LU Scope Dr. These drawhw k4catt tw yen�raanced pl. � "h of tM pro�Ct fn lean. o, ae ecturd dwsigrt the dlmegdaee at d . t'�v<a4i a� kd mid �ac�tric4i w w the tpe mm y The drawing� do not neeesarlly ands or desarbe al work required far KA performance and omostbn wt the requ'ewnwde of tin Contract On the beefs of the gmetal stepp• h4caled or dsm%ed. Hw trade contfacfon etwl iumfeh d Iterne requkwd for the proper execution WW complatka of the rock oa»+nyrme: ELECTRICAL RISER DIAGRAM PANEL I FIXTURE SCHEDULES Wslons: Issue Date Drawn By Chedred By Certified By: Drawing Nurnber. E301 Project Number•. 06044 � � z W Lu "J LU Scope Dr. These drawhw k4catt tw yen�raanced pl. � "h of tM pro�Ct fn lean. o, ae ecturd dwsigrt the dlmegdaee at d . t'�v<a4i a� kd mid �ac�tric4i w w the tpe mm y The drawing� do not neeesarlly ands or desarbe al work required far KA performance and omostbn wt the requ'ewnwde of tin Contract On the beefs of the gmetal stepp• h4caled or dsm%ed. Hw trade contfacfon etwl iumfeh d Iterne requkwd for the proper execution WW complatka of the rock oa»+nyrme: ELECTRICAL RISER DIAGRAM PANEL I FIXTURE SCHEDULES Wslons: Issue Date Drawn By Chedred By Certified By: Drawing Nurnber. E301 Project Number•. 06044