HomeMy WebLinkAbout06020015 Carmel Arts Building Plumbing Plans 18in x 13in reduced prints) issue date 3/10/06:3.
a
Cr
M
v
N
(D
M
5
CD
CD
CD
III 11
'' ii -III
H H
3' STORM DRAINS
FROM ABOVE
V \-.J
I I I I
i �I -- - - - - -� - I
I I
y� 3' STORM LINES TO �y
MAN STORM SEWER
( 2% MIN. SLOPE )
uu
r t:
It
.........�- ..,._ _..._ ...... I E i
CO
WCI
H
i
LAV
I
H
H
I^
I
�
W �
®
TO 3rd FLOOR CEILING PLENUM
- -
F
0
I
RPZ
V
FD
AND 4' SANITARY DOWN
PRESSURE ZONE ASSEMBLY
PD
?' WATER SUPPLY UP TO
1' WATER SUPPLY
OVERFLOW PATIO DRAIN
3rd FLOOR CEILING PLENUM
OVERHEAD FOR
Al ID 3' VENT UP
4' SANITARY FROM ABOVE
2nd
ROOMS FLOOR REST
ROOMS
WCl
3' VENT UP
CONNECTED TO 6' SANITARY
OUT TO MAIN SEWER
LAV
CO
H
H
6' STORM
H
DRAM FROM
H H
i
�i
ABOVE
�•
i.
6' STORM LIN\TO
3' STORM DRAINS FROM
MAIN STORM SEAR
ABOVE AND 3' DRAINS
DOWN
(COORDINATE WITH
10 oo
RD ORD ORD RD
CIVIL /SITE CONTRACTOR)
27
Second Floor Plumbing Plan
P201
1/8. = 1' -0"
H H
3' STORM DRAINS
FROM ABOVE
V \-.J
I I I I
i �I -- - - - - -� - I
I I
y� 3' STORM LINES TO �y
MAN STORM SEWER
( 2% MIN. SLOPE )
uu
r t:
It
.........�- ..,._ _..._ ...... I E i
Plumbing Notes
L CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CODES.
?. CONTRACTOR TO VERIFY ALL CONDITIONS PRIOR TO INITIATING ANY WORK
3. CONTRACTOR t0 COORDINATE WORK WITH ALL OTHER TRADES.
4. CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND PAYMENT OF ALL PERMITS
REQUIRED FOR PLUMBING WORK
5. CONTRACTOR SHALL PROVIDE ALL MATERIALS AND LABOR AS REQUIRED TO
ACHIEVE A COMPLETE OPERATING SYSTEM.
6. THESE DRAWINGS ARE DIAGRAMMATIC AND REPRESENT THE INTENT OF EQUIPMENT,
DEVICES, ETC. TO BE METALLED AND CONNECTED. PLUMBING CONTRACTOR SHALL
OBTAM OWNERS APPROVAL, FOR ALL PI•IASES OF WORK, PRIOR TO INSTALLATION.
1. CONTRACTOR TO COORDINATE WATER SERVICE INSTALLATION REQUIREMENTS AND
LOCATION WITH OWNER AND LOCAL UTILITY.
8. CONTRACTOR TO COORDINATE EXACT ROOF DRAM AND OVERFLOW DRAIN
LOCATIONS WITH ROOFING CONTRACTOR
3 CONTRACTOR TO COORDINATE EXTERIOR HOSE BIBS REQUIREMENTS AND
LOCATIONS WTN OWNER AND /OR ARCHITECT.
lm, CONTRACTOR 10 COORDINATE WATER HEALER SIZES AND TEMPERATURE
SETTINGS WITH OWNER
IL CONTRACTOR TO PROVIDE AND INSTALL THRUST BLOCKS, CHECK VALVES,
WATER HAMMER ARRESTORS, EXPANSION LOOPS, PIPE HANGERS, ETC. FOR A
COMPLETE OPERATING SYSTEM.
12. CONTRACTOR SHALL PROVIDE ALL SANITARY WASTE VENTING AS REQUIRED
BY ALL APPLICABLE CODES.
