HomeMy WebLinkAbout06020016 Landscape Plan printed 1/19/2006s�
J
v
LL:
Q V p
J W ft]
Z � �
< J
fl Qr Q J
J _1 L7 IZ
r•�
U
0
WATER DRIP -LINE
HIGH VISIBILITY
PLASTIC MESH
FENCE
FENCE POST
EX. GRADE
�J
TREE (DRIP -LINE
OP. FENCE POST
0. HIGH VISIBILITY PLASIC
MESH FENCE
� p
N
NOTE. AVOIDING DAMAGE DURING CONSTRU.TIO
THE SUREST WAY TO PROTECT TREES THAT ARE TO BE SAVED IS TO:
(1) WORK WITH THE BUILDER TO LOCATE AND MARK WITH FLAGGING AND /OR SIGNSXI
CONSTRUCTION ROADS, PARKING PLACES FOR WORKERS, AND AREAS FOR STORE OF BUILDING
MATERIALS, GRAVEL AND SOIL,
r
(2) WORK WITH THE UTILITY CONTRACTORS TO STAKE OUT THE EXACT LOCA11ON OFTRENCHES, AND
(3) ERECT PHYSICAL BARRIERS AROUND ALL "SAVED- TREES OR, BETTER YET, AROUND GROUPS OF
. ...:.... .
,.Kkl
TREES, NEAR THE CONSTRUCTION ACTIVITY.
BARRIERS THAT EXTEND BEYOND THE DRIP LINE PROTECT TREES DURING CONSTRUCTION.
TREE PRESERVATION DETAIL
�-J
(NO SCALE)
DO NOT CUT CENTRAL LEADER
V1
U
TREES OF THE SAME SPECIES TO BE MATCHED IN
BOTANICAL NAME
GROWTH CHARACTER AND UNIFORMITY
s�
TWO - GALVANIZED NO. 12 WIRE GUYS: FASTEN
ROOT CONDITION
To WOOD STAKES. PLACE 2 -PLY RUBBER HOSE
TREE CONTACT.
REMARKS
ON WIRE AT ALL POINTS OF
�i
SHADE TREES
\�
MINIMUM 2x2x6' TREATED WOOD STAKES 2 PER TREE.
AUTUMN GOLD
GINKGO
DRIVE STAKES AT AN ANGLE AND DRAW VERTICAL
a
TOP OF STAKES TO BE PAINTED WITH FLUORESCENT
PAINT OR EQUIVALENT.
AS
SHOWN
a�
4 " TALL, 36" DIAMETER MINIMUM EARTH
GLEDITSIA TRICANTHOS
INERMIS SHADEMASTER ,
SAUCER TO RETAI14 MULCH. MINIMUM 3" DEEP
LAYER PINE BARK MULCH.
2 1/2
CALIPER
N
O
X
SPECIFIED BY MAC IUFACTURER FOR EACH VARIETY OF PLANT.
FINISH GRADE
it
TOPSOIL MIXTURE TAMPED FIRM
TO PREVENT SETTLEMENT.
SCARIFY SIDES J
BEFORE PLANTING
lzo PLANT BALL
PLANTING &STAKING DETAIL
(NO SCALE)
I
PLACE ROOT BALL SO
ROOT FLARE IS LEVEL
WITH FINISHED GRADE
ROLL BACK TOP 1/3 -� °� a °° 4" LAYER OF SHREDDED
BURLAP, AND CUT LO HARDWOOD MULCH
ALL TWINE AND WIRE P ov ° P ° PRE - EMERGANCE HERBICIDE
4" HIGH EARTH SAUCER P FINISH GRADE
P (4a,
PLANTING BED ° °° ° °e �° °p p° ° o 0
VIII1111111111
>(
PREPARED BACKFILL
I-
II III I= III = III =1I
ROOT BALL 0
SCARIFY PIT SIDES
- AND BOTTOM NO
_ LESS THAN 2" DEEP
EXISTING SUBSOIL
-I I . OR COMPACTED
BACKFILL
3" LAYER OF COMPACTED
TOPSOIL BACKFILL
SHRU3 & SMALL TREE
PLANTING DETAIL
(NO SCALE)
5
NOTE: STAKE & GUY
TREES AS SHOWN IF
SITE CONDITIONS
DICTATE.