13. CONTRACTOR TO COORDINATE ALL PIPING MATERIAL WITH OIwER ARCHITECT
LOCAL REQUIREMENTS•
14. CONTRACTOR TO PROVIDE CLEAN-OUTS AS REQUIRED BY ALL APPLICABLE
CODES. COORDINATE LOCATIONS WITH OWNER AND /OR ARCHITECT.
15. CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL WATER SUPPLY LINES
FROM CONDENSATION AND FREEZING.
16. INSTALL PRESSURE RELIEF DRAIN PIPING FROM WATER NEATER TO ADJACENT
FLOOR DRAIN. DRAM TO BE METALLED IN STRICT GUIDANCE WITH LOCAL AND
STATE CODES.
11. CONTRACTOR TO COORDINATE FIRE-CAULKING INSTALLATION FOR ALL PIPING
THROUGH FIRE -RATED WALLS, WITH GENERAL CONTRACTOR
18. CONTRACTOR TO COORDINATE ALL VENT THROUGH ROOF PENETRATIONS WITH
ROOFING CONTRACTOR, TO ENSURE ROOF WARRANTY,
13 ALL NEW SUPPLY PIPING SHALL BE TESTED UNDER WORKING PRESSURE AND
SHALL SNOW NO DROP FOR A PERIOD OF 15 MINUTES.
?m. WATER CLOSET FLUSH CONTROLS AND LAVATORY FAUCETS, ON FIRST AND
SECOND FLOORS, SHALL BE LEVER OPERATED, PUSH, ELECTRICALLY OR
AUTOMATIC CONTROLLED MECHANISMS, OPERABLE WITH ONE HAND AND SHALL
NOT REOUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. THE
FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER THAN 5 lb.'s. .
?L CONTRACTOR TO COORDINATE ALL FIXTURE TYPES, MODELS, COLORS, ETC.
WTN ARCHITECT AND OWNER PRIOR TO INSTALLATION.
? ?. SEE CIVIL/SITE
PLANS FOR PLUMBING CONTINUATIONS.
Plumbing Fix
ture Legend
WCl WATER CLOSET l HANDICAP )
WC2 WATER CLOSET
LAV LAVATORY
S SUMP PUMP
SK KITCHEN SINK
WH WASH BASH
FD FLOOR DRAM
WH WASH BASIN
RD ROOF DRAM
ORD OVERFLOW ROOF DRAIN
CO CLEAN-OUT
NR CLOTHS WASHER RECEPTOR
BA BATH TUB
BS BATH /SHOWER
sH SHOWER
WH WATER HEATER
HD WIJBB DRAIN
VTR VENT - THROUGH -ROOF
RPZ REDUCED
I�
H H
H
i
?' WATER SUPPLY FROM BELOW
�
W �
®
TO 3rd FLOOR CEILING PLENUM
F
0
a
4 ' SANITARY FROM ABOVE
V
AND 4' SANITARY DOWN
PRESSURE ZONE ASSEMBLY
PD
jLAAV
3' VENT FROM BELOW
OVERFLOW PATIO DRAIN
i
Al ID 3' VENT UP
WCl
6' STORM ORAN DOWN
LAV
H
H H
i
�i
3' STORM DRAINS FROM
ABOVE AND 3' DRAINS
DOWN
10 oo
RD ORD ORD RD
27
Second Floor Plumbing Plan
P201
1/8. = 1' -0"
Plumbing Notes
L CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CODES.
?. CONTRACTOR TO VERIFY ALL CONDITIONS PRIOR TO INITIATING ANY WORK
3. CONTRACTOR t0 COORDINATE WORK WITH ALL OTHER TRADES.
4. CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND PAYMENT OF ALL PERMITS
REQUIRED FOR PLUMBING WORK
5. CONTRACTOR SHALL PROVIDE ALL MATERIALS AND LABOR AS REQUIRED TO
ACHIEVE A COMPLETE OPERATING SYSTEM.
6. THESE DRAWINGS ARE DIAGRAMMATIC AND REPRESENT THE INTENT OF EQUIPMENT,
DEVICES, ETC. TO BE METALLED AND CONNECTED. PLUMBING CONTRACTOR SHALL
OBTAM OWNERS APPROVAL, FOR ALL PI•IASES OF WORK, PRIOR TO INSTALLATION.
1. CONTRACTOR TO COORDINATE WATER SERVICE INSTALLATION REQUIREMENTS AND
LOCATION WITH OWNER AND LOCAL UTILITY.
8. CONTRACTOR TO COORDINATE EXACT ROOF DRAM AND OVERFLOW DRAIN
LOCATIONS WITH ROOFING CONTRACTOR
3 CONTRACTOR TO COORDINATE EXTERIOR HOSE BIBS REQUIREMENTS AND
LOCATIONS WTN OWNER AND /OR ARCHITECT.
lm, CONTRACTOR 10 COORDINATE WATER HEALER SIZES AND TEMPERATURE
SETTINGS WITH OWNER
IL CONTRACTOR TO PROVIDE AND INSTALL THRUST BLOCKS, CHECK VALVES,
WATER HAMMER ARRESTORS, EXPANSION LOOPS, PIPE HANGERS, ETC. FOR A
COMPLETE OPERATING SYSTEM.
12. CONTRACTOR SHALL PROVIDE ALL SANITARY WASTE VENTING AS REQUIRED
BY ALL APPLICABLE CODES.
13. CONTRACTOR TO COORDINATE ALL PIPING MATERIAL WITH OIwER ARCHITECT
LOCAL REQUIREMENTS•
14. CONTRACTOR TO PROVIDE CLEAN-OUTS AS REQUIRED BY ALL APPLICABLE
CODES. COORDINATE LOCATIONS WITH OWNER AND /OR ARCHITECT.
15. CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL WATER SUPPLY LINES
FROM CONDENSATION AND FREEZING.
16. INSTALL PRESSURE RELIEF DRAIN PIPING FROM WATER NEATER TO ADJACENT
FLOOR DRAIN. DRAM TO BE METALLED IN STRICT GUIDANCE WITH LOCAL AND
STATE CODES.
11. CONTRACTOR TO COORDINATE FIRE-CAULKING INSTALLATION FOR ALL PIPING
THROUGH FIRE -RATED WALLS, WITH GENERAL CONTRACTOR
18. CONTRACTOR TO COORDINATE ALL VENT THROUGH ROOF PENETRATIONS WITH
ROOFING CONTRACTOR, TO ENSURE ROOF WARRANTY,
13 ALL NEW SUPPLY PIPING SHALL BE TESTED UNDER WORKING PRESSURE AND
SHALL SNOW NO DROP FOR A PERIOD OF 15 MINUTES.
?m. WATER CLOSET FLUSH CONTROLS AND LAVATORY FAUCETS, ON FIRST AND
SECOND FLOORS, SHALL BE LEVER OPERATED, PUSH, ELECTRICALLY OR
AUTOMATIC CONTROLLED MECHANISMS, OPERABLE WITH ONE HAND AND SHALL
NOT REOUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. THE
FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER THAN 5 lb.'s. .
?L CONTRACTOR TO COORDINATE ALL FIXTURE TYPES, MODELS, COLORS, ETC.
WTN ARCHITECT AND OWNER PRIOR TO INSTALLATION.
? ?. SEE CIVIL/SITE
PLANS FOR PLUMBING CONTINUATIONS.