3, 10 GAUGE
STEEL GUY WIRES
EVENLY SPACED
PLACE ROOT BALL SO
ROOT FLARE IS LEVEL
WITH FINISHED GRADE
ROLL BACK TOP 1/3
BURLAP, AND REMOVE
ALL BINDERS
4" HIGH EARTH SAUCER °
PLANTING BED�°�° °
�I�III
111
TREE PROTECTOR
TREE WRAP
4" LAYER OF SHREDDED
HARDWOOD MULCH
PRE- EMERGANCE HERBICIDE
FINISH GRADE
SCARIFY PIT SIDES
_ AND BOTTOM NO
LESS THAN 2" DEEP
PREPARED BACKFILL---*,� - I I I [=�I 1 =1 11 =rte I i I =t I (� I I I II _EXISTING
�I I I I �I i t III III SUBSOIL OR
' I I I I I =1 I =1 I I =q 11 =1 11 =1 11 =1 I I I� COMPACTED
APPROVED ROOT BA BACKFILL
TREE ANCHORS DIAMETER
X 00 BALL DIAMETER
SHADE TREE PLANTING DETAIL
(NO SCALE)
ALL EXISTING VEGETATION NOT LABELED ON THE
DEMOLITION PLAN OR LANDSCAPE PLAN AS BEING
PROTECTEDEFROM CONSTRUCTION DAMAG PROPERLY
EGEN
SPY TREE
- DECIDUOUS SHRUBS
UIVUCfCJ I VEC I I f�LL
EVERGREEN TREE
PLAN NOTES
ALL LAWN AREAS SHALL BE 100% TURF TYPE TALL FESCUE
/ 1 (BLEND 3 IMPROVED VARIETIES) SEED AT 7LBS. /1000 SQUARE
FEET.
GENERAL MULCH NOTE:
MULCH AROUND ALL PROPOSED LANDSCAPE MATERIAL.
SCALE: 1 " = 100'
0 50 100 200
4
J
3
L
PROPOSED PLANT SCHEDULE
V1
U
FLAN
KEY
BOTANICAL NAME
COMMON NAME
SIZE
MM CO
ROOT CONDITION
ON CENTE
SPACING
REMARKS
B & B BARE ICONT
�i
SHADE TREES
GgA
'AUTUMN GOLD'
GINKGO BILOBA U
AUTUMN GOLD
GINKGO
2 1/2
CALIPER
a
X
AS
SHOWN
a�
Gtl
GLEDITSIA TRICANTHOS
INERMIS SHADEMASTER ,
SHADEMASTER
HONEYLOCUST
2 1/2
CALIPER
N
O
X
SPECIFIED BY MAC IUFACTURER FOR EACH VARIETY OF PLANT.
o 0
AS
SHOWN
�a
J
.
PaC
PLATANUS x ACERIFOLIA COLUMBIA
COLUMBIA LONDON
PLANETREE
2 1/2
CALIPER
w
Q ;�
X
a'
L7
AS
SHOWN
OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOODED STAKE INDICATING VARIETY AND
Q a
UERCUS AL
Q BA
WHITE OAK
2 1 /2
CALIPER
X
SIZE OF TREE. ALL GROUND COVER AND MULCH BED LINES SHALL BE MARKED BY A HIGHLY VISIBLE PAINT LINE WITH
o
A
SHOWN
w
Or
Q UERCUS RUBRA
RED OAK
2 1 /2
CALIPER
Q
X
0
ra
AS
SHOWN
ORNAMENTAL TREES
Agr
ACER GRISEUM
PAPERBARK MAPLE
2
CALIPER
PROJECT IDENTIFICATION AT NURSERY OR CONTRACTORS OPERATION PRIOR TO MOVING TO JOB SITE. PLANTS MAY ALSO BE
X
INSPECTED AND APPROVED OR REJECTED ON THE JOB SITE.
AS
SHOWN
o
Cc
CERIS CANADENSIS
EASTERN REDBUD
2
CALIPER
X
A
SHOWN
a
CfC
CORNUS FLORIDA
'CHEROKEE BRAVE'
1
CHEROKEE BRAVE
DOGWOOD
2"
CALIPER
X
LANDSCAPE DESIGNER. AT THE END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD OR UNSATISFACTORY BY LANDSCAPE
AS
SHOWN
DESIGNER SHALL EE REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR.
MALUS SARGENTII
M sC ' CANDYMINT'
CANDYMINT
CRABAPPLE
2"
CALIPER
X
AS
SHOWN
l�
EVERGREEN TREES
Pa
PICEA ABIES
NORWAY SPRUCE
6 -g
HEIGHT
X
Cn
AS
SHOWN
Q
PpG
PICEA PUNG ENS GLAUCA
COLORADO BLUE
SPRUCE
6' -8'
HEIGHT
Cn
X
LANDSCAPE DESI� r�ER.
AS
SHOWN
13. ALL LAWNS `'-'ALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT END OF ONE YEAR
Ps
PINUS STROBUS
WHITE PINE
6' -8,
HEIGHT
RESODDED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED.
X
14. ALL LANDSCAPING PLANTINGS TO BE MAINTAINED FOR 60 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE DESIGNER.
AS
SHOWN
,
i
±l�
f
.� NO oo
V1
U
\oo\o
�
oho oho �
t,...{
MM CO
*-♦ U
2. ALL SHRUBS PLANTING AREAS TO BE COVERED WITH 3" THICK LAYER OF SHREDDED HARDWOOD BARK MULCH. ALL
�i
Q
�a
a
w
CID
ao
a�
_
N
O
A
SPECIFIED BY MAC IUFACTURER FOR EACH VARIETY OF PLANT.
o 0
W�
�a
J
o
4. FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL BE APPROVED BY LANDSCAPE DESIGNER BEFORE PLANTING
va
�a�
w
Q ;�
z
a'
L7
tn
OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOODED STAKE INDICATING VARIETY AND
GENERAL NOTES
O
1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE. IF IN QUESTION,
t,...{
CONTACT THE LANDSCAPE DESIGNER.
*-♦ U
2. ALL SHRUBS PLANTING AREAS TO BE COVERED WITH 3" THICK LAYER OF SHREDDED HARDWOOD BARK MULCH. ALL
��
GROUND COVER BEDS SHALL BE COVERED WITH 1 " SHREDDED HARDWOOD BARK MULCH. BARK MULCH SHALL BE APPROVED
0
BY LANDSCAPE DESIGNER IGNER AND SHALL BE UNIFORM IN TEXTURE AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR
w
CID
LUMBERING OPERATIONS. NO UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED.
3. AN APPROVED PRE - EMERGENT HERBICIDE SHALL BE APPLIED IN ALL PLANTING AND GROUND COVER BEDS AT RATES
_
SPECIFIED BY MAC IUFACTURER FOR EACH VARIETY OF PLANT.
o 0
o
M J
J
o
4. FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL BE APPROVED BY LANDSCAPE DESIGNER BEFORE PLANTING
co
w
Q ;�
z
a'
Q o
0
OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOODED STAKE INDICATING VARIETY AND
w o
z �
o
.a
U
U
w
SIZE OF TREE. ALL GROUND COVER AND MULCH BED LINES SHALL BE MARKED BY A HIGHLY VISIBLE PAINT LINE WITH
o
� o
w
OCCASIONAL WOOD STAKES FOR REFERENCE. ALL STAKES SHALL BE REMOVED FOLLOWING PLANTINGS OPERATIONS.
a.,
Q
Q
Q
0
ra
LANDSCAPE DESIGNER RESERVES THE RIGHT TO ADJUST PLANT LOCATIONS ON SITE.
5. NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ALLOWED. IF PLANTS ARE SHOWN TO BE UNAVAILABLE, THE CONTRACTOR
o
SHALL NOTIFY LANDSCAPE DESIGNER PRIOR TO BID DATE IN WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH
1
Q
M
U
PROJECT IDENTIFICATION AT NURSERY OR CONTRACTORS OPERATION PRIOR TO MOVING TO JOB SITE. PLANTS MAY ALSO BE
INSPECTED AND APPROVED OR REJECTED ON THE JOB SITE.
w
o
E�
6. ALL PLANTS ARE TO MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, 1986 EDITION, AS SET FORTH BY
Q
AMERICAN ASSOCIATION OF NURSERYMEN.
7. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL NOT CONFLICT WITH
a
CONSTRUCTION OPERATIONS AND AS DIRECTED BY OWNER.
o
d
8. ALL NEW LANDSCAPE PLANTINGS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY
LANDSCAPE DESIGNER. AT THE END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD OR UNSATISFACTORY BY LANDSCAPE
DESIGNER SHALL EE REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR.
9. THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE REQUIRED FOR HIS
PORTION OR WORK.
10. PEAT MOSS TC BE USED ON PROJECT SHALL BE A DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR
AND COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS TO ALSO BE MILDLY ACIDIC IN CHARACTER
AND SHALL MEET APPROVAL OF LANDSCAPE DESIGNER.
Cn
11. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE DESIGNER IN WRITING PRIOR TO BID DATE OF ANY PLANTS THAT HE
Q
FEELS MAY NOT SURVIVE IN LOCATIONS NOTED.
<
12. ALL DISTURB�•� LAWN AREAS SHALL BE SEEDED AS NOTED. LAWNS SHALL BE SEEDED WITH SEED MIX AS APPROVED
Cn
LANDSCAPE DESI� r�ER.
o
13. ALL LAWNS `'-'ALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT END OF ONE YEAR
GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MORE THAN 2% OF ANY LAWN AREA. ANY AREA SO NOTED WILL BE
RESODDED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED.
14. ALL LANDSCAPING PLANTINGS TO BE MAINTAINED FOR 60 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE DESIGNER.
,
ALL SEEDED LAWNS TO BE MAINTAINED FOR A PERIOD OF 60 DAYS AND SODDED LAWNS 30 DAYS FOLLOWING FINAL
INSPECTION BY LANDSCAPE DESIGNER AFTER WRITTEN REQUEST FROM LANDSCAPE CONTRACTOR. MAINTAINING TO INCLUDE
WATERING, WEEDING, CULTIVATION, MULCHING, MOWING AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER
ESTABLISHMENT OF LAWNS AND PLANTINGS.
15, CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS REQUESTED BY LANDSCAPE DESIGNER.
16. ALL LAWN ARLA WITHIN BASE PROJECT SITE TO RECEIVE 4 -6" APPROVED TOPSOIL PRIOR TO HYDROSEEDING OPERATIONS.
17. BACKFILL FOR TREE AND SHRUB PLANTING SHALL BE 75% APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS. TOP
LAYER OF BACKRLL SHALL BE 100% EXISTING TOPSOIL. A 5 -10 -5 ANALYSIS SLOW RELEASE FERTILIZER SHALL BE
INCORPORATED INTO BACKFILL AT APPROVED RATES.
18. PROVIDE MINJAUNI 4" PLANTING SOIL IN ALL GROUND COVER AND FLOWER AREAS WITH MIXTURE COMPRISING OF ONE
PART COMPOSTED MANURE, 5 PARTS TOPSOIL AND 4 PARTS PEAT MOSS. A FULL 4" LAYER OF APPROVED SHREDDED
FIBROUS PEAT MOSS MAY BE USED IN LIEU OF PLANTING MIX.
19. LAWNS SHALL BE HYDROSEEDED FOLLOWING SCARIFYING FINAL GRADING FERTILIZING AND RAKING OPERATIONS. LAWN
AREA SHALL BE FERTILIZED AT RATES SPECIFIED AND LIME APPLIED AS DICTATED BY SOILS TESTS PRIOR TO SEEDING
OPERATIONS.
Q)
20. GRADE AGGREGATE USED IN BEDS AS NOTED SHALL BE OVERSIZED WASHED RIVER GRAVEL 4" IN DIAMETER AND PLACED d
IN 6" MINIMUM LAYER AND DEEPER AS NOTED OVER 6 MIL. VISQUEEN.