Plumbing Fix
ture Legend
WCl WATER CLOSET l HANDICAP )
WC2 WATER CLOSET
LAV LAVATORY
S SUMP PUMP
SK KITCHEN SINK
WH WASH BASH
FD FLOOR DRAM
WH WASH BASIN
RD ROOF DRAM
ORD OVERFLOW ROOF DRAIN
CO CLEAN-OUT
NR CLOTHS WASHER RECEPTOR
BA BATH TUB
BS BATH /SHOWER
sH SHOWER
WH WATER HEATER
HD WIJBB DRAIN
VTR VENT - THROUGH -ROOF
RPZ REDUCED
Plumbing Piping Legend
NEW SANITARY WASTE
- - - - - - - - - SANITARY VENT
- -- GOLD WATER SUPPLY
C8 - •- •- •- • -• -•- STORM WATER DRAIN
N
w -g
z I
�
W �
�w
U
F
0
V
PRESSURE ZONE ASSEMBLY
PD
PATIO DRAM
OPD
OVERFLOW PATIO DRAIN
Plumbing Piping Legend
NEW SANITARY WASTE
- - - - - - - - - SANITARY VENT
- -- GOLD WATER SUPPLY
C8 - •- •- •- • -• -•- STORM WATER DRAIN
N
w -g
z I
AMERICAN PLUMBING
SERVICES LLC
P.O. BOX 19157
1NDIANAPO
LIS, IN 46219
ph 317 - 357 -3748
fx 317 - 356 -3607
KEELER-WEBB
ASSOCIATES
Consulting Engineers
486 CRADLE DRIVE
CARMEI, INDIANA 46032
ph 317 - 574 -0140
FX 317- 574 -1269
infol9keelerwebb.com
PROJECT No. 060 2-030
Q � z
J
W J W
(3= Q
Q0
U
U
Q'ffift T&
First &Second
Floor
Plumbing Plans
Is!!JQ Dot Dri)M11 By G10CkOd By
3 -2-0
6 GSH JPM
P201
25429
�
W �
�w
U
F
0
V
LIS, IN 46219
ph 317 - 357 -3748
fx 317 - 356 -3607
KEELER-WEBB
ASSOCIATES
Consulting Engineers
486 CRADLE DRIVE
CARMEI, INDIANA 46032
ph 317 - 574 -0140
FX 317- 574 -1269
infol9keelerwebb.com
PROJECT No. 060 2-030
Q � z
J
W J W
(3= Q
Q0
U
U
Q'ffift T&
First &Second
Floor
Plumbing Plans
Is!!JQ Dot Dri)M11 By G10CkOd By
3 -2-0
6 GSH JPM
P201
25429
P201
25429
T
:3
r1q.
CD
a
Cr
1<
M
CD
M
CD
CD
:3.
=3
(a
co
HE �_
BA BA
C4
it LAV
F FR
WC2
LAV WC2
ORD Q ORD RD (D p ORD
cn
2'
WC2
LAV
WC2 v ca
3. FD
3'
SH
S HX
4' SANITARY DOWN AND
4" VENT UP THRU-ROOF
4' 4' 3' VENT FROM BELOW
CONNECTED TO 49 VENT
0'11 ------- 01 UP
6' STORM DRAIN DOWN
ILL_
HD&;
Lvw
LAV
3 3' 2
2 SH B
OFD
--------------------------- r ----------------------
x4'
J* 19 B 2'-
-00
LAV ]BA
e
LAV
Ir LAV
BA LAV 00 — SH
0
31* RD
SH WC2 0 . R D (;RD WC2
OPD PD PD OFD
LAI it
3' STORM DRAINS DOWN-/
NOTE:
MINIMUM HORIZONTAL STORM
DRAIN SLOPE TO BE 1.5%.
Fourth Floor Plumbing Plan
COORDINATE ROOF VENT LOCATIONS
11/2' VENT-\
WIT14 OWNER AND RooFWs CONTRACTOR
GSH
JPM
VTR
SK
4th FLOOR FIXTURES
(SEE PLAN)
INCOMING SANITARY FROM
4th FLOOR FIXTURES
cs
(SEE PLAN)
I
I co
•
F] HD
--------------- - _r.
3rd FLOOR FIXTURES
v WC2
(SEE PLAN)
1<
SK
3'
I In'VENT --
71A
0 FD F1
4•
w
I H -
2nd FLOOR FIXTURES
- -- 1AV
r
I
cI
CI
WC1
2' WATER SUPPLY FROM
BELOW TO 3rd FLOOR
VN
11-CEILING PLENUM
r
2' — -"
4' SANITARY FROM ABOVE
//1 4' SANITARY DOWN
•
3 -----------
4'
3' VENT FROM BELOW
LAV
f-
WC
c
AND 3' VENT UP
WC2
v
&'STORMI DRAIN DOWN
L..
V7
en
SH
. ............
N I WC2
11/? VENT
SK
I ;,. LAV
WATER HEATER
ON 4th FLOOR
7;i7
HD 1R ------- - - -
- --
a
----------
------------- _3
SK
or
1 1/2 VENT
3' STORM DRAINS FROM
ABOVE AND 3' DRAINS
DOLLN
Third Floor Plumbing Plan
1/8. = 1s-00
HE �_
BA BA
C4
it LAV
F FR
WC2
LAV WC2
ORD Q ORD RD (D p ORD
cn
2'
WC2
LAV
WC2 v ca
3. FD
3'
SH
S HX
4' SANITARY DOWN AND
4" VENT UP THRU-ROOF
4' 4' 3' VENT FROM BELOW
CONNECTED TO 49 VENT
0'11 ------- 01 UP
6' STORM DRAIN DOWN
ILL_
HD&;
Lvw
LAV
3 3' 2
2 SH B
OFD
--------------------------- r ----------------------
x4'
J* 19 B 2'-
-00
LAV ]BA
e
LAV
Ir LAV
BA LAV 00 — SH
0
31* RD
SH WC2 0 . R D (;RD WC2
OPD PD PD OFD
LAI it
3' STORM DRAINS DOWN-/
NOTE:
MINIMUM HORIZONTAL STORM
DRAIN SLOPE TO BE 1.5%.
Fourth Floor Plumbing Plan
"-1 let FLOOR FIXTURES
I WC1
LAV
-I WC1 co
LAV
FD
rI
COORDINATE ROOF VENT LOCATIONS
Checked By
WIT14 OWNER AND RooFWs CONTRACTOR
GSH
JPM
VTR
INCOMING VENT FROM
4th FLOOR FIXTURES
(SEE PLAN)
INCOMING SANITARY FROM
4th FLOOR FIXTURES
cs
(SEE PLAN)
I
I co
U
INCOMING VENT FROM
3rd FLOOR FIXTURES
V)
(SEE PLAN)
1<
%4
1
1
1
1
1
1
INCOMING SANITARY FROM
3rd FLOOR FIXTURES
(SEE PLAN)
4•
e
2nd FLOOR FIXTURES
- -- 1AV
r
I
cI
CI
WC1
"-1 let FLOOR FIXTURES
I WC1
LAV
-I WC1 co
LAV
FD
rI
AMERICAN PLUMBING
SERVICES LLC
P. D. BOX 19157
INDIANAPOLIS, IN 46219
ph 317-357-3748
Fx 317-356-3607
KEELER -WEB B
ASSOCIATES
Consulting Engineers
486 CRADLE DRIVE
CARMEL, INDIANA 46032
ph 317-574-0140
FX 317-574-1269
;nfoOkeelerwebb.com
PROJECT No. 0602-030
a�
W
W j w
J M
<
0
[>-&*Q nw
Third & Fourth
Floor
Plumbing Plans
bm Dge
Draw By
Checked By
3-2-06
GSH
JPM
cs
9wi
U
01 Od
0
V)
U
AMERICAN PLUMBING
SERVICES LLC
P. D. BOX 19157
INDIANAPOLIS, IN 46219
ph 317-357-3748
Fx 317-356-3607
KEELER -WEB B
ASSOCIATES
Consulting Engineers
486 CRADLE DRIVE
CARMEL, INDIANA 46032
ph 317-574-0140
FX 317-574-1269
;nfoOkeelerwebb.com
PROJECT No. 0602-030
a�
W
W j w
J M
<
0
[>-&*Q nw
Third & Fourth
Floor
Plumbing Plans
bm Dge
Draw By
Checked By
3-2-06
GSH
JPM
Exaft mftw.
P202
Rood mziw.
25429