21. PROVIDE FEi T ILE, FRIABLE, NATURAL LOAM SURFACE REASONABLY FREE OF SUBSOIL, CLAY LUMPS, STONES LARGER THAN 1
'a U
1/2 BRUSH & OTHER LITTER. SOIL PARTICULATES NOT TO EXCEED 1/4 IN SIZE PRIOR TO SEEDING/ SODDING.
PERMANENT SEEDING SPECIFICATIONS:
1) ALL DISTURBED LAWN AREAS SHALL RECEIVE PERMANENT SEEDING AS SOON AS
CONSTRUCTION AND WEATHER PERMITS.
2) ALL DISTURBED LAWN AREA TO HAVE A MINIMUM OF 6 INCHES OF TOPSOIL
(COMPACTED THICKNESS).
3) TOPSOIL TO BE FERTILE, FRIABLE, SANDY LOAM REASONABLY FREE OF SUBSOIL,
CLAY LUMPS, STONES LARGER THAN 1/2 , EXCESSIVE QUANTITIES OF SMALL
STONE /GRAVEL, BRUSH AND OTHER LITER.
4) SOLVE ANY SURFACE OR SUBSURFACE DRAINAGE PROBLEMS AND CONSTRUCT
PERMANENT EROSION CONTROL STRUCTURES.
5) PERFORM THE MAJOR FILLING, SHAPING AND SMOOTHING OF GULLIES OR
ERODED AREAS.
6) HAVE TOPSOIL TESTED TO CHECK PH AND NUTRIENT LEVELS. PROVIDE
FERTILIZER AND SOIL AMENDMENTS AS REQUIRED TO MEET /EXCEED MINIMUM
REQUIREMENTS AS SUGGESTED ON SOILS TEST RESULTS FOR LAWNS.
7) WORK FERTILIZER AND SOIL NUTRIENTS INTO TOP 2 -3 INCHES OF THE TOPSOIL
WITH A SMALL DISK, HARROW OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS
POSSIBLE.
8) ROLL THE TOPSOIL WITH A WATER BALLAST ROLLER WEIGHING 100 TO 300
POUNDS DEPENDING ON SOIL TYPE. ROLL WITH TOPSOIL IN A SEMI -DRY CONDITION
IN TWO OPPOSITE DIRECTIONS (RIGHT ANGLES).
9) RAKE OR SCARIFY AND CUT OR FILL IRREGULARITIES THAT DEVELOP AS
REQUIRED AND AGAIN ROLL UNTIL AREA IS TRUE AND UNIFORM, FREE FROM LUMPS,
DEPRESSIONS AND IRREGULARITIES.
10) SOW SEED WITH ADEQUATE EQUIPMENT AT A TIME WHEN LITTLE OR NO WIND IS
BLOWING. BROADCAST HALF OF SEED IN ONE DIRECTION AND THE OTHER HALF IN
THE OPPOSITE DIRECTION (RIGHT ANGLES).
1 1) COVER SEED TO A DEPTH OF 1/2" BY RAKING OR HARROWING. PROVIDE A
�I �� �I 112 Q�� ACRE. LAYER OF S T RAW OR 'i f MULCH � i A RATE F
APPLY TACKIFIER TO STABILIZE MULCH.
12) HYDROSEEDING IS ACCEPTABLE METHOD OF SEEDING.
13) KEEP TOPSOIL RELATIVELY MOIST UNTIL LAWN IS ESTABLISHED.
14) RESEED AREAS THAT DO NOT SHOW PROMPT GERMINATION AT 14 DAY
INTERVALS UNTIL AN ACCEPTABLE STAND OF GRASS IS ASSURED.
HOLEY MOLEY SAYS
"DIG SAFELY"
"IT'S THE LAW"
CALL 2 WORKING DAYS BEFORE YOU DIG
1-800-382-5544
CALL TOLL FREE
PER INDIANA STATE LAW IC 8 -1 -26.
IT IS AGAINST THE ls1W TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING
DAYS BEFORE COMMENCING WORK.
SHEET N0.
PROJECT N0.
W06 -0031
0
d
w
CID
Cw
14
0
03
co
o
0
1--ft4
.a
U
U
o
�
0
d
M,
o
" 1
1
Q
M
U
0
�
o
o
w
�
d
�
w
co
a
-
o
d
SHEET N0.
PROJECT N0.
W06 -0